Government of Karnataka
Public Health Engineering Department
KARNATAKA : Integrated Rural Water Supply
and Environmental Sanitation Project
(World Bank Assistance)
Phase II - Package II
Consultancy Services for Construction
Supervision and Material Quality Control for
Rural Piped Water Supply Schemes
Progress Report - December 1999
Intercontinental Consultants and Technocrats Pvt. Ltd.
and
mm
Multimedia Consulting Engineers
11
CONTENTS
SI. No.
Particulars
Page No.
From
To
1.
Brief Note
1
-06
07
15
17
20
14
16
19
22
2.
ANNEXURE- I
ANNEXURE - II
ANNEXURE-III
ANNEXURE-IV
ANNEXURE- V
Organisation Chart
3.
Summary of Financial Progress for December 1999
25
4.
Summary of Abstract ( Milestone wise )
26
5.
Summary of Financial Progress (Format-01)
6.
23
24
a) Part - I
27
b) Part - 11
28
Summary of Physical Progress (Format-02)
a) Abstract (Batch I.II & III)
b) Batch-I & II
c) Batch - III
Summan- of Commissioning & Handing over schemes
29
31
33
8.
List of villages commissioned during the month
36
37
9.
Total commissioned village list to end of December'99
38
40
10.
List of villages handed over to VWSC
41
11.
Status report of commissioned of schemes to end of
December 1999
42
12.
Status Position of District wise commissioning of
schemes to end of December 1999
43
13.
List of villages awaiting Energisation
14.
Implementation As per Exit Policy
47
15.
Statement of Bottlenecks
48
16.
17.
Details of villages where work not started
Notations
49
50
18
District wise Progress Report
19
30
32
34
35
44
46
(i) Belgaum District
51
99
(ii) Bellary District
100
122
(iii) Bidar District
123
142
(iv) Gulbarga District
143
170
(vi) Raichur District
171
195
(v) Shimoga District
SSI - SSR Schemes
196
218
217
235
I
I
. ...
gg
j'X
<’'r
w
X
j?-
.$>
X
f
4:
■I
k
<
I1
1 \\ J
*
vu
I
£ : i .ii-X^^S. ^j
J
:;.....4 y .X
|•
||
•
■■
'
’ ■
iQ
(S.Ramadan)
Project Manager
LC.T. (P). Ltd.
Bangalore.
wx rw
i Wvt
I
-
I I
ys 1.
:iff::><<:Sy..
■I
cfc
■
i r.
iff
I ’C
y f:
.rSSSSfWff -?
J I
II 17
INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
Integrated Rural Water Supply & Environmental Sanitation Project, Karnataka
|
X
*.... ...
...
■
ir
fl
;:f
f
■
.
«SjSW»f^
-^*--
;
^***!
g
•"■1 r;?
1' F’/ Ii I■ 1 *"...
■i
I'w
|g
t
BRIEF NOTE:
The Rural Development and Panchayat Raj Department Government of Karnataka
is implementing an Integrated Rural Water Supply and Environmental Sanitation Project
with World Bank Assistance. The Intercontinental Consultants and Technocrats Private
Limited are the Consultants for Construction Supervision and Material Quality Control for
Phase-II Schemes in Six districts of Northern part of Karnataka.
The Progress Report as per the prescribed formats of Engineer-in-Chief PHED are
herein enclosed along with formats as per Aid Memoir of World Bank Review Mission of
November 1998 communicated by EIC to the Consultants.
ACTIVITIES:
Schemes so far awarded are for 145 Packages covering 424 villages
excluding dropped villages for non payment of required contribution by beneficiary
villages. Work in 12 villages is not yet started due to source not yet finalised. The list of
villages is furnished in this Progress Report. During the month 33 schemes have been
commissioned. A total of 107 schemes have been commissioned to end of December 1999.
During the month a total of 4 Schemes have handed over to VWSC. The up to date nos. of
schemes handed over so far are 26. In 66 villages physical work is completed however
energisation is awaited.
Review meeting with the Director PPMU:
The Director PPMU conducted a review meeting on 28-12-99 wherein the Engineer
in-Chief PHED, the Superintending Engineers PHE Circles, the Executive Engineers
DPMU (WBP), District Managers ICT, Project Manager and other consultants attended.
1
The review by the Director focussed on the World Bank Review Mission NovemberDecember 1999 Aide Memoire observation as indicated below:
(a) On handing over of schemes in a complete manner and observing its
performance for another two to three months by visiting these handed over
schemes and invoking construction liability defects clause of contractor for
rectification of defects noticed.
1
(b) Physical progress unsatisfactory
(c) Exit Policy 1st Visit and 2nd Visit has been elaborated by the World Bank Review
Mission for a joint inspection by all concerned.
(d) If the Disinfectant unit (DIU) is not energized or not functioning the schemes
cannot be taken as completed for handing over.
The Director PPMU later had a review meeting on energisation of schemes with the
KPTCL Officers. After observing contratory statements on the joint statement of Executive
Engineer DPMU and KPTCL Officers on the energisation of schemes. The Director
instructed that all the Executive Engineers should sign the joint statement of energisation
only after the Executive Engineers are convinced of the complete energisation by KPTCL.
The Director hinted that the next meeting will be held by 15th January and above subject
will be the main Agenda.
District Managers Meeting:
A meeting of all District Managers ICT (P) Ltd. was conducted by the Project
Manager on 28-12-99 after noon. The Project Manager reviewed the status position on the
pendency of obtaining approvals for extension of time for packages where the packages
could not be completed by the contractors as per the Agreemental period of commissioning
and needs extension of time as per the provision of contract agreement by competent
authority. The Engineer-in-Chiefs letter No.3405 dt.4-10-99 in this regard was brought to
their knowledge.
2
The Project Manager further sought immediate action by the District Managers in
obtaining final bills, record drawings and getting up revised estimates as and when villages
are completed and not to allow this work to be kept pending till end and get it accumulated.
Once the AEs posts are reduced as per the completed schemes by the Government, the
District Managers will face difficulty. As already instructed if the Contractors fail to
respond, these may be got attended by the concerned AEs and service charges claimed from
the Executive Engineer for deducting from the Contractor’s Bill under intimation to the
Project Manager.
The Project Manager also directed the District Managers to submit and obtain
approvals for modifications from the Executive Engineer for all technical deviation as per
the prescribed World Bank format. They should not submit proposals in piece meal
manner. Modifications proposals in such Packages should be submitted in a complete
manner indicating financial implications for entire package to avoid delay in obtaining
approvals, these modifications work may be taken up with the contractor after approval
from the Executive Engineer.
The Project Manager also brought to the notice that the District Managers should
adhere to the physical completion programme prepared by them in consultation with the
Contractors and submitted to the Government and the Engineer-in-Chief PHED. The
Contractors should be committed to the programme. The Contractors should adhere to
this programme scrupulously and not changed fortnightly or monthly as it well have no
credibility. The District Managers should also take up proactive action with the Contractors
for completion of schemes as per the schedule. The Superintending Engineers may also be
persuaded to conduct management meetings for coercing the Contractors to keep the
schedule of physical completion.
3
Inspection visit by the Project Manager
1.
Shimoga District from 1/12/1999 to 5/12/199 and from 15-12-1999 to 19-121999. The Inspection details are enclosed vide Annexure-I.
ii.
Belgaum District from 6-12-199 to 9-12-1999: Copy of the contents of the
report submitted to the Director PPMU reproduced for needful of
concerned at Annexure-II
iii.
Gulbarga District from 10-12-199 to 13-12-1999: The inspection report vide
Annexure-III
Delay in implementation of schemes: (News Report)
It is a matter of great resentment that the World Bank has communicated to the
Government of India, the delay in implementation of these World Bank aided Water
Supply Schemes in Karnataka as per News Paper reports on the discussions on state issues
in Lok Sabha in last session . This unhappy situation is entirely due to non performance of
these Contractors as per their own Agreemental commitment. The Consultants are taking
all possible efforts to motivate these Contractors. In order to bring this lethargic attitude to
their notice and its repercussion on the in coming World Bank Project, I have issued
Circular instructions to all District Managers to bring to their personal notice and
constantly reminding them the need to improve their performance. The details are
indicated in Annexure-IV.
Potability of drinking water
The presence of lead in drinking water beyond permissible limits which is highly
toxic substance is a health hazard. A write up on the deliberations of international
t
conference on lead poisoning held in Bangalore is appended at Annexure-V for information
and appraisal of all concerned.
4
Bottlenecks:
66 Schemes have been physically completed and awaiting energisation. There is no
immediate required action by KPTCL (KEB) to reduce the monthly pending list to nil. This
has also been brought to the notice by the consultants to the Director PPMU vide
Consultants letter No. DO.NO.ICT/WB-KAR/PRM/TA-I/F-26/65/00-2000 dt. 30-12-1999.
This has to be taken at the top appropriate level at the Government. Further there are 8
villages where sources have to be established. In 5 villages OHT sites has to be handed over.
Early action from the Client is requested.
Slow Progress by the Contractors
The Contractors continue with the slow progress despite lot of inducement,
persuasion and motivation and finally levying liquidated damages. These particulars are
being regularly brought to the notice of the Client in the Progress Reports, for further
drastic action. The Clients department have to take up timely action as per the conditions of
contract or terminate their contract in cases of most incorrigible contractors or otherwise
the completion of schemes will be delayed.
Welcome to the New Engineer-in-Chief PHED
I on behalf of the consultants heartily Welcome our new Engineer-in-Chief PHED
Sri. B.Srinivasa. He being a dynamic result oriented man, I am sure the Project will further
gain immensely under his command and able guidance in accelerating the commissioning
of schemes.
We extend full cooperation and services in fulfilling the assigned tasks in the
Project.
5
Welcome to the New Additional Director (Administration)
I also welcome Sri. Pande, the new Additional Director (Administration) PPMU we
assure our full cooperation, towards project implementation. The Consultants also record
with gratitude the outgoing Additional Director (Administration) Sri. C.M. Shirol for his
services rendered to this project.
The Monthly Progress Report for the month of November 1999 is herewith
submitted to the Director PPMU and Special Secretary to Govt. RD & PR Department
Government of Karnataka for kind information and needful action.
io
(S.Ramadas)
Team Leader & Project Manager
ICT (P) Ltd., Bangalore.
10/01/2000
6
ANNEXURE -1
Inspection Notes Of Sri S. Ramadas, Project Manager, ICT (P) Ltd.,
Bangalore During His Inspection Of Works Of KIRWS, Phase-II Works In
Shimoga District On 02-12-99 to 03-12-99.
-:The inspection of works in Phase-11 w orks under Package SMG-2 in Shimgoa taluk
On 2nd Dec’99
Officer^ and Engineers Present
Sri S T Krishnamurthy. District Manger. ICT (P) Ltd.. Shimoga
2. Sri B Shivakumar & Sri L.S. Manjunath, Assistant Engineer, ICT (P) Ltd.. Shimoga.
3. Contractor / Representative not present.
1.
1. Village : Haramaghatta This scheme has been approved under package SMG-2
entrusted to Sri S. Umesh, Class I
Contractor. Shimoga. In this village water supply works have been completed and commissioning
could not be done due to delay in energisation by the KEB authorities, inspite of continued persuatioii
with them. It was instructed to obtain power supply and commission the scheme. Then OHT to be
filled up with water and hydraulic test to be conducted. If there are any leakage in the container of
the OHT, then the defects should be attended immediately and rectified. If every thing is O.K. trial
run the scheme for 7 days and then arrange to hand over the scheme to VWSC.
2. Village : HolalurThis scheme has been approved under package SMG-2 &, entrusted to Sri S. Umesh, Class I
Contractor. Shimoga. In this \ illage water supply works have been completed'and it was informed.
that commissioning could not be done due to delay in energisation by the KEB authorities, inspite of
continuous persuation with them
It was instructed to obtain power supply and commission the
scheme. Then OHT to be filled up w ith water and hydraulic test to be conducted. If there are any
leakage in the container of the OHT. then the defects should be attended immediately and rectified
If
every thing is O.K trial run the scheme for 7 days and then arrange to hand over the scheme io
vwsc.
Could.
- 7-
-1-
-^The inspection of works in Phase-11 works under Package SMG-8 in Shimgoa taluk.:On 2"d Dec’99
3. Village : Kudli
Officers and Engineers Present.
1. Sri S.T. Krishnamurthy, District Manger, ICT (P) Ltd., Shimoga.
2. Sri B.Shivakumar & Sri L.S. Manjunath, Assistant Engineers, ICT (P) Ltd., Shimoga
3. From contractor side Sri Vasudev, Site Engineer presented.
This scheme has been approved under package SMG-8 & entrusted to Sri K.C. Shivaram,
Class I Contractor. The OHT site was inspected, the bottom raft slab was laid and concrete columns
have come upto G.L brace beams.
The reinforcement for the brace beams at G.L was tied and
centring work was in progress. It was observed that for the bottom of the brace beam, centring plates
were not provided and they were getting ready to lay the concrete on the earthen surface only, which
is not desirable, and highly objectionable. When questioned vyith the site engineer of the contractor.
he was unable to justify the action taken by him. He was warned and instructed to provide centring
for the bottom and sides of the brace beams and after the inspection of the same by the District
Manger, then concrete may be laid. In this regard the engineer incharge from the ICT. side was also
warned for not instructed the contractor properly and instructed to see such .mistakes should not be
allowed to occur in future.
Contd.
-8-
3
-3-
-:The inspection of works in Phase-ll works under Package SMG-16 in Shimgoa taluk*:On 2nd Pec,99
4. Village : Nidige
Officers and Engineers Present.
1 Sri S T. Krishnamurthy. District Manger, ICT (P) Ltd., Shimoga.
2. Sri S.V. Sateesh, Assistant Engineer, ICT (P) Ltd.. Shimoga.
3. Contractor Sri V. Narasimhan present.
This scheme has been approved under package SMG-16 & entrusted to Sri V. Narasimhan,
Class 1 Contractor. The water supply works has been completed, except some minor works such as
providing fencing alround the OHT area, fixing of gauge plates, lightening arrestor and Disinfection
unit etc.
