KARNATAKA INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
Item
- Title
-
KARNATAKA
INTEGRATED RURAL WATER SUPPLY
AND
ENVIRONMENTAL SANITATION PROJECT - extracted text
-
I
KARNATAKA
INTEGRATED RURAL WATER SUPPLY
AND
ENVIRONMENTAL SANITATION PROJECT
’
’'S
'
*'
-
'
■■
■
<•
(WORLD BANK ASSISTED)
VOL. I
NO.9
SEPTEMBER 1999
M................................. M
• PROGRESS REPORT :
i
on
:
J TRAINING PROGRAMMES J
'■S'-
'^■1
Pipelayer and Valvemen Training Programme
held at MIT, Manipal, D.Kannada district.
f
JSS CONSULTANTS
'
S.J.C.E. CAMPUS
MYSORE - 570 006
I
I
MAP OF KARNATAKA
GULBARGA
BIJAPUR
RAICHUR
/
BELGAUM
KOPPAL
DHARWAD
‘WBELLARY
Q
X
UTTARA
KANNADA
DAVAN fCHITRADURGA \r’>
AGERE/
«
SHIMOGA
8,4
IUDUPX
CHICKMAGALUI
TUMKUR
O
C
1
KOLAR
O DAKSHINA
KANNADA
COORG
BANGALORE
O
O
HASSAN
MANDYA
O
MYSORE
O
IWiM
LIST OF ABBREVIATIONS
Conceptual Design Report
CDR
Community Participation Management
CPM
District Level Co-ordination Committee,
DLCC
District Project Manager
PPM
District^Project Management_Umt
PPMU
EIC_______ Engineer-in-Chief
Engineering Study Report
ESR
Government Of Karnataka
GOK
Health Sanitation and Hygiene Education
HS&HE
IRWS & ES integrated Rural Water Supply &_Enyironmental^.Sanitation
House Hold Latrine
HHL
Jawaharlal Nehru National College of Engineering, Shimoga
JNNCE
j.S.S. Industrial Training Centre, Nanjangud
JSS ITC
J. S. S. Consultants, Mysore
JSSC
J.S.S. Academy of Technical-Education, Bang,^
JSSATE
J.S.S. Polytechnic, Nanjangud
JSSP
KLESCET KLE Society’s College of Engineering and .Technology^
Management Information System^.Consultancy
MISC
Manipal Institute of Technology, Manipal
MIT
NA_______ Not Applicable
Non Governmental Organisation__________________________
NGO
ND_______ Not Done
NS________ Not Scheduled
Operation and Maintenance
O&M
Poojya
Doddappa. AppaEngineering_College2_Gujba^^
PDAEC
Project Planning & Monitoring Unit
PPMU
Participatory Rural Appraisal____________________
PR A
Rural Engineering College, Bhalki
REC
Sri Bahubali Polytechnic's^
SBP
SE________ Superintendent Engineer
Sanjay Gandhi Rural- Polytechmc,_^
SGRP
SIT_______ Siddaganga Institute; of
Sri Jayachamarajendra Colllege of Engineering y
SJCE
Sarojini Leeladharan Nair College of Engineering, Raichur
SLNCE
T
raining Management-Consultant
TMC
Training of Trainers
TOT
Village Water Supply and Sanitation Committee
VWSC
M' A Ki JU JK
<0, If-
SI.
No.
I
Contents
Page
No.
1
SUMMARY OF PROGRESS
1
2
PREAMBLE
2.1 TRAINING MANAGEMENT CONSULTANCY (TMC)
2.2 ACHIEVEMENT IN PHASE ! & PHASE-II TRAINING
PROGRAMMES
2.2.1 PHASE ! TRAINING PROGRAMME
2.2.2 PHASE-II TRAINING PROGRAMME
3
4
5
5
6
PHASE-HI TRAINING PROGRAMME
3.1 DETAILS OF TRAINING PROGRAMMES,
CONTRACTED FOR PHASE-HI
3.2 INSTITUTIONAL NETWORK FOR TRAINING
3.3 CONDUCTION OF TRAINING PROGRAMMES
3.4 MODE OF SELECTION OF PARTICIPANTS FOR
SKILL TRAINING
10
STATUS OF GRAM PANCHAYAT SECRETARIES TRAINING
PROGRAMMES AS ON 30.9.99
12
CONCEPTUAL VERIFICATION OF TRAINING PROGRAMMES
17
5
STATE/DISTRICT LEVEL TRAINING PROGRAMMES
20
6
S DISTRICT WISE - VILLAGE BASED TRAINING PROGRAMMES
e MASONS TRAINING PROGRAMMES
$ CONSTRUCTION OF DEMONSTRATION TPPFL
e PIPELAYER AND VALVEMEN TRAINING PROGRAMMES
e PUMP OPERATORS TRAINING PROGRAMMES
21
22
26
27
30
EMPLOYABILITY OF THE TRAINED PERSONS IN THE PROJECT
VILLAGES
40
8
FEEDBACK FROM THE PARTICIPANTS
41
9
ACTION NEEDED FROM NODAL INSTITUTIONS / DISTRICT
CO-ORDINATORS / NGOs / CONSULTANTS
46
ACTION NEEDED FROM GOVERNMENT AGENCIES
47
3
4
7
10
7
8
9
2. Mr C.H.Govinda Bhat, IAS, Director, PPMU, had discussion with personnel of
JSS Consultants, regarding conduction of different State/District level training
programmes.
3. Mr.Hamid Ahmed, Social Scientist, Monitored and Reviewed the process of
planning, organising and conduction of training programmes during this month.
4. JSS Consultants personnel have attended the review of progress meeting held at
PPMU Office, Bangalore on 28.9.99.
5. JSS Consultants personnel have attended the Workshop on MIS held at Hotel
Ramanashri, Bangalore on 29.9.99.
6.
Masons training programmes have been successfully conducted in Belgaum,
Mysore and Tumkur districts. District Coordinators of Training Management
Consultancy have participated in the training programmes.
7. Pipelayer and Valvemen training programmes have been successfully conducted in
Bellary and D.Kannada districts. District Coordinators of Training Management
Consultancy have participated in the training programmes.
8. Pump Operators training programmes have been successfully conducted in
Belgaum, Bidar, Gulbarga, Hassan, Mandya, Mysore, Raichur, Shimoga and
Tumkur districts. District Coordinators of Training Management Consultancy have
participated in the training programmes.
9. Gram Panchayat Secretaries training programmes have been successfully conducted
in Belgaum and Raichur districts. District Coordinators of Training Management
Consultancy have participated in the training programme as resource person.
10. Monthly Progress Report on training programmes are sent to M/s.Excel Soft,
Management Information Consultants regularly.
2
?
<
2.0
■
PREAMBLE
S' /
J
..............
Karnataka Government is implementing an Integrated Rural Water Supply and
Environmental Sanitation Project in about 1200 villages spread over 12 districts (now 16
districts) with the assistance from World Bank at a cost of Rs.447.2 Crores. The project
districts are Bangalore (R), Belgaum, Bellary - Davanagere, Bidar, D.Kannada - Udupi,
Gulbarga, Hassan, Mandya, Mysore - Chamarajanagar, Raichur - Koppal, Shimoga -
Davanagere and Tumkur. The main objective of the project is to improve the productivity
of the rural population by providing adequate safe drinking water and clean environment.
The uniqueness of the project is that it is demand driven, user participatory, user operated
and maintained based on collection of user charges. At all levels viz.. Planning,
Implementing and Handing over, the local population is involved and when the project
components are completed, the whole system will be handed over to the local bodies, in
this case, it is the VWSC to operate and maintain the system on a sustainable basis.
The project has two components, the Hardware and the Software. The
Hardware component consists of construction of different Water Supply components.
Environmental Sanitation and Habitat components. The different water supply
components consists of construction of distribution system, construction of OHT and
ground water recharging. The main intention of providing water supply components is to
supply adequate safe drinking water to community (70 Ipcd for house connection, 40 Ipcd
for stand post). The environmental sanitation and habitat component helps in providing
clean environment. The different environmental sanitation components are Road Reprofiling, Construction of different drainages. Cattle Trough, Washing platforms. Dust
bins and most important of all is the construction of House Hold Latrines. The location of
the habitat components are determined by the VWSC members. The Software involves in
creating the necessary procedures and capacity building for a sustainable Operation and
Maintenance of the system by the user community. For creating the hardware
components, besides the PPMU, several agencies such as Design consultancy.
3
Consultancy for Construction Supervision etc are used. For implementing the software
component of the project the services of NGOs / NGIs, CPM Consultants, HSHE
Consultancy, Training Management Consultancy and the MIS Consultancy have been
used.
2.1
TRAINING MANAGEMENT CONSULTANCY (TMC)
Training Management Consultancy plays an important role in terms of the
necessary capacity building, both in terms of quantity and quality, which are essential for
the implementation and Operation and Maintenance of assets created in the project
villages on a sustainable basis.
The main role of the TMC is to conduct and monitor training programmes for the
various categories of people involved in this project, which include the officials of the
Govt., Engineers, NGOs / NGIs, Personnel from various consultants etc, besides
conducting awareness programmes for the user community. Training programmes are
conducted in awareness. Skill development. Accounts procedures. Engineering design
and Management besides Operation and Maintenance of the assets.
As a measure of capacity building, training programmes were conducted in three
phases.
Phase-I : Programmes conducted during 1994.
Phase-II : Programmes conducted during the period November 1996 to October 1998.
Phase-III: Programmes scheduled for the period November 1998 to December 1999.
4
2.2
ACHIEVEMENT
PROGRAMMES
IN
PHASE-I
AND
PHASE-II
TRAINING
2.2.1 PHASE-I TRAINING PROGRAMME
During Phase-I, only 10 districts of Karnataka State were included in the project.
The Phase-I training programmes were conducted during 1994, the details of training
programmes conducted during Phase-I are as follows
SI.
No.
Details of Training
Programmes
1
Orientation of Primary School
Teachers (Water Supply and
Sanitation)_______________
Awareness programme to
Senior Engineers__________
Awareness programme to
Engineers________________
Training in Construction
Methods_________________
Care Taker Programmes
(Water Supply and Sanitation)
Training in
a) Accounts
b) Stores________________
Programme for Senior
Administrative Personnel
Programme for Voluntary
Agencies and Social Workers
(NGO’s)_________________
Training of Masons________
Training of Pipelayers______
Training of Valvemen______
Training of Composite
Mechanics
2
3
4
5
6
7
8
9
10
11
12
5
No. of
Persons
trained
514
Course
Duration
in days
2
No. of
Programmes
Conducted
257
1
1
8
3
3
36
5
10
209
2
257
3
3
1
2
60
13
35
2
1
31
8
3
2
4 Weeks
15
5
5
2
No. of
Villages
covered
257
257
116
45
115
35
1285
243
93
233
72
2.2.2 PHASE-II TRAINING PROGRAMME
In addition to the Phase-I project districts two new districts Viz. Hassan and
Tumkur were included in Phase-II project. The various training programmes conducted
during (Nov.96 to Oct.98) Phase-II training programmes are as follows.
