KARNATAKA INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT

Item

Title
KARNATAKA
INTEGRATED RURAL WATER SUPPLY
AND
ENVIRONMENTAL SANITATION PROJECT
extracted text
I

KARNATAKA

INTEGRATED RURAL WATER SUPPLY
AND

ENVIRONMENTAL SANITATION PROJECT


’'S

'

*'

-

'

■■



<•

(WORLD BANK ASSISTED)

VOL. I

NO.9

SEPTEMBER 1999

M................................. M
• PROGRESS REPORT :
i
on
:
J TRAINING PROGRAMMES J

'■S'-

'^■1

Pipelayer and Valvemen Training Programme
held at MIT, Manipal, D.Kannada district.

f

JSS CONSULTANTS

'

S.J.C.E. CAMPUS
MYSORE - 570 006

I
I

MAP OF KARNATAKA

GULBARGA
BIJAPUR

RAICHUR

/

BELGAUM

KOPPAL

DHARWAD

‘WBELLARY

Q

X

UTTARA
KANNADA

DAVAN fCHITRADURGA \r’>
AGERE/
«

SHIMOGA

8,4
IUDUPX

CHICKMAGALUI

TUMKUR

O

C

1

KOLAR

O DAKSHINA
KANNADA

COORG

BANGALORE
O

O
HASSAN

MANDYA
O
MYSORE

O
IWiM

LIST OF ABBREVIATIONS
Conceptual Design Report
CDR
Community Participation Management
CPM
District Level Co-ordination Committee,
DLCC
District Project Manager
PPM
District^Project Management_Umt
PPMU
EIC_______ Engineer-in-Chief
Engineering Study Report
ESR
Government Of Karnataka
GOK
Health Sanitation and Hygiene Education
HS&HE
IRWS & ES integrated Rural Water Supply &_Enyironmental^.Sanitation
House Hold Latrine
HHL
Jawaharlal Nehru National College of Engineering, Shimoga
JNNCE
j.S.S. Industrial Training Centre, Nanjangud
JSS ITC
J. S. S. Consultants, Mysore
JSSC
J.S.S. Academy of Technical-Education, Bang,^
JSSATE
J.S.S. Polytechnic, Nanjangud
JSSP
KLESCET KLE Society’s College of Engineering and .Technology^
Management Information System^.Consultancy
MISC
Manipal Institute of Technology, Manipal
MIT
NA_______ Not Applicable
Non Governmental Organisation__________________________
NGO
ND_______ Not Done
NS________ Not Scheduled
Operation and Maintenance
O&M
Poojya
Doddappa. AppaEngineering_College2_Gujba^^
PDAEC
Project Planning & Monitoring Unit
PPMU
Participatory Rural Appraisal____________________
PR A
Rural Engineering College, Bhalki
REC
Sri Bahubali Polytechnic's^
SBP
SE________ Superintendent Engineer
Sanjay Gandhi Rural- Polytechmc,_^
SGRP
SIT_______ Siddaganga Institute; of
Sri Jayachamarajendra Colllege of Engineering y
SJCE
Sarojini Leeladharan Nair College of Engineering, Raichur
SLNCE
T
raining Management-Consultant
TMC
Training of Trainers
TOT
Village Water Supply and Sanitation Committee
VWSC

M' A Ki JU JK

<0, If-

SI.
No.

I

Contents

Page
No.

1

SUMMARY OF PROGRESS

1

2

PREAMBLE
2.1 TRAINING MANAGEMENT CONSULTANCY (TMC)
2.2 ACHIEVEMENT IN PHASE ! & PHASE-II TRAINING
PROGRAMMES
2.2.1 PHASE ! TRAINING PROGRAMME
2.2.2 PHASE-II TRAINING PROGRAMME

3
4
5
5
6

PHASE-HI TRAINING PROGRAMME
3.1 DETAILS OF TRAINING PROGRAMMES,
CONTRACTED FOR PHASE-HI
3.2 INSTITUTIONAL NETWORK FOR TRAINING
3.3 CONDUCTION OF TRAINING PROGRAMMES
3.4 MODE OF SELECTION OF PARTICIPANTS FOR
SKILL TRAINING

10

STATUS OF GRAM PANCHAYAT SECRETARIES TRAINING
PROGRAMMES AS ON 30.9.99

12

CONCEPTUAL VERIFICATION OF TRAINING PROGRAMMES

17

5

STATE/DISTRICT LEVEL TRAINING PROGRAMMES

20

6

S DISTRICT WISE - VILLAGE BASED TRAINING PROGRAMMES
e MASONS TRAINING PROGRAMMES
$ CONSTRUCTION OF DEMONSTRATION TPPFL
e PIPELAYER AND VALVEMEN TRAINING PROGRAMMES
e PUMP OPERATORS TRAINING PROGRAMMES

21
22
26
27
30

EMPLOYABILITY OF THE TRAINED PERSONS IN THE PROJECT
VILLAGES

40

8

FEEDBACK FROM THE PARTICIPANTS

41

9

ACTION NEEDED FROM NODAL INSTITUTIONS / DISTRICT
CO-ORDINATORS / NGOs / CONSULTANTS

46

ACTION NEEDED FROM GOVERNMENT AGENCIES

47

3

4

7

10

7
8
9

2. Mr C.H.Govinda Bhat, IAS, Director, PPMU, had discussion with personnel of

JSS Consultants, regarding conduction of different State/District level training

programmes.
3. Mr.Hamid Ahmed, Social Scientist, Monitored and Reviewed the process of

planning, organising and conduction of training programmes during this month.
4. JSS Consultants personnel have attended the review of progress meeting held at

PPMU Office, Bangalore on 28.9.99.
5. JSS Consultants personnel have attended the Workshop on MIS held at Hotel

Ramanashri, Bangalore on 29.9.99.
6.

Masons training programmes have been successfully conducted in Belgaum,

Mysore and Tumkur districts. District Coordinators of Training Management
Consultancy have participated in the training programmes.

7. Pipelayer and Valvemen training programmes have been successfully conducted in
Bellary and D.Kannada districts. District Coordinators of Training Management
Consultancy have participated in the training programmes.

8. Pump Operators training programmes have been successfully conducted in

Belgaum, Bidar, Gulbarga, Hassan, Mandya, Mysore, Raichur, Shimoga and

Tumkur districts. District Coordinators of Training Management Consultancy have

participated in the training programmes.
9. Gram Panchayat Secretaries training programmes have been successfully conducted

in Belgaum and Raichur districts. District Coordinators of Training Management
Consultancy have participated in the training programme as resource person.
10. Monthly Progress Report on training programmes are sent to M/s.Excel Soft,

Management Information Consultants regularly.

2

?

<

2.0



PREAMBLE

S' /

J

..............

Karnataka Government is implementing an Integrated Rural Water Supply and

Environmental Sanitation Project in about 1200 villages spread over 12 districts (now 16
districts) with the assistance from World Bank at a cost of Rs.447.2 Crores. The project
districts are Bangalore (R), Belgaum, Bellary - Davanagere, Bidar, D.Kannada - Udupi,
Gulbarga, Hassan, Mandya, Mysore - Chamarajanagar, Raichur - Koppal, Shimoga -

Davanagere and Tumkur. The main objective of the project is to improve the productivity

of the rural population by providing adequate safe drinking water and clean environment.

The uniqueness of the project is that it is demand driven, user participatory, user operated
and maintained based on collection of user charges. At all levels viz.. Planning,

Implementing and Handing over, the local population is involved and when the project
components are completed, the whole system will be handed over to the local bodies, in
this case, it is the VWSC to operate and maintain the system on a sustainable basis.

The project has two components, the Hardware and the Software. The
Hardware component consists of construction of different Water Supply components.

Environmental Sanitation and Habitat components. The different water supply
components consists of construction of distribution system, construction of OHT and

ground water recharging. The main intention of providing water supply components is to
supply adequate safe drinking water to community (70 Ipcd for house connection, 40 Ipcd

for stand post). The environmental sanitation and habitat component helps in providing
clean environment. The different environmental sanitation components are Road Reprofiling, Construction of different drainages. Cattle Trough, Washing platforms. Dust

bins and most important of all is the construction of House Hold Latrines. The location of
the habitat components are determined by the VWSC members. The Software involves in

creating the necessary procedures and capacity building for a sustainable Operation and
Maintenance of the system by the user community. For creating the hardware
components, besides the PPMU, several agencies such as Design consultancy.

3

Consultancy for Construction Supervision etc are used. For implementing the software
component of the project the services of NGOs / NGIs, CPM Consultants, HSHE
Consultancy, Training Management Consultancy and the MIS Consultancy have been

used.

2.1

TRAINING MANAGEMENT CONSULTANCY (TMC)
Training Management Consultancy plays an important role in terms of the

necessary capacity building, both in terms of quantity and quality, which are essential for
the implementation and Operation and Maintenance of assets created in the project

villages on a sustainable basis.

The main role of the TMC is to conduct and monitor training programmes for the
various categories of people involved in this project, which include the officials of the
Govt., Engineers, NGOs / NGIs, Personnel from various consultants etc, besides

conducting awareness programmes for the user community. Training programmes are

conducted in awareness. Skill development. Accounts procedures. Engineering design
and Management besides Operation and Maintenance of the assets.

As a measure of capacity building, training programmes were conducted in three
phases.

Phase-I : Programmes conducted during 1994.
Phase-II : Programmes conducted during the period November 1996 to October 1998.
Phase-III: Programmes scheduled for the period November 1998 to December 1999.

4

2.2

ACHIEVEMENT
PROGRAMMES

IN

PHASE-I

AND

PHASE-II

TRAINING

2.2.1 PHASE-I TRAINING PROGRAMME

During Phase-I, only 10 districts of Karnataka State were included in the project.

The Phase-I training programmes were conducted during 1994, the details of training
programmes conducted during Phase-I are as follows

SI.
No.

Details of Training
Programmes

1

Orientation of Primary School
Teachers (Water Supply and
Sanitation)_______________
Awareness programme to
Senior Engineers__________
Awareness programme to
Engineers________________
Training in Construction
Methods_________________
Care Taker Programmes
(Water Supply and Sanitation)
Training in
a) Accounts
b) Stores________________
Programme for Senior
Administrative Personnel
Programme for Voluntary
Agencies and Social Workers
(NGO’s)_________________
Training of Masons________
Training of Pipelayers______
Training of Valvemen______
Training of Composite
Mechanics

2

3
4

5
6

7
8

9
10
11
12

5

No. of
Persons
trained
514

Course
Duration
in days
2

No. of
Programmes
Conducted
257

1

1

8

3

3

36

5

10

209

2

257

3

3

1

2

60
13
35

2

1

31

8
3
2
4 Weeks

15
5
5
2

No. of
Villages
covered
257

257

116
45
115
35

1285

243
93
233
72

2.2.2 PHASE-II TRAINING PROGRAMME

In addition to the Phase-I project districts two new districts Viz. Hassan and
Tumkur were included in Phase-II project. The various training programmes conducted

during (Nov.96 to Oct.98) Phase-II training programmes are as follows.