The contractor has been instructed to obtain power supply from KEB authorities and
commission the scheme immediately. Further he was also instructed to fill up the OHT with water
and observe for leakages if any. If so immediate action to be taken to rectify the defects and if every
thing is O.K. then the scheme should be trial run for 7 days and action to be taken to hand over the
scheme to VWSC after its successful trial run.
The contractor Sri Narasimhan has promised to
complete all the balance works and habitat development works by end of December’99.
5. Village : Antharagange
Officers and Engineers Present.
1 Sri S T. Krishnamurthy. District Manger, ICT (P) Ltd., Shimoga.
2. Sri S.V. Sateesh, Assistant Engineer, ICT (P) Ltd., Shimoga.
3 Contractor Sri V. Narasimhan present.
This scheme has been approved under package SMG-16 & entrusted to Sri V. Vlarasimhan,
Class 1 Contractor. The water supply works has been completed, except some minor works
Contd.
-9-
4
- 4such as providing fencing alround the OHT area, fixing of gauge plates, lighting arrestor and
Disinfection unit etc.
The contractor has been instructed to obtain power supply from KEB
authorities and commission the scheme immediately.
OHT with water and observe for leakage if any.
Further he was also instructed to fill up the
If so immediate action to be taken to rectify the
defects and if every thing is O.K. then the scheme should be trial run for 7 days and then action to be
taken to hand over the scheme to VWSC after its successful trial run. The contractor Sri Narasimhan
has promised to complete all the above mentioned minor works and habitat development works by
end of December'99.
-:The inspection of works in Phase-11 works under Package SMG-8 in Shimgoa taluk.
On 3rd Dec’99
6. Village : Anandapuram - SSR Works.
Officers and Engineers Present.
1. Sri S.T. Krishnamurthy, District Manger, ICT (P) Ltd., Shimoga.
2. Sri T. Prakash, Assistant Engineer, ICT (P) Ltd., Shimoga.
3. Contractor side Engineer Sri Anand was present.
This scheme has been approved under package SMG-11 & entrusted to M/s Maloo
Constructions, Bangalore. The inside finishing works of the Water Treatment Plant were nearing
completion. The over burdened earth near pure water sump was removed. Further it was instructed
to provide 0.60 x 0.60 m steps alround the pure water sump upto G.L. and suitable slope to be
provided where ever necessary and to be protected with rough stone revetment alround the pure water
sump if necessary'
Pump houses are to be provided (2 Nos.) on either side of pure water sump on
North-South side, so that the length of the suction pipes are to be provided as minimum a^possible.
Further it was instructed to fill up the OHT’s with water at Achapura, Yadehalli,
Anandapuram & Malandur by making other arrangements by the contractor and to test for its water
tightness and to conduct hydraulic test of OHTs etc. The balance works are to be completed early.
Contd. . . 5.
-57. Impounding Reservoir Between Anandapuram & Nandi Hole :
Officers and Engineers Present.
1.
2.
3
Sri S T. Krishnamurthy, District Manger, ICT (P) Ltd., Shimoga.
Sri L S'. Manjunath, Sri S.K. Muralidhar & Sri T Prakash, Assistant Engineers
ICT (P) Ltd . Shimoga
Contractor representative Sri Harikumar Reddy presented.
This work is recently entrusted to Sri R. Maheswara Naidu on tender basis under package
SMG-1 1A and the site was handed over to the tender contractor on 27-10-99. The jungle clearing of
site was nearing completion. During the discussion with Engineers about the early completion of the
Project, the following instruction were issued.
I).
Block level plan to be got up at 5.0 M intervel and levels taken and plotted on the drawing
sheet, and contours to be marked and work should be completed with in a weeks time.
2).
Check up the available soil and its suitability for the bund
3).
Check up the additional quantity and quarry required for casing of the bund and its suitability.
4).
If both the soils are suitable check up the quantity required for construction of bund.
5).
If required quantity not available find out addition quarry for the balance quantity required
and its suitability is also to be got tested.
< •
6).
Check up the soil available for hearting i.e puddle from the proposed quarry and its suitability.
If sufficient quantity is not available from the proposed quarry, new quarry to be located and
soil to be got tested for its suitability.
7).
Work up the section of the bund for storing water for 210 days with the available area kept in
I
mind
Contd.
6.
- 6 -
8).
Comparative cost to be worked out with alternative sections taking into consideration of
economics and proposals to be submitted to Executive Engineer. DPMU(WBP), Shimoga and
a copy submitted ttf the Project Manager. ICT (P) Ltd.. Bangalore with in a week time.
The contractor has to give his weekly program for planing, indicating the machineries
required. Men required and Materials, considering the time available, so as to complete the
scheme by 15-3-2000. Another I ’/2 months left out for final finishing, since already 1 ’/z
month has been elapsed
10).
Bar chan program to be furnished by the contractor
H).
A notice to be issued to the tender contractor for slow progress.
12).
Further instructed to check up the capacity of the pump and pipe line required to pump the
water during the monsoon period of 4 months for 210 days requirement.
-:The inspection of works in Phase-11 works under Package SMG-IO in Shimgoa taluk.:On 3rd Dec’99
8. Village: Keladi (SSI).
Officers and Engineers Present.
1. Sri S T. Krishnamurthy, District Manger, ICT (P) Ltd., Shimoga
2 Sri T Prakash, Assistant Engineer. ICT (P) Ltd., Shimoga.
4. Contractor side Engineer Sri Kumbar was present.
This scheme has been approved under package SMG-10 & entrusted to M/s Suprada
Construction Company, Dharwad. The structures like Water Treatment Plant, Pre-settling tank and
Raw Water Storage tank and OHT at Keladi village were completed. The finishing workk was under
progress. Tlie contractor was instructed to finish smoothly and neatly all the structures and instructed
to fill up the structures with water for hydraulic testing and its soundness.
Contd.
. . 7.
- 7It was also instructed to provide RCC approach slab for L5M width from tank bund to the
jackwell. For the OHT at Bandagadde. RCC columns have casted up to bottom slab level
It was
instructed to complete the balance works i e. laying of RCC for bottom slab, side wall and top dome
very early and scheme should be completed with in 31-01-2000.
_.The inspection of works in Phase-ll works under Package SMG-9 in Shimgoa taluk.:’
On 3rd Dec’99
9. Village : Chandragutti (SSI).
Officers and Engineers Present.
1. Sri S T. Krishnamurthy, District Manger, ICT (P) Ltd., Shimoga.
2. Sri E.B Chandrashekar and Sri T Prakash, Assistant Engineers, ICT (P) Ltd.. Shimoga
3. Contractor Sri V. Narasimhan presented.
This scheme has been approved under package SMG-9 & entrusted to Sri V. Narasimhan, Class I
Contractor.
The Pre-settling tank. Raw Water storage Tank and Pure Water Sump have been
completed long back.
Water Treatment Plant was in progress. Bottom slab concrete for the Water
Treatment Plant have been laid, side wall concrete is to be laid.
The balance work of the jackwell is not resumed for which the contractor expressed that as
soon as the water level receedes in the river he is going to speed up the work.
The OHT at
Chandragutti has been constructed. Other works such as Cl-vertical pipes erection, construction of
valve chambers, fixing of valves and fixing of Disinfection unit, lightening arrestor, etc are yet to be
completed.
The contractor has been instructed to complete balance works and commissionjhe scheme
before 30-4-2000 and to submit implement action schedule program keeping in consideration of the
completion date
Contd. . . . 8.
-8fumish the revised
The contractor Sri. V.Narasimhan was also instructed to
implementation schedule (village wise) for packages SMG-4, SMG-16 & SMG-19 also.
----X—
♦
ANNEXURE - II
Report submitted to the DirectorPPMU
A management meeting with the Contractors was conducted at Belgaum on 8-12-99
by the Additional Director (Technical) PPMU Bangalore and Engineer-in-Chief PHED
Bangalore. This was attended by the undersigned and the Superintendent Engineer PHE
Belgaum, and District Manager ICT Belgaum. The concerned contractors attended the
meeting.
The Contractors were called upon by the Additional Director (Technical) to streamline
the implementation work in Belgaum which is very much lagging behind and the exist
policy schedule could not be adhere to. These contractors brought to the notices that, there
has been a number of bottlenecks in the implementation of schemes as indicated below.
1. Approval for Revised designs of rising main and Pumping machinery are not yet
communicate for many schemes by the client department.
2. Approval is yet to be accorded for schemes where the contractual amount is likely to
enhance due to modifications etc.
3. Handing over of sites for OHT/Sump/Approach Bund/Approach Road.
4. Establishment of sources
5. Land Acquisition.
Unless the pending approvals are immediately accorded and communicated, sources are
established, sites handed over, the contractors have expressed their inability to go ahead
with these schemes and complete as per exit policy programme
I would therefore request that immediate action has to be taken by the concerned for
sorting out above issues so that the contractors may be prevailed upon to expedite works
without excuses and hindrances for implementation of exit policy programme.
A copy of above particulars is submitted herewith for issuing necessary' directions in this
regard.
I am happy to inform you thqt the exercise of jointly conducting of meeting by
-15 -
Sri. H.Rajasimha Additional Director (Technical) and Engineer-in-Chief PHED has helped
very much to assess the status position and has also impressed the contractors very much. I
would therefore request that such joint interaction meeting must be continued in Belgaum
and taken up in other districts also as I am sure it is bound to have a very positive impact
on the speeding up of commissioning of schemes.
-/6 -
ANNEXURE - III
I
Inspection notes issued by Sri. S.Ramadas Project
Manager ICT Bangalore during Inspection of works on
10-12-1999 and 11-12-1999 in Gulbarga District.
10-12-99: The DM ICT Gulbarga and the Executive Engineer DPMU (WBP) accompanied
the Project Manager ICT Bangalore during inspection of works.
The Project Manger met the Executive Engineer DPMU and DPM in their office
and discussed regarding progress of Phase-II works. It was informed to complete all the on
going works by end of March’1999 positively as per exit plan. The contractors having slow
progress are to be expedited to speed up the works so as to complete them before March’99.
Executive Engineer is informed to conduct the management meeting with the contractors
immediately and get in writing on bond papers from them, the dates of commissioning of
each village in their packages and try to commission the schemes accordingly. This should
be watched regularly in every management meetings. If contractors fail, stringent action
should be taken to levy the L.D clause Executive Engineer told that now all the OHT sites
are cleared and also sources have been established except Kondagalli, Tadkal, Halgadla &
Hongunta. The Executive Engineer is informed to establish balance sources immediately.
1. Name of Work : KIRWS Schemes to Village Hongunta in Chittapur Taluk under
Package GLB-19 of Phase-ll Works.
The OHT excavation for foundation is done up to 3 mtr depth. The excavated soil is
Tilled up clay. The bottom is soft one. The excavation for another 2 mtr more (total 5 mtr) or
until hard strata met with is to be done. If hard strata is not met with even after excavation
to a depth of 5 mtr, then pile foundation to be provided to the raft.
The S.B.C received in 8 mt/sqmt as against 15 mt/sqmr in ESR. The width of foundation to
be increased as per actual SBC met with and full raft to be provided. The staging of OHT
may be changed to 12 mtr from 10.5 mtr as the ground level of the OHT is 1 mtr lower then
the ESR as told by the DM ICT Gulbarga.
There is a provision of infiltration well in the river bed and a R.C.C pump house. It was
examined in detail whether it is possible to make use of the existing Jack well and pump
house. The proposed Jack well depth is 10 mtr from the bed of the river. The bed of the
Jack well be about 4 mtr above the bed of the infiltration well. Hence it is proposed to pump
-17-
water directly from infiltration well. Instead of 2 Submersible pumps as per usual practice
(one stand by) 3 Submersible pumps (with 2 stand by) may be provided as there will be 8 to
10 mtr depth of water over infiltration well during rainy season for 3 months period. The
R.M from infiltration well to OHT may be provided G.I instead of PVC as it will be under
flood and ground is undulating and paved road is there instead of hume pipe pump house
small room may be constructed as per the suggestion of the contractor as hume pipe cannot
be transported to work site.
2. Name of Work: KIRWS Scheme to Village Bhagodi under Package GLB-23
under Phase-ll Works.
The proposed site for OHT is situated at about 2 km away from the village. The main
source is a shallow well in the river bed. The village is situated just on the bank of riverbed
near the shallow well. The shallow well is provided with centrifugal pump.
This pump will be stopped during rainy season, as the suction head is more than 8 mtr.
During 99 rainy season, the shall bore well is wash out and at present water is being
pumped directly to the mini water supply in the village. The existing R.M beyond village up
to existing OHT for a length of 1 km is damaged and stolen by the villagers. There are only
6 tanda houses are there near the proposed OHT site. The water for these tanda houses may
be provided by the existing hand pumps. Hence it is instructed to locate the OHT near the
village only by increasing the staging of OHT if required as per actual ground level. The
bore well sources may also be established near by village in consultation with geologist, so
that RM & DM each for a length of 2 km may be avoided. In this regard villagers are
contacted and have agreed to get the lands at higher levels near the village and resolution
will be sent with in a week after conducting village meeting. Executive Engineer is informed
to get the OHT site and establish the bore well sources immediately.
ON 11-12-99
1. Name of Work : KIRWS Scheme to Village Chimmaidalai under Package
GLB-11
OHT is completed. C.I pipes are being fixed. The excavation of valve chambers is being
done. The plaster is being done inside. The plaster should also be done outside to have neat
appearance before painting. The DM ICT Gulbarga told that the scheme will be
commissioned during 1st Week of January’2000.
2. Name of Work : KIRWS Scheme to Village Degalmadi under package GLB-2 of
Phase-ll works.
The side wall of OHT 3rd lift is under progress. The contractors representative told that
OHT will be completed by end of December’99. The R.M & D.M completed except rocky
out crop. In rocky out crop it is proposed to lay G.I pipes instead of PVC. The financial
implication are being worked out and will be submitted to Executive Engineer within a
week as told by the DM ICT Gulbarga. Immediate arrangements to lay GJ pipes in rocky
out crop to be made. The DM ICT Gulbarga told that the work will be completed by end of
2/2000.