SI.
No.
Details of Training
Programmes
1
Orientation of Primary
School Teachers and
Caretakers_________
Awareness
Programmes to Senior
Engineers__________
Awareness
Programmes to
Engineers__________
Training in
a) Investigation &
Design
b) Construction
Methods________
Training of
Administration
Accounts
Programme for Senior
Administrative
Personnel__________
Programme for
Voluntary Agencies &
Social Workers
(NGO’s)___________
Training of Masons
Training of Pipelayers
& Valvemen________
Pump Operators
2
3
4
5
6
7
8^
9
10
Course
Duration
in days
3
No. of
Programmes
Conducted
581
1
1
10
3
3
60
5
2
33
5
2
55
3
2
27
1
3
46
4
4
68
8
3
70
80
641
746
1280
1476
3
30
283
534
6
No. of
Villages
covered
581
No. of Persons
trained
Teachers : 1162
Caretakers : 2905
3.0
PHASB-III TRAINING PROGRAMME
..
✓. . . .
....
!,. • * -1
«
.
...
.................. H
.....
PROGRAMMES,
Course Name
Target Group
No. of
prgs.
1
Programme for
Senior Engineers
2
Programme for
Engineers
3
Training in
Construction
Methods_____
Training in
Accounts
procedure
Programme for
District Senior
Administrative
Personnel
Superintending Engineers of
PHED
and
Executive
Engineers of DPMU of the
project districts____________
Asst. Executive Engineers and
Asst. Engineers of project
districts___________________
Asst. Executive Engineers,
Asst. Engineers and Engineers
from NGO________________
Accounts Superintendents and
Accounts Personnel of DPMU
of project districts__________
Deputy
Secretary
for
Development (ZP), District
Health and Family Welfare
Officers, District and Deputy
Health Education Officers
Engineer and Team Leader of
NGOs. Engineer of DPMU
and Engineer of Construction
Supervision consultants
DETAILS OF
PHASE-UI
SI.
No
5
6
7
Programme for
Training of
Trainers on O
and M of the
project_______
Training of
Masons
8
Training of
Pipelayer and
Valvemen
9
Training of
Pump Operators
10
Training to Lab
Technicians
Training to Gram
Panchayat
Secretaries
11
/
[
TRAINING
3.1
4
;
M'. ;:t:r: :.i i
-V.
Masons and Semi-skilled
labourers - two persons each
from the project villages
selected by the VWS SC_____
Pipelayer and Valvemen - two
persons each from the project
villages selected by the
VWSSC___________ '
Two persons from each
project village selected by
VWSSC__________
and
Lab
Technicians
Engineers of ZP
Secretaries
of
Gram
Panchayats of project villages
7
CONTRACTED FOR
2
Duration of
the course
in days
1
No. of
persons
per prg
10
Total No.
of
persons
20
3
3
20
60
2
5
15
30
1
3
30
30
1
1
30
30
4
4
30
120
36
8
20
720
32
3
20
640
83
3
20
1660
2
2
24
48
40
1
24
960
SI.
No
Course Name
12
Training to Dry
Land
Development
Board (DLDB)
Personnel____
Training to
Consultants
13
3.2
Engineers of DLDB
1
Duration of
the course
in days
2
Persons representing CPM.
NGO, HSHE, Construction
Supervision,
Design
Consultants and TMC
2
1
No. of
prgs.
Target Group
No. of
persons
per prg
24
Total No.
of
persons
24
30
60
INSTITUTIONAL NETWORK FOR TRAINING
The Training Management Consultancy has its own infrastructure and group of
experts working exclusively for this project in its Head Quarters, Mysore. Besides, TMC
have identified 12 nodal institutions (one per project district)
where the required
infrastructure and expert manpower is available for conducting the village based training
programmes, in particular those meant for skill enhancement of participants. Trainer
teams from each nodal institution are trained by experts at the head quarters of Training
Management Consultants, in all aspects of Training. To supervise. Co-ordinate and
organize the training programmes there is one Co-ordinator in each nodal institution.
besides, one District Co-ordinator for each district directly employed by the Training
Management Consultants. The project Manager, who is in overall charge and the
Monitoring consultants, make sure of the implementation of the Training programmes by
surprise visits during the programmes. The programme conduction is well documented
and reporting is done on monthly basis. The scheduling of the programmes is done in
such a manner that the required trained personnel be made available, prior to the handing
over of the project assets.
8
Following are the list of Nodal Institutions for conducting village based
training programmes under Phase-III.
Nodal Institution
SI No
District
3.3
1
Bangalore (R)
JSS Academy of Technical Education, Bangalore
2
Belgaum
K.L.E. Society’s College of Engineering & Technology,
Belgaum.
3
Bellary /
Davanagere-1
Sanjay Gandhi Rural Polytechnic, Bellary.
4
Bidar
Rural Engineering College, Bhalki.
5
Dakshina Kannada / Manipal Institute of Technology, Manipal.
Udupi
6
Gulbarga
Poojya Doddappa Appa Engineering College, Gulbarga.
7
Hassan
Sri Bahubali Polytechnic, Shravanabelagola.
8
Mandya
JSS Polytechnic, Nanjangud.
9
Mysore / C.H.Nagar JSS Industrial Training Centre, Nanjangud.
10
Raichur / Koppal
Sarojini Leeladharan Nair College of Engineering,
Raichur.
11
Shimoga /
Davanagere-2
Jawaharlal Nehru National College of Engineering,
Shimoga.
12
Tumkur
Siddaganga Institute of Technology, Tumkur.
CONDUCTION OF TRAINING PROGRAMMES
The village based training programmes are conducted at the Nodal Institution of
the project districts. The list of villages, from which participants are to be trained, is
provided to the Nodal Institution well in advance by the NGOs. The sequencing of
villages is done with the help of District Co-ordinator, CPM Consultancy and the NGOs.
Based on the priority given by these agencies, the scheduling is done and the programmes
conducted. In this way trained persons are available in the project villages which are
ready for handing over. During Masons training programme, for hands on experience the
9
participants will construct at least one demonstration HHL at any one of the project
villages. The Masons training is conducted keeping in mind the targets for construction of
HHL by the NGOs. Similarly, during Pipelayer & Valvemen and Pump Operators
training programme the participants will be taken to the nearby project village for
demonstration and hands on training of giving house connections. Operation and
Maintenance of disinfection unit. Preparation of Bleaching Powder solutions and their
use etc. Tool kits and respective Course Materials will be given to the participants during
all skill training programmes. To motivate and to partially compensate the loss of wages
for the participants who are attending the training programmes, the loss of wages
Rs.660/- for Masons and Rs.220/- for Pipelayer & Valvemen and Rs.247.50 for Pump
Operators will be given to each participant.
The State/District level training programmes are conducted at the Nodal Centre,
Mysore. However some of the Nodal Institutions of the project districts also undertake
district level training programmes, keeping in mind the requirements of the engineers for
proper execution of their tasks.
3.4
MODE OF SELECTION OF PARTICIPANTS FOR SKILL TRAINING
The selection of participants for skill training programmes such as Masons,
Pipelayer & Valvemen and Pump Operators will be done by NGOs / NGIs, in
consultation with VWSC members. The selected participants should be semi-skilled. The
list of villages and time schedule for skill training (date of conduction) will be sent to
each district NGOs / NGIs well in advance, so that the NGOs / NGIs will select the
participants for training programme with the consultation of VWSC members. NGOs/
NGIs have been specially requested to identify Women for skill training programmes, as
a means to encourage womens participation. After the selection of participants the NGOs/
NGIs will send the list of participants and their address to the Nodal Institutions of
respective districts. The Nodal Institution will in turn write letter to the participants
inviting them for training programme with Pre-paid reply post card, requesting
participants to post the card to the Nodal Institution confirming their attendance to the
training programme.
10
Bellary/Davanagere-l
Not Scheduled
Bangalore(R)
No.of programme* conducted:!
No.of Villages co^ered:24
Not Scheduled
Bidar
Tiimkur
Not Scheduled
Not Scheduled
D.Kannada / Udiipi
*
Not Scheduled
Gulbarga
Shinioga/Davanagere-2
Not Scheduled
Raich ur/Koppal
Not Scheduled
No.of programmes conducted:3
No.of Villages covered:S2
Hassan
Not Scheduled
Mandya
Not Scheduled
Mysore/C.H.Nagar
Not Scheduled
STATUS OF GRAM PANCHAYAT SECRETARIES TRAINING PROGRAMMES AS ON 30.9.99
No.of
villages
covered
No.of
persons
trained
58
51
3
70
70
3
3
63
63
Bidar
3
3
57
57
5 D.Kannada
3
3
70
70
6 Gulbarga
3
3
61
61
7 Hassan
4
4
96
96
8 Mandya
3
3
77
70
9 Mysore
4
4
85
81
10 Raichur
4
4
102
102
11 Shimoga
3
3
69
69
12 Tumkur
4
4
71
69
40
40
879
859
SI.
No.
District
No.of
programmes
to be
conducted
1
Bangalore (R)
3
2
Belgaum
3
3 Bellary
4
TOTAL
Balance
No.of
No.of
programmes
conducted as programmes
to be
on 30.9.99
conducted
3
0
12
Remarks
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL
SANITATION PROJECT - PHASE-III TRAINING PROGRAMME
(WORLD BANK ASSISTED)
TRAINING TO GRAM PANCHAYAT SECRETARIES HELD AT
TALUK PANCHAYAT HALL , CHIKKODI ON 17th SEPTEMBER 1999
List of Participants - Belgaum District
SI.