SI.
No.

Details of Training
Programmes

1

Orientation of Primary
School Teachers and
Caretakers_________
Awareness
Programmes to Senior
Engineers__________
Awareness
Programmes to
Engineers__________
Training in
a) Investigation &
Design
b) Construction
Methods________
Training of
Administration
Accounts
Programme for Senior
Administrative
Personnel__________
Programme for
Voluntary Agencies &
Social Workers
(NGO’s)___________
Training of Masons
Training of Pipelayers
& Valvemen________
Pump Operators

2

3

4

5

6

7

8^
9

10

Course
Duration
in days
3

No. of
Programmes
Conducted
581

1

1

10

3

3

60

5

2

33

5

2

55

3

2

27

1

3

46

4

4

68

8
3

70
80

641
746

1280
1476

3

30

283

534

6

No. of
Villages
covered
581

No. of Persons
trained
Teachers : 1162
Caretakers : 2905

3.0

PHASB-III TRAINING PROGRAMME
..
✓. . . .

....

!,. • * -1

«

.

...

.................. H

.....

PROGRAMMES,

Course Name

Target Group

No. of
prgs.

1

Programme for
Senior Engineers

2

Programme for
Engineers

3

Training in
Construction
Methods_____
Training in
Accounts
procedure
Programme for
District Senior
Administrative
Personnel

Superintending Engineers of
PHED
and
Executive
Engineers of DPMU of the
project districts____________
Asst. Executive Engineers and
Asst. Engineers of project
districts___________________
Asst. Executive Engineers,
Asst. Engineers and Engineers
from NGO________________
Accounts Superintendents and
Accounts Personnel of DPMU
of project districts__________
Deputy
Secretary
for
Development (ZP), District
Health and Family Welfare
Officers, District and Deputy
Health Education Officers
Engineer and Team Leader of
NGOs. Engineer of DPMU
and Engineer of Construction
Supervision consultants

DETAILS OF
PHASE-UI

SI.
No

5

6

7

Programme for
Training of
Trainers on O
and M of the
project_______
Training of
Masons

8

Training of
Pipelayer and
Valvemen

9

Training of
Pump Operators

10

Training to Lab
Technicians
Training to Gram
Panchayat
Secretaries

11

/

[

TRAINING

3.1

4

;

M'. ;:t:r: :.i i

-V.

Masons and Semi-skilled
labourers - two persons each
from the project villages
selected by the VWS SC_____
Pipelayer and Valvemen - two
persons each from the project
villages selected by the
VWSSC___________ '
Two persons from each
project village selected by
VWSSC__________
and
Lab
Technicians
Engineers of ZP
Secretaries
of
Gram
Panchayats of project villages

7

CONTRACTED FOR

2

Duration of
the course
in days
1

No. of
persons
per prg
10

Total No.
of
persons
20

3

3

20

60

2

5

15

30

1

3

30

30

1

1

30

30

4

4

30

120

36

8

20

720

32

3

20

640

83

3

20

1660

2

2

24

48

40

1

24

960

SI.
No

Course Name

12

Training to Dry
Land
Development
Board (DLDB)
Personnel____
Training to
Consultants

13

3.2

Engineers of DLDB

1

Duration of
the course
in days
2

Persons representing CPM.
NGO, HSHE, Construction
Supervision,
Design
Consultants and TMC

2

1

No. of
prgs.

Target Group

No. of
persons
per prg
24

Total No.
of
persons
24

30

60

INSTITUTIONAL NETWORK FOR TRAINING

The Training Management Consultancy has its own infrastructure and group of

experts working exclusively for this project in its Head Quarters, Mysore. Besides, TMC

have identified 12 nodal institutions (one per project district)

where the required

infrastructure and expert manpower is available for conducting the village based training
programmes, in particular those meant for skill enhancement of participants. Trainer

teams from each nodal institution are trained by experts at the head quarters of Training

Management Consultants, in all aspects of Training. To supervise. Co-ordinate and
organize the training programmes there is one Co-ordinator in each nodal institution.
besides, one District Co-ordinator for each district directly employed by the Training

Management Consultants. The project Manager, who is in overall charge and the
Monitoring consultants, make sure of the implementation of the Training programmes by
surprise visits during the programmes. The programme conduction is well documented

and reporting is done on monthly basis. The scheduling of the programmes is done in
such a manner that the required trained personnel be made available, prior to the handing
over of the project assets.

8

Following are the list of Nodal Institutions for conducting village based
training programmes under Phase-III.
Nodal Institution
SI No
District

3.3

1

Bangalore (R)

JSS Academy of Technical Education, Bangalore

2

Belgaum

K.L.E. Society’s College of Engineering & Technology,
Belgaum.

3

Bellary /
Davanagere-1

Sanjay Gandhi Rural Polytechnic, Bellary.

4

Bidar

Rural Engineering College, Bhalki.

5

Dakshina Kannada / Manipal Institute of Technology, Manipal.
Udupi

6

Gulbarga

Poojya Doddappa Appa Engineering College, Gulbarga.

7

Hassan

Sri Bahubali Polytechnic, Shravanabelagola.

8

Mandya

JSS Polytechnic, Nanjangud.

9

Mysore / C.H.Nagar JSS Industrial Training Centre, Nanjangud.

10

Raichur / Koppal

Sarojini Leeladharan Nair College of Engineering,
Raichur.

11

Shimoga /
Davanagere-2

Jawaharlal Nehru National College of Engineering,
Shimoga.

12

Tumkur

Siddaganga Institute of Technology, Tumkur.

CONDUCTION OF TRAINING PROGRAMMES

The village based training programmes are conducted at the Nodal Institution of
the project districts. The list of villages, from which participants are to be trained, is

provided to the Nodal Institution well in advance by the NGOs. The sequencing of

villages is done with the help of District Co-ordinator, CPM Consultancy and the NGOs.
Based on the priority given by these agencies, the scheduling is done and the programmes

conducted. In this way trained persons are available in the project villages which are

ready for handing over. During Masons training programme, for hands on experience the

9

participants will construct at least one demonstration HHL at any one of the project

villages. The Masons training is conducted keeping in mind the targets for construction of
HHL by the NGOs. Similarly, during Pipelayer & Valvemen and Pump Operators
training programme the participants will be taken to the nearby project village for

demonstration and hands on training of giving house connections. Operation and
Maintenance of disinfection unit. Preparation of Bleaching Powder solutions and their

use etc. Tool kits and respective Course Materials will be given to the participants during
all skill training programmes. To motivate and to partially compensate the loss of wages

for the participants who are attending the training programmes, the loss of wages

Rs.660/- for Masons and Rs.220/- for Pipelayer & Valvemen and Rs.247.50 for Pump
Operators will be given to each participant.

The State/District level training programmes are conducted at the Nodal Centre,
Mysore. However some of the Nodal Institutions of the project districts also undertake

district level training programmes, keeping in mind the requirements of the engineers for
proper execution of their tasks.

3.4

MODE OF SELECTION OF PARTICIPANTS FOR SKILL TRAINING

The selection of participants for skill training programmes such as Masons,
Pipelayer & Valvemen and Pump Operators will be done by NGOs / NGIs, in
consultation with VWSC members. The selected participants should be semi-skilled. The
list of villages and time schedule for skill training (date of conduction) will be sent to

each district NGOs / NGIs well in advance, so that the NGOs / NGIs will select the

participants for training programme with the consultation of VWSC members. NGOs/
NGIs have been specially requested to identify Women for skill training programmes, as
a means to encourage womens participation. After the selection of participants the NGOs/

NGIs will send the list of participants and their address to the Nodal Institutions of

respective districts. The Nodal Institution will in turn write letter to the participants
inviting them for training programme with Pre-paid reply post card, requesting
participants to post the card to the Nodal Institution confirming their attendance to the
training programme.

10

Bellary/Davanagere-l
Not Scheduled

Bangalore(R)

No.of programme* conducted:!
No.of Villages co^ered:24

Not Scheduled

Bidar

Tiimkur

Not Scheduled

Not Scheduled

D.Kannada / Udiipi

*

Not Scheduled

Gulbarga

Shinioga/Davanagere-2
Not Scheduled

Raich ur/Koppal

Not Scheduled

No.of programmes conducted:3
No.of Villages covered:S2

Hassan
Not Scheduled

Mandya
Not Scheduled

Mysore/C.H.Nagar
Not Scheduled

STATUS OF GRAM PANCHAYAT SECRETARIES TRAINING PROGRAMMES AS ON 30.9.99

No.of
villages
covered

No.of
persons
trained

58

51

3

70

70

3

3

63

63

Bidar

3

3

57

57

5 D.Kannada

3

3

70

70

6 Gulbarga

3

3

61

61

7 Hassan

4

4

96

96

8 Mandya

3

3

77

70

9 Mysore

4

4

85

81

10 Raichur

4

4

102

102

11 Shimoga

3

3

69

69

12 Tumkur

4

4

71

69

40

40

879

859

SI.
No.