3. Name of Work: KIRWS Scheme to Village Polakpalli under Package GLB-21.
Stating of OHT is under progress. The DM ICT Gulbarga told that the R.M & D.M is
completed except in rocky out crop. The proposals along with financial implications for
laying G.I pipes is submitted to S.E. PRE through Executive Engineer DPMU Gulbarga.
The excess is 24.5% over the bid amount. The contractor representative told that all the
works in villages Sawaleshwar and Chinchansoor completed and will be commissioned
during December’99 & January’2000 after receipt of power supply. Contractor is asking
permission to G.I pipes, so that he will complete balance R.M & D.M by the time OHT is
completed and Polakpalli Village can be commissioned by end of April’lOOO. The DM is
directed to get the approval from the competent authority.
4. Name of Work: KIRWS Scheme to Village Kallur road under Package GLB-02
Phase-ll Works.
The OHT is completed and painted also. The construction of valve chamber is under
progress. It is instructed to connect the over flow pipe to the distribution main to avoid
unnecessary wastage of water R.M, D.M and stand posts etc. are completed. The
contractor’s representative told that scheme will be commissioned by end of 12/99 if power
is made available. DM informed to commission the scheme by end of 12/99 positively.
-19-
ANNEXURE- IV
intercontinental consultants and technocrats pvt. ltd.
S.RAMADAS
Integrated Rural Water Supply & Envtronmenlal Sanitahon Rroject. Karnataka
Project Office: No.99, Groundfloor, Nishant Enclave,13 H' Main, -T1' Cross,
Doopanahalli, Vasanthappa Garden. Indiranagar, Hangalore - 56°
B.E.. F.I.E., Mem. 1.
Residence PH: No. 3301032
V1/2W“
VERY URGENT
To,
The District Manager
ICT, Belgaum/Bidar/Raichur/Bellary/Shimoga/Gulbarga
Sir.
Sub
K1RWS & ESP (WBP) Phase-11. -Delay in commissioning of water supply
schemes.
It is observed that, from the last two months the physical and financial progress is very
meager As per the exit policy, for achieving physical targets, financial progress will have to be
in the order of about Rs 10 Crores per month, for all six districts put together whereas the
progress so
far achieved for the last two months is about Rs.3.5 Crores per month in all districts
put together which is 1/3 of the anticipated progress. Position is the same in almost all the six
districts. This kind of progress definitely very poor achievement. I feel, at this rate it is not
possible to keep up the targeted progress and complete the project as per the Exit policy and the
project will not be completed before March 2000 as envisaged in the programme and in some
critical cases of SSR/SSI Schemes before June 2000.
If the project is continued to be progressed like tortoise low speed, the fixed time limit of
completion cannot be maintained. You are all very well aware farther extension of time beyond
March 2000 for major schemes of the Project and in some extraordinary cases beyond June 2000
cannot be extended at all and the World Bank will not agree to extend the further extended time
again. Further, the follow-on project ot Rs 1500 Crores depends
on the performance of these
..2/-
-A0-
-2-
ongoing works and its completion as per scheduled time limit If the Project is unnecessarily
delayed by the contractors, then the World Bank will definitely have rethinking on sanctioning of
the proposed follow-on Project to the state of Karnataka and the state may loose this good help
by the World Bank
The full World Bank Team will be visiting the Karnataka State in the month of February
2000 to study the situation and status of progress of the ongoing project and thereby to assess the
capability of completing the ongoing project well within the scheduled programme. Further, if
the progress is unnecessarily hampered by the contractors, the contractors will be offering
adverse, scope to the visiting team to decide on the sanctioning the follow-on Project to
Karnataka. That means, if the progress of works and performance of the Contractors are really
good then the follow-on Project will be a good boon to the state or vice-versa.
This fact is being repeatedly brought to your knowledge by the undersigned from the last
6 months whenever I visit the Project districts and apprise the Contractors. Such being the case I
request you to motivate them to achieve good progress in a befitting manner with high standards
of quality of works.
Under the above circumstances, I request all the District Managers, AEs of ICT, District
Project Managers DPMU, Executive Engineer DPMU, AEEs & AEs of DPMU, Superintending
Engineers of PHE Circles to bestow their special attention in motivating the contractors to step
up the works so as to complete the Project well in time with high standard of quality of work so
that the follow-on Project could easily be sanctioned by the World Bank. In order to achieve this
it is suggested to pull up the contractors now and then and to have close watch on daily basis
and monitor the progress for completing the Project well in time.
Further, it is also requested that any bottlenecks encountered has to be solved
immediately by the concerned persons, either he may be a Consultant or the Client
If
..3/-
-XJ-
bottlenecks are still not solved it definitely afiects the Project and cannot be prolonged for the
slackness of the persons responsible
If there are any contractors who failed to cope up with the work in spite of repeated
appeal and request it is suggested to issue final warning to them giving a time of 7 days for
improvement, if there is no improvement in their performance it is very much obligated to take
necessary action against them to terminate their contract forthwith and such of these contractors
names has to be sent to the EIC with adverse remarks to prevent them from having further
opportunity in getting fresh works. I request all of you to strive hard round the clock in the
coming crucial months and motivate the contractors now and then to complete the project both in
quality wise and quantity wise and see that all schemes are completed as per scheduled
programme. The matter may be treated as most important and urgent and there should not be any
slackness in any comer and at any point of time.
All the Contractors may please be advised suitably and motivate them to step up the
progress and complete all schemes well in time as per exit policy and as per terms of agreement
Yours faithfully
-sd/(S.Ramadas)
Project Manager
ICT, Bangalore.
Copy to: The Director PPMU Bangalore for kind information and needful action
Copy to: The Engineer-in-Chief PHED Bangalore for kind information and needful action
Copy for kind information and needful action to:
1. The Superintending Engineer PHE Circle Bangalore/Belgaum/Gulbarga.
2. The District Project Manager DPMU (WBP)
Belgaum/Bidar/Bellary/Raichur/Gulbarga/Shimoga.
3. The Executive Engineer DPMU (WBP)
Belgaum/Bidar/Bellary/Raichur/Gulbarga/Shimoga.
Copy for kind information to:
1. Col. (Retd) M.C.Nangia Project Co-ordinator ICT Bangalore
2. Col.(Retd) M R Salmi Resident General Manager ICT Bangalore
Copy for information to:
1. Technical Assistant-l/ll | Assistant Engineer 1C I Project Office Bangalore
2. Assistant Engineers , ICT (P) Ltd Belgaum/Bidar/Bellary/Raichur/Gulbarga/Shimoga.
-'22 -
ANNEXURE- V
LEAD IN BLOOD;
CHILDREN AT RISK
lead in the air, soil, water and food and the levels of
blood lead, it is necessary to set standards for control
ACCORDING to several studies conducted in India,
ling lead in the environment.
over 50 per cent of the children living in many of its
On the priority list is the monitoring and ensuring that
major cities already have elevated blood lead levels,
lead in drinking water and milk supply is within safe lim
raising serious concerns about their health and future
its. The use of lead solder in pipes for public water sup
potential to be productive members of society. Lead, a
ply should be discontinued. Health care providers
highly toxic substance can significantly alter the health
should be trained to diagnose lead poisoned cases, pro
of people exposed, even at low levels. It can cause a
vide treatment where needed and
decrease in IQ and learning ability in
offer preventive steps to patients
young children.
On the priority list is
and families. Periodic and selective
A document on the prevention
screening of blood lead of individu
the
monitoring
and
and treatment of lead poisoning in
als living or working in high-risk
developing countries was released
ensuring that lead in
areas and availability of safe and
in Bangalore last month. This was
drinking water and
effective orally administered chelat
prepared by the executive council of
ing agents at affordable prices
milk
supply
is
within
the International Conference on
should be an on-going process.
Lead Poisoning held in the city from
safe limits. The use of
The white paper suggests that for
February 8-TO this year. Scientists,
implementation of the above a num
lead solder in water
public policy makers and industry
ber of government ministries need
leaders from over 20 countnes took
pipes should
to be involved. Energy and trans
part in this conference. Submitted
portation ministries for unleaded fuel
be discontinued.
as a “call for action" by govern
in automobiles, environment and
ments, industry, health and environ
labour ministries for environment,
mental institutions, the recommendations are offered as
workplace and product safety, health ministry for pre
guidelines for policy making and implementation.
vention and treatment measures, law and justice min
In order to establish and implement a national plan,
political will and participation of venous agencies is istry for enforcement and so on.
In its concluding remarks the report points out that in
needed. The government must begin to force changes
in long standing practices in industry and public services many industrialised countries, a decrease of over 70 per
such as eliminating leaded petrol, testing for lead in cent in the average blood lead level of the population
water supply, food and other consumer products and was achieved in less than 20 years.
For more information contact The George Foundation
regulating lead in industrial emissions.
Given the direct link between the many sources of on 5440164.
Sangeeta Cavale
- 23 -
INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
KARNATAKA INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT. PHASE D PACKAGE D
NEW DELHI.
Mr. K.K.KAPILA
Chairman & Managing Director
A-l 1. Green Park. New Delhi
Ph.No.011-6964757. 6863000
Col.(Rtd) M.C.Nangia
Project Co-ordinator
ICT
New Delhi.
Col.(Rtd) M.K.Sahni
Resident General Manager
ICT, Bangalore.
Ph.No. Office 080-5275325. Resi 5288654
I
£
Mr. ELKRangaswamy
Deputy General Manager
ICT, Bangalore.
Ph.No. Office: 080-5275319 Resi: 3356617
Mr.S.Ramadas
Project Manager
ICT. Bangalore
Ph.No. Office:080-5275319
Resi. 3301032,3382387
Mr.J.D.Boli
District Manager
Gulbarga
Ph.No.06472-35780
Mr. P.V. Naik
District Manager
Bidar
Ph.No. 08482-29377
Mr.V.G.Khened
District Manager
Raichur
Ph. No. 08532-26527
Mr.M.G.Badappanavar
District Manager
Bellary
Ph. No. 08392-55160
CoL(Retd) Anath B.Kakhandaki
District Manager-I (North)
Belgaum
Ph.No. 0831-472710
Mr. T. Basav anthappa
District Manager-II
(South)
Belgaum
Ph. No. 0831 -472710
Mr. S.T. Krishnamurthy
District Manager
Shimoga
Ph. No. 08182-75984
INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
(WORLD BANK ASSISTANCE)
SUMMARY OF FINANCIAL PROGRESS FOR THE MONTH OF DECEMBER 1999
(Rs. in lakhs)
BATCH I & II
!
I
BATCH - III
Sr.
No.
District
Pkg
Vlg
Contract
value
Achievement
during month
Cum.
Achievement
%
Pkg
Vlgs
Contract
value
Achievement
during month
Cum.
Achievement
%
Total
Packages
(3+9)
Total
Villages
(4+10)
1
2
3
4
5
Total
During the
month
(6+12)
6
Total
Contract
value
(5+11)
7
8
9
10
11
12
13
14
15
16
17
18
19
20
1
Belgaum
28
67
3383
37
2217
65
10
10
265
6
92
35
38
77
3648
43
2309
63
2 Bellary
11
49
1096
81
755
69
5
10
224
7
62
28
16
59
1320
88
817
62
3 Bidar
20
60
1706
90
1582
93
9
17
386
63
16
29
77
2092
90
1645
79
4 Gulbarga
19
59
1304
21
1046
80
4
13
218
84
40
23
72
1522
21
1130
74
5 Raichur
18
80
2125
93
1797
85
1
2
35
9
26
19
82
2160
99
1806
85
6 Shimoga 12+1
44
1034
787
76
7
13
220
97
44
20(19+1)
57
1254
884
70
8184
77
36
65
1348
407
30
144+1
424
11996
8591
72
Total
108+1 359 10648
• r
Fp4rm Sheet?
322
6
19
341
Cumulative
%age against
Achievement
Contract value
(7+13)
INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
(WORLD BANK ASSISTANCE)
ABSTRACT
Summary of Milestone wise financial achievement for the month of DECEMBER 1999
i
O'
Sr.
No.
Total Villages
Batch No. of
No. of
No. of
work in
Contract
Programme Packages villages
progress
Value
villages
1
Batch I & II
108
359
10648
2
Batch III
36
65
Grand Total
144
424
III Milestone
Cumulative
II Milestone
Cumulative
I Milestone
Cumulative
T
A
%
T
A
%
358
3111
3339
107 3377 3163 93
1348
53
652
327
50
696
11996
411
3763
3666
97
4073 3243 99
80
T
A
%
3625 1682 46
11
3625 1682 46
___ (Rs. in laKnS)___
%age of |
Cumulative
Achievement
Achievement
against
During month
Upt to date
Contract Value
322
8184
77
19
407
30
341
8591
72
INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
(WORLD BANK ASSISTANCE)
ABSTRACT SUMMARY OF FINANCIAL PROGRESS FOR THE MONTH OF DECEMBER 1999 PART -1 (BATCH I & II Villages)
Financial Progress (Rs in Lakhs'
Contract Total no. of
III Milestone Achievement
II Milestone Achievement
villages
I Milestone Achievement
Value
During
To end of During
During
To end of
No. of
(Rs in where work is
To end of
Total
Total Target Prev.month
Total Target Prev. month
Target
in
progress
Prev.
month
month
month
Villages Lakhs)
month
Cumulative Achievement
during
%
Total
month
SI.
No.
District
No. of
packages
1
Belgaum
28
67
3383
67
661
838
838
1287
1110
33
1143
1435
232
4
236
37
2217
65
2
Bellary
11
49
1096
48
484
274
274
445
226
20
246
167
174
61
235
81
755
69
3
Bidar
20
60
1706
60
722
734
734
500
375
375
484
383
90
473
90
1582
93
4
Gulbarga
19
59
1304
59
274
470
470
401
247
247
629
308
21
329
21
1046
80
5
Raichur
18
80
2125
80
637
663
663
340
840
856
613
201
77
278
93
1797
85
6
Shimoga
12 + 1
108+1
(11 A)
44
1034
44
333
360
360
404
296
296
297
131
787
76
359
10648
358
3111
3339
3339
3377
3094
3163 3625
1429
8184
77
I
i
0
16
69
131
253
1682
322
INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
(WORLD BANK ASSISTANCE)
SUMMARY OF FINANCIAL PROGRESS FOR THE MONTH OF December’ 1999 PART II (BATCH III Villages)
Contract
Value
Total no. of
villages
Financial Progress (Rs in Lakhs)
II Milestone Achievement
I Milestone Achievement
During
Total
month
cumulative
achievement
during
month
total
SI.No.