No
1
2
3
4
5
_6_
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
Name
Mr.Shamagond Gangappa Nilavagi
MrALMudase_______________
MrJRSanadi_________________
Mr. S.D. Dhanagar______________
Mr.K.Vam Naik_______________
Mr.MBKarimani______________
Mr. BB, Patil__________________
MrSDAwati_________________
Mr.HLVaddatti_______________
Mr.M.ADhadde_______________
Mr Raosab Ramagowda Patil_____
Mr.S.N.Vani
Mr.V.M.Doddamani____________
Mr.S.N.Bendavade_____________
Mr.S.M.Jamdar_______________
MrRMMudhol_______________
MrGDDalal_________________
Mr.L.S.Latkar_________________
Mr. Ashok P, Patil______________
Mr.Maruthi Parappa Killadar_____
SmtYBSamannavar___________
Mr.K.S.Ambale _______________
Mr.JP.Charya_________________
Mr.BT.Samaje
13
Name of the Gram Panchayat /
_____________ Taluk__________
Kottalagi / Athani______________
Navalihal / Chikkodi____________
Bada / Hukkeri_________________
Kunnur / Chikkodi______________
Savadatti / Raibag______________
Katakabavi / Raibag_____________
Kankanwadi / Raibag____________
Bendwad / Raibag______________
Jaganur / Chikkodi______________
Belkod / Chikkodi______________
Kadaklat / Chikkodi_____________
Khanapur / Hukkeri_____________
Belageri (Chamkeri) / Athani______
Chikkalvad / Chikkodi___________
Daddi / Hukkeri________________
Parthanahalli / Athani___________
Yalehadagali / Athani___________
Chinchali / Raibag______________
Naianglag / Chikkodi____________
Bambalwad / Chikkodi__________
Gudas / Hukkeri________________
Akkol / Chikkodi_______________
B Bagewadi / Hukkeri___________
Naslapur / Raibag
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL
SANITATION PROJECT - PHASE-III TRAINING PROGRAMME
(WORLD BANK ASSISTED)
TRAINING TO GRAM PANCHAYAT SECRETARIES HELD AT
TALUK PANCHAYAT HALL, S1NDHANUR, ON 18th SEPTEMBER 1999
List of Participants - (Programme -1) Raichur District
SI.
No
1
2
3
4
5
6
7
8
_9_
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Taluk
Name of the Gram Panchayat
Lingasugur
Lingasugur
Lingasugur
Deodurga
Deodurga
Manvi
Lingasugur
Manvi
Lingasugur
Manvi
Manvi
Manvi
Sindhanur
Deodurga
Lingasugur
Sindhanur
Sindhanur
Sindhanur
Raichur
Raichur
Deodurga
Deodurga
Manvi
Lingasugur
Lingasugur
Sindhanur
Lingasugur
Sindhanur
Manvi
Raichur
Sindhanur
Ankushdoddi
Khota______
Santhekellur
Gabbur_____
Galag______
Sanna Hossur
Gonwatla
Kavital_____
Goudur_____
Mastur_____
Gavigatta
Bagalwad
Hulganchi
Gugal______
Nagaral
Gonal______
K.Hosahalli
Malkapur
Turakandona
Bijangera
Kardigudda
Kurkihalli
Jambaldinni
Mattur_____
Yarjanthi
Hullur______
Talekhan
Ramathnal
Sadapur____
Katlatkur
Basapur E.J
14
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL
SANITATION PROJECT - PHASE-III TRAINING PROGRAMME
(WORLD BANK ASSISTED)
TRAINING TO GRAM PANCHAYAT SECRETARIES HELD AT
TALUK PANCHAYAT HALL, KOPPAL, ON 21st SEPTEMBER 1999
List of Participants - (Programme - 2) Raichur District
SL
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
Taluk
Name of the Gram Panchayat
Kustagi
Kustagi
Kustagi
Kustagi
Kustagi
Kustagi
Kustagi
Kustagi
Kustagi
Kustagi
Kustagi
Kustagi
Kustagi
Kustagi
Kustagi
Kustagi
Kustagi
Kustagi
Kustagi
Kustagi
Kustagi
Hiregonnagara
Malgitti_____
Hanamnal
Tugaldoni
Nilogal______
Hulgeri______
Chalgeri_____
Kalalbandi
Kandkoor
Nerebenchi
Kyadguppa
Dotihal______
Kesur_______
Hiremannapur
Navalahalli
Huliyapura
Tawargera
Hirebannigol
Koradakera
Nidsesi______
Wanigeri
15
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL
SANITATION PROJECT - PHASE-III TRAINING PROGRAMME
(WORLD BANK ASSISTED)
TRAINING TO GRAM PANCHAYAT SECRETARIES HELD AT
TALUK PANCHAYAT HALL, KOPPAL, ON 21 sl SEPTEMBER 1999
List of Participants - (Programme - 3) Raichur District
SI.
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Taluk
Name of the Gram Panchayat
Ojanahalli
Bhagyanagar
Kunikeri_____
Muddaballi
Vanabellary
Gudadalli_____
Boodgumpa
Hiresindhogi
Chikkasindhogi
Kolur________
Katralli______
Bisaralli______
Mainalli______
Bikanalli_____
Boodihal_____
Neeralgi______
Mattur_______
Belur________
Hankunti_____
Tigari________
Dambralli
Handral______
Veerapur_____
Karmudi_____
Heroor_______
Hoskera______
Jiralkalgudi
Singanal_____
Bevinal______
Eliganur
Koppal
Koppal
Koppal
Koppal
Koppal
Koppal
Koppal
Koppal
Koppal
Koppal
Koppal
Koppal
Koppal
Koppal
Koppal
Koppal
Koppal
Koppal
Koppal
Koppal
Koppal
Koppal
Yelburga
Yelburga
Gangavati
Gangavati
Gangavati
Gangavati
Gangavati
Gangavati
16
CONCEPTUAL, VERIFICATION
OF
TRAININC PROGRAMMES
KARNATAKA I NT13 GRATFD RURAL WATER SUPPLY ANO ENVIRONMENTAL ^AN'TATION PRO 'E^T 'W0RLn BANK A.cSISTEn)
CONLEkTUaL VEkIFIuA iiON Ob TRAINING PROGRAMMES
SI.
No.
2
Name of the Training Programme
Awareness to villagers_____________
Trg. forVWSSC members_________
Orientation of Primary School Teachers
3 Caretakers Training_____________
4 Masons Training_______________
5 Pipelayer & Labour Training_______
6 Valvemen & Helper Training______
7 Composit Mechanic Training______
8 Pump Operators Training________
9 Investigation & Design Training
10 Construction Methods Training
11 Prg. for Voluntary Agencies & Social
Workers
12 Programme for Sr.Engineers______
13 Programme for Engineers________
14 Programme for Sr. Admn. Personnel
15 Training in Accounts_______________
16 Training in Stores Administration______
17 District Project Manager Training______
18 Orientation workshop on sustainability of
alternate delivery system
No. of
villages
No.of
Training
Progra
mme
No.of
Trainees
Target
Target
Target
11
11
Contract No.l Pilot Phase
(1993-94)
No.of
No.of Trg.
villages
Prg.
covered
condu
cted
11 All villagers
11 All members
1200
1200
1200
1200
1200
1200
120
120
2400
6000
2400
2400
1200
1200
120
120
2
13
2400
2400
30
291
3
2
6
90
20
120
5
5
1
150
150
30
36
1
136
2
No.of
Trainees
trained
11
11
11 All villagers
11 All members
11
11
11
1
1
1
11
_9
W
10
1
22
55
18
20
20
16
No.of
villages
covered
257
257
110
45
109
40
No.of Trg.
No.of
Prg. condu Trainees
cted
trained
257
257
13
5
5
2
Contract No.lll Phase-ll
(1996-98)
Cumulative (Contract No. I & II)
Contract No. II Phase-I
(1994-95)
514
1285
230
97
134
38
No.of
villages
covered
No.of Trg.
Prg. condu
cted
No.of Trainees
trained
11
11
11 All villagers
11 All members
268
268
119
55
119
38
268
268
14
6
6
2
536
1340
248
117
154
40
No.of
villages
covered
No.of Trg.
Prg.
conduc
ted
No.of
Trainees
trained
581
581
641
746
581
581
70
80
1162
2905
1280
1474
283
30*
2
2
534
33
55
68
10
248
11
264
1
2
2
2
30
8
36
2
30
_____ 2
8_____ See Note
36 See Note
2
2
3
1
34
58
31
2
3
1
34 See Note
58 See Note
31
2
51
2
1
46
27
1
36
1
109
1
47
19 One day training on O & M for trainers
48
1
20 Training to Lab Technicians_____________ -_______ -________ -_______ 21 Training to Gram Panchayat Sec._________ -_______ -________ -________22 Training to DLDB personnel_____________ -_______ -________ -________23 Training to Consultants_________________ -_______ -________ -_______ 24 Prg. for Training of Trainers on 0 & M of
-_______ .
.
_
_
.
_____ __________ -________ -________ -_______ -_______ -_______ -________ -_________ -_________ -________ -________ -_______ -_______ -_______ -________ -_________ -_________ -___
-________ ...
.
_____ -_________
the project_______________________
Note: 1. One programme for Senior Engineers, One programme for Engineers and One programme for Senior Admn. Personnel have been adjusted against conduction of
D.P.M training programme, as per the direction of Director, PPMU, Bangalore.
2. One programme for Engineers and One programme for Training in Accounts was adjusted against the conduction of One day orientation workshop on Sustainability
of Alternate deliver system created in the project villages, as per the direction of Director, PPMU, Bangalore.
* As per the direction of Director, PPMU, 19 OPST & CT training programmes have been adjusted against conduction of 5 Pump Operators training programmes of Phase-ll villages which are commissioning shortly.
2
KARNATAKA INTFGPATF=D RURAL WATER SUPPLY ANO ENVIRONMENTAL SANITATION PRO ■ECT 'WORL" B^NK ASSISTEn)
CONuErfbAL VEkIFIuAiiON Or- TRAINING PROGRAMMES
SI. No.
Name of the Training Programme
Cumulative (Contract No. I, II & III)
No.of villages
covered
2
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Awareness to villagers__________
Trg. for VWSSC members_______
Orientation of Primary School
T eachers
Caretakers Training____________
Masons Training_______________
Pipelayer & Labour Training______
Valvemen & Helper Training______
Composit Mechanic Training______
Pump Operators Training________
Investigation & Design Training
Construction Methods Training
Prg. for Voluntary Agencies & Social
Workers
Programme for Sr. Engineers_____
Programme for Engineers________
Programme for Sr. Admn. Personnel
Training in Accounts___________
Training in Stores Administration
District Project Manager Training
Orientation workshop on
sustainability of alternate delivery
system
11
11
849
849
760
801
119
38
283
No.of Trg.