District

No.of
programmes
to be
conducted

1

Bangalore (R)

3

2

Belgaum

3

3 Bellary

4

TOTAL

Balance
No.of
No.of
programmes
conducted as programmes
to be
on 30.9.99
conducted
3

0

12

Remarks

INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL
SANITATION PROJECT - PHASE-III TRAINING PROGRAMME
(WORLD BANK ASSISTED)

TRAINING TO GRAM PANCHAYAT SECRETARIES HELD AT

TALUK PANCHAYAT HALL , CHIKKODI ON 17th SEPTEMBER 1999

List of Participants - Belgaum District
SI.
No
1
2
3
4
5
_6_
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Name

Mr.Shamagond Gangappa Nilavagi
MrALMudase_______________
MrJRSanadi_________________
Mr. S.D. Dhanagar______________
Mr.K.Vam Naik_______________
Mr.MBKarimani______________
Mr. BB, Patil__________________
MrSDAwati_________________
Mr.HLVaddatti_______________
Mr.M.ADhadde_______________
Mr Raosab Ramagowda Patil_____
Mr.S.N.Vani
Mr.V.M.Doddamani____________
Mr.S.N.Bendavade_____________
Mr.S.M.Jamdar_______________
MrRMMudhol_______________
MrGDDalal_________________
Mr.L.S.Latkar_________________
Mr. Ashok P, Patil______________
Mr.Maruthi Parappa Killadar_____
SmtYBSamannavar___________
Mr.K.S.Ambale _______________
Mr.JP.Charya_________________
Mr.BT.Samaje

13

Name of the Gram Panchayat /
_____________ Taluk__________
Kottalagi / Athani______________
Navalihal / Chikkodi____________
Bada / Hukkeri_________________
Kunnur / Chikkodi______________
Savadatti / Raibag______________
Katakabavi / Raibag_____________
Kankanwadi / Raibag____________
Bendwad / Raibag______________
Jaganur / Chikkodi______________
Belkod / Chikkodi______________
Kadaklat / Chikkodi_____________
Khanapur / Hukkeri_____________
Belageri (Chamkeri) / Athani______
Chikkalvad / Chikkodi___________
Daddi / Hukkeri________________
Parthanahalli / Athani___________
Yalehadagali / Athani___________
Chinchali / Raibag______________
Naianglag / Chikkodi____________
Bambalwad / Chikkodi__________
Gudas / Hukkeri________________
Akkol / Chikkodi_______________
B Bagewadi / Hukkeri___________
Naslapur / Raibag

INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL
SANITATION PROJECT - PHASE-III TRAINING PROGRAMME
(WORLD BANK ASSISTED)
TRAINING TO GRAM PANCHAYAT SECRETARIES HELD AT
TALUK PANCHAYAT HALL, S1NDHANUR, ON 18th SEPTEMBER 1999

List of Participants - (Programme -1) Raichur District
SI.
No
1
2
3
4
5
6
7
8
_9_
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

Taluk

Name of the Gram Panchayat

Lingasugur
Lingasugur
Lingasugur
Deodurga
Deodurga
Manvi
Lingasugur
Manvi
Lingasugur
Manvi
Manvi
Manvi
Sindhanur
Deodurga
Lingasugur
Sindhanur
Sindhanur
Sindhanur
Raichur
Raichur
Deodurga
Deodurga
Manvi
Lingasugur
Lingasugur
Sindhanur
Lingasugur
Sindhanur
Manvi
Raichur
Sindhanur

Ankushdoddi
Khota______
Santhekellur
Gabbur_____
Galag______
Sanna Hossur
Gonwatla
Kavital_____
Goudur_____
Mastur_____
Gavigatta
Bagalwad
Hulganchi
Gugal______
Nagaral
Gonal______
K.Hosahalli
Malkapur
Turakandona
Bijangera
Kardigudda
Kurkihalli
Jambaldinni
Mattur_____
Yarjanthi
Hullur______
Talekhan
Ramathnal
Sadapur____
Katlatkur
Basapur E.J

14

INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL
SANITATION PROJECT - PHASE-III TRAINING PROGRAMME
(WORLD BANK ASSISTED)

TRAINING TO GRAM PANCHAYAT SECRETARIES HELD AT

TALUK PANCHAYAT HALL, KOPPAL, ON 21st SEPTEMBER 1999

List of Participants - (Programme - 2) Raichur District
SL
No
1
2
3
4
5
6

7
8
9
10
11

12
13

14
15
16

17
18
19
20
21

Taluk

Name of the Gram Panchayat

Kustagi
Kustagi
Kustagi
Kustagi
Kustagi
Kustagi
Kustagi
Kustagi
Kustagi
Kustagi
Kustagi
Kustagi
Kustagi
Kustagi
Kustagi
Kustagi
Kustagi
Kustagi
Kustagi
Kustagi
Kustagi

Hiregonnagara
Malgitti_____
Hanamnal
Tugaldoni
Nilogal______
Hulgeri______
Chalgeri_____
Kalalbandi
Kandkoor
Nerebenchi
Kyadguppa
Dotihal______
Kesur_______
Hiremannapur
Navalahalli
Huliyapura
Tawargera
Hirebannigol
Koradakera
Nidsesi______
Wanigeri

15

INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL
SANITATION PROJECT - PHASE-III TRAINING PROGRAMME
(WORLD BANK ASSISTED)
TRAINING TO GRAM PANCHAYAT SECRETARIES HELD AT
TALUK PANCHAYAT HALL, KOPPAL, ON 21 sl SEPTEMBER 1999

List of Participants - (Programme - 3) Raichur District
SI.
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

Taluk

Name of the Gram Panchayat
Ojanahalli
Bhagyanagar
Kunikeri_____
Muddaballi
Vanabellary
Gudadalli_____
Boodgumpa
Hiresindhogi
Chikkasindhogi
Kolur________
Katralli______
Bisaralli______
Mainalli______
Bikanalli_____
Boodihal_____
Neeralgi______
Mattur_______
Belur________
Hankunti_____
Tigari________
Dambralli
Handral______
Veerapur_____
Karmudi_____
Heroor_______
Hoskera______
Jiralkalgudi
Singanal_____
Bevinal______
Eliganur

Koppal
Koppal
Koppal
Koppal
Koppal
Koppal
Koppal
Koppal
Koppal
Koppal
Koppal
Koppal
Koppal
Koppal
Koppal
Koppal
Koppal
Koppal
Koppal
Koppal
Koppal
Koppal
Yelburga
Yelburga
Gangavati
Gangavati
Gangavati
Gangavati
Gangavati
Gangavati

16

CONCEPTUAL, VERIFICATION
OF
TRAININC PROGRAMMES

KARNATAKA I NT13 GRATFD RURAL WATER SUPPLY ANO ENVIRONMENTAL ^AN'TATION PRO 'E^T 'W0RLn BANK A.cSISTEn)
CONLEkTUaL VEkIFIuA iiON Ob TRAINING PROGRAMMES
SI.
No.

2

Name of the Training Programme

Awareness to villagers_____________
Trg. forVWSSC members_________
Orientation of Primary School Teachers

3 Caretakers Training_____________
4 Masons Training_______________
5 Pipelayer & Labour Training_______
6 Valvemen & Helper Training______
7 Composit Mechanic Training______
8 Pump Operators Training________
9 Investigation & Design Training
10 Construction Methods Training
11 Prg. for Voluntary Agencies & Social
Workers
12 Programme for Sr.Engineers______
13 Programme for Engineers________
14 Programme for Sr. Admn. Personnel
15 Training in Accounts_______________
16 Training in Stores Administration______
17 District Project Manager Training______
18 Orientation workshop on sustainability of
alternate delivery system

No. of
villages

No.of
Training
Progra­
mme

No.of
Trainees

Target

Target

Target

11

11

Contract No.l Pilot Phase
(1993-94)

No.of
No.of Trg.
villages
Prg.
covered
condu­
cted

11 All villagers
11 All members

1200
1200
1200
1200

1200
1200
120
120

2400
6000
2400
2400

1200
1200

120
120
2
13

2400
2400
30
291

3
2
6

90
20
120

5
5

1

150
150
30
36

1

136

2

No.of
Trainees
trained

11
11

11 All villagers
11 All members

11

11
11
1
1
1

11
_9
W
10

1

22
55
18
20
20

16

No.of
villages
covered

257
257
110
45
109
40

No.of Trg.
No.of
Prg. condu Trainees
cted
trained

257
257
13
5
5
2

Contract No.lll Phase-ll
(1996-98)

Cumulative (Contract No. I & II)

Contract No. II Phase-I
(1994-95)

514
1285
230
97
134
38

No.of
villages
covered

No.of Trg.
Prg. condu­
cted

No.of Trainees
trained

11
11

11 All villagers
11 All members

268
268
119
55
119
38

268
268
14
6
6
2

536
1340
248
117
154
40

No.of
villages
covered

No.of Trg.
Prg.
conduc­
ted

No.of
Trainees
trained

581
581
641
746

581
581
70
80

1162
2905
1280
1474

283

30*
2
2

534
33
55

68

10

248

11

264

1

2
2

2

30
8
36

2

30
_____ 2
8_____ See Note
36 See Note
2

2
3
1

34
58
31

2
3
1

34 See Note
58 See Note
31

2

51

2
1

46
27

1

36

1

109

1

47

19 One day training on O & M for trainers

48
1
20 Training to Lab Technicians_____________ -_______ -________ -_______ 21 Training to Gram Panchayat Sec._________ -_______ -________ -________22 Training to DLDB personnel_____________ -_______ -________ -________23 Training to Consultants_________________ -_______ -________ -_______ 24 Prg. for Training of Trainers on 0 & M of

-_______ .
.
_
_
.
_____ __________ -________ -________ -_______ -_______ -_______ -________ -_________ -_________ -________ -________ -_______ -_______ -_______ -________ -_________ -_________ -___
-________ ...
.
_____ -_________

the project_______________________
Note: 1. One programme for Senior Engineers, One programme for Engineers and One programme for Senior Admn. Personnel have been adjusted against conduction of
D.P.M training programme, as per the direction of Director, PPMU, Bangalore.
2. One programme for Engineers and One programme for Training in Accounts was adjusted against the conduction of One day orientation workshop on Sustainability
of Alternate deliver system created in the project villages, as per the direction of Director, PPMU, Bangalore.
* As per the direction of Director, PPMU, 19 OPST & CT training programmes have been adjusted against conduction of 5 Pump Operators training programmes of Phase-ll villages which are commissioning shortly.

2

KARNATAKA INTFGPATF=D RURAL WATER SUPPLY ANO ENVIRONMENTAL SANITATION PRO ■ECT 'WORL" B^NK ASSISTEn)
CONuErfbAL VEkIFIuAiiON Or- TRAINING PROGRAMMES
SI. No.