District
No. of
packages
No. Of
Villages
(Rs in
Lakhs)
where work is in
progress
1
Belgaum
10
10
265
10
106
43
43
159
2
Bellary
5
10
224
5
123
55
55
101
3
Bidar
9
17
386
17
193
63
63
193
63
4
Gulbarga
4
13
218
8
109
84
84
109
84
5
Raichur
1
2
35
2
11
6
Shimoga
7
13 *
220
11
110
82
36
65
1348
53
652
327
I
N
oo
1
To end of During
Target Prev.month
Total
month
0
To end of
Target Prev.month
43
24
3
82
110
15
327
696
61
6
49
6
92
7
7
7
62
6
9
6
97
15
19
80
9
19
407
Remarks
INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LT:
LTD.
INTEGRATED RUR.AL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
Phase- II Package-II
(WORLD BANK ASSISTANCE)
Frm 02
SUMMARY OF PHYSICAL PROGRESS FOR THE MONTH OF DECEMBER" 1999
ABSTRACT (BATCH I & 11+ BATCH III)
_____________________
Total no
SI.No
1
District
No of
No of
Packages villages
of villages
where work
is in
2
3
4
progress
5
Belga um
28
67
10
Physical Progress______
Sump
_
OHT
Milestone in
Target
Nos
To end of
Prev month
During
month
Total
Target
To end of
Prev. month
During
month
Total
GLSR
Target
R.M. (kms)
To end of
Prev month
During
month
Total
17
18
Target
To end of
Prev
19
month
20
During
month
Total
21
22
8 ’
137
6
7
8
9
10
11
12
13
14
15
16
67
I & II
57
8c/50up
4c/1up
8c/48up
14
4c/6up
3up
4c/9up
11
6up
4c/5up 4c/5up
206
129
10
10
III
8
Sup
8up
Sup
2
1up
1up
1up
2
1 c/1 up
1c/1up 1 c/1 up
33
6
38
77
77
65
8c/58up
4c/9up
8c/56up
16
4c/7up
4up
4c/10up
13
1c/7up
5c/6up 5c/6up
239
135
8
143
11
49
48
I & II
47
32c
3
35c
8
5
5
6
7
7
76
81
3
84
5
10
5
III
5
1
1
23
7
4
11
16
59
53
20
60
60
25
9
17
17
i
29
77
77
19
59
59
4
13
23
1
2
3
Bellary
Bidar
I
4
5
6
Gulbarga
Raichur
Shimoga
Grand Total
3
3
52
32c
3
35c
11
5
I & II
53
47
2c/4up
49c/4up
4
3c/1up
II
15
1
68
47
2c/4up
49c/4up
5
3c/1up
I & II
54
38c/11up
2c
40c/14up
4
2c
8
II
13
3c/9up
9up
3c/7up
72
67
III
67
41c/25up
2c
43c/21up
4
2c
18
80
80
I & II
88
44c/44up
18c
62c/26up
21
8c/3up
1
2
2
III
2
2ld
1 c/1 up
1 c/1 up
19
82
82
12+1
44
44
I & II
42+1
35c/7up
7
13
11
III
12
3c/6up
19+1
144+1
57
424
55
358+53
411
54
396
Nos Compl
90
38c/13up
under prog.
Balance
8up
w
122
38
5
9
6
1
7
99
88
7
95
1c
4c
8
4c/1up
1c
4c/1 up
175
158
1
159
1
1up
2
38
4
1
5
2c
4c/1up
10
4c/1 up
1c
4c/1up
213
162
2
164
2c
5
3c
2up
3c/2up
142
112
2
114
25
14
0.5
14.5
2c
5
3c
2up
2up
167
128
0.5
114.5
8c/3up
4
3c/1 up
1up
3c/1 up
231
171
73
244
2
1 up
1up
3
6
3c/1up
3c/2up
234
171
73
244
35c/8up
1
1c
1c
80
97
1
98
3c/6up
2
1 up
1up
2up
18
12
3
46
1 c/1 up
1up
1 c/2up
Nos. Compl
“23"
98
1050
compl.
13
10
44c/44up 19c/1 up 63c/27up
Sup
6
21
8c/3up
Sup
3up
38c/14up
57
Nos. Compl
8c/3up
under prog.
14
under prog
Balance
20
Balance
1up
12
108
848
Balance
212
10kms excess in Raichur
108
Contd...
INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT Phase-ll
(WORLD BANK ASSISTANCE)
Districts
Belgaum
Be Mary
Bidar
/
Gulbarga
Raichur
Shimoga
Grand Total
Frm-02
Package - II
SUMMARY OF PHYSICAL PROGRESS FOR THE MONTH OF DECEMBER” 1999
____________________________ ABSTRACT (BATCH I & II BATCH III)
___________________ Physical Progress
D.M.
S.P. (nos.)
C.P. (nos.)
To end of
During
To end of
During
To end of
During
Awaiting
Villages
Target
Total Target
Total
Target
total
Dropped
Prey, month month
Prev. month month
energisation
Commissioned
Prey, month month
23
24
25
26
27
28
350
264
7
271
158
39
46
35
1
36
49
3
396
299
8
307
207
167
166
166
80
40
11
8
19
19
207
177
8
185
317
331
1
83
6
400
337
231
191
42
4
273
195
3
294
257
7
30
31
32
39
54
10
10
9
2
5
2
42
2
44
56
10
10
9
59
3
62
14
10
10
16
99
59
3
62
14
10
10
16
332
142
124
124
16
10
10
19
6
53
1
338
195
124
3c
194
138
95
20
2
198
158
97
89
346
168
39
2
5
7
5
301
259
94
353
173
39
39
217
225
225
67
58
58
79
43
43
21
11
11
296
268
Kms.
compl
Balance
268
88
69
Nos.
Compl
Balance
69
1873
Phy_co~1 Sheetl
1649
276
920
29
33
34
35
36
5
5
124
21
10
10
19
100
10
6
6
11
102
10
6
6
11
39
30
16
16
30
32
16
16
30
16
10
10
22
16
10
10
22
149
Compl
Balance
2
5
2
520
400
66
83
107
37
Remarks
38
Frm-02
INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT Phase- II Package !I
(WORLD BANK ASSISTANCE)
SUMMARY OF PHYSICAL PROGRESS FOR THE MONTH OF DECEMBER” 1999
(BATCH I & II)
Total no
SI.No
Total
Target
To end of
Prev month
During
month
Total
Target
To end of
Prev month
During
month
10
11
12
13
14
15
16
17
2
3
4
5
6
7
1
Belgaum
28
67
67
I
II
III
9
24
24
4c/51 up
1up
4c/52
4c/1 up
4c
4c
57
8c/52up
4c/1up
8c/52up
3
4
Bellary
Bidar
Gulbarga
11
20
19
49
60
59
48
60
59
I
II
III
I
II
III
9
18
20
47
14
20
19
53
16
19
19
80
80
Shimoga
12
44
44
88
44c/44up
I
II
III
Grand Total
49
359 |
358
32c
II
III
6
6
35
28
54
18
7
19
25
III
Raichur
7
I
I
9
19
8
12
27
47c
3c
17c/16up
18c
38c/16up
25c
19c/16up
28up
II
5
8
3
3c
GLSR
Sump
1
2
I
GJ
O
I
Distnct
Physical Progress
of villages
OHT
where work
No of
No of
To end of
During
Milestone in
Target
is in
Packages villages
Nos
Prev month
month
progress
9
35c
6
8
14
2
5_
8
8
12
1 c/2up
1 c/2up
3c/4up
3up
3c/7up
4c/6up
3up
4c/9up
1
4
5c
1c
1c
2/4up
29c/4up
_2
1 c/1 up
1c
2c/4up
49c/4up
4
3c/1up
1c
3
1
4
6
7
8
21
2c
1
4
5c
1
1
2
4c
2c
20c
2c
40c/14up
25c
16c
2c
18c
35c
2c/26up
62c/26up
8c/2up
9+1
2up
8c/1up
17c/4up
4up
17c/4up
18
10c/2up
2up
10c/2up
15
3Sc/8up
Sup
42+1 35c/7up
341+1 204c/119up 13up/29c 229c/104up
6
6
£
2
2
Sup
1up
6up
1
4
2
7c
4c
1up
4up
4up
4c/5up|4c/5up
1
4
2
7c
4
1up
4/1 up
18
1c
1c
1
4
5c
2_
3c
17c/14up
5
6
11
Total
2c
2c
6c
2c/3up
8c/3up
2c/3up
3up
2c
6c
2c/3up
8c/3up
2
5
2
2
T
1
1
51
22c/10up
1c/6up
23c/12up
35
2c
1c
3c
1c
2c
1up
3c/1up
2up
2up
1up
1up
2c
1c/2up
3c/2up
1c
2c
1up
3 c/1 up
1c
1c
1c
1c
18c/8up 5c/8up 23c/8up
Target
R.M. (kms)
To end of
During
Prev
month
month
19
20
105
46
55
206
18
44
14
76
70
71
34
175
26
54
62
142
95
40
96
231
16
34
30
80
80
33
16
129
20
18
43
81
69
60
29
158
32
38
42
112
95
40
36
171
53
27
17
97
748
910
21
£
4_
8
2
3
2
7
2
2
73
73
1
1
88
Total
22
80
37
20
137
20
18
46
84
69
60
30
159
32
38
44
114
95
40
109
244
53
27
18
98
836
Contd...
INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT Phase-ll Package - II
(WORLD BANK ASSISTANCE)
SUMMARY OF PHYSICAL PROGRESS FOR THE MONTH OF DECEMBER" 1999
Frm-02
BATCH I & II
Districts
[Belgaum
[Bellary
[Bidar
l
i
[Gulbarga
[Raichur
[Shimoga
[Grand Total
Phv
D.M.
To end of
During
Target
Total Target
Prey, month month
23
"se”
60
104
350
41
88
38
167
247
17
264
56
72
38
166
133
124
60
317
65
79
87
231
132
32
130
294
44
88
85
217
1576
130
109
92
331
80
43
68
191
132
32
93
257
98
87
40
225
1434
24
25~
26
27
Physical Progress
S.P, (nos.)
To end of
During
Prev, month month
28
7'^9
C.P. (nos.)
Total
30
1
7
3
3
89
89
100
247
24
271
56
72
38
166
71
55
158
130
109
92
332
80
43
71
194
132
32
182
346
98
87
40
225
1534
42
46
54
142
31
42
65
138
60
48
60
168
13
27
27
67
753
48
32
80
31
32
During
total
month
33”
34
To
~32
7
7
Target
To end of
Prev. month
39
39
39
39
59
3
59
42
46
36
124
' 14
30
51
95
y
5
T
59
3
62
42
46
36
124
14
30
56
100
39
39
39
12
32
14
58
414
39
12
32
14
58
422
8
Awaiting
energisation
Villages
Commissioned
Dropped
Remarks
35
36
37
38
26
18
54
10
10
10
10
14
10
10
14
10
10
8
8
16
8
2
10
8
2
10
19
6
4
10
12
8
10
30
4
2
6
4
2
11
7T
16
16
16
16
10
10
10
62
10
8
8
16
140
nn
9
16
30
22
107
INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT Phase- II Packagc-II
(WORLD BANK ASSISTANCE)
BATCH - III (VILLAGES)
SUMMARY OF PHYSICAL PROGRESS FOR THE MONTH OF DECEMBER 1999
_____________ Physical Progress
Total no.
of villages
where work
is in
SI.No
District
No. of
Packages
No. of
villages
1
2
3
4
progress
5
1
Belgaum
10
10
10
OHT
Milestone
in Nos
Target
To end of
Prev. month
During
month
Total
Target
To end of
Prev. month
During
month
Total
Target
6
7
8
9
10
11
12
13
14
15
3
Bellary
Bidar
6
9
13
17
8
3
4
5
6
Raichur
Shimoga
GrandTotal
4
1
7
37
13
11
2
15
70
13
Sup
Sup
8up
8
Sup
8up
8up
During
To end of
Prev. month month
16
2
2
1up
1up
1up
1up
2up
2up
2
2
1 c/1 up
1 c/1 up
17
Total
Target
To end of
Prev. month
During
month
TotAI
18
19
20
21
22
14
3
3
19
£
3_
6
II
_4
5
1 c/1 up 1 c/1 up
1 c/1 up 1 c/1 up
33
16
2
1
7
4
4
11
1
5
38
4
1
5
8
14
1
2
7
3
3
1
1
23
19
5
1
15
5
1
1
1
19
2
2
3c
I
3
3c
II
10
9up
9up
9up
13
3c/9ui
9up
3c/9up
7
4
3_
15
6
7
£
2.
I
is
Gulbarga
8_
1
II
J
R.M. (kms)
GLSR
I
II
2
Sump I GLSR______________
15
17
0.5
0.5
25
0.5
14.5
14
1
I
1
1
2up
1c/1up 1 c/1 up
2
2
II
2up
1c/1up 1c/1up
1
3
2
I
7
2c/5up
2c/5up
II
5
1 c/1 up
1 c/1 up
12
3c/6up
3c/6up
55
6c/25up
1c/18up 7c/24up
2
2
10
1up
2up
3up
10
1up
1up
1c/1up
1up
1up
2up
2up
1c/3up 1c/4up
9
9
18
140
9
9
3
3
12
43
5.5
Contd..