Prg. conduc
ted
No.of
Trainees
trained
Cumulative (Contract No. I, II, III & IV)
as on 30.9.1999
Contract No.IV (Nov* 1998- 31st Dec'99)
as on 30.9.1999
No.of villages No.of villages
to be covered covered as on
30.9.99
No. of Prog.
To be
conducted
No.of Trg.
Prg.conducted
as on 30.9.99
No.of
Trainees to
be trained
No.of Trainees
trained as on
30.9.99
11 All villagers
11 All members
849
849
84
86
6
__ 2
30*
__ 2
13
1698
4245
1528
1591
154
40
534
33
319
3
4
98
8
87
4
4
1
1
80
85
31
36
2
No.of villages
covered
11
11
No.of Trg. Prg.
conduc-ted
No.of Trainees
trained
11 All villagers
11 All members
2
Nil
30
Nil
849
849
114
115
__ 6
2
89
__ 2
13
2
3
1
1@
24
60
63
Nil
3
2
4
98
71_
87
1
1
Nil
Nil
30
30
Nil
Nil
4
4
1
80
85
31_
36
1
109
1
47
40
1
859
13
4
108
360
320
264
262
36
32
30
29
720
640
503
491
828
590
83
59
1656
1119
849
849
1024
1063
119
40
873
109
1
One day training on O & M for
trainers
1
47
Training to Lab Technicians______
20
__2
Nil
48
Nil____
21
Training to Gram Panchayat Sec.
40
40
960
859
879
Training to DLDB personnel______
22
24
1
1
13
23
Training to Consultants_________
2
Nil
60
Nil
24
Prg. for Training of Trainers on O &
M of the project
4
4
120
108
@ This Programme was adjusted against conduction of one day training programme on contract management procedure and use of MIS output for effective project management
on 6th April 1999 @ California Resort.
2
1698
4245
2031
2082
154
38
1653
33
319
19
Qo
District Wise Village Based Training Programmes conducted during Pilot Phase, Phase-1, Phase-ll and Phase-lll
Contract No.IV Phase-lll (Nov.98 to Dec.99)
CO
No.of
Total
No.of
prg.to
be
condu
cted
prg.
condu
cted
upto
30.9.99
Pump Operator
Pipelayer/Valvemen
Mason
SI.
No
Total
No.of
village
to be
cove
red
No.of
village
cove
red
upto
30.9.99
Total
No.of
trainees
to be
Trained
No.of
trainees
Trained
upto
30.9.99
No.of Total No.of
village
No.of
prg.
condu village cove
cted
to be
red
upto
cove upto
30.9.99 red
30.9.99
Total
No.of
prg.to
be
condu
cted
Total
No.of
trainees
to be
Trained
No.of
trainees
Trained
upto
30.9.99
No.of Total No.of
No.of
village
prgcondu village cove
cted
to be
red
upto
cove upto
30.9.99 red
30.9.99
Total
No.of
prg.to
be
condu
cted
Total
No.of
trainees
to be
Trained
No.of
trainees
Trained
upto
30.9.99
1
Bangalore (R)
3
1
26
7
52
12
1
1
14
10
28
19
5
3
46
33
92
63
2
Belgaum
6
5
59
49
118
91
5
4
45
34
90
64
9
7
87
66
174
131
3
Bellary
2
2
19
16
38
32
1
1
12
5
24
10
6
4
57
32
114
62
4
Bidar
2
2
18
17
36
34
2
2
18
16
36
32
7
5
73
51
146
102
5
□.Kannada
2
2
23
18
46
34
3
3
26
30
52
53
5
3
54
37
108
71
6
Gulbarga
3
2
30
22
60
44
4
3
36
24
72
48
7
5
68
46
136
91
7
Hassan
2
2
20
15
40
29
2
2
21
20
42
36
8
6
83
64
166
119
8
Mandya
3
1
35
16
70
30
3 3 + 1*
34
29
68
53
5
3
53
32
106
57
9
Mysore
4
4
36
28
72
54
2
2
25
23
50
40
8
6
77
64
154
114
10
Raichur
3
3
31
30
62
59
3
3
27
25
54
50
8
6
77
52
154
99
11
Shimoga
2
2
24
11
48
19
2
2
21
22
42
39
6
4
65
43
130
74
12
Tumkur
4
4
39
35
78
65
4
3
41
24
82
47
9
7
88
70
176
136
36
30
360
264
720
503
32 29+1*
320
262
640
491
83
59
828
590
1656
1119
TOTAL
Note: * Additional programme was conducted to covere uncovered villages of previous programmes
t
i
SUMMART OF REPORT ON
STATE/DISTRIOT EEVEE TRAINING
PROGRAMMES CONDUCTED DURING
THE MONTH OF SEPTEMBER 1999
STATE/DISTRICT LEVEL TRAINING PROGRAMMES
SI.
Training programmes
No
No. of
Scheduled Conducted Conducted
No. of
T arget Duration
persons
during
upto
for the
of the
Participants/
No. of
trained
Sept. 99
Sept. 99
prog. Course in programme month of
upto
Sept. 99
days
Sept. 99
Programme for Senior
Engineers
2
1
10
Nil
Nil
1
63
2 Programme for Engineers
3
3
20
Nil
Nil
1*
Nil
3 Training in Construction
methods
2
5
15
Nil
Nil
Nil
Nil
4 Training in Accounts Procedure
1
3
30
Nil
Nil
Nil
Nil
5 Programme for District Senior
Administrative Personnel
1
1
30
Nil
Nil
Nil
Nil
6 Programme for Training of
Trainers on O & M of the project
4
4
30
Nil
Nil
4
108
7 Training to Lab Technicians
2
2
24
Nil
Nil
Nil
Nil
8 Training to Dry Land
Development Board (DLDB)
Personnel
1
2
24
Nil
Nil
1
13
9 Training to Consultants
2
1
30
Nil
Nil
Nil
Nil
1
Note: * This programme was adjusted against conduction of One day training programme on Contract Management Procedure
and Use of MIS output for Effective Project Management on 6.4.99 at California Resort, Bangalore.
20
SUMMARY OF REPORT ON
VILLAGE BASEL TRAINING
PROGRAMMES GONEUGTEE
EURING THE MONTH
OF SEPTEMBER. 1999
DISTRICT WISE -VILLAGE BASED TRAINING PROGRAMMES
Training Programmes Conducted
SI.No.
District
J _ Bangalore (R)________
Masons
P i pel ayer/Va I vem en
Pump Operator
Gram Panchayat
Secretaries
NS
NS
NS
NS
NS
1
1
2
Belgaum
J
3
Bellary & Davanagere-2
NS
1
NS
NS______
4
Bidar
NS
NS
1
NS______
5 _ D.Kannada & Udupi____
NS
1
NS
NS______
6
Gulbarga______
NS
NS
1
NS______
7
Hassan
NS
NS
1
NS
8
Mandya
NS
NS
1
NS_____
9
Mysore & C.H.Nagar
__________
10 _ Raichur & Koppal
11
12
Shimoga & Davanagere-1
Tumkur______________
No. Progs.Conducted
during September 1999
Total No.of Programmes
to be conducted_______
Total No.of programmes
conducted upto
September 1999_______
1
NS
1
NS
NS
NS
1
3
NS
NS
1
NS
1
NS
1
NS
3
2
9
4
36
32
83
40
30
29
59
40
I □ No.of Programmes to be conductedD No.of Programmes conducted □ No.of villages covered□ No.of persons trained |
1119
1200
1000
879
859
800
590
cn
503
E
491
600
z
264
400
200-
0
36
A
i
30
iPHrazfli’+l
Masons
■;
262
32
(If
29
fn
83
Is
59
40
Pump Operator
Pipelayer & Valvemen
21
it:
Gram Panchayat Secretaries
G- -130
08U79
40
/<?r
11
X **
7
^Tr
Bangalore(R)
Not Scheduled
f
Bidar
No.of Village covered:1?
No.of persons trained: 16
Not Scheduled
Not Scheduled
Not Scheduled
MASONS TRAINING
Gulbarga
Raichur/Koppal
Not Scheduled
.
Not Scheduled
Mysore/C HLNagar
Mandya
Not Scheduled
re
No.of Village cove red: 9
No.of persons trained: 18
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
MASONS TRAINING - SEPTEMBER 1999
Institution:
District: Belgaum
SI.
No.
1
2
3
4
Village
Sanikoppa
Sanikoppa
Bagamal
Bagarnal
Ji Karaguppi
6 Karaguppi
7 Rustumpur
8 Rustumpur
9 Pachapu£
10 Pachapur
11 Neginal
1^ Neginal
13^ Sindhihatti
14 Sindhihatti
Holihosur
16 Arabhavi
Taluk
Name of Participant
Bylahongal
Bylah°nga[
Hukkeri__
Hukkeri
Hukkeri___
Hukkeri
Hukkeri
Hukkeri
Hukkeri
Hukkeri
Bylahongal
Bylahongal
Hukkeri
Hukkeri
Bylahongal
Basavaraj Sidrappa Gurannavar
To be Covered/Trained
Actual Covered/Trained
Date of conduction
3.9.99 to 10.9.99
Arjuna Siddappa Harijana________
Mallappa_Basappa Kempannavar__
Nagappa Ittappa Dindigatti_______
Babu Satappa Neeralagi_________
Satyappa Mallappa Malagi________
R^machandra^Mallappa Kolundri__
Lagamanna Avanappa Lankannavar
Adivappa Shankar Patil__________
Ajeeth Laxman Jathava_________
Shivappa Rudrappa Jamanur_____
Arjuna Kareppa Keseregoppa
Ramappa Yashwanth Vaddar_____
Satyappa Ramappa Patil_________
Suresh Ramappa Mannur_______
Kallappa Shivalingappa Talavar__
Hanumant Siddappa Harijana
Gokak
Gokak
Arabhavi
17
KLESCET - BELGAUM
Masons
20
17
Village
W
9
25
3
17
20
.E
2
H
w>
15
IE
10
z
5
ZJ
io
9
KSSSSfcW
wv,
wv,
ww
0
Masons
Village
I □ To be Covered/Trained □ Actual Covered/Trained |
Cumulative Progress from Nov.98 to Sept.99
160
1 140
.£ 120
118
91
2 100
«
80
1
60
E
40
20
0
3
z
59
6
5
No.of Programmes
to be conducted
No.of Programmes
conducted
49
No.of villages to be
covered
No.of villages
covered
No.of persons to be
trained
No.of persons
trained
Observations^^ Attendance for Masons training programme was good.______________________
2. Masons training programme was conducted successfully._________________________
3. Participants were taken to Mache villages of Belgaum Taluk to give hands on experience
training. Total 4 HHLs were constructed during the training programme.