Name of the Training Programme

Cumulative (Contract No. I, II & III)

No.of villages
covered

2
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

Awareness to villagers__________
Trg. for VWSSC members_______
Orientation of Primary School
T eachers
Caretakers Training____________
Masons Training_______________
Pipelayer & Labour Training______
Valvemen & Helper Training______
Composit Mechanic Training______
Pump Operators Training________
Investigation & Design Training
Construction Methods Training
Prg. for Voluntary Agencies & Social
Workers
Programme for Sr. Engineers_____
Programme for Engineers________
Programme for Sr. Admn. Personnel

Training in Accounts___________
Training in Stores Administration
District Project Manager Training
Orientation workshop on
sustainability of alternate delivery
system

11
11
849
849
760
801
119
38
283

No.of Trg.
Prg. conduc­
ted

No.of
Trainees
trained

Cumulative (Contract No. I, II, III & IV)
as on 30.9.1999

Contract No.IV (Nov* 1998- 31st Dec'99)
as on 30.9.1999

No.of villages No.of villages
to be covered covered as on
30.9.99

No. of Prog.
To be
conducted

No.of Trg.
Prg.conducted
as on 30.9.99

No.of
Trainees to
be trained

No.of Trainees
trained as on
30.9.99

11 All villagers
11 All members
849
849
84
86
6
__ 2
30*
__ 2
13

1698
4245
1528
1591
154
40
534
33
319

3
4

98
8
87

4
4
1
1

80
85
31
36

2

No.of villages
covered

11
11

No.of Trg. Prg.
conduc-ted

No.of Trainees
trained

11 All villagers
11 All members

2

Nil

30

Nil

849
849
114
115
__ 6
2
89
__ 2
13

2
3

1
1@

24
60

63
Nil

3
2
4

98
71_
87

1
1

Nil
Nil

30
30

Nil
Nil

4
4

1

80
85
31_
36

1

109

1

47

40
1

859
13

4

108

360
320

264
262

36
32

30
29

720
640

503
491

828

590

83

59

1656

1119

849
849
1024
1063
119
40
873

109
1
One day training on O & M for
trainers
1
47
Training to Lab Technicians______
20
__2
Nil
48
Nil____
21
Training to Gram Panchayat Sec.
40
40
960
859
879
Training to DLDB personnel______
22
24
1
1
13
23
Training to Consultants_________
2
Nil
60
Nil
24
Prg. for Training of Trainers on O &
M of the project
4
4
120
108
@ This Programme was adjusted against conduction of one day training programme on contract management procedure and use of MIS output for effective project management
on 6th April 1999 @ California Resort.

2

1698
4245
2031
2082
154
38
1653
33
319

19

Qo

District Wise Village Based Training Programmes conducted during Pilot Phase, Phase-1, Phase-ll and Phase-lll

Contract No.IV Phase-lll (Nov.98 to Dec.99)

CO

No.of

Total
No.of
prg.to
be
condu­
cted

prg.
condu­
cted
upto
30.9.99

Pump Operator

Pipelayer/Valvemen

Mason

SI.
No

Total
No.of
village
to be
cove­
red

No.of
village
cove­
red
upto
30.9.99

Total
No.of
trainees
to be
Trained

No.of
trainees
Trained
upto
30.9.99

No.of Total No.of
village
No.of
prg.
condu­ village cove­
cted
to be
red
upto
cove­ upto
30.9.99 red
30.9.99

Total
No.of
prg.to
be
condu­
cted

Total
No.of
trainees
to be
Trained

No.of
trainees
Trained
upto
30.9.99

No.of Total No.of
No.of
village
prgcondu­ village cove­
cted
to be
red
upto
cove­ upto
30.9.99 red
30.9.99

Total
No.of
prg.to
be
condu­
cted

Total
No.of
trainees
to be
Trained

No.of
trainees
Trained
upto
30.9.99

1

Bangalore (R)

3

1

26

7

52

12

1

1

14

10

28

19

5

3

46

33

92

63

2

Belgaum

6

5

59

49

118

91

5

4

45

34

90

64

9

7

87

66

174

131

3

Bellary

2

2

19

16

38

32

1

1

12

5

24

10

6

4

57

32

114

62

4

Bidar

2

2

18

17

36

34

2

2

18

16

36

32

7

5

73

51

146

102

5

□.Kannada

2

2

23

18

46

34

3

3

26

30

52

53

5

3

54

37

108

71

6

Gulbarga

3

2

30

22

60

44

4

3

36

24

72

48

7

5

68

46

136

91

7

Hassan

2

2

20

15

40

29

2

2

21

20

42

36

8

6

83

64

166

119

8

Mandya

3

1

35

16

70

30

3 3 + 1*

34

29

68

53

5

3

53

32

106

57

9

Mysore

4

4

36

28

72

54

2

2

25

23

50

40

8

6

77

64

154

114

10

Raichur

3

3

31

30

62

59

3

3

27

25

54

50

8

6

77

52

154

99

11

Shimoga

2

2

24

11

48

19

2

2

21

22

42

39

6

4

65

43

130

74

12

Tumkur

4

4

39

35

78

65

4

3

41

24

82

47

9

7

88

70

176

136

36

30

360

264

720

503

32 29+1*

320

262

640

491

83

59

828

590

1656

1119

TOTAL

Note: * Additional programme was conducted to covere uncovered villages of previous programmes

t

i

SUMMART OF REPORT ON
STATE/DISTRIOT EEVEE TRAINING

PROGRAMMES CONDUCTED DURING

THE MONTH OF SEPTEMBER 1999

STATE/DISTRICT LEVEL TRAINING PROGRAMMES

SI.
Training programmes
No

No. of
Scheduled Conducted Conducted
No. of
T arget Duration
persons
during
upto
for the
of the
Participants/
No. of
trained
Sept. 99
Sept. 99
prog. Course in programme month of
upto
Sept. 99
days
Sept. 99

Programme for Senior
Engineers

2

1

10

Nil

Nil

1

63

2 Programme for Engineers

3

3

20

Nil

Nil

1*

Nil

3 Training in Construction
methods

2

5

15

Nil

Nil

Nil

Nil

4 Training in Accounts Procedure

1

3

30

Nil

Nil

Nil

Nil

5 Programme for District Senior
Administrative Personnel

1

1

30

Nil

Nil

Nil

Nil

6 Programme for Training of
Trainers on O & M of the project

4

4

30

Nil

Nil

4

108

7 Training to Lab Technicians

2

2

24

Nil

Nil

Nil

Nil

8 Training to Dry Land
Development Board (DLDB)
Personnel

1

2

24

Nil

Nil

1

13

9 Training to Consultants

2

1

30

Nil

Nil

Nil

Nil

1

Note: * This programme was adjusted against conduction of One day training programme on Contract Management Procedure
and Use of MIS output for Effective Project Management on 6.4.99 at California Resort, Bangalore.

20

SUMMARY OF REPORT ON

VILLAGE BASEL TRAINING

PROGRAMMES GONEUGTEE
EURING THE MONTH

OF SEPTEMBER. 1999

DISTRICT WISE -VILLAGE BASED TRAINING PROGRAMMES
Training Programmes Conducted

SI.No.

District

J _ Bangalore (R)________

Masons

P i pel ayer/Va I vem en

Pump Operator

Gram Panchayat
Secretaries

NS

NS

NS

NS

NS

1

1

2

Belgaum

J

3

Bellary & Davanagere-2

NS

1

NS

NS______

4

Bidar

NS

NS

1

NS______

5 _ D.Kannada & Udupi____

NS

1

NS

NS______

6

Gulbarga______

NS

NS

1

NS______

7

Hassan

NS

NS

1

NS

8

Mandya

NS

NS

1

NS_____

9

Mysore & C.H.Nagar

__________

10 _ Raichur & Koppal

11
12

Shimoga & Davanagere-1

Tumkur______________
No. Progs.Conducted
during September 1999
Total No.of Programmes
to be conducted_______
Total No.of programmes
conducted upto
September 1999_______

1

NS

1

NS

NS

NS

1

3

NS

NS

1

NS

1

NS

1

NS

3

2

9

4

36

32

83

40

30

29

59

40

I □ No.of Programmes to be conductedD No.of Programmes conducted □ No.of villages covered□ No.of persons trained |
1119

1200

1000

879

859

800
590

cn

503

E

491

600

z
264

400

200-

0

36

A
i

30

iPHrazfli’+l
Masons

■;

262

32

(If

29

fn

83

Is

59

40

Pump Operator

Pipelayer & Valvemen

21

it:

Gram Panchayat Secretaries

G- -130

08U79

40

/<?r
11

X **

7

^Tr

Bangalore(R)
Not Scheduled

f

Bidar
No.of Village covered:1?
No.of persons trained: 16

Not Scheduled

Not Scheduled

Not Scheduled

MASONS TRAINING

Gulbarga

Raichur/Koppal

Not Scheduled

.

Not Scheduled

Mysore/C HLNagar

Mandya
Not Scheduled

re

No.of Village cove red: 9
No.of persons trained: 18

INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT

MASONS TRAINING - SEPTEMBER 1999

Institution:

District: Belgaum

SI.
No.
1
2
3
4

Village

Sanikoppa
Sanikoppa
Bagamal
Bagarnal
Ji Karaguppi
6 Karaguppi
7 Rustumpur
8 Rustumpur
9 Pachapu£
10 Pachapur
11 Neginal
1^ Neginal
13^ Sindhihatti
14 Sindhihatti
Holihosur
16 Arabhavi

Taluk

Name of Participant

Bylahongal
Bylah°nga[
Hukkeri__
Hukkeri
Hukkeri___
Hukkeri
Hukkeri
Hukkeri
Hukkeri
Hukkeri
Bylahongal
Bylahongal
Hukkeri
Hukkeri
Bylahongal

Basavaraj Sidrappa Gurannavar

To be Covered/Trained
Actual Covered/Trained

Date of conduction

3.9.99 to 10.9.99

Arjuna Siddappa Harijana________
Mallappa_Basappa Kempannavar__
Nagappa Ittappa Dindigatti_______
Babu Satappa Neeralagi_________
Satyappa Mallappa Malagi________
R^machandra^Mallappa Kolundri__
Lagamanna Avanappa Lankannavar
Adivappa Shankar Patil__________
Ajeeth Laxman Jathava_________
Shivappa Rudrappa Jamanur_____
Arjuna Kareppa Keseregoppa
Ramappa Yashwanth Vaddar_____
Satyappa Ramappa Patil_________
Suresh Ramappa Mannur_______
Kallappa Shivalingappa Talavar__
Hanumant Siddappa Harijana

Gokak
Gokak

Arabhavi

17

KLESCET - BELGAUM

Masons
20
17

Village
W
9

25

3

17

20

.E
2
H
w>

15

IE

10

z

5

ZJ

io

9

KSSSSfcW
wv,
wv,
ww

0

Masons

Village
I □ To be Covered/Trained □ Actual Covered/Trained |

Cumulative Progress from Nov.98 to Sept.99

160
1 140
.£ 120

118

91

2 100
«

80

1

60

E

40
20
0

3

z

59

6

5

No.of Programmes
to be conducted

No.of Programmes
conducted

49

No.of villages to be
covered

No.of villages
covered

No.of persons to be
trained

No.of persons
trained

Observations^^ Attendance for Masons training programme was good.______________________
2. Masons training programme was conducted successfully._________________________
3. Participants were taken to Mache villages of Belgaum Taluk to give hands on experience
training. Total 4 HHLs were constructed during the training programme.