12
48.5
INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT Phase-II Package - II
(WORLD BANK ASSISTANCE)
BATCH III (VILLAGES)
SUMMARY OF PHYSICAL PROGRESS FOR THE MONTH OF DECEMBER 1999
D.M. (kms)
Target
Districts
Belgaum
Bellary
To end of During
Prev. month month
Target
26
27
7
15
23
24
18
7
28
28
1
29
46
35
1
15
11
25
Bidar
Total
40
11
42
6
[culbarga
30
31
34
3
2
5
2
36
49
3
2
6
2
11
8
8
8
11
8
19
19
6
25
Grand Total
OK
5
28
83
6
6
53
13
4
4
6
5
14
2
2
2
1
42
4
4
20
2
2
2
2
5
5
3
2
5
7
5
2
5
Shimoga
To end of
Prev. month
Target
29
29
[Raichur
C.P. (nos.)
28
25
41
I
Physical Progress
S.P, nds.)
To end of
During
Total
Prev.
month
month
7
2
34
35
35
9
45
8
8
12
79
43
43
21
297
101
115
167
ChnntO
14
11
11
11
16
11
2
18
9
32
During
month
33
total
34
Ready for
Commission
commissioni
ed
ng
35
36
Dropped
Remarks
37
38
INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
(WORLD BANK ASSISTANCE) PHASE - II PACKAGE - II
Summary of Commissioning and handing over of schemes/villages DECEMBER 1999
I
Sr.N
o
District
1
2
vlgs
Vlgs
Target of
Total
Achievem
Handed
Balance vlg.
commissioned handed commission
No. of
ent during over during not achieved
to end of
over Prev. ing for the
vlgs
the mth.
the mth.
against target
Prev. month
mth.
mth
—3~
4
5
6
7
8
1
Belgaum
77
1
2
Bellary
59
12
2
3
Bidar
77
13
10
4
Gulbarga
72
11
3
12
5
Raichur
82
21
1
7
9
6
Shimoga
57
16
6
5
6
2
Total
424
74
22
41
33
4
7
8
10
4
6
9
6
2
Total achieved
Handed over Balance vlgs to
Vlgs.
commission (up to date) (up to date)
be
awaiting
Cumulative
cumulative commissioned) energisation
10 J
11
12
13
14
Target
Achievement
22
9
45
16
2
43
2
56
19
12
58
26
52
11
3
61
17
55
30
1
52
11
26
22
8
35
10
Com&hn-I Sheetl
18
256
107
26
317
66
15
’ Une village have been
commissioned ahead of the
tarnet
68
j
12
Remarks
* Six villages
commissioned
Target
have been
ahead
of
•
Two villages have been
dropped due to non receipt ol
required contribution.
INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
(WORLD BANK ASSISTANCE) PHASE - II PACKAGE - II
list OF VILLAGES COMMISSIOINED during the
MONTH OF DECEMBER 1999
ABSTRACT
SI No.
District
Total No. of Villges Commissioned during 12/99
1
________ 2
3
2
3
4
5
6
Belgaum
Bellary
Bidar
Gulbarga
Raichur
Shimoga
8
4
6
nil
9
Total
33
list OF VILLAGES COMMISSIOINED during the
MONTH OF DECEMBER 1999
Belgaum :
1
2
3
4
5
6
7
8
BGM - 1
BGM-6
BGM-7
BGM-7
BGM-8
BGM- 12
BGM - 12
BGM - 28
Peeranwadi
Katakabhavi
Bijaguppi
Godachi
K. Bekwad
Tolagi
Kakkeri
Budigoppa
Bellary :
1
2
3
4
BLR - 1
BLR - 1
BLR - 1
BLR - 10
P. D. Halli
Y.Kaggal
Karmachedu
Honnahalli
Bidar:
1
2
3
4
5
6
BDR-2
BDR-5
BDR-6
BDR-7
BDR- 11
BDR - 20
Santhapur
Madargi
Waddankera
Rajola
Kamathana
G. Chincholi
mpr-kk
-3G -
INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
(WORLD BANK ASSISTANCE) PHASE - II PACKAGE - II
LIST OF VILLAGES COMMISSIOINED DURING THE
MONTH OF DECEMBER 1999
Gulbarga:
Nil
Raichur:
1
2
3
4
5
6
7
8
9
RCR- 1
RCR-5
RCR-6
RCR-6
RCR-7
RCR-7
RCR-9
RCR - 18
RCR - 18
Govighat
Tugal Dona
Goudur
Gonwatla
Wadaganal
Nerebenchi
Jeerkalgudi
Kalalbandi
Kyadiguppa
Shimoga :
1
2
3
4
5
6
SMG-2
SMG -2
SMG-3
SMG-3
SMG-5
SMG-7
Harmaghatta
Holalur
Somalapura
Devarahalli
Kudligere
Billahalli
mpr-kk
-37-
1
INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT LTD.
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
(WORLD BAK ASSISTANCE) PHASE - II PACKAGE - II
LIST OF TOTAL VILLAGES COMMISSIONED TO END OF DECEMBER 1999
ABSTRACT
DISTRICT
SL NO.
1
2
' 3
4
5
6
TOTAL NO. OF SCHEMES COMMISSIONED
9
16
19
11
30
Belgaum
Bellary
Bidar
Gulbarga
Raichur
Shimoga
22
107
Total
LIST OF TOTAL VILLAGES COMMISSIONED TO
END OF DECEMBER 1999
BELGAUM:
1
2
3
4
5
6
7
8
9
BGM-1
BGM - 3
BGM-6
BGM-7
BGM-7
BGM-8
BGM - 12
BGM - 12
BGM - 28
Peeranwadi
Chikkalwad
Katakabhavi
BLR - 1
BLR - 1
BLR - 1
P.D. Halli
Y.Kaggal
Kamarachedu
BLR - 3
BLR-3
BLR-4
BLR-4
BLR-4
BLR-4
BLR-6
BLR-6
BLR-7
BLR-7
BLR-7
BLR - 10
BLR - 10
D. Kaggal
Kyadigihal
Hakkandi
S. L. Halli
N. Basapura
Tambarahalli
Eshapura
Chirasthalli
Kondanayakahnahalli
Gudiobalapura
Suggenahalli
Old Daroji
Honnahalli
Bijag uppi
Godachi
K.Bekwad
Tolagi
Kakkeri
Budigoppa
BELLARY:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
MPR-KK
-38-
INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
’ (WORLD BAK ASSISTANCE) PHASE - II PACKAGE - II
LIST OF TOTAL VILLAGES COMMISSIONED TO
END OF DECEMBER 1999
BIDAR :
I
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
BDR - 2
BDR-3
BDR-3
BDR-4
BDR-4
BDR - 5
BDR - 5
BDR-6
BDR-6
BDR - 7
BDR-9
BDR - 10
BDR- 11
BDR - 11
BDR - 12
BDR - 16
BDR - 18
BDR - 18
BDR- 20
Santhpur
Eklar
Aliambar
Dhannura
H.Tugaon
Madargi
Kodambal
Samthabad
Waddankera
Rajola
K.Jawalga
K.Chincholi
Nagoora
Kamthana
Manahalli
Kalagapur
Hippalgaon
Markal
G.Chincholi
GLB- 1
GLB-2
GLB-2
GLB - 3
GLB-4
GLB-6
GLB - 10
GLB -14
GLB - 14
GLB - 15
GLB - 16
Dasthapur
Ranjole
Dugnoor
Gundahalli Main
Keriambalga
Badadal
Nimbal
Killenkera
Balched
Melkunda
Arekera . K
RCR- 1
RCR- 1
RCR - 1
RCR-2
RCR-2
RCR-5
RCR - 5
RCR - 5
RCR-5
RCR - 6
Sadapur
Mustur
Gavigat
Nilogal
Hirebannigol
Vanagera
Malgatti
Hanumanal
Tugaldona
Nagaral
GULBARGA:
1
2
3
4
5
6
7
8
9
10
11
RAICHUR :
1
R
3
4
5
6
7
8
9
10
MPR-Nov
-37-
INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
(WORLD BAK ASSISTANCE) PHASE - II PACKAGE - II
LIST OF TOTAL VILLAGES COMMISSIONED TO
END OF DECEMBER.1999
RAICHUR :
11
RCR-6
12
RCR-6
13
RCR-6
14
RCR-7
15
RCR-7
16
RCR-7
17
RCR-8
18
RCR-9
19
RCR-11
20
RCR- 11
21
RCR-11
22
RCR-12
RCR-12
23
RCR-12
RCR-12
24
RCR-12
25
RCR-13
26
RCR -13
27
RCR -13
28
RCR-15
29
RCR -16
30
RCR-17
Basapura
Goudur
Go nwatla
Koradakera
Wadagnal
Nerebenchi
Gabbur
Jeerkalgudi
Ankasadodahi
Santhekallur
Yerjunti
Eleganoor
Eleganoor (Camp)
Hosakera Soul Camp
Hosakera Kottai Camp
Bevinal
Huliyapur
Kalalbandi
Kyadiguppa
Herur
Ramathnal
Sannahosur
SHIMOGA :
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
SMG-1
SMG-1
SMG-1
SMG-1
SMG-2
SMG-2
SMG-3
SMG-3
SMG-3
SMG-3
SMG-3
SMG-3
SMG-4
SMG-4
SMG-5
SMG-5
SMG-5
SMG-5
SMG-5
SMG-5
SMG-5
SMG-7
Beeragandanatialli
Mukthenahaili
Chiradoni
Bannikodu
Haramagatta
Holalur
Kagathur
Vaddanal
Kanctiiganal
Somalapura
De’.varahalli
Hodigere
Gama
Thyagarthi
Attigunda
Veerapura
Tattehalli
Marashettihalli
Thimalapura
D.B.Halli
Kudligera
Billahalli
MPR-Nov
-40 -
INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT LTD.
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
(WORLD BANK ASSISTANCE) PHASE- II PACKAGE - II
VILLLAGES COMMISSIONED AND HANDED OVER TO END OF DECEMBER 1999
ABSTRACT
SI
No
District
1
2
No. of Schemes Commissioned & Handed over
3
Nil
2
12
3
1
Belgaum
Bellary
Bidar
Gulbarga
Raichur
Shimoga
1
2
3
4
5
6
26
Total
VILLLAGES COMMISSIONED AND HANDED OVER TO END OF DECEMBER 1999
si
District
Package No.
Name ofVillages
Remarks
1
2
3
4
5
1
Belgaum
1
Belllary
BLR-4
BLR-7
Hakkandi_______
Ko ndanayakantral li
1
2
3
4
5
6
7
8
9
10
11
12
Bidar
BDR - 3
BDR-3
BDR-4
BDR - 6
BDR-7
BDR - 9
BDR -10
BDR -11
BDR -12
BDR - 16
BDR -18
BDR-18
Ekiar
Aiiambur
H.Tugaon
Samthabad
Rajola
K.Jawalga
K.Chincholi
Nagoora
Manahalli
Kalagapur
Hippalgaon
Markal
GLB - 1
GLB-2
GLB -10
Dasthapur
Ranjole
Nimbal
RCR-11
Ankasadoddi
SMG-1
SMG-1
SMG-3
SMG-3
SMG -4
SMG-5
SMG-5
SMG-5
Beeragondanahalli
Mukhenahalli
Kagathur_______
Somalapura_____
Gama__________
Attigunda_______
Veerapura______
Tattehalli
No
Gulbarga
2
2
3
Raich ur
1
Shimoga
1
2_
2
4
2
2
2
8
MI’K NOV
-41-
INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
(WORLD BANK ASSISTANCE) PHASE - II PACKAGE - II
STATUS REPORT ON COMMISSIONING OF SCHEMES AS ON END OF DECEMBER ' 99
1
-b
i
Energised Completed and Commissioned
No. of Water supply No. of Water supply No. of Water supply schemes
schemes taken up
schemes handed
commissioned and yet to be
over to VWSC
handed over to VWSC
Total
No. of Water supply schemes
completed but yet to be
energised and commissioned
No. of Water
supply
schemes under
progress
5
6
7
8
9
9
2
14
16
2
43
77
12
7
19
26
58
Gulbarga
72
3
8
11
17
61
5
Raichur
82
1
29
30
11
52
6
Shimoga
57
8
14
22
10
35
Total
424
26
81
107
66
317
SI
No
District
1
2
3
1
Belgaum
77
2
Bellary
59
3
Bidar
4
★
4
In Shimoga two villages are dropped for want of reguired contribution
68
INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
(WORLD BANK ASSISTANCE) PHASE - II PACKAGE - II
STATUS POSITION OF DISTRICT WISE COMMISSIONING OF SCHEMES
TO END OF DECEMBER ’ 99
SI
No
District
1
2
No. of Schemes
Ready for
Commissioning
3
No. of Schmes
commissioned and
under Trial run
4
No. of Schemes
commissioned and Handed
over for maintenance
5
9
No. of Villages completed
(3) + (4) + (5)
6
9
1
Belgaum
2
Bellary
2
14
2
18
3
Bidar
26
7
12
45
4
Gulbarga
17
8
3
28
5
Raichur
11
29
1
41
6
Shimoga
10
14
8
32
Total
66
81
26
173
Com&hn~3
-43-
INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
(WORLD BANK ASSISTANCE) PHASE - II PACKAGE - II
LIST OF VILLAGES WHERE CIVIL WORKS COMPLETED BUT AWAITING ENERGISATION
TO END OF DECEMBER 1999
ABSTRACT
SI No.
District
Name of the Villages
2
T
3
Nil
________ 2________
________26________
________17________
________11________
10
Belgaum
Bellary
Bidar
Gulbarga
Raichur
Shimoga
2
2
£
£
6
Total
66
LIST OF VILLAGES WHERE CIVIL WORKS COMPLETED BUT AWAITING ENERGISATION
TO END OF DECEMBER 1999
DISTRICT WISE SUMMARY
SI No.
District
Package No.