23
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
MASONS TRAINING - SEPTEMBER 1999
District: Mysore-C.H.Nagar
SI.
No.
Institution:
Village
Taluk
“T- Kelaganahally
Periyapatna
Periyapatna
CH.Nagar
C.H.Nagar
C.H.NagaF"
C.H. Nagar
Gundlupet
Gundlupet
K.R.Nagar
K.R.Nagar~
Periyapatna
Periyapatna
C.H.Nagar
C.H.Nagar
T.N.Pura
T.N.Pura
K.R.Nagar
K.R.Nagar
2
3
4
5
6
7
8
Kelaganahally
Ummathuru
Ummathuru
Kagalwadi
Kagalwadi
Alathur
Alathur
“9“
Chandagal
10 Chandagal
11 Kanagal
12 Kanagal
13 Honganur__ _
14 Honganur
15 Hykanoor
16 Hykanoor
17 Kestur
18 Kestur
Name of Participant
£
S
9
20
20
15
10
10
EZJ
z
3.9.99 to 10.9.99
Masons
20
18
_ 10 “
25
3
Date of conduction
Prasannakumar S/o.Shivannashetty
Manjunath S/o.Ramasetty
Chikkanna S/o.Verathappa
Suresh S/o.Chandra Naik
Mallikarjunaswamy S/o.Rudraiah
Mahadevaswamy S/o.Maraiah
Swamy S/o.Madaiah
Murthy S/o.Kempaiah
Ramegouda S/o.Thimmegouda—
SoTnaiah S/o.Ramaiah
Krishegouda S/o.Thimmegouda
Swamy S/o.Javaraiah___
Maruswamy S/o.Madaiah
Shivaiah S/o.Basavaiah
Gurusiddaiah S/o.Nanjaiah
Kalaiah S/o.Basavaiah
Krishemurthy S/o.Kenchegouda
KrcTKrishegouda S/o.Chikkegouda
Village
TobeCo v e red/Tra i n ed
Actual Covered/Trained
JSS ITC - NANJANGUD
9
W2
•Me
5
xx
^^31
0
Village
Masons
Tobe Covered/Trained
Actual Covered/Trained j
Cumulative Progress from Nov.98 to Sept.99
90
80
■g 70
72
54
I 60
H 50
36
S 40
f 30
z 20
10
0
28
4
4
No.of Programmes
to be conducted
No.of Programmes
conducted
No.of villages to be
covered
No.of villages
covered
No.of persons to be
trained
No.of persons
trained
Observations: L Attendance for Masons training programme was goqd^
__________ 2. Masons training programme was conducted successfully._____________________
______ 3. Participants were taken to Kupparvalli villages of Nanjangud Taluk to give hands on
experience training.
24
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
MASONS TRAINING - SEPTEMBER 1999
Institution:
District: Tumkur
SI.
No.
Village
1
2
Bandakunte
Bandakunte
3 Tarur
4 Tarur
"3“ Tadakalur
6 Tadakalur
__
7 Yaladabagi _ _
8 Yaladabagi
”9“ Ratnasandra
10 Ratnasandra
11 Chikkamalalawadi
12 Chikkamalalawadi
IT Mayasandra
14 Talakere
15 Talakere
16 Kanathur
Date of conduction
Name of Participant
Taluk
15.9.99 to 22^99
Malleshappa
Basavaraju
Raj annaTh imma ray a ppa
Mahalingappa
Beeralingappa
Narasimhamurthy
Doddaiah
Shanmukappa
Nagappa
Byatarayappa
Chikkagangaiah
Manjunatha
Mahalingaiah
Chand rajah
Nagaraju
Sira
Sira
Sira
Sira
Sira
Sira
Sira
Sira
Sira_____
Sira
Kunigal
KunigaT
Turuvekere
T uruvekere
T uruvekere
Turuvekere
Masons
20
Village
10
9
To be Covered/Trained
Actual Covered/Trained
SIT-TUMKUR
16
25
20
20
3
.E
S
16
15
M
10
IE
9
10
at.
&
3
z
s,
5
0
a
Masons
Village
□ To be Covered/Trained □ Actual Covered/Trained |
Cumulative Progress from Nov.98 to Sept.99
120 -j
100
78
80
2
60
w
%
40
E
20
z
0
3
39
4
35
4
No.of Programmes No.of Programmes No.of villages to be
to be conducted
conducted
covered
No.of villages
covered
No.of persons to be
trained
Observations: 1. Attendance for Masons training programme was very good.
2. Masons training programme was conducted successfully.
25
No.of persons
trained
DEMONSTRATION OF TWIN PIT POUR
FLUSH WATER SEAL LATRINES
CONSTRUCTED AS PART OF HANDS ON
TRAINING DURING MASONS TRAINING
FROM 3.9.99 TO 10.9.99
NUMBER OF DEMONSTRATION TWIN PIT POUR FLUSH
WATER SEAL LATRINES CONSTRUCTED AS PART OF
HANDS ON TRAINING DURING MASONS TRAINING
FROM 3.9.99 TO 10.9.99
SI.
No.
District
Village
Taluk
’T’
Belgaum
Mache
Belgaum
2
Mysore
Kupparavalli
Nanjangud
26
No. of HHL
constructed
1
Bellary/Davanagere-1
No.of Villages covered:5
No.of persons trained: 10
atoA .
Belgaum
Bangalore(R)
Not Scheduled
■^ot Scheduled
Tumkur
Bidar
.v Not Scheduled
Not Scheduled
■
■
D.Kannada / Udupi
No.of Villages covered: 10
No.of persons trained:!?
Shimoga/Davanagere-2
Not Scheduled
PIPELAYER AND VALVEMEN
TRAINING
Gulbarga
Raichiir/Koppai
Not Scheduled
Not Scheduled
Hassan
Not Scheduled
____
Mandya
Not Scheduled
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
PIPELAYER AND VALVEMEN TRAINING - SEPTEMBER 1999
District: Bellary - Davanagere
SGRP - BELLARY
Institution:
SI.
No.
Village
1
Somasamudra
Bellary
K.Chandrashekar S/o.Basavara£
2
Somasamudra
Bellary
B.M.Gangadhar S/o.Hanu manthappa
3
Garaga
Hospet
M.Ramu S/o.Basappa
4
Garaga
Hospet
D.Nagabhmshan S/o.D. Nagappa
5
M.H.Tanda
Hospet
Prema Naik S/o.Ramanaik________
6
M.H.Tanda
Hospet
Laxman Naik S/o.Rekhya Naik____
7
BachigondanahalH H.B.Halli
7.9.99 to 9.9.99
________
ThimappaS/o.Sharanappa________
T.Basavaraj S/o.Mareppa
8 Bachigondanahalli H.B.Halli
Hospet
9 Ramanagar
Hospet
10 Ramanagar
Pompanna S/o.Neelakantappa
Lokesh S/o.JVIurariyappa
P i pe layer/Valveme n
20
10
Village
10
5
To be Covered/Trained
Actual Covered/Trained
Date of conduction
Name of Participant
Taluk
25
20
20
3
.E
tc
15
%
10
E
3
sg’S
5-
Z
ii
10
5
■
0
it
t
BUI
■
10
Pipelayer/Valvemen
Village
i □ To be Covered/Trained □ Actual Covered/Trained I
Cumulative Progress from Nov.98 to Sept.99
30
24
25
.£ 20
2
w 15
12
10
110
z
5
5 -
1
1
0 J------------ 1.
.
.
.i--------------------------■.
No.of Programmes
to be conducted
.
.
.i------------- ------------ ■
No.of Programmes
conducted
■
■
----------------
No.of villages to be
covered
No.of villages
covered
No.of persons to be
trained
Observations: 1. Attendance for Pipelayer/Valvemen training programme was normal.
2. Pipelayer/Valvemen training programme was conducted successfully.
28
No.of persons
trained
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
PIPELAYER AND VALVEMEN TRAINING - SEPTEMBER 1999
District: D.Kannada-Udupi
SI.
No.
Village
1 Shimantoor
_2 Shimantoor
3_ Amparu__
4 Amparu
5 Mala___
6 Mala_____
7 Chitoor
8 Kowdoor
9 Beloor
10 Beloor
11 Hakladi
12 Hakladi
13 Idikkidu
14 Idikkidu
__
15 Hebri
16 Hebri
17 Al badi
Name of Participant
Date of conduction
Purushottam Das^S/o.Koragadas
Lokesh Shettigar S/o.Sheena Shettigar
Bhojaraj.N S/o.chikkakulal____________
Sitaram Shetty S/o.Korgayya Shetty___
Ravi Gouda S/o.Mahabala Gouda
Shekara Moolya S/o.Sankayya Mqolya__
Gopal Naik S/o.Shankara Naik
Rajendra S/o.Nagesh Sarvegar________
Bharatkumar S/o.Manja______________
Udaya Achar S/o.Venkataramana Achar
Vijaya Shetty S/o.Subbanna Shetty
Bhaskara Mogaveera S/o.Ranga Mogaveera
Prakash Sapalya S/o.Shivappa Sapalya
U.Ravikumar S/o.K.Sheshappa Moolya__
Shankara Naik S/o.Narayana Naik______
Manjunath Achar S/o.Padmanabha Achar
Suresh Poojary S/o.Annappa Poojari____
7.9.99 to 9.9.99
Taluk
Mangalore
Mangalore
Kundapur
Kundapur
Karkala
Karkala__
Kundapur
Karkala__
Kundapur
Kundapur
Kundapur
Kundapur
Bantwal
Bantwal__
Karkala
Karkala
Kundapur
Pipelayer/Valvemen
20
Village
10
10
To be Covered/Trained
Actual Covered/Trained
MIT -MANIPAL
Institution:
17
25
17
20
3
£
2
h<2
%
E3
15
10
10
10
VW
p: few!
5
Z
1
20
0
Pipelayer/Valvemen
Village
!□ To be Covered/Trained
Actual Covered/Trained '
Cumulative Progress from Nov.98 to Sept.99
3
.E
2
hw
o
E
3
z
70
60
50
40
30
20
10
52
26
3
3
No.of Programmes
to be conducted
No.of Programmes
conducted
0---No.of villages to be
covered
No.of villages
covered
No.of persons to be
trained
Observations: 1 .-Attendance for Pipelayer and Valvemen training programme was good.