23

INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT

MASONS TRAINING - SEPTEMBER 1999
District: Mysore-C.H.Nagar

SI.
No.

Institution:

Village

Taluk

“T- Kelaganahally

Periyapatna
Periyapatna
CH.Nagar
C.H.Nagar
C.H.NagaF"
C.H. Nagar
Gundlupet
Gundlupet
K.R.Nagar
K.R.Nagar~
Periyapatna
Periyapatna
C.H.Nagar
C.H.Nagar
T.N.Pura
T.N.Pura
K.R.Nagar
K.R.Nagar

2
3
4
5
6
7
8

Kelaganahally
Ummathuru
Ummathuru
Kagalwadi
Kagalwadi
Alathur
Alathur
“9“
Chandagal
10 Chandagal
11 Kanagal
12 Kanagal
13 Honganur__ _
14 Honganur
15 Hykanoor
16 Hykanoor
17 Kestur
18 Kestur

Name of Participant

£
S

9

20

20
15

10

10

EZJ
z

3.9.99 to 10.9.99

Masons
20
18

_ 10 “

25

3

Date of conduction

Prasannakumar S/o.Shivannashetty
Manjunath S/o.Ramasetty
Chikkanna S/o.Verathappa
Suresh S/o.Chandra Naik
Mallikarjunaswamy S/o.Rudraiah
Mahadevaswamy S/o.Maraiah
Swamy S/o.Madaiah
Murthy S/o.Kempaiah
Ramegouda S/o.Thimmegouda—
SoTnaiah S/o.Ramaiah
Krishegouda S/o.Thimmegouda
Swamy S/o.Javaraiah___
Maruswamy S/o.Madaiah
Shivaiah S/o.Basavaiah
Gurusiddaiah S/o.Nanjaiah
Kalaiah S/o.Basavaiah
Krishemurthy S/o.Kenchegouda
KrcTKrishegouda S/o.Chikkegouda

Village
TobeCo v e red/Tra i n ed
Actual Covered/Trained

JSS ITC - NANJANGUD

9

W2
•Me

5

xx

^^31

0

Village

Masons

Tobe Covered/Trained

Actual Covered/Trained j

Cumulative Progress from Nov.98 to Sept.99

90
80
■g 70

72
54

I 60
H 50

36

S 40
f 30
z 20
10
0

28
4

4

No.of Programmes
to be conducted

No.of Programmes
conducted

No.of villages to be
covered

No.of villages
covered

No.of persons to be
trained

No.of persons
trained

Observations: L Attendance for Masons training programme was goqd^
__________ 2. Masons training programme was conducted successfully._____________________
______ 3. Participants were taken to Kupparvalli villages of Nanjangud Taluk to give hands on
experience training.

24

INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT

MASONS TRAINING - SEPTEMBER 1999

Institution:

District: Tumkur

SI.
No.

Village

1
2

Bandakunte
Bandakunte
3 Tarur
4 Tarur
"3“ Tadakalur
6 Tadakalur
__
7 Yaladabagi _ _
8 Yaladabagi
”9“ Ratnasandra
10 Ratnasandra
11 Chikkamalalawadi
12 Chikkamalalawadi
IT Mayasandra
14 Talakere
15 Talakere
16 Kanathur

Date of conduction

Name of Participant

Taluk

15.9.99 to 22^99

Malleshappa
Basavaraju
Raj annaTh imma ray a ppa
Mahalingappa
Beeralingappa
Narasimhamurthy
Doddaiah
Shanmukappa
Nagappa
Byatarayappa
Chikkagangaiah
Manjunatha
Mahalingaiah
Chand rajah
Nagaraju

Sira
Sira
Sira
Sira
Sira
Sira
Sira
Sira
Sira_____
Sira
Kunigal
KunigaT
Turuvekere
T uruvekere
T uruvekere
Turuvekere

Masons
20

Village

10
9

To be Covered/Trained
Actual Covered/Trained

SIT-TUMKUR

16

25
20

20

3
.E
S

16

15

M

10

IE

9

10

at.

&

3

z

s,

5
0

a
Masons

Village

□ To be Covered/Trained □ Actual Covered/Trained |

Cumulative Progress from Nov.98 to Sept.99
120 -j

100

78

80
2

60

w
%

40

E

20

z

0

3

39
4

35

4

No.of Programmes No.of Programmes No.of villages to be
to be conducted
conducted
covered

No.of villages
covered

No.of persons to be
trained

Observations: 1. Attendance for Masons training programme was very good.
2. Masons training programme was conducted successfully.

25

No.of persons
trained

DEMONSTRATION OF TWIN PIT POUR
FLUSH WATER SEAL LATRINES

CONSTRUCTED AS PART OF HANDS ON
TRAINING DURING MASONS TRAINING

FROM 3.9.99 TO 10.9.99

NUMBER OF DEMONSTRATION TWIN PIT POUR FLUSH
WATER SEAL LATRINES CONSTRUCTED AS PART OF
HANDS ON TRAINING DURING MASONS TRAINING
FROM 3.9.99 TO 10.9.99

SI.
No.

District

Village

Taluk

’T’

Belgaum

Mache

Belgaum

2

Mysore

Kupparavalli

Nanjangud

26

No. of HHL
constructed

1

Bellary/Davanagere-1
No.of Villages covered:5
No.of persons trained: 10

atoA .

Belgaum

Bangalore(R)

Not Scheduled

■^ot Scheduled

Tumkur
Bidar

.v Not Scheduled

Not Scheduled





D.Kannada / Udupi
No.of Villages covered: 10
No.of persons trained:!?

Shimoga/Davanagere-2
Not Scheduled

PIPELAYER AND VALVEMEN
TRAINING

Gulbarga

Raichiir/Koppai

Not Scheduled

Not Scheduled

Hassan
Not Scheduled
____

Mandya
Not Scheduled

INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT

PIPELAYER AND VALVEMEN TRAINING - SEPTEMBER 1999

District: Bellary - Davanagere

SGRP - BELLARY

Institution:

SI.
No.

Village

1

Somasamudra

Bellary

K.Chandrashekar S/o.Basavara£

2

Somasamudra

Bellary

B.M.Gangadhar S/o.Hanu manthappa

3

Garaga

Hospet

M.Ramu S/o.Basappa

4

Garaga

Hospet

D.Nagabhmshan S/o.D. Nagappa

5

M.H.Tanda

Hospet

Prema Naik S/o.Ramanaik________

6

M.H.Tanda

Hospet

Laxman Naik S/o.Rekhya Naik____

7

BachigondanahalH H.B.Halli

7.9.99 to 9.9.99

________

ThimappaS/o.Sharanappa________

T.Basavaraj S/o.Mareppa

8 Bachigondanahalli H.B.Halli
Hospet
9 Ramanagar
Hospet
10 Ramanagar

Pompanna S/o.Neelakantappa
Lokesh S/o.JVIurariyappa

P i pe layer/Valveme n
20
10

Village

10
5

To be Covered/Trained
Actual Covered/Trained

Date of conduction

Name of Participant

Taluk

25

20

20

3

.E
tc

15

%

10

E
3

sg’S

5-

Z

ii

10
5



0

it
t

BUI


10

Pipelayer/Valvemen

Village

i □ To be Covered/Trained □ Actual Covered/Trained I

Cumulative Progress from Nov.98 to Sept.99

30
24

25

.£ 20

2

w 15

12

10

110

z

5

5 -

1

1

0 J------------ 1.

.

.

.i--------------------------■.

No.of Programmes
to be conducted

.

.

.i------------- ------------ ■

No.of Programmes
conducted





----------------

No.of villages to be
covered

No.of villages
covered

No.of persons to be
trained

Observations: 1. Attendance for Pipelayer/Valvemen training programme was normal.
2. Pipelayer/Valvemen training programme was conducted successfully.

28

No.of persons
trained

INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT

PIPELAYER AND VALVEMEN TRAINING - SEPTEMBER 1999

District: D.Kannada-Udupi
SI.
No.

Village

1 Shimantoor
_2 Shimantoor
3_ Amparu__
4 Amparu
5 Mala___
6 Mala_____
7 Chitoor
8 Kowdoor
9 Beloor
10 Beloor
11 Hakladi
12 Hakladi
13 Idikkidu
14 Idikkidu
__
15 Hebri
16 Hebri
17 Al badi

Name of Participant

Date of conduction

Purushottam Das^S/o.Koragadas
Lokesh Shettigar S/o.Sheena Shettigar
Bhojaraj.N S/o.chikkakulal____________
Sitaram Shetty S/o.Korgayya Shetty___
Ravi Gouda S/o.Mahabala Gouda
Shekara Moolya S/o.Sankayya Mqolya__
Gopal Naik S/o.Shankara Naik
Rajendra S/o.Nagesh Sarvegar________
Bharatkumar S/o.Manja______________
Udaya Achar S/o.Venkataramana Achar
Vijaya Shetty S/o.Subbanna Shetty
Bhaskara Mogaveera S/o.Ranga Mogaveera
Prakash Sapalya S/o.Shivappa Sapalya
U.Ravikumar S/o.K.Sheshappa Moolya__
Shankara Naik S/o.Narayana Naik______
Manjunath Achar S/o.Padmanabha Achar
Suresh Poojary S/o.Annappa Poojari____

7.9.99 to 9.9.99

Taluk

Mangalore
Mangalore
Kundapur
Kundapur
Karkala
Karkala__
Kundapur
Karkala__
Kundapur
Kundapur
Kundapur
Kundapur
Bantwal
Bantwal__
Karkala
Karkala
Kundapur

Pipelayer/Valvemen
20

Village

10
10

To be Covered/Trained
Actual Covered/Trained

MIT -MANIPAL

Institution:

17

25

17

20

3
£
2
h<2
%
E3

15

10

10

10

VW

p: few!

5

Z

1

20

0

Pipelayer/Valvemen

Village

!□ To be Covered/Trained

Actual Covered/Trained '

Cumulative Progress from Nov.98 to Sept.99

3
.E
2

hw
o
E
3

z

70
60
50
40
30
20

10

52
26

3

3

No.of Programmes
to be conducted

No.of Programmes
conducted

0---No.of villages to be
covered

No.of villages
covered

No.of persons to be
trained

Observations: 1 .-Attendance for Pipelayer and Valvemen training programme was good.
2. Pipelayer and Valvemen training programme was conducted successfully.