Name of the Villages
1
2
3
7
4
Belgaum
Nil
Bellary
1
2
BLR-6
BLR-6
BLR-6
Anekal
Anekal (Tanda)
Eshapura
BDR- 1
BDR- 1
BDR - 1
BDR - 1
BDR-2
BDR-2
BDR-2
BDR-2
BDR-2
BDR-4
BDR-4
BDR-4
BDR-5
BDR - 5
BDR-5
BDR-6
Betgera
Kitta
Ladwanthi
Hirnagaon
Santhapur
Khathgaon
Dongaon
Hedgapur
Dapka
Bhatambara 1
Chalkapur
Wanjor Khed
Madorgi
Bernal Khed
Waddan Kera
Nagan Kera
Bidar
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
mpr-kk
LIST OF VILLAGES WHERE CIVIL WORKS COMPLETED BUT AWAITING ENERGISATION
TO END OF DECEMBER 1999
DISTRICT WISE SUMMARY
SI No.
District
Package No.
1
Name of the Villages
2
Bidar
3
4
BDR-7
BDR-8
BDR-8
BDR-8
BDR - 8
BDR- 11
BDR - 13
BDR - 16
BDR - 16
BDR - 19
Muc?:L.ii
Murki
Kherda (B)
Hokarna
Nidoda
Kamthana
Kohinoor
Wadagaon
Kamalanagar
Nittur (B)
Tz
18
19
20
21
22
23
24
25
26
Gulbarqa
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
1
2
3
4
5
6
7
8
9
10
11
Raichur
GLB- 1
GLB- 1
GLB - 1
GLB-2
GLB-3
GLB-5
GLB-5
GLB-8
GLB-9
GLB -10
GLB-11
GLB-11
GLB - 14
GLB - 16
GLB -18
GLB - 21
GLB-21
RCR-5
_RCR-6
RCR-7
RCR-8
RCR-8
RCR-9
RCR-11
RCR- 13
RCR - 14
RCR - 16
RCR - 18
mpr-kk
-45'-
Kumsi
Arunkal
S.Saradogi
Kallur Raod
Kakkasagera
Bapparga
Rajankollur
Nalwar
Yelwar
Madaki
Chimmaidalai
Nagaidalai
Kotgera
Devapur
padasawali
Sawaie^jwar
Chinchansou.
Hulgera
Gonwala
Koradakera
Bagalwada
Turkundona
Singonal
Mednapur
Navalahalli
Ojanahalli
Katlatkur
Kota
INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
(WORLD BANK ASSISTANCE) PHASE - II PACKAGE - II
LIST OF VILLAGES WHERE CIVIL WORKS COMPLETED BUT AWAITING ENERGISATION
TO END OF DECEMBER 1999
DISTRICT WISE SUMMARY
SI No.
District
2
7
2
Shimoga
2
3
4_
2
6_
7
8
9
10
mpr-kk
Package No.
Name of the Villages
3
4
Chiradoni
Hosakera
Kamasagar
Devarahalli
Vaddanal
Pandomatti
Maravanji
Maravanji Camp
Arabilachi
Nidige
Antharagange
SMG- 1
SMG- 1
SMG - 1
SMG-3
SMG-3
SMG - 7
SMG-7
SMG-7
SMG-8
SMG - 16
SMG -16
INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
(WORLD BANK ASSISTANCE) PHASE - II PACKAGE - II
IMPLEMENTATION ASPER EXIT POLICY
SL
No
District
Villages Completed &
Commissioned at the
end of Previous Month
Villages Handed over to VWSC
Villages Completed Commissioned
Cumulative
During the Month
Target
Achivement
Target
No. of
Previous
Achivement
Month
8
7
1
2
3
4
5
6
1
Belgaum
1
7
8
22
9
2 Bellary
12
10
4
45
16
2
3 Bidar
13
6
56
19
10
I
4 Gulbarga
11
12
52
11
3
i
5 Raichur
21
7
9
55
30
1
6 Shimoga
16
5
6
26
22
6
Total
74
41
33
256
107
22
£
Cumulative
During the Month
Target
Achivement
Target
Achivement
9
10
11
12
25
2
2
12
2
40
14
3
1
8
2
16
-4
65
26
INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
• (WORLD BANK ASSISTANCE) PHASE - II PACKAGE - II
Villages covered under different Bottlenecks
For the month of DECEMBER 1999
No. of villages
No. of Open
No. of Bore wells
OHT site under
flushing to be
well/Shaliow
Bore
to be drilled
dispute
done
wells to be drilled
Sr.
No.
District
1
i
Belgaum Bulganawadi
Hudli (1)
Katakabhavi
Doddi (2)
Parthanahalli
2
Bellary
3
Bidar
4
Gulbarga
Sump sites to
be handed
over
Arabhavi (college) Pachapur
Turunur
Sindhikurbet
SBC
Results
GLSR site
to be
handed
over
Nainglaz
Rustumpur
Nagenwadi
Kodal
Baparga (1)
Tadakal
Jeeratagi
Bheemanahalli (1) Halgadala
Bheemanahalli
Ankalga
Hungunta (SBW)
5
Raichur
K.Hosahalli. 3 nos.
Kolur
Bhagyanagar
Singnal. 2 nos.
Kandakur. 3 nos.
6
Shimoga -
Total Nos.
B.Beeranahalli (1)
4
14
4
Btl_vlg Sheet 1
— 4$-
5
3
2
1
Details of villages where work is not started
Dt:
1
Belgaum
BGM-26
Sampagaon
Surface source not settled
2
BGM-26
Sanikop
-do-
3
BGM-26
Hole Hosur
-do-
4
BGM-26
M K. Hubli
-do-
Dt:
Bellary
1
BLR-5
Bagewade
SBW yet to be established
OHT-2: GL Bracing Beam
SP = Not procured
RM,DM= Not procured
Oct_Age
2
BLR-14
Sidiginamola
SBW yet to be established
SP,RM, DM: Not started
OHT: 2nd bracing beam
3
BLR-17
Hargondanahalli
SBW yet to be established
OHT: Not started
SP : Not procured
RM : Not started
DS : Not started
Dt:
Gulbarga
1
GLB-9
Halgadla
source not established
2
GLB-13
Ravoor
-do-
3
GLB-19
Honegunta
-do-
4
GLB-22
Chintapalli
-do-
5
GLB-13
Salahalli
-do-
NOTATIONS
OHT-1
OHT-2
Foundation
OHT-3
2nd Bracing Beam
OHT-4
3rd Bracing Beam
Bottom Ring Beam & Slab
OHT-5
OHT-6
G.L. Bracing Beam
Side Wall
B.B.
Dome
Bracing Beam
G.L.
Ground Level
OHT-7
(BRB & S)
(SW)
a. GLSR-1 - foundation
b. GLSR-2 - RCC Beam
c. GLSR-3 - Masonry
d. GLSR-4 - Roof
PSBW
F&YT
Proposed Shallow Borewell
WR
Water requirement
WPR
Water Potability Results
PR
Pumping rate
HP
Hand Pump
SP
Stand Post
CS
CT
Cistern
WP
Flushed and Yield tested
Cattle Trough
Washing Platform
SSI
Dust Bin
Surface Source Scheme (Individual)
SSR
Surface Source Scheme (Regional)
UP
Under Progress
C
Completed
JW
1W
WTP
Jack well
Intake well
Water Treatment Plant
N.A.
CCS
Not applicable
Construction Schedule
MS-1
I Milestone
MS-2
MS-3
II Milestone
III Milestone
DB
-50-
INTEGRATED RURAL WATER SUPPLY AND
ENVIRONMENTAL SANITATION PROJECT
KARNATAKA
(World Bank Assistance)
Phase II
Package II Villages
PROGRESS REPORT
of Belgaum District
For the Month of DECEMBER 1999
INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.. NEW DELHI
CONSULTANTS FOR CONSTRUCTION MANAGEMENT AND QUALI FY CONTROL
Format
3
M/s. intercontinental Consultants And Technocrats Pvt. Ltd.
Integra ted Rural Water Supply and Environmental Sanitation Project
(World Bank Assisted)
Physical & Financial Progress Package wise (Month December 99)
Name of District: Belgaum
Sr.
No
Pack
-age
No of
villages
Name of
Contractor
Period of
completion
PDC
Mile
stone
Contract
Value
Rs. in
Lakhs
Date of
start
PDC
Financial
Progress In
Lakhs
(cumulative)
Physical Progress
A
25
T
2
A
25.00
26-9-98
It
85.00
95.77
7
26-3-99
III
1
up
121.3
115.71
BGM
1
01
4
K
Ramakrishna
Hyderabad
18 months
121.30
26-3-98
4th Sept 99
I
4
ip
5
o
04
05
07
A
a'
3
3
4
M/s B T Patil
and Sons,
Belgaum
Shri
R Nagraj,
Ramadurg
M/s
Coramandal.
Hyderabad
18 months
94 60
27-4-98
27th Oct 99
18 months
53 70
12-1-98
12th July 99
18 months
29th Sept
99
53 30
20-3-98
2
A
2
4
2.
A
2
1
1
up
OHT
in
Nos.
DM
in Kms
RM
In Kms
CP
in
Nos.
SP
in
Nos.
T
T_
4
A
2
A
T’
5.5
13
21.7
2
3
up
2/1
3/1
up
8
5.5
22
22.7
3
3
3/1
2C/
1C
20.00
18.32
2
2
27-10-98
II
60.00
28.23
5
7
2.2
11
9.30
1
27-4-99
III
94.60
39.45
9
11
2.75
18
15.5
2
27-10-99
I
10.00
10.00
1
1
12-7-98
II
35.00
19.69
4
3
1.2
12-1-99
III
53.7
25.99
6
5
1.2
12-7-99
I
13.00
11.42
1
1
II
35.00
16.87
4
20-3-99
III
53.3
33.22
6
4
Under
extended
time
4
2
11
-/1
2
up
-12
2
up
Under
extended
time
1
5.4
2
2
up
8.5
3
3
up
Godachi
Biiagupp<
1
2
20-9-98
Up
Remarks
Under
extended
time
5
12
No
of
sche
me
prop
osed
A
1/-
1
29-9-99
I
20-9-99
Sump I
GLSR
in
Nos.
No of
sche
me
comm
ission
ed
4
0.6
5
0.6
2
3
up
6
5.7
8
5.8
3
3
up
Under
extended
time
Contd..
Physical & Financial Progress Package wise (Month December 99)
Sr.
No
Pack Age
No of
village
Name of
Contractor
Period of
completion
Contract
Value Rs.
in Lakhs
Mile
stone
Date of
start
PDC
Financial
Progress in
Lakhs
(cumulative)
Physical Progress
PDC
08
M/s. B.T.Patil
and Sons,
Belgaum
4
18 months
12-5-98
16.00
17.12
2
64.00
28.63
6
III
80.00
46.07
10
12-11-99
I
13.10
13.10
1
1
2
13-10-98
II
40.00
15.01
3
2
7
13-4-99
III
66.00
34.80
5
3
1.6
12
25.00
9.72
4
3
0.9
80.00
17.56
13
10
21.4
I
A
2
3
up
-/1
1
up
1
3
3
up
1/2
Up
1C/
1up
1
T
6.7
11
5.0
11.7
18
16
1
6
2
10
1
A
Under
extended
time
1
up
12-11-98
12th Nov99
II
Remarks
Sump /
GLSR
in
Nos.
T‘
A
2.8
A
A
No of
sche
-me
Prop
-osed
A
3
up
T
4
T
2
T
OHT
in
Nos.
DM
in Kms
A
£
80.00
RM
In Kms
CP
in
Nos.
SP
in
Nos.
T
BGM
8
No of
sche
me
com
missi
oned
12-5-99
9
09
3
I
M/s.
Pochampad,
Hyderabad
18 months
66.00
13-4-98
13th Oct 99
N
10
Up
Under
extended
time
1
up
2
up
1
2
up
-/1
1
up
4.0
(0-5)
2
2
up
-/1
1
up
3
0.5
1
3
up
1
8
9.6
3
4
up
1/1
-/1
up
6.32
(2.8)
14
10.17
5
4
up
1/1
-/1
13-10-99
10
10
3
M/s. B.T.Patil
and Sons
Belgaum
18 months
136.30
27-5-98
Under
extended
time
27-11-98
18th Nov 99
II
1
I
27-5-99
III
136.3
49.37
30
(13)
2
up
27-11-99
12
12
4
Shn S A.
Magdum.
Belgaum
18 months
21st Aug 99
96.70
21-2-98
I
19.00
19.00
3
21-8-98
II
59.00
51.45
8
21-2-99
III
21-8-99
1
Up
4
U
8
12.2
10
14.80
2
96.70
74.80
(7.56)
14
(5)
6
3
21-
1
up
3/-
1
up
up
P
14
15.2
17
16.45
(0.7)
3
Under
extended
time
1/-
1
3
3
3C
2
1
Cor.td . .
Physical & Financial Progress Package wise (Month December 99)
Sr.
No
Pack
-age
No of
villag
-es
Name of
Contractor
Period of
completion
PDC
Contract
Value
Rs. In
Lakhs
Date of
start
Mile stone
PDC
Financial
Progress in
Lakhs
(cumulative)
Physical Progress
A
8.00
20.53
2
M/s. Rao
Cont.
Bangalore
18 months
58.00
28.00
20.53
58.00
25.26
30-5-2000
I
60.00
53.99
27-4-99
II
140.00
116.48
1
1
3
0.30
4
5.0
1
27-10-99
III
241.00
116.48
2
2
5
0.30
6
5.00
1
4.5
2.90
1
0.57
1.0
0.68
2
1.45
1.2
1.95
1.6
(06)
4
19.0
5
23.20
1
2
Up
15
24.0
2
2C/
30-11-98
24
Hosur
Shri G.
Krishna
Reddy
18 months
241
27-10-98
I
W
26
27
25
26
1
Neginhal
Sampgaon
M.K.
Hubh
HoleHosur
M/s Suprad a
Cont.
M/s Rao
Cont.