2. Pipelayer and Valvemen training programme was conducted successfully.
29
No.of persons
trained
Belgaum
Bellary/Davanagere-1
No.ofVillages covered:#
No.of persons trained: 17
Not Scheduled
BangalorefR)
Not Scheduled
Tumkur
Bidar
No.ofVillages covered: 10
No.of persons trained: 19
No.of Villages cove red: 9
No.of persons trained: 19
_
:
■
■
Shimoga/Davanagere-2
■■■■■
D.Kannada / Udupi
________ f
■
. /r-
■
<
Not Scheduled
PUMP OPERATORS TRAINING
Raichur/Koppal
Gul barga
No.ofVillages covered: 12
No.of persons trained:22
No.of Villages covered: 12
No.of persons trained:24
Hassan
No.ofVillages covered: 11
No.of persons trained: 19
GO
o
No.ofVillages covered:9
No.of persons trained:16
Mandya
No.of Villages covered: 11
No.of persons trained: 19
Mysore/C.H.Nagar
No.ofVillages covered:9
No.of persons trained: 17
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
PUMP OPERATORS TRAINING - SEPTEMBER 1999
SI.
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
KLESCET - BELGAUM
Institution:
District: Belgaum
Village
Taluk
Borgouh
Borgoun
Soundathi
Soundathi
Neginahal
Neginahal
Chincholi
Chincholi___
Hosur______
Hosur
Asundi_____
Asundi_____
Holihosur___
Holihosur___
Hudali
Hudali_
Bekwad *
Chikkodi
Chikkodi
Raibag
Raibag
Bailahongala
Bailahongala
Raibag
~
Raibag ___
Sayadathi
Savadathi__
Savadathi
Savadathi
Bailahongala
Bailahongala
Belgaum
Belgaum
Khanapur
Name of Participant
Date of conduction
JaypaTDhanapal
________________
Abhay Soragowda Patil
Sathyappa Kallappa Mirje
Maruthi Shanbu Godale
_____
Gangappa Kareppa Malagi
Madivalappa Rudrappa Badigera____
Gopala Shankara Pareet
Krishna Kadappa Durgai
Mallappa Basappa Hahchinamane
Hanumantha Fakeerappa Malamethri
Basappa Yellappa Gireppannavar
Pundaleek Sangappa Lakkappannayar
Yellappa HanumanthapjyyKotur_______
Rayappa Huchhappa Chikkappannavar
Chandrahasa Krishnappagi Mutalikadesai
Raju Ramachandra Kammar
______
Parashurama Hanumantha Zande
21.9.99 to 23.9.99
Pump Operator
20
Village
10
8
To be Covered/Trained
Actual Covered/Trained
17
25
20
17
20
w wwi
3
.£
2
H
co
o
E
15
10
8
10
5
5
z
is
viii
:
&$
wwwS
s
’zWqs "I
o
To be Covered/Trained
I
7
Pump Operator
Village
Actual Covered/TrainedJ
Cumulative Progress from Nov.98 to Sept.99
250
174
200
1| 150
131
87
i 100
E
z 50
66
9
rim
W!
zz
Ml
7
I 1 I 1 ! 1 11
0
No.of Programmes
to be conducted
No.of Programmes
conducted
No.of villages to be
covered
No.of villages
covered
No.of persons to be
trained
No.of persons
trained
Observations: 1. Attendance for Pump Operators training programme was good._____ _______
2. Pump Operators training programme was conducted successfully._____________
“^Participants were taken to Bendigeri village of Belgaum Taluk to demonstration of
disinfectioryunit^___________ _______
Note: * One participant had attended in the previous programme.
31
6 - 130
08079
o(
I X3
J
<■
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
PUMP OPERATORS TRAINING - SEPTEMBER 1999
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
REC - BHALKI
Institution:
District: Bidar
SI.
No.
Village
Taluk
Kamalnagar__
Kamalnagar
Son ala______
Sonala_
Bylahalli (K)
Bylahalli (K)
Gadgi_______
Gadgi_______
Markhal
Markhal_____
Wadgaon___
Wadgaon___
Hipalgaon
Hipalgaon__
Chillargi
Chillargi_____
Chimkod____
Chimkod____
Hallikhed (B) *
Au rad
Aurad
Au rad___
Aurad
Bhalki
Bhalki
Bidar
Bidar___
Bidar
Bidar
Aurad
Aurad__
Bidar
Bidar___
Bidar____
Bidar “
Bidar____
Bidar
Humnabad
To be Covered/Trained
Actual Covered/Trained
Pump Operator
Village
10
9
20
19
20
15
19
iOS
20
.£
10
9
WS
10
E
s
7.9.99 to 9.9.99
Dhulappa S/o.Baburao______
Rajshekhar^/qjyiadiyalappa_
Ashok S/o Vishwanath Rao
Chandreshekhar S/o.Gurunath
Hanmanth S/o.Tukkarao_____
Ramrao S/o.Basappa______
G h a I e ppa S/o.C ha ndra ppa_
Baburao S/o.Adeveppa_____
Kalappa S/o.Shivaram_____
Ghaleppa S/o.Manikappa ____
Madappa S/o.Kanteppa_____
Bheemsingh S/o.Pratapsingh
Rajkumar S/o.Shankerrao___
Madayya S/o.Panchayya
Rajkumar S/o.Arjun________
Sanganna S/o.Shiyram____
Amrutrao S/o.Bichappa_____
PandarinathS/o.Maruti
Vaijinath S/o. Mani kappa
25
2
!-
Date of conduction
Name of Participant
5
z
7
o
Village
Pump Operator
InTo be Covered/Trained □ Actual Covered/Trained |
Cumulative Progress from Nov.98 to Sept.99
180
160
3 140
.E 120
2
H 100
w
80
E= 60
z 40
20
0
146
102
73
51
7
5
No.of Programmes
to be conducted
No.of Programmes
conducted
No.of villages to be
covered
No.of villages
covered
No.of persons to be
trained
Observationsyl . Attendance for Pump Opeyajors trainingTprojr^^^^^
good.
2. Pump Operators training programme was conducted successfully.
Note: * One participant had attended in the previous programme._____________
32
No.of persons
trained
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
PUMP OPERATORS TRAINING - SEPTEMBER 1999
Institution:
District: Gulbarga
SI.
No.
Village
1 DevathkalF
2 Devathkal
T" Devapur
4 Devapur
5 Arkere-K
6 Arkere-K
~T Rudnur
8 Rudnur
9 Kudaluru
10 Kudaluru
11 Ba I ached
12 Balached ’
13 Au rad
14 Au rad
15 Keriambalaga
16 Keriambalaga
17 B/Tegnur
18 B.Tegnur
"19 MudaboT
20 Mudabol
21 Hagargandagi
22 Hagargandagi
23
Melakunda-K
Melakunda-K
Devendrappa S/o.Paramainn^
Vasudeva S/o.Goppanna
Kalappa S/o.Gangadhara
Bheemaraya S/o.Husenayya
Bheemangouda S/o.Shivangouda
Subhash Chandra S/o.Kris^hnappa
Rachaya Swamy S/o.Sangayya Swamy
Prabhulinga S/o.Nagappa
Ka iasayya S/o. H usa i nappa
’______
Mahadevappa S/o^Siddanna
Shivaraj S/o.Basavaraj
Husainsab S/o.Nabeesab _____ __
Sanganna^/o.Sahebgouda
Mailaree S/o.Babu Rao
Shivasharanappa S/o.Ambruthappa
Shahka£S/o?Hanumantharaya
Rangappa S/o.Chandrashaha
M a nth appa S/o. Sam ban na
Gurudeva S/o.Babu Rao
Sharanappa S/o.Bhimasha
Chandrakanth S/o.Nagappa
Babu Rao^S/o2Siddanna
Siddarudha S/o.Shivaraya
Sharanappa S/o.Hanumanthraya
Shorapur
Shorapur
Shorapur
Shorapur
Shorapur
"Shorapur
Chincholi
"Chincholi
’ Yadagir
Yadagir
Yadagir
Yadagir
" Jewargi
Jewargi
Aland
Aland
Gulbarga
Gulbarga
Chittapur
Chittapur
Gulbarga
Gulbarga
Gulbarga
Gulbarga
10
12
30i
24
20
25
s
20
w
o
15
12
5
-
0
SRSS
8r'
I
Village
Pump Operator
ra
Isa
10
10
E
z
7.9.99 to 9.9.99
Pump Operator
20
24
Village
=
Date of conduction
Name of Participant
Taluk
To'be Covered/T rained
Actual Covered/Trained
PDACE - GULBARGA
□ To be Covered/Trained □ Actual Covered/Trained |
Cumulativ Progress from Nov.98 to Sept.99
160
140
3
.E
re
w
re
E
3
z
136
120
100 80 60
40
20 -
91
68
46
7
5
No.of Programmes
to be conducted
No.of Programmes
conducted
0
No.of villages to be
covered
No.of villages
covered
No.of persons to be
trained
Observations: 1. Attendance for Pump Operators training programme was very good.
2. Pump Operators training programme was conducted successfully.
33
No.of persons
trained
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
PUMP OPERATORS TRAINING - SEPTEMBER 1999
SBP - SHRAVANABELAGOLA
Institution:
District: Hassan
SI.
Village
No.
1 Bagur
2 Bagur
3 Dudda
4 Dadigatta
5 Dadigatta
6 Hongere_______
7 Hongere
8 Hebbale
“9“
Hebbale_______
10 Kattepur’
11 Banavase _ ___
12 Banavase
13 Hasugavally
14 Hasugavally
15" Pallya
16 Pallya
17 Chikkakadalur
18 Chikkakadalur
19 Chattachatnahalli
C.R.Patna
C.R.Patna
Hassan
C.R.Patna
C.R.Patna
Hassan__
Hassan
Arakalgud
Arakalgud
Arakalgud
SakleshpuT
Sakleshpur
Sakleshpur
Sakleshpur
Alur
Alur
Hassan
Hassan
Belur
7.9.99 to 9.9.99
B.J.Jagadish S/o.Javarasetty
B. M.Gangadhar/ B.M.Malleshappa
Devaraju S/o.Puttamaigaiah
C. Kumar S/o.D.N.Chikkegowda
C. Deva raj u S/o. D. N. C h i kkeg owd a
Puttegowda S/o. Ku 11 eg owd a
HI. M. D harm eg owd a S/o.Madigowda
Mahjars/c>. Ka I a bh ov i
Laxman S/o.Jambegowda___
'
K.V.Manjegowda S/o.Appannagowda
B. N. Manjunatha S/o.B.S.Nanjappa____
B. T.Chandrashekar S/o.N.Basavegowda
B-B/Somashekar S/o.B.H.Basappa
Javarappa S/o.Venkata
D A. Ma he nd ra S/o. An n egowd a
C. T.Devaraju S/o.P.Y.Thimmegowda
Manjunatha S/o.Sannaramaiah ~
C.P.Kategowda S/o.Puttegowda
Eregowda S/o.Haruvegowda_________
10
Pump Operator
20 ~
11
19
Village
To be Covered/Trained
Actual Covered/Trained
Date of conduction
Name of Participant
Taluk
20
25i
19
20
£
S
w
15
B
10
E
z
5
0
; 8®
':W
11
10
i
Pump Operator
Village
□ To be Covered/Trained □ Actual Covered/Trained j
Cumulative Progress from Nov.98 to Sept.99
250
200
166
2 150
119
Cfl
83
I 100
E3
Z
50
6
8
0---------- 1
64
1-----------1---------- ■
No.of Programmes
to be conducted
----------- T---------- 11
No.of Programmes
conducted
---------
No.of villages to be
covered
No.of villages
covered
No.of persons to be
trained
Observations: L Attendance fo^Pump^Operators training programme wasvery good.