29

No.of persons
trained

Belgaum

Bellary/Davanagere-1

No.ofVillages covered:#
No.of persons trained: 17

Not Scheduled

BangalorefR)
Not Scheduled

Tumkur

Bidar

No.ofVillages covered: 10
No.of persons trained: 19

No.of Villages cove red: 9
No.of persons trained: 19

_
:





Shimoga/Davanagere-2

■■■■■

D.Kannada / Udupi

________ f



. /r-



<

Not Scheduled

PUMP OPERATORS TRAINING

Raichur/Koppal

Gul barga

No.ofVillages covered: 12
No.of persons trained:22

No.of Villages covered: 12
No.of persons trained:24

Hassan
No.ofVillages covered: 11
No.of persons trained: 19

GO

o

No.ofVillages covered:9
No.of persons trained:16

Mandya
No.of Villages covered: 11
No.of persons trained: 19

Mysore/C.H.Nagar
No.ofVillages covered:9
No.of persons trained: 17

INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT

PUMP OPERATORS TRAINING - SEPTEMBER 1999
SI.
No.

1
2
3

4
5
6
7
8
9
10
11
12

13
14
15
16
17

KLESCET - BELGAUM

Institution:

District: Belgaum

Village

Taluk

Borgouh
Borgoun
Soundathi
Soundathi
Neginahal
Neginahal
Chincholi
Chincholi___
Hosur______
Hosur
Asundi_____
Asundi_____
Holihosur___
Holihosur___
Hudali
Hudali_
Bekwad *

Chikkodi
Chikkodi
Raibag
Raibag
Bailahongala
Bailahongala
Raibag
~
Raibag ___
Sayadathi
Savadathi__
Savadathi
Savadathi
Bailahongala
Bailahongala
Belgaum
Belgaum
Khanapur

Name of Participant

Date of conduction

JaypaTDhanapal
________________
Abhay Soragowda Patil
Sathyappa Kallappa Mirje
Maruthi Shanbu Godale
_____
Gangappa Kareppa Malagi
Madivalappa Rudrappa Badigera____
Gopala Shankara Pareet
Krishna Kadappa Durgai
Mallappa Basappa Hahchinamane
Hanumantha Fakeerappa Malamethri
Basappa Yellappa Gireppannavar
Pundaleek Sangappa Lakkappannayar
Yellappa HanumanthapjyyKotur_______
Rayappa Huchhappa Chikkappannavar
Chandrahasa Krishnappagi Mutalikadesai
Raju Ramachandra Kammar
______
Parashurama Hanumantha Zande

21.9.99 to 23.9.99

Pump Operator
20

Village
10
8

To be Covered/Trained
Actual Covered/Trained

17

25

20

17

20

w wwi

3


2
H
co
o
E

15

10

8

10
5

5

z

is

viii

:

&$

wwwS

s

’zWqs "I

o

To be Covered/Trained

I

7

Pump Operator

Village

Actual Covered/TrainedJ

Cumulative Progress from Nov.98 to Sept.99

250

174

200

1| 150

131

87

i 100
E
z 50

66

9

rim

W!
zz
Ml

7

I 1 I 1 ! 1 11

0

No.of Programmes
to be conducted

No.of Programmes
conducted

No.of villages to be
covered

No.of villages
covered

No.of persons to be
trained

No.of persons
trained

Observations: 1. Attendance for Pump Operators training programme was good._____ _______
2. Pump Operators training programme was conducted successfully._____________
“^Participants were taken to Bendigeri village of Belgaum Taluk to demonstration of
disinfectioryunit^___________ _______
Note: * One participant had attended in the previous programme.

31

6 - 130

08079

o(

I X3

J

<■

INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT

PUMP OPERATORS TRAINING - SEPTEMBER 1999

1
2
3

4
5
6
7
8

9
10
11
12
13
14
15
16
17
18
19

REC - BHALKI

Institution:

District: Bidar
SI.
No.

Village

Taluk

Kamalnagar__
Kamalnagar
Son ala______
Sonala_
Bylahalli (K)
Bylahalli (K)
Gadgi_______
Gadgi_______
Markhal
Markhal_____
Wadgaon___
Wadgaon___
Hipalgaon
Hipalgaon__
Chillargi
Chillargi_____
Chimkod____
Chimkod____
Hallikhed (B) *

Au rad
Aurad
Au rad___
Aurad
Bhalki
Bhalki
Bidar
Bidar___
Bidar
Bidar
Aurad
Aurad__
Bidar
Bidar___
Bidar____
Bidar “
Bidar____
Bidar
Humnabad

To be Covered/Trained
Actual Covered/Trained

Pump Operator

Village
10
9

20
19
20

15

19

iOS

20


10

9

WS

10

E
s

7.9.99 to 9.9.99

Dhulappa S/o.Baburao______
Rajshekhar^/qjyiadiyalappa_
Ashok S/o Vishwanath Rao
Chandreshekhar S/o.Gurunath
Hanmanth S/o.Tukkarao_____
Ramrao S/o.Basappa______
G h a I e ppa S/o.C ha ndra ppa_
Baburao S/o.Adeveppa_____
Kalappa S/o.Shivaram_____
Ghaleppa S/o.Manikappa ____
Madappa S/o.Kanteppa_____
Bheemsingh S/o.Pratapsingh
Rajkumar S/o.Shankerrao___
Madayya S/o.Panchayya
Rajkumar S/o.Arjun________
Sanganna S/o.Shiyram____
Amrutrao S/o.Bichappa_____
PandarinathS/o.Maruti
Vaijinath S/o. Mani kappa

25

2
!-

Date of conduction

Name of Participant

5

z

7

o

Village

Pump Operator

InTo be Covered/Trained □ Actual Covered/Trained |

Cumulative Progress from Nov.98 to Sept.99

180
160
3 140
.E 120
2
H 100
w
80
E= 60
z 40
20
0

146
102

73

51

7

5

No.of Programmes
to be conducted

No.of Programmes
conducted

No.of villages to be
covered

No.of villages
covered

No.of persons to be
trained

Observationsyl . Attendance for Pump Opeyajors trainingTprojr^^^^^
good.
2. Pump Operators training programme was conducted successfully.
Note: * One participant had attended in the previous programme._____________

32

No.of persons
trained

INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT

PUMP OPERATORS TRAINING - SEPTEMBER 1999
Institution:

District: Gulbarga
SI.
No.

Village

1 DevathkalF
2 Devathkal
T" Devapur
4 Devapur
5 Arkere-K
6 Arkere-K
~T Rudnur
8 Rudnur
9 Kudaluru
10 Kudaluru
11 Ba I ached
12 Balached ’
13 Au rad
14 Au rad
15 Keriambalaga
16 Keriambalaga
17 B/Tegnur
18 B.Tegnur
"19 MudaboT
20 Mudabol
21 Hagargandagi
22 Hagargandagi
23

Melakunda-K
Melakunda-K

Devendrappa S/o.Paramainn^
Vasudeva S/o.Goppanna
Kalappa S/o.Gangadhara
Bheemaraya S/o.Husenayya
Bheemangouda S/o.Shivangouda
Subhash Chandra S/o.Kris^hnappa
Rachaya Swamy S/o.Sangayya Swamy
Prabhulinga S/o.Nagappa
Ka iasayya S/o. H usa i nappa
’______
Mahadevappa S/o^Siddanna
Shivaraj S/o.Basavaraj
Husainsab S/o.Nabeesab _____ __
Sanganna^/o.Sahebgouda
Mailaree S/o.Babu Rao
Shivasharanappa S/o.Ambruthappa
Shahka£S/o?Hanumantharaya
Rangappa S/o.Chandrashaha
M a nth appa S/o. Sam ban na
Gurudeva S/o.Babu Rao
Sharanappa S/o.Bhimasha
Chandrakanth S/o.Nagappa
Babu Rao^S/o2Siddanna
Siddarudha S/o.Shivaraya
Sharanappa S/o.Hanumanthraya

Shorapur
Shorapur
Shorapur
Shorapur
Shorapur
"Shorapur
Chincholi
"Chincholi
’ Yadagir
Yadagir
Yadagir
Yadagir
" Jewargi
Jewargi
Aland
Aland
Gulbarga
Gulbarga
Chittapur
Chittapur
Gulbarga
Gulbarga
Gulbarga
Gulbarga

10
12

30i

24

20

25

s

20

w
o

15

12

5

-

0

SRSS

8r'

I

Village

Pump Operator

ra
Isa

10

10

E
z

7.9.99 to 9.9.99

Pump Operator
20
24

Village

=

Date of conduction

Name of Participant

Taluk

To'be Covered/T rained
Actual Covered/Trained

PDACE - GULBARGA

□ To be Covered/Trained □ Actual Covered/Trained |

Cumulativ Progress from Nov.98 to Sept.99

160
140

3

.E
re

w
re
E
3

z

136

120
100 80 60
40
20 -

91
68

46

7

5

No.of Programmes
to be conducted

No.of Programmes
conducted

0
No.of villages to be
covered

No.of villages
covered

No.of persons to be
trained

Observations: 1. Attendance for Pump Operators training programme was very good.
2. Pump Operators training programme was conducted successfully.

33

No.of persons
trained

INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT

PUMP OPERATORS TRAINING - SEPTEMBER 1999

SBP - SHRAVANABELAGOLA

Institution:

District: Hassan
SI.
Village
No.
1 Bagur
2 Bagur
3 Dudda
4 Dadigatta
5 Dadigatta
6 Hongere_______
7 Hongere
8 Hebbale
“9“
Hebbale_______
10 Kattepur’
11 Banavase _ ___
12 Banavase
13 Hasugavally
14 Hasugavally
15" Pallya
16 Pallya
17 Chikkakadalur
18 Chikkakadalur
19 Chattachatnahalli

C.R.Patna
C.R.Patna
Hassan
C.R.Patna
C.R.Patna
Hassan__
Hassan
Arakalgud
Arakalgud
Arakalgud
SakleshpuT
Sakleshpur
Sakleshpur
Sakleshpur
Alur
Alur
Hassan
Hassan
Belur

7.9.99 to 9.9.99

B.J.Jagadish S/o.Javarasetty
B. M.Gangadhar/ B.M.Malleshappa
Devaraju S/o.Puttamaigaiah
C. Kumar S/o.D.N.Chikkegowda
C. Deva raj u S/o. D. N. C h i kkeg owd a
Puttegowda S/o. Ku 11 eg owd a
HI. M. D harm eg owd a S/o.Madigowda
Mahjars/c>. Ka I a bh ov i
Laxman S/o.Jambegowda___
'
K.V.Manjegowda S/o.Appannagowda
B. N. Manjunatha S/o.B.S.Nanjappa____
B. T.Chandrashekar S/o.N.Basavegowda
B-B/Somashekar S/o.B.H.Basappa
Javarappa S/o.Venkata
D A. Ma he nd ra S/o. An n egowd a
C. T.Devaraju S/o.P.Y.Thimmegowda
Manjunatha S/o.Sannaramaiah ~
C.P.Kategowda S/o.Puttegowda
Eregowda S/o.Haruvegowda_________

10

Pump Operator
20 ~

11

19

Village

To be Covered/Trained
Actual Covered/Trained

Date of conduction

Name of Participant

Taluk

20

25i

19

20

£
S
w

15

B

10

E
z

5
0

; 8®
':W

11

10

i

Pump Operator

Village

□ To be Covered/Trained □ Actual Covered/Trained j

Cumulative Progress from Nov.98 to Sept.99

250
200

166

2 150

119

Cfl

83

I 100
E3

Z

50

6

8

0---------- 1

64

1-----------1---------- ■

No.of Programmes
to be conducted

----------- T---------- 11

No.of Programmes
conducted

---------

No.of villages to be
covered

No.of villages
covered

No.of persons to be
trained

Observations: L Attendance fo^Pump^Operators training programme wasvery good.
2. Pump Operators training programme was conducted successfully.