Bangalore
A
4.0
1
5
7.0
3
10
1
1
A
T
3
1
2
5
2
2
A
A
28
1
6 months
11.32
540
4-6-99
24-9-98
11.32
2.90
100.00
240.37
24-3-99
II
300.00
323.68
1
2
13
22.10
540.00
335.30
2
4
29
22.10
23
24.2
1.12
1.12
1.52
1.30
2.81
2.905
3.80
3.80
(0.30)
2
6 Months
15 73
25-3-99
*28-4-99
I
28-7-99
II
28-10-99
-/2
up
1
Up
Contract
in Mile
stone II
-/1
up
3
Con tract
in Mile
stone II
Contract
in Mile
stone III
1
Up
2C/
1
Up
6.30
9.94
1
15.73
15.72
2
2
s
Contract
in Mile
stone III
-/1
18 months
III
Remark
Contract
in Mile
stone II
1
Up
27-4-2000
I
4-9-99
II
4-12-99
I
1
2
24-9-99
M/s Deepa
Cont. Co
Goa
A
Sump I
GLSR
in
___Nos^
T
A
-/2
1/up
No of
sche
me
prop
o-sed
2/2
24-3-2000
30
T
30-5-99
II
30-11-99
III
25
T_
2
T
T
15
OHT
In
Nos.
DM
in Kms
RM
In Kms
CP
In
Nos.
SP
in
Nos.
T
BGM
15
No of
sche
me
com
missi
oned
1
Up
-/1
1
Up
1C
1
Under
extende
d time
Conid...
Physical & Financial Progress Package wise (Month December 99)
Period of
completion
Sr.
No
Pack
-age
No of
villag
es
Name of
Contractor
PDC
Contr
act
Value
Rs. in
Lakhs
Mile
stone
Date of
start
Financial Progress
in Lakhs
(cumulative)
Physical Progress
PDC
T
A
I
8.00
5.24
20-11-99
II
19.77
BGM
31
29
30
1
Asundi
M/s
Suprada
Cont.
Shri H. P.
Madhukar
HuWi
6 months
18 months
19.77
197
20-08-99
25-10-98
I
32
31
1
1
33
32
1
M/s Rao
Constn.
Bangalore
6 months
Shn. G.
Krishna
Reddy
Dharwad
6 months
25.06
31-5-99
*13-8-99
30 12
13-11-99
20-02-2000
I
25-4-99
II
25-10-99
III
25-4-2000
I
13-11-99
II
13-2-2000
I
11-10-99
II
11-1-2000
CP
in
Nos.
SP
in
Nos.
x
29
No
Of
sch
eme
Com
miss
ione
d
RM
in Kms
1
T
2.0
2
4.375
A
A
T
DM
in Kms
A
T
1.2
3.215
OHT
In
Nos.
__ A_
0.50
T
0.80
1
A
No
of
sch
erne
prop
ose
d
Remarks
Sump /
GLSR
in
_Nos.
T
A
Contract
in Mile
stone II
(0.30)
30.00
114.49
3
12.80
2
0.80
1
1
1
8
13.50
7
9.0
1
197.00
2
2
14
13.50
11
9.0
1
10.00
1
1
2
100.00
154.03
25.06
5.22
2
2
4.5
12.00
11.52
1
1
2
3
2
5
30.12
4.00
Up
1
Up
1
Up
1
Up
1
1
Up
2.50
1
I
Note : Values in brackets indicate this month progress.
District Manager (South),
ICT. Pvt. Ltd.,
Belgaum.
Contract
in Mile
Stone III
Contract
in Mile
stone II
Contract
in Mile
stone II
Format
3
M/s. intercontinental Consultants And Technocrats Pvt. Ltd.
Integrated Rural Water Supply and Environmental Sanitation Project
(World Bank Assisted)
Physical & Financial Progress Package wise (Month December 99)
Name of District: Belgaum
Period of
completion
Sr.
No
Pack
-age
No of
villages
Name of
Contractor
PDC
Contr
act
Value
Rs. in
Lakhs
Mlle
stone
Date of
start
Financial Progress
in Lakhs
(cumulative)
Physical Progress
PDC
T
A
02
Bellad
Bagewadi
Shri
B R Patil,
Nippani
18 months
95.74
25.00
35.93
II
60.00
25-10-99
III
95.74
13-10-98
T
A
50.26
1
2
55.32
2
T
A
T_
2
A
1
T_
1
A
5
1.40
2
0.5
8
2.90
4
3
03
4
M/s.
Coramandal.
Hyderabad
18 months
21st June
99
53 20
21-3-98
25^4:
2000
I
12.00
2
2
M/s.
Coramandal,
Hyderabad
18 months
21st Sept
99
3.0
Sump I
GLSR
in
Nos._
A
T
Contract
in Mile
Stone III
1
36.00
16.61
5
III
53.20
38.43
21-9-99
I
11.50
21-9-98
II
30.00
1
up
Under
extended
period
1
3
1
21-9-98
3
0.30
9
4.90
2
3
up
8
5
0.732
16
12.38
3
3
up
11.50
1
1
2
13.15
4
2
7
3
up
21-3-99
06
A
Remarks
1
up
(1-5)
12.00
II
6
T
No
of
sche
me
prop
osed
25-4-99
(0.46)
v)
OHT
in
Nos.
DM
in Kms
RM
In Kms
CP
In
Nos.
SP
in
Nos.
BGM
2
No of
scheme
commis
sioned
46.85
21-3-98
Up
1
U
Under
extended
time
1
2
up
1Z-
2
2
up
1/-
P
21-3-99
III
21-9-99
46.85
35.42
(1114)
6
2
3
1.8
12
Chikalwad
10.6
1
up
Contd..
Physical & Financial Progress Package wise (Month December 99)
Period of
completion
Sr.
No
Pack
age
No of
villag
-es
Name of
Contractor
PDC
Contract
Value
Rs. In
Lakhs
Mile
stone
Date of
start
PDC
Financial
Progress in
Lakhs
(cumulative)
Physical Progress
T
A
13.00
7.5
2
22-11-98
II
45.00
18.73
6
11
22-5-99
III
73.80
27.21
10
2
22-11-99
I
7.00
7.00
1
24-11-98
II
23.00
13.57
4
24-5-99
III
38.42
23.27
6
5
24-11-99
I
15.00
15.00
3
2
25-9-98
II
55.00
29.44
10
6
1.0
7
8.64
3
2
up
-71
25-3-99
III
80.35
40.59
13
8.9
4.59
21.7
12.3
4
2C7
2
up
-71
BGM
T_
11
13
11
13
2
3
I
Uf
M/s. B T.
Patil and
Sons.
Balgaum
Shri
R Nag raj.
Ramadurg
18 months
73.80
22-5-98
17th Nov 99
18 months
38.42
24-5-98
24th Nov 99
I
14
14
4
Shri
S A.Magdu
m. Belgaum
18 months
25th Sept
99
80.35
25-3-98
25-9-99
CP
in
Nos.
SP
in
Nos.
A
T
Up
I -
RM
in Kms
A
T.
2
A
DM
in Kms
T
OHT
in
Nos.
Sump 7
GLSR
in
Nos.
A
T
3
A
3.4
T
1
A
1
up
5
10
4.9
2
1
up
1/-
8
16
12.85
3
2
up
17-
1
2
3
6
3.30
1
1
up
10
9.12
2
2
up
3.1
4
No
of
sche
me
com
miss
I
one
d
No
of
sche
me
Prop
ose
d
Remarks
Contract in
Milestone
III
Under
extended
time
1
Under
extended
time
Conid..
Physical & Financial Progress Package wise (Month December 99)
Sr.
No
Pack
-age
No of
villag
-es
Name of
Contractor
Period of
completion
PDC
Contract
Value
Rs. In
Lakhs
Date of
start
Mile stone
PDC
Financial
Progress in
Lakhs
(cumulative)
Physical Progress
T
A
I
16.11
73.00
08-6-99
II
56.11
83.11
1
1
08-12-99
III
116.11
83.11
2
2
08-6-2000
I
11.26
12.36
18-6-99
II
26.26
12.36
18-12-99
III
51.26
18-6-2000
I
20.00
25.36
25-4-99
II
50.00
25.36
2
2
1
0.3
8
3.6
25-10-99
III
2
Up
1
up
93.36
32.26
(6.9)
2
2
Up
2
2
0.3
13
5.0
1
Up
20.00
12.35
2
5.5
25-4-99
II
1
up
50.00
20.65
1
2
1
1
7
5.5
25-10-99
III
1
up
99.34
20.65
2
2
2
2
11
5.5
25-4-2000
I
15.00
19.59
1
2
2.6
25-4-99
II
40.00
22.06
1
1
3
4
4.5
1
1
up
25-10-99
III
79.30
29.56
2
2
5
9
6.5
1
1
up
SP
in
Nos.
BGM
T
16
17
16
17
Kunnur
Mangav
-ati
M/s Suprada
Cont.
Dharwad
Shri Lathure
& Brothers
Lathur
18 months
18 months
116 11
51.26
08-12-98
18-12-98
No Of
sche
me
comm
ission
ed
A
CP
in
Nos.
T
A
OHT
in
Nos.
RM
in Kms
DM
in Kms
T
A
0.70
T_
2
A
6.0
T
1
1.50
6
7.0
1
2
1.50
8
1
1
1
2
2
1
1.80
A
1
up
No
of
sche
me
prop
osed
Remarks
Sump /
GLSR
in
Nos._
T
A
Contract
In mile
Stone Hi
1
up
1
1
3.2
2
3.2
1
up
Contract
in Mile
Stone III
1
up
Contract
in Mile
stone III
1
1
3
I
U)
J
18
18
Ainapur
i
Shri
B.R.Patil,
Nippani
18 months
93.36
25-10-98
25-4-2000
19
20
19
19(A)
Jugul
Shirugu
-ppi
Shri
B.R.Patil,
Nippani
Shri
B R Patil,
Nippani
18 months
18 months
99.34
79.30
25-10-98
25-10-98
25-4-2000
3
2
(Pr)
1
Contract
in Mile
stone III
1
up
1
up
Contract
in Mile
stone III
Contd...
Physical & Financial Progress Package wise Month (December 99)
Period of
completion
Sr.
No
Pack
-age
No of
villa
-ges
Name of
Contractor
PDC
Contract
Value
Rs. in
Lakhs
Mile
stone
Date of
start
Financial
Progress in Lakhs
(cumulative)
Physical Progress
PDC
T
A
20.00
26.75
50.00
49.54
1
117.10
53.74
2
SP
in
Nos.
BGM
T
21
20
Akkol
Shri
B R.Patil,
Nippani
117.10
25-10-98
No of
sche
-me
commissoned
CP
In
Nos.
A
T
A
RM
in Kms
JT
A
T_
OHT
in
Nos.
A
2.7
T
1
1.2
4
5.0
1
1
up
2.8
7
6.7
(1.7)
1
1
up
0.6
2
12
1
18 months
DM
in Kms
1
2
25-10-99
III
21
Sounda
-tti
M/s Suprada
Cont.
Dharwad
18 months
126.80
23-9-98
vr
oO
I
23
22
Chinchali
Shri H. P
Madhukar
225
27-10-98
23
Borg
-aon
Shri
B. R.Patil.
Nippani
25-10-98
2
3
(1.6)
25.00
91.39
23-3-99
II
60.00
91.39
1
2
1
1.35
7
12
1
23-9-99
III
1
up
126.80
91.39
2
4
2
1.35
12
12
1
23-3-2000
I
1
up
55.00
69.94
1
2
2.20
4
7.6
1
27-4-99
II
1
up
130.00
152.41
1
4
7
8.43
13
8.0
2
3
up
152.41
2
6
11
9.63
21
8.8
(0.8)
4
3
Up
2
2.0
1
18 months
146.45
2
25-4-2000
I
27-10-99
III
24
2
(Pr)
27-4-2000
I
225.00
(12)
1
26.00
34.97
76.00
46.68
1
146.45
55.49
2
1
18 months
25-4-99
II
1
1
up
I 25-4-2000
2
Pr
2
2
Sump /
GLSR
in
Nos.
T
A
Contract
in Mile
stone III
Contract
in Mile
stone II
Contract
in Mile
stone III
2
0.70
6
3.0
1
1
Up
3
0.70
10
5.0
(2.0)
1
1
Up
25-10-99
III
Remarks
Contract
in Mile
stone III
25-4-99
II
22
A
No of
sche
me
propo
sed
Contd...
Physical & Financial Progress Package wise (Month December 99)
Period of
completion
Sr.
No
Pack
-age
No of
villag
es
Name of
Contractor
PDC
Contr
act
Value
Rs. in
Lakhs
stone
Date of
start
Financial
Progress In Lakhs
(cumulative)
Physical Progress
PDC
T
A
30.00
81.39
120.00
142.84
(10.56)
T
27
Pach
apur
Sindhihatti
Shri H. P.
Madhukar
Hubli
202
16-12-98
4
35
33
34
1
1
V)
A
T
A
OHT
In
Nos.
DM
in Kms
RM
in Kms
Sump /
GLSR
in
_Nos.
T_
A
1
1
Up
T.
3
A
4.90
T_
1
A
5.75
T.
1
A
10.25
(2.15)
4
6.82
3
4
Up
2
3
Up
4
2
Up
3
2
Up
18 months
26-6-99
II
Rustumpur
Bagarnal
Karaguppi
34.
CP
in
Nos.
SP
in
Nos.
BGM
28
No
of
sch
eme
Com
miss
ione
d
26-12-99
III
S. A
Magdum
Belgaum.
6 months
B R Patil
Nippani
6 months
43.20
2
8
2
4
13
7
6.82
17.00
3.62
2
2
3
2.20
43.20
17.55
3
4
7
5.40
22.00
4.25
2
2
4
3
1.20
26-3-99
26-6-2000
I
19-9-99
II
19-12-99
I
7-10-99
*7-7-99
II
57.48
14.49
5
4
9.54
8.6
6.40
I
19-10-99
II
19-1-2000
I
25-9-99
11.00
7.0
3
1
1
2
29.08
7.0
6
2
2.5
4.5
1
1
2
II
25-12-99
I
6-8-99
15.18
4.04
2
1.60
0.20
4.40
4.20
9.00
7.61
2
1.0
1.80
1.0
3.20
II
6-11-99
22.96
18.06
(6.15)
2
2.0
2.0
3.0
3.20
19-6-99
57 48
I
202.00
1
1
1
Up
Remarks
Contract
in Mile
Stone II
Contract
in Mile
stone II
1
Up
1
Up
1/1
No
of
sch
erne
prop
ose
d
Contract
in Mile
stone II
1/-
7-1-2000
36
37
38
35
36
37
1
1
1
Shri B. R.