2. Pump Operators training programme was conducted successfully.
34
No.of persons
trained
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
PUMP OPERATORS TRAINING - SEPTEMBER 1999
District: Mandya
SI.
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Taluk
Name of Participant
Date of conduction
Malavalli
Ma lav alii
Mandya
Mandya
Malavalli
Malavalli
Pandavapura
Pandavapura
Srirangapatna
Srirangapatna
Mandya
Mandya
Mandya
Malavalli
Pandavapura
Mandya
Mandya
Malavalli
Malavalli
M.Mahadevappa S/o.Marimadaiah
Mahadevaiah S/o.Ramegouda
Befiyappa S/o.Boraiah
_ _
__
Ramegouda S/o.Purada Thippegouda
T. Ni ng a raj u S/o. M ad a i ah
Chowdaiah S/o.Kalaiah
Channaveeragouda S/o.Veeragouda
~
NazeerAhmed S/o.Mohamed Anif
Manju S/o.Mariyanna
Sh ivashetty S/o. Ken ch ash etty
K.R.Arya S/o.Rudrappa
____
H.B.Ganesh S/o.Basavaiah__________
H.A.Krishnegouda S/o.Ankegouda
~
Shivaramu S/o.Chikkamadiah
KaHegouda S/o.Kalegouda__________
Javaregouda S/o.Chowdegouda
B.S.Madappa S7o.Siddappa
Sridhar Murthy S/o.Lakshmi Narasimhaiah
Nagar^ifS/o^Kenchegouda
7.9.99 to 979799
Village
Sargoor
Sargoor_____
Shivapura
Shiva pura
Talagawadi
Talagawadi_
Kythanahalli
Kythanahalli
P.HosahallF
P.Hosahalli
Bevkal
Hulikere
Hulikere
Kodagahalli
Bannangadi
Kothathi
'TT Kothathi
18 Lingapatna
19 Lingapatna
JSS^Pqlytechni^-NANJANGUD
Institution:
10
Pump Operator
20
11
19
Village
To be Covered/Trained
Actual Covered/Trained
25
20
20
ic
.E
S
15
10
E3
5
2
0
19
!
11
10
SI
cfc’l
11
I # £II
Pump Operator
Village
□ To be Covered/Trained □ Actual Covered/TrainedJ
Cumulative Progress from Nov.98 to Sept.99
140
106
1 120
=g 100
E
2
80
60
40
5
20
0 -----No.of Programmes
to be conducted
57
53
32
3
No.of Programmes
conducted
No.of villages to be
covered
No.of villages
covered
No.of persons to be
trained
Observations: 1. Attendance for Pump Operators training programme was very good.
2. Pump Operators training programme was conducted successfully.
35
No.of persons
trained
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
PUMP OPERATORS TRAINING - SEPTEMBER 1999
District ^Mysore-C.H.Nagar
SI.
No.
1
2
3
4
5
6
7
8
10
11
12
13
14
15
16
17
Institution:
Village
Taluk
Alagodu
Alagodu
Haliyur
Haliyur_____
Tarikkallu
Tarikkallu
Thumbusoge
Thumbusoge
Jakkahallj—~
Jakkahalli
"Marchalli
Marchall i
Jodimellalli
Jodimellalli
KM.Hally
Agara
Agara
T.N.Pura
T.N.Pura~
K.R.Nagar
K.R.Nagar
Hunsur
Hunsur
H.D.Kote
H.D.Kote
H.D.Kote
H.D.Kote
K.R.Nagar
K.R.Nagar
Yelandur
Yelandur
H.DTKote
Yelandur
Yelandur
Name of Participant
Date of conduction
Nagaraju S/o.CharTna Naik
Puttaswamy S/o.Madaiah
Tholsiramagowda S/o.Kalegowda
H.J.Lakshamana S/o.Javarashetty'
T.S.Shivakumar S/o.Siddegowda
R.Chinnaswamy S/o.Ramaswamegowda~
Rajendra S/o.Hesudasa______________
Ananda S/o.Hanumanthaiah
Mahadevaiah S/o.Chikkamadaiah
Rajashekaramurthy S/o.Puttasiddaiah
Rajanaika S/o.Sidda Naik
Sanneswamy S/o.Kunnegowda
M.C.Subbanna S/o.M.R.Channananjappa
Shivananjaiah S/o.Kenchaiah
Swamegowda_ S/o. Ma rigowda
Santhosh KurriaTS/o.Ramanna
21.9.99 to 23.9.99
Chikkathammdi Gowda S/o.Thammaiah Gowda
Pump Operator
20
Village
10
9
To be Covered/Trained
Actual Covered/Trained
JSS ITC - NANJANGUD
17
25
a
a
20
3
ra
rJ'
20
.E
2
15
52
10
I/v^SSylfi
9
10
E
3
Z
17
5
Hi
11!
0
Pump Operator
Village
To be Covered/Trained
I
Actual Covered/Trained I
Cumulative Progress from Nov.98 to Sept.99
180
160
140
154
114
f 120
l- 100
52o 80
E 60
3
z 40
8
20
0 ----- | r " i *
No.of Programmes
to be conducted
77
64
6
No.of Programmes
conducted
No.of villages to be
covered
No.of villages
covered
No.of persons to be
trained
Observations: 1. Attendance for Pump Operators training programme was good.
2. Pump Operators training programme was conducted successfully.
36
No.of persons
trained
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
PUMP OPERATORS TRAINING - SEPTEMBER 1999
Institution:
District^Raichur-Koppal
SI.
Taluk
Village
No.
’ Gangavathi
1 Singnal
Gangavathi
2 Singnal__
Koppal
3 Bhagyanagar
4 Bhagyanagar_ Koppal
Koppal
5 Bikanahalli
Koppal
6 Bikanahalli
7 Bisarahalli_____ Koppal
Koppal
8 Bisarahalli
“9"
10
11
12
13
14
15
16
17
18
19
20
21
22
Date of conduction
Name of Participant
7.9.99 to 9.9.99 “
Kuntegowda S/o.Hanumangowda.K
Veerayya S/o.Channayya Hiremath
P a rasa ppa S7o. M a h ad ev a ppa. M
Vittappa S/o.Yellappa Shavi_ ____
Gavisiddappa S/o. Eashwargowda
Chandrappa S7d:Shlvappa Harijan_
Sannabasavaraja S/o.Gavisiddappa
Sanjaykumar S/o.Narayanbhal__
Somanagowda S/o.Cliandragowda
Shekharappa S/o.Siddappa_______
Ramanna S/o.Somalingappa.B
Basayya S/o.Gavisiddayya
Yenkappa S/o.Narayana Barker
Ramappa S/o.Balappa Barker
Pakhirappa S/o.Yeimunappa_____
Kanakappa S/o.Sakrappagaddi
Somalingappa S/o.Basappa
Pampanna S/o.Nagappagodikera
Ningappa S/o.Malakappa Nayak
Hanumalah S/o^Sivayya
Amaragowda S/o.Ayyanagowda
Sa nth amurthy SZq. Th a yap pa
Koppal
Budihal
Koppal
Budihal
Chikkasindhagi Koppal
Chikkasindhagi Koppal
Hanwal_______ Koppal
Koppal
Hanwal
Koppal
Handral
_ Kustagi
Tugaldaoni
Kustagi
Tugaldaoni
Koppal
Muddaballi
Koppal
Muddaballi
Kustagi
Koradakere
Kustagi
Koradakere
J ag i rv en kata pur Raichur
To be Covered/Trained
Actual Covered/Trained
SLNCE - RAICHUR
Village
10
Pump Operator
12
22
20 ’
25
20
20
s
12
15
U)
10
10
E
z5
5
------
0
Village
pump Operator
[□To be Covered/Trained □ Actual Covered/Trained |
Cumulative Progress from Nov.98 to Sept.99
=
S
H
<2
E
3
Z
200
180
160
140
120
100
80
60
40
20
0
154
99
52
8
6
No.of Programmes
to be conducted
No.of Programmes
conducted
No.of villages to be
covered
No.of villages
covered
No.of persons to be
trained
Observations: 1. Attendance for Pump Operators training programme was very good.
~2. Pump Operators training programme was conducted successfully.
37
No.of persons
trained
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
PUMP OPERATORS TRAINING - SEPTEMBER 1999
District: Shimoga-Davanagere
SI.
Village
No.