34

No.of persons
trained

INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT

PUMP OPERATORS TRAINING - SEPTEMBER 1999
District: Mandya
SI.
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

Taluk

Name of Participant

Date of conduction

Malavalli
Ma lav alii
Mandya
Mandya
Malavalli
Malavalli
Pandavapura
Pandavapura
Srirangapatna
Srirangapatna
Mandya
Mandya
Mandya
Malavalli
Pandavapura
Mandya
Mandya
Malavalli
Malavalli

M.Mahadevappa S/o.Marimadaiah
Mahadevaiah S/o.Ramegouda
Befiyappa S/o.Boraiah
_ _
__
Ramegouda S/o.Purada Thippegouda
T. Ni ng a raj u S/o. M ad a i ah
Chowdaiah S/o.Kalaiah
Channaveeragouda S/o.Veeragouda
~
NazeerAhmed S/o.Mohamed Anif
Manju S/o.Mariyanna
Sh ivashetty S/o. Ken ch ash etty
K.R.Arya S/o.Rudrappa
____
H.B.Ganesh S/o.Basavaiah__________
H.A.Krishnegouda S/o.Ankegouda
~
Shivaramu S/o.Chikkamadiah
KaHegouda S/o.Kalegouda__________
Javaregouda S/o.Chowdegouda
B.S.Madappa S7o.Siddappa
Sridhar Murthy S/o.Lakshmi Narasimhaiah
Nagar^ifS/o^Kenchegouda

7.9.99 to 979799

Village

Sargoor
Sargoor_____
Shivapura
Shiva pura
Talagawadi
Talagawadi_
Kythanahalli
Kythanahalli
P.HosahallF
P.Hosahalli
Bevkal
Hulikere
Hulikere
Kodagahalli
Bannangadi
Kothathi
'TT Kothathi
18 Lingapatna
19 Lingapatna

JSS^Pqlytechni^-NANJANGUD

Institution:

10

Pump Operator
20

11

19

Village

To be Covered/Trained
Actual Covered/Trained
25

20

20

ic

.E

S

15

10

E3

5

2

0

19

!

11

10

SI
cfc’l

11

I # £II
Pump Operator

Village

□ To be Covered/Trained □ Actual Covered/TrainedJ

Cumulative Progress from Nov.98 to Sept.99
140
106

1 120
=g 100
E
2

80
60
40
5
20
0 -----No.of Programmes
to be conducted

57

53

32
3

No.of Programmes
conducted

No.of villages to be
covered

No.of villages
covered

No.of persons to be
trained

Observations: 1. Attendance for Pump Operators training programme was very good.
2. Pump Operators training programme was conducted successfully.

35

No.of persons
trained

INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT

PUMP OPERATORS TRAINING - SEPTEMBER 1999
District ^Mysore-C.H.Nagar

SI.
No.
1
2
3
4
5
6
7
8

10
11
12
13
14
15
16
17

Institution:

Village

Taluk

Alagodu
Alagodu
Haliyur
Haliyur_____
Tarikkallu
Tarikkallu
Thumbusoge
Thumbusoge
Jakkahallj—~
Jakkahalli
"Marchalli
Marchall i
Jodimellalli
Jodimellalli
KM.Hally
Agara
Agara

T.N.Pura
T.N.Pura~
K.R.Nagar
K.R.Nagar
Hunsur
Hunsur
H.D.Kote
H.D.Kote
H.D.Kote
H.D.Kote
K.R.Nagar
K.R.Nagar
Yelandur
Yelandur
H.DTKote
Yelandur
Yelandur

Name of Participant

Date of conduction

Nagaraju S/o.CharTna Naik
Puttaswamy S/o.Madaiah
Tholsiramagowda S/o.Kalegowda
H.J.Lakshamana S/o.Javarashetty'
T.S.Shivakumar S/o.Siddegowda
R.Chinnaswamy S/o.Ramaswamegowda~
Rajendra S/o.Hesudasa______________
Ananda S/o.Hanumanthaiah
Mahadevaiah S/o.Chikkamadaiah
Rajashekaramurthy S/o.Puttasiddaiah
Rajanaika S/o.Sidda Naik
Sanneswamy S/o.Kunnegowda
M.C.Subbanna S/o.M.R.Channananjappa
Shivananjaiah S/o.Kenchaiah
Swamegowda_ S/o. Ma rigowda
Santhosh KurriaTS/o.Ramanna

21.9.99 to 23.9.99

Chikkathammdi Gowda S/o.Thammaiah Gowda

Pump Operator
20

Village

10
9

To be Covered/Trained
Actual Covered/Trained

JSS ITC - NANJANGUD

17

25

a
a
20

3

ra
rJ'

20

.E
2

15

52

10

I/v^SSylfi

9

10

E

3
Z

17

5

Hi
11!

0

Pump Operator

Village

To be Covered/Trained

I

Actual Covered/Trained I

Cumulative Progress from Nov.98 to Sept.99
180
160
140

154

114

f 120
l- 100
52o 80
E 60
3
z 40

8
20
0 ----- | r " i *
No.of Programmes
to be conducted

77
64

6
No.of Programmes
conducted

No.of villages to be
covered

No.of villages
covered

No.of persons to be
trained

Observations: 1. Attendance for Pump Operators training programme was good.
2. Pump Operators training programme was conducted successfully.

36

No.of persons
trained

INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT

PUMP OPERATORS TRAINING - SEPTEMBER 1999
Institution:

District^Raichur-Koppal

SI.
Taluk
Village
No.
’ Gangavathi
1 Singnal
Gangavathi
2 Singnal__
Koppal
3 Bhagyanagar
4 Bhagyanagar_ Koppal
Koppal
5 Bikanahalli
Koppal
6 Bikanahalli
7 Bisarahalli_____ Koppal
Koppal
8 Bisarahalli
“9"

10
11
12
13
14
15
16
17
18
19
20
21
22

Date of conduction

Name of Participant

7.9.99 to 9.9.99 “

Kuntegowda S/o.Hanumangowda.K
Veerayya S/o.Channayya Hiremath
P a rasa ppa S7o. M a h ad ev a ppa. M
Vittappa S/o.Yellappa Shavi_ ____
Gavisiddappa S/o. Eashwargowda
Chandrappa S7d:Shlvappa Harijan_
Sannabasavaraja S/o.Gavisiddappa
Sanjaykumar S/o.Narayanbhal__
Somanagowda S/o.Cliandragowda
Shekharappa S/o.Siddappa_______
Ramanna S/o.Somalingappa.B
Basayya S/o.Gavisiddayya
Yenkappa S/o.Narayana Barker
Ramappa S/o.Balappa Barker
Pakhirappa S/o.Yeimunappa_____
Kanakappa S/o.Sakrappagaddi
Somalingappa S/o.Basappa
Pampanna S/o.Nagappagodikera
Ningappa S/o.Malakappa Nayak
Hanumalah S/o^Sivayya
Amaragowda S/o.Ayyanagowda
Sa nth amurthy SZq. Th a yap pa

Koppal
Budihal
Koppal
Budihal
Chikkasindhagi Koppal
Chikkasindhagi Koppal
Hanwal_______ Koppal
Koppal
Hanwal
Koppal
Handral
_ Kustagi
Tugaldaoni
Kustagi
Tugaldaoni
Koppal
Muddaballi
Koppal
Muddaballi
Kustagi
Koradakere
Kustagi
Koradakere
J ag i rv en kata pur Raichur

To be Covered/Trained
Actual Covered/Trained

SLNCE - RAICHUR

Village
10

Pump Operator

12

22

20 ’

25

20

20

s

12

15

U)

10

10

E
z5

5

------

0

Village

pump Operator

[□To be Covered/Trained □ Actual Covered/Trained |

Cumulative Progress from Nov.98 to Sept.99

=
S
H
<2
E

3
Z

200
180
160
140
120
100
80
60
40
20
0

154

99

52
8

6

No.of Programmes
to be conducted

No.of Programmes
conducted

No.of villages to be
covered

No.of villages
covered

No.of persons to be
trained

Observations: 1. Attendance for Pump Operators training programme was very good.
~2. Pump Operators training programme was conducted successfully.