1 Humcha
2 Humcha
3 Yadehalli
T- Yadehalli
5 Anandapuram
6 Hunasekatte
7 Hunasekatte
8 Haranahalli
9 Haranahalli
10 Arebilichi
11 Arebilichi
12 Achapur
13 Achapur__
14 Shigga
15 Shigga
16 Chandragutti
Institution:
Pump Operator
20
Village
10
9
16
20
16
20
15
o
10
E3
z
5
H
6.9.99 to 879799“
H.Nagendra S/o.Narayanappa
H.V.Ananda S7q7Venkappa
Mohamad Amzad S/o.A.jaleel Sab
R.SathisKS/o.K.Rarnappa
TTNingappa S/o.Thimmappa______
B.Gangadhar S/o.Beerappa
R. Kumar S/o.R.Rangaswamy
M.Jaganatha S/o.L.Lakshman Rao
Nagaraj S/o.Hanumanthappa Poojar
S. Shekarappa S/o.Siddappa
Sunil Basha S/o.Pyaru Saab
~
Choodamani S/o.Lokappa Pandit
^ShaTk Faizal S/o.Shaik Ghouse Saab
H.N.Raghavendra S/o.H.Nirvanappa
R.B.Harish S/o.R.Bheemappa
A.P.Tengsi S/o.Subba Rao
Hosanagar
Hosanagar
Sagar
Sagar
Sagar
Bhadravathi
Bhadravathi
Shimoga
Shimoga
Bhadravathi
Bhadravathi
Sagar
Sagar
Soraba
Soraba
Soraba
25
.E
2
Date of conduction
Name of Participant
Taluk
To be Covered/Trained
Actual Covered/Trained
JNNCE - SHIMOGA
■c
10
s
9
I
KI
kA
0
Pump Operator
Village
□ To be Covered/Trained □ Actual Covered/Trained |
Cumulative Progress from Nov.98 to Sept.99
200
■3
•1Cv 150
V)
130
100
2
X2
E3 50
z
74
65
6
4
No.of Programmes
to be conducted
No.of Programmes
conducted
43
0
No.of villages to be
covered
No.of villages
covered
No.of persons to be
trained
Observations: 1~Attendance for^PumpOperator training^programme was good.
Pump Operator training programme was conducted successfully.
38
No.of persons
trained
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
PUMP OPERATORS TRAINING - SEPTEMBER 1999
District: Tumkur
SI.
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
Institution:
Village
Taluk
Hosur______
Hosur
Alilughatta
Alilughatta___
Manchadore
Manchadore
Kadaba
Kadaba
Palavalli
Palavalli
Ven kata pura
Venkatapura
Talakere
Talakere___
Al bur
Albur
___
Nonavinakere
Nonayinakere
Heggere
Sira
Sira
Gubbi
Gubbi
Gubbi
Gubbi
Gubbi
Gubbi
Pavagada
Pavagada
Pavagada
Pavagada
Turuvekere
Turuvekere
Tiptur
Tiptur
Tiptur___
Tiptur____
Tumkur
To be Covered/Trained
Actual Covered/Trained
■2
.E
S
w
Date of conduction
Name of Participant
21.9.99 to 23.9.99
Siddesh.H.S__________
Hainuma nth rayaippa. N
Manjunath.D
Thippeswamy.A.R_____
Honnappa___
Narasimhamurthy____
Sredhar____________
Hu ch have re Gowda. D
Obalesh.T
___
Gopal
Venkatesh
Thirumalesh____ _____
fheertha Swamy_____
JJngaraju____________
Veerakumar Swamy.A.H
DoddegowdakA.N_____
Prakash. N.B
Hareesh Kumar.N.G
Yogendra
Pump Operator
20
19
Village
10
10
25
20
20
’'■WKS!!W
15
g
E3
z
SIT-TUMKUR
V
10
10
19
10
•X
5
<-■
111I
|
I
Wl
0^
___ J
Pump Operator
Village
'□To be Covered/Trained
Actual Covered/Trained |
Cumulative Progress from Nov.98 to Sept.99
250
176
200
£
2 150
136
88
100
E
s
2
50
9
7
No.of Programmes
to be conducted
No.of Programmes
conducted
70
0
No.of villages to be
covered
No.of villages
covered
No.of persons to be
trained
Observations: 1. Attendance for Pump Operators training programme was very good.
2. Pump Operators training programme was conducted successfully.
39
No.of persons
trained
EMPLOTABILITT OF THE
TRAINEE PERSONS IN THE
PROJECT VIEEACES
EMPLOYABILITY OF THE TRAINED PERSONS
IN THE PROJECT VILLAGES
Project village
Chintrapalli
Gram Panchayat
Chintrapalli
Taluk
Hagaribommanahalli
District
Bellary
The following persons were trained in Pipelayer/Valvemen and Pump
Operators skill training.
SI.
No.
Name of the training
programme
1
Pipelayer & Valvemen
Pipelayer & Valvemen
Pump Operators_____
Pump Operators
2
3
4
Name of the
Date of
conduction of
participant
training
Mr.H.Bheemappa
6.2.97 to 8.2.97
Mr.B.Sakarappa_____
6.2.97 to 8.2.97
25.3.98 to 27.3.98 Mr.P.Kumara_______
25.3.98 to 27.3.98 I Mr.P.Veeranna Gowda
The above trained persons are employed by the Gram Panchayat,
Chintrapalli (copy enclosed) and are paid monthly salary as follows SI.
No.
Name
Name of the Post
1
Mr.H.Bheemappa
Mr.B.Sakarappa_____
Mr.P.Kumara_______
Mr.P.Veeranna Gowda
Pipelayer & Valvemen
Pipelayer & Valvemen
Pump Operator______
Pump Operator
2
3
4
40
Salary /
month
in Rs.
700
720
700
670
FEEDEACK
FROM THE
PARTICIPANTS
FEEDBACK FROM THE PARTICIPANTS OF SKILL TRAINING
CONDUCTED DURING SEPTEMBER 1999
Name of the programme
Masons training
No.of programmes conducted
3
Duration of training programme
8 days
No.of participants attended
51
No.of villages covered
27
SUMMARY OF THE FEEDBACK
1. The concept of clean village has been very well understood by the
participants by attending the training programme.
2. Earlier they were using inch and foot as unit for measurement, but now,
they are informed clearly about the use of centimeter and meter as unit
measurement of length.
3. Earlier, they were knowing about the general construction of building.
Now, they were given training in Construction of Sanitation Components
such as different kinds of Drains, Washing Platforms, Cattle Troughs and
Dustbin.
41
4. Earlier, they were knowing about the construction of latrines without
proper technical know how. Now, after training they are able to construct
Two Pit Pour Flush Latrine as per technical specifications. This was
evidenced by construction of HHL’s during training by trainees
themselves.
5. During first day some trainees expressed difficulties in understanding the
theory. However, their doubts were cleared during hands on training.
6. Participants expressed their satisfaction about the arrangements made for
the training, like qualified Resource Persons, Lodging arrangements.
Food arrangements etc.
7. All the participants expressed, that they have learnt during training many
things, which they were not knowing before the training.
42
FEEDBACK FROM THE PARTICIPANTS OF SKILL TRAINING
CONDUCTED DURING SEPTEMBER 1999
Name of the programme
Pipelayer & Valvemen training
No.of programmes conducted
2
Duration of training programme
3 days
No.of participants attended
27
No.of villages covered
15
SUMMARY OF THE FEEDBACK
1. The concept of clean village has been very well understood by the
participants by attending the training programme.
2. Participants have appreciated the hands on experience training on
storage, preparation of bleaching powder solution, determination of
residual chlorine and operation and maintenance of disinfection unit.
3. Participants have appreciated the hands on experience training regarding
giving house connection from main distribution pipe. Earlier some of
them were giving house connection by crude method. Now they have
understood technical methods of giving house connections.
4. Participants have appreciated the training on different uses of valves and
pipes. The use of different valves at suitable places for equitable
distribution of water and their operation and maintenance.
43
FEEDBACK FROM THE PARTICIPANTS OF SKILL TRAINING
CONDUCTED DURING SEPTEMBER 1999
Name of the programme
Pump Operators training
No.of programmes conducted
9
Duration of training programme
3 days
No.of participants attended
172
No.of villages covered
91
SUMMARY OF THE FEEDBACK
1. The concept of clean village has been very well understood by the
participants by attending the training programme.
2. Participants have appreciated the hands on experience training on
storage, preparation of bleaching powder solution, determining residual
chlorine and Operation and maintenance of disinfection unit.
3. Participants have understood about the use of different meters in the
Panel board of Pump House, Advantages of Capacitors etc.
4. Earlier they were knowing very little about submersible pumps,
centrifugal pumps, starters, motor winding, etc. Now they are well versed
with motor winding etc.
44
FEEDBACK FROM GRAM PANCHAYAT SECRETARIES
A total of 4 Gram Panchayat Secretaries training programmes were conducted
during September 1999. Total number of Gram Panchayat Secretaries attended is 106.
The feedback from the Gram Panchayat Secretaries is as follows -
1. Majority of the Gram Panchayat Secretaries felt that the training should have been
conducted in the beginning for successful monitoring of the project.
2. Majority opinion of the Gram Panchayat Secretaries is that One day training duration
is not sufficient. It should be at least for 2 days.
3. The Gram Panchayat Secretaries training should be conducted once in 3 to 6 months.
4. The President/Vice President of the VWSC should be included in the training
programme for better coordination in achieving the objectives of the project.
5. This programme has helped in monitoring for sustainable operation of the assets
created in the project villages.
6. Printed registers of different formats should be made available at the earliest, for
proper maintenance of records.
45
BHsaaraHauH
III
__________
FROM n'JunL,
NODAL uiomuiiuiw/
INSTITUTIONS/
A 1TION NEEDED rmum.
DU_ FRICT CO ORDINATORS/NGOs/CONSULTANTS
I
====^^
Training reports to be sent by 3 of every month, so that the progress report can
be prepared and submitted by 10th of every month.
The names of the trained Masons, Pipelayer & Valvemen and Pump operators to
be provided to DPMU and
Gram Panchayats for displaying in the Gram
Panchayat Office/VWSC Office and the DPMU Office.
Nodal Institution Co-ordinators to effectively communicate with District Project
Manager, Executive Engineer (DPMU) and NGOs for better attendance of skill
based training programmes.
>
Nodal Institutions to conduct skill training programmes more effectively.
Nodal Institutions to conduct survey to obtain information about the Engagement/
Employment of the trained Masons, Pipelayer & Valvemen and Pump operators
in the project villages.
>
Nodal institutions should not postpone scheduled programmes under normal
conditions. If due to emergency, a scheduled programme is to be postponed, all
the concerned agencies are to be informed, and the programme to be rescheduled
suitably.
Nodal Institution Co-ordinator should conduct Hands on Experience training to
increase effectiveness of the training programme.
>
HHL constructed by the trained Masons in project villages are to be inspected by
District Co-ordinators to ensure the construction as per design.
46
I
___________I
Avllwlw JN&Jc/V£4J rJKVJML <jrMVl!rKNJMl£dN 1
:
- ____________________
>
Participation of DPMU/Government officials in the skill training programmes
may be encouraged in all the project districts.
>
NGOs are requested to get semi-skilled participants in consultation with VWSC
for skill training programmes. More number of women participants may be
encouraged.
District Project Managers may be requested to depute personnel from their units
to State level training programmes as and when conducted.
>
Trained skilled persons should be involved in the project during construction and
implementation stage.
47