37

No.of persons
trained

INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT

PUMP OPERATORS TRAINING - SEPTEMBER 1999

District: Shimoga-Davanagere
SI.
Village
No.
1 Humcha
2 Humcha
3 Yadehalli
T- Yadehalli
5 Anandapuram
6 Hunasekatte
7 Hunasekatte
8 Haranahalli
9 Haranahalli
10 Arebilichi
11 Arebilichi
12 Achapur
13 Achapur__
14 Shigga
15 Shigga
16 Chandragutti

Institution:

Pump Operator
20

Village
10
9

16
20

16

20
15

o

10

E3
z

5

H

6.9.99 to 879799“

H.Nagendra S/o.Narayanappa
H.V.Ananda S7q7Venkappa
Mohamad Amzad S/o.A.jaleel Sab
R.SathisKS/o.K.Rarnappa
TTNingappa S/o.Thimmappa______
B.Gangadhar S/o.Beerappa
R. Kumar S/o.R.Rangaswamy
M.Jaganatha S/o.L.Lakshman Rao
Nagaraj S/o.Hanumanthappa Poojar
S. Shekarappa S/o.Siddappa
Sunil Basha S/o.Pyaru Saab
~
Choodamani S/o.Lokappa Pandit
^ShaTk Faizal S/o.Shaik Ghouse Saab
H.N.Raghavendra S/o.H.Nirvanappa
R.B.Harish S/o.R.Bheemappa
A.P.Tengsi S/o.Subba Rao

Hosanagar
Hosanagar
Sagar
Sagar
Sagar
Bhadravathi
Bhadravathi
Shimoga
Shimoga
Bhadravathi
Bhadravathi
Sagar
Sagar
Soraba
Soraba
Soraba

25

.E
2

Date of conduction

Name of Participant

Taluk

To be Covered/Trained
Actual Covered/Trained

JNNCE - SHIMOGA

■c
10

s

9

I

KI

kA

0

Pump Operator

Village

□ To be Covered/Trained □ Actual Covered/Trained |

Cumulative Progress from Nov.98 to Sept.99

200

■3
•1Cv 150
V)

130

100

2
X2
E3 50
z

74

65
6

4

No.of Programmes
to be conducted

No.of Programmes
conducted

43

0
No.of villages to be
covered

No.of villages
covered

No.of persons to be
trained

Observations: 1~Attendance for^PumpOperator training^programme was good.
Pump Operator training programme was conducted successfully.

38

No.of persons
trained

INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT

PUMP OPERATORS TRAINING - SEPTEMBER 1999

District: Tumkur
SI.
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

Institution:

Village

Taluk

Hosur______
Hosur
Alilughatta
Alilughatta___
Manchadore
Manchadore
Kadaba
Kadaba
Palavalli
Palavalli
Ven kata pura
Venkatapura
Talakere
Talakere___
Al bur
Albur
___
Nonavinakere
Nonayinakere
Heggere

Sira
Sira
Gubbi
Gubbi
Gubbi
Gubbi
Gubbi
Gubbi
Pavagada
Pavagada
Pavagada
Pavagada
Turuvekere
Turuvekere
Tiptur
Tiptur
Tiptur___
Tiptur____
Tumkur

To be Covered/Trained
Actual Covered/Trained
■2
.E
S
w

Date of conduction

Name of Participant

21.9.99 to 23.9.99

Siddesh.H.S__________
Hainuma nth rayaippa. N
Manjunath.D
Thippeswamy.A.R_____
Honnappa___
Narasimhamurthy____
Sredhar____________
Hu ch have re Gowda. D
Obalesh.T
___
Gopal
Venkatesh
Thirumalesh____ _____
fheertha Swamy_____
JJngaraju____________
Veerakumar Swamy.A.H
DoddegowdakA.N_____
Prakash. N.B
Hareesh Kumar.N.G
Yogendra
Pump Operator
20
19

Village
10
10

25

20

20

’'■WKS!!W

15

g
E3
z

SIT-TUMKUR

V

10

10

19

10

•X

5

<-■

111I
|

I

Wl

0^

___ J

Pump Operator

Village
'□To be Covered/Trained

Actual Covered/Trained |

Cumulative Progress from Nov.98 to Sept.99

250
176

200
£
2 150

136
88

100

E
s

2

50

9

7

No.of Programmes
to be conducted

No.of Programmes
conducted

70

0

No.of villages to be
covered

No.of villages
covered

No.of persons to be
trained

Observations: 1. Attendance for Pump Operators training programme was very good.
2. Pump Operators training programme was conducted successfully.

39

No.of persons
trained

EMPLOTABILITT OF THE

TRAINEE PERSONS IN THE

PROJECT VIEEACES

EMPLOYABILITY OF THE TRAINED PERSONS
IN THE PROJECT VILLAGES
Project village

Chintrapalli

Gram Panchayat

Chintrapalli

Taluk

Hagaribommanahalli

District

Bellary

The following persons were trained in Pipelayer/Valvemen and Pump
Operators skill training.

SI.
No.

Name of the training
programme

1

Pipelayer & Valvemen
Pipelayer & Valvemen
Pump Operators_____
Pump Operators

2
3
4

Name of the
Date of
conduction of
participant
training
Mr.H.Bheemappa
6.2.97 to 8.2.97
Mr.B.Sakarappa_____
6.2.97 to 8.2.97
25.3.98 to 27.3.98 Mr.P.Kumara_______
25.3.98 to 27.3.98 I Mr.P.Veeranna Gowda

The above trained persons are employed by the Gram Panchayat,
Chintrapalli (copy enclosed) and are paid monthly salary as follows SI.
No.

Name

Name of the Post

1

Mr.H.Bheemappa
Mr.B.Sakarappa_____
Mr.P.Kumara_______
Mr.P.Veeranna Gowda

Pipelayer & Valvemen
Pipelayer & Valvemen
Pump Operator______
Pump Operator

2
3
4

40

Salary /
month
in Rs.
700
720
700
670

FEEDEACK
FROM THE
PARTICIPANTS

FEEDBACK FROM THE PARTICIPANTS OF SKILL TRAINING
CONDUCTED DURING SEPTEMBER 1999

Name of the programme

Masons training

No.of programmes conducted

3

Duration of training programme

8 days

No.of participants attended

51

No.of villages covered

27

SUMMARY OF THE FEEDBACK

1. The concept of clean village has been very well understood by the

participants by attending the training programme.

2. Earlier they were using inch and foot as unit for measurement, but now,

they are informed clearly about the use of centimeter and meter as unit

measurement of length.

3. Earlier, they were knowing about the general construction of building.

Now, they were given training in Construction of Sanitation Components

such as different kinds of Drains, Washing Platforms, Cattle Troughs and
Dustbin.

41

4. Earlier, they were knowing about the construction of latrines without

proper technical know how. Now, after training they are able to construct
Two Pit Pour Flush Latrine as per technical specifications. This was

evidenced by construction of HHL’s during training by trainees
themselves.

5. During first day some trainees expressed difficulties in understanding the

theory. However, their doubts were cleared during hands on training.

6. Participants expressed their satisfaction about the arrangements made for
the training, like qualified Resource Persons, Lodging arrangements.
Food arrangements etc.

7. All the participants expressed, that they have learnt during training many
things, which they were not knowing before the training.

42

FEEDBACK FROM THE PARTICIPANTS OF SKILL TRAINING
CONDUCTED DURING SEPTEMBER 1999

Name of the programme

Pipelayer & Valvemen training

No.of programmes conducted

2

Duration of training programme

3 days

No.of participants attended

27

No.of villages covered

15

SUMMARY OF THE FEEDBACK

1. The concept of clean village has been very well understood by the
participants by attending the training programme.
2. Participants have appreciated the hands on experience training on

storage, preparation of bleaching powder solution, determination of
residual chlorine and operation and maintenance of disinfection unit.

3. Participants have appreciated the hands on experience training regarding

giving house connection from main distribution pipe. Earlier some of
them were giving house connection by crude method. Now they have
understood technical methods of giving house connections.

4. Participants have appreciated the training on different uses of valves and

pipes. The use of different valves at suitable places for equitable
distribution of water and their operation and maintenance.

43

FEEDBACK FROM THE PARTICIPANTS OF SKILL TRAINING
CONDUCTED DURING SEPTEMBER 1999

Name of the programme

Pump Operators training

No.of programmes conducted

9

Duration of training programme

3 days

No.of participants attended

172

No.of villages covered

91

SUMMARY OF THE FEEDBACK

1. The concept of clean village has been very well understood by the
participants by attending the training programme.

2. Participants have appreciated the hands on experience training on

storage, preparation of bleaching powder solution, determining residual
chlorine and Operation and maintenance of disinfection unit.

3. Participants have understood about the use of different meters in the

Panel board of Pump House, Advantages of Capacitors etc.

4. Earlier they were knowing very little about submersible pumps,

centrifugal pumps, starters, motor winding, etc. Now they are well versed

with motor winding etc.

44

FEEDBACK FROM GRAM PANCHAYAT SECRETARIES

A total of 4 Gram Panchayat Secretaries training programmes were conducted
during September 1999. Total number of Gram Panchayat Secretaries attended is 106.

The feedback from the Gram Panchayat Secretaries is as follows -

1. Majority of the Gram Panchayat Secretaries felt that the training should have been

conducted in the beginning for successful monitoring of the project.
2. Majority opinion of the Gram Panchayat Secretaries is that One day training duration

is not sufficient. It should be at least for 2 days.
3. The Gram Panchayat Secretaries training should be conducted once in 3 to 6 months.

4. The President/Vice President of the VWSC should be included in the training

programme for better coordination in achieving the objectives of the project.
5. This programme has helped in monitoring for sustainable operation of the assets

created in the project villages.

6. Printed registers of different formats should be made available at the earliest, for

proper maintenance of records.

45

BHsaaraHauH

III

__________

FROM n'JunL,
NODAL uiomuiiuiw/
INSTITUTIONS/
A 1TION NEEDED rmum.
DU_ FRICT CO ORDINATORS/NGOs/CONSULTANTS

I

====^^

Training reports to be sent by 3 of every month, so that the progress report can
be prepared and submitted by 10th of every month.

The names of the trained Masons, Pipelayer & Valvemen and Pump operators to
be provided to DPMU and

Gram Panchayats for displaying in the Gram

Panchayat Office/VWSC Office and the DPMU Office.
Nodal Institution Co-ordinators to effectively communicate with District Project
Manager, Executive Engineer (DPMU) and NGOs for better attendance of skill
based training programmes.
>

Nodal Institutions to conduct skill training programmes more effectively.

Nodal Institutions to conduct survey to obtain information about the Engagement/

Employment of the trained Masons, Pipelayer & Valvemen and Pump operators
in the project villages.
>

Nodal institutions should not postpone scheduled programmes under normal

conditions. If due to emergency, a scheduled programme is to be postponed, all
the concerned agencies are to be informed, and the programme to be rescheduled

suitably.

Nodal Institution Co-ordinator should conduct Hands on Experience training to
increase effectiveness of the training programme.

>

HHL constructed by the trained Masons in project villages are to be inspected by
District Co-ordinators to ensure the construction as per design.

46

I
___________I

Avllwlw JN&Jc/V£4J rJKVJML <jrMVl!rKNJMl£dN 1
:
- ____________________

>

Participation of DPMU/Government officials in the skill training programmes
may be encouraged in all the project districts.

>

NGOs are requested to get semi-skilled participants in consultation with VWSC

for skill training programmes. More number of women participants may be

encouraged.

District Project Managers may be requested to depute personnel from their units
to State level training programmes as and when conducted.

>

Trained skilled persons should be involved in the project during construction and
implementation stage.

47