Patil
Nippani
6 months
Shri B R.
Patil
Nippani
6 months
Shri R S
Patil,
Shiraguppi
29.08
26-3-99
*19-7-99
15.18
26-3-99
*25-6-99
6 months
22.96
6-5-99
6.00
2
Pr
4.50
1
1
1
1
Up
1
Up
1
Up
1
Up
1
Up
1/-
Contract
in Mile
stone II
Contract
in Mile
stone II
Contract
in Mile
stone II
1
Up
Note : Values in brackets indicate this month progress.
District Manager (North),
ICT. Pvt. Ltd.,
Belgaum.
Fc rmat
4
Intercontinental Consultants And Technocrarts Pvt. Ltd.
Name and Address of the District Manager (North): Col. (Retd.) A. B. Kakhandaki,
CCB - 365, Giri Nivas, Sadashiva Nagar,
Belgaum-01 Tel: (0831) 472710
For the month of December 99
District: Belgaum
Sr.
No
Package
Name
BGM
Total
No. of
villages
Value of
the work
in Rupees
in Lakhs
Name and
address of the
contractor
Name and
address of
the
contractor
personnel
Name and
address of
Assistant
Engineer
Date of
award
Date of
starting
Financial Progress (Cumulative) in Rs. In
Lakhs
Date of
completion
MS -I
2
1
2
1
I
2
3
3
4
95.74
1
4
53.20
(F*
O
3
4
5
6
11
13
2
2
3
46.85
73.80
38.42
Shri
Nippani
6
5________
B.R.Patil
M/s. Coromandel
Pvt.
Prestcrete
Ltd.
Hills
Banjara
Hyderabad
Sunil
Shri
Kumar
Gokak
Ph : 08332 25215
M/s. Coromandel
Pvt.
Prestcrete
Ltd.
Hills
Banjara
Hyderabad
Shri
R.S.Hukkeri
Gokak
Ph : 08332 25215,2798
4
M/s. B.T.Patil and
Patsons
Sons
House Belgaum
0831
Ph
421112
Shri
J. S. Sawant
Belgaum
Ph : 0831
463617
R.Nagraj Beelagi
Nagar Ramadurg
Ph : 08335 42801
D.G.Yedhalli
S.K.Hadima
ni
Ramadurg
7
Shri
V.S.Diwate,
Kabbur.
Ph: 0833
57073
B.
Shri
R.
Chougule. at
Chikkodi.
S.
Shri
V.
Shri.
Diwate,
B. S. Kamate
Shri Nitturkar
Belgaum
for
village Daddi
V.S.
Shri
for
Divate
Katakbhavi
Shri
B.S.Kamate for
Khadaklat
village
Shri
V.S.Diwate for
Belkud Village
Hanji
Shri
for
Athani
villages
Kannal,
Parthanalli and
Yelihadagali
I
MS-II
A
12
T
13I
14
MS - III
T ______ A_
15
16
8
9
10
T
11
13-10-98
13-10-98
18 months
25
35.93
60
50.26
95.74
55.32
(0.46)
16-8-97
21-3-98
21-1-99
12
12
36
16.61
53.2
38.43
26-2-98
21-3-98
21-9-99
11.5
11.5
30
18.55
46.85
35.42
(11.14)
25-4-98
22-5-98
22-11-99
13
7.5
45
16.43
73.80
27.21
28-3-98
24-5-98
24-11-99
7
7
23
13.57
38.42
23.27
I
2
Contd..
Sr.
No
Pack
age
Name
BGM
Total No.
of
villages
Financial Progress (Cumulative) in Rs. in Lakhs
Value of
the work
in Rupees
in Lakhs
Name and address
of the contractor
Name and
address of
the
contractor
personnel
Name and
address of
Assistant
Engineer
Date of
award
Date of
starting
Date of
comple
tion
A
12
MS-II
T
A
13J
14
MS-I
1
6
2
14
3
4
4
5
80.35
Shri S.A.Magdum
“Shreeyansh” 9th
cross,
Bhagya
Nagar Belgaum
Ph : 0831 -481818
7
16
1
116.11
8
17
1
51.26
9
18
1
93.36
10
19
1
99.34
I
Ts
6
Suprada
Constructions,
Dharwad
M/s.Lathure &
brothers,
Lathur.
Shri. Patil
Belgaum
Shri.
Krishnaraj
Shri. Desai
I
11
19(A)
1
79.30
Shri
Nippani
B.R.Patil
Shri
B.R. Patil
Engineers
and
Contractors,
Rajashila
Apartments,
Ashoka
Nagar,
Nippani.
Shri
B.R.Patil
Engineers
and
Contractors,
Rajashila
Apartments,
Ashoka
Nagar,
Nippani.
Shri Karoshi.
Shri.
Karoshi.
Shri. Karoshi
7
Shri.
R.
B.
Chougala.
Shri Abbubakar
Mulla
Belgaum
for
Nesaragi
village
Shri
B.
S.
Revankar
Khanapur
for
village Ankalagi
Shri B.S.Kamate
at Khadaklat for
Kunnur________
Shri
Hanamantraya
Patil.
Mangavati.
Shri Prabhakar
Hanji, Athani Ph:
08189-51632
for village
Ainapur(SSI)
Shri.
Hanumantraya
Patill
Jugul
Shri
Hanamantraya
Patil.
Siraguppi.
MS - lll_
T
_A_
15
16
8
9
10
T
11
4-2-98
25-3-98
25-9-99
15
15
55
29.44
80.35
40.59
8-12-98
8-12-98
18
months
16.11
66.74
56.11
83.11
116.1
83.11
2-1-99
2-1-99
18
months
11.26
12.36
21.26
12.36
51.26
12.36
29-9-98
25-10-98
18
months
20
25.36
50
25.36
93.36
32.26
(6.9)
29-9-98
25-10-98
18
months
20
12.35
50
20.65
99.34
20.65
29-9-98
25-10-98
18
months
15
22.06
40
22.06
79.30
29.56
3
Contd..
Financial Progress (Cumulative) in Rs. in Lakhs
[
Sr.
No
Total No.
of
villages
Value of
the work in
Rupees in
Lakhs
1
2
3
4
12
20
1
117.10
21
1
126.80
14
22
1
225.00
15
23
1
146.45
16
27
5
202.11
17
33
1
43.20
18
34
1
57.48
13
I
Pack
age
Name
BGM
cys
Name and
address of
the
contractor
personnel
Name and
address of the
contractor
_______ 5_______
Shri
B.R.Patil
and
Engineers
Contractors,
Rajashila
Apartments,Ashok
a Nagar.Nippani.
M/s.
Suprada
Construction
Dharwad
Shri
H.P.Madhukar,41,
Prashant, Vijaya
Nagar.Hubli_____
Shri
B.R.Patil
and
Engineers
<
Contractors,
Rajashila
Apartments,
Ashoka
Nagar.Nippani.
Shri
H.P.Madhukar
S.
• Shri.
Magdum
Ms. B. R. Patil
A.
Name and
address of
Assistant
Engineer
Date of
award
Date of
starting
Date of
completion
MS-I
T J[~X
11
12
MS - II
T ___ X
14
13I
MS-III
T
15
A
16
7
8
9
10
Shri
Manjunath, R.
Akkol
29-9-98
25-10-98
18 months
20
26.75
50
49.54
117.10
53.74
(4.10)
Shri. Raju
Shri. Desai
Shri.
Kamble
yet
Not
given
Shri S. R.
Patil
at
Mangavatti.
21-9-98
23-9-98
18 months
25
68.71
60
91.39
126.80
91.39
Shri SR Patil
At
mangavati.
23-10-98
25-10-98
18 months
55
69.94
130
138.07
225.00
152.41
Shri. Meti I.
N.
Shri
Manjunath, R.
Borgaon
29-9-98
25-10-98
18 months
26
34.97
76
46.68
146.45
55.49
Shri. Mohan
Kulkarni &
Shri Patil S.
M.
Shri
S.M.Sondur
Gokak Ph ;
08332
for
25104
village
Pachapur &
six villages
Veeresh
Satya Naik
Veeresh
Satya Naik
16-12-98
16-12-98
I
18 months
30
81.39
120
142.84
202
19-6-99
19-6-99
6 months
17
14.12
43.20
17.55
26-3-99
7-7-99
6 months
22
4.25
57 48
14.49
____ 6
Shri.
Hedage
Not
given
Not
given
yet
yet
(10.56)
4
Contd..
Financial Progress (Cumulative) in Rs. in Lakhs
Sr.
No
Pack
age
Name
BGM
Total No.
of
villages
1
19
2
35
2
20
21
Value of
the work in
Rupees in
Lakhs
Name and
address of the
contractor
1
4
29.08
_______ 5
Ms. B. R. Patil
36
1
15.18
Ms. B. R. Patil
37
1
22.96
Shri. R. S. Patil.
Name and
address of
the
contractor
personnel
Name and
address of
Assistant
Engineer
6
7
Veeresh
Satya Naik
Shri
Manjunath, R.
Shri.
Prabhakar C.
Hanji
Not
given
Not
given
Not
given
yet
yet
yet
Date of
award
Date of
starting
Date of
completion
MS -II__
A
T
14
13
7.00
29.08
8
26-3-99
9
19-7-99
10
6 months
MS-I
T _____ A
12
11
7.00
11
26-3-99
25-6-99
6 months
6
4.04
15.18
4.04
6-5-99
6-5-99
6 months
9
7.61
22.96
18.06
(6.15)
_MS - III
A
_T_
16
15
Note ;- The values in brackets shows the present months progress.
Distric^Manager(North),
I
o
GJ
I
ICT. Pvt. Ltd.,
Belgaum.
J
F o rma t
Intercontinental Consultants And Technocrarts Pvt. Ltd.
Name and Address of the District Manager (South) : Shri. T. Basavantappa.
CCB - 365, Giri Nivas, Sadashiva Nagar,
Belgaum-01 Tel: (0831) 472710
District: Belgaum
For the month of December 99
Sr.
No
Package
Name
BGM
Total
No. of
villages
Value of
the work
in Rupees
in Lakhs
1
2
3
4
1
1
4
121.30
Name and
address of the
contractor
Name and
address of
the
contractor
personnel
5
M/s.
K.Ramakrishna
Road - 3, Banjara
Hills Hyderabad
6
K.Bhavani
Belgaum-16
Ph : 0831453520
7
Raghavendra
Majakar
Belgaum
Ph : 0831
455080
M/s. B.T.Patil and
Sons
326/5,
Patsons House
Belgaum
Ph
0831
421112_________
R.Nagraj Beelagi
Nagar Ramadurg
Ph : 08335 42801
Shri
Pradeep
Sawant
Ph ; 0831
463617
I
i
2
3
4
4
5
7
3
3
4
94.60
D.G.Yedhalli
Sudhir Datye
Ramadurg
Ph : 42449
53.7
53.30
Name and
address of
Assistant
Engineer
M/s. Coromandel
Prestcrete
Pvt.
Ltd.
Banjara
Hills
Hyderabad
Shri
Lakshminara
yan
Gokak
Ph : 08332 25215
Date of
award
Date of
starting
Financial Progress (Cumulative) in Rs. in
Lakhs
Date of
completion
MS -I
T ___ A_
11
12
T
13;
MS - II
A_
14
MS - III
T _____
15
16
8
9
10
11-2-98
26-6-98
26-9-99
25
25
85
95.77
121.3
115.71
Shri
U.N.Nitturkar
Belgaum
13-4-98
27-4-98
27-10-99
20
18.32
60
39.45
94.60
39.45
Shri Ravindra
M.S Ramadurg
for
village
Hulkund
I
19-12-97
12-1-98
12-7-99
10
10
35
19.69
53.7
25.99
26-2-98
20-3-98
20-9-99
13
11.42
35
16.87
53.30
33.22
Shri Ravindra
Ramadurg Ph :
08335 - 42713
for
villages
Godachi,
Bijaguppi and
Toranagatti
Shri
Gummagol
Ramadurg for
Nandihal
4
Contd..
Financial Progress (Cumulative) in Rs. in Lakhs
Sr
No
Package
Name
BGM
Total
No. of
villages
Value of
the work in
Rupees in
Lakhs
6
A.T.Chipre
Belgaum
Y.S.Rao
G.V.Sairam
Dharawad
66
M/s. Pochampad
Cement
Pipe
Const. Co Jubilee
Hills Hyderabad
Shri
J.S.Sawant
Belgaum
Ph : 0831
136.30
M/s. B.T.Patil and
Patsons
Sons
Belgaum
House
0831
Ph
421112
S.A.Magdum
“Shreeyansh” 9th
Bhagya
cross,
Belgaum
Nagar
Ph :
0831 -481818
M/s Rao
Constructions,
Bangalore
Shri Patil
Belgaum
2
3
4
5
8
4
80
7
9
10
3
3
Name and
address of
the
contractor
personnel
________ 5________
M/s. B.T.Patil and
Patsons
Sons
Belgaum
House
0831
Ph
421112
1
6
Name and
address of the
contractor
9
12
4
96.70
10
15
2
58.00
Date of
award
Name and
address of
Assistant
Engineer
Date of
completion
________ 7________
Shri B.S.Revankar
C/O
Petgar
Compound
Parishwad,
Khanapur. Ph
0831 - 420902
S.R.Gummagol
Ramadurg
for
Village Hooli and
Hanchinal
_MS - III
A
T
16
15
8
9
10
T
11
12
MS - ll_
A_
T
14
13
25-4-98
12-5-98
12-11-99
16
17.12
64
28.63
80
46.09
4-2-98
13-4-98
13-10-99
13.1
13.1
40
15.01
66
34.80
25-4-98
27-5-98
27-11-99
25
9.72
80
17.56
136.3
49.37
4-2-98
21-2-98
21-8-99
19
19
59
51.45
96.70
82.36
(7.56)
30-11-98
20-1-99
18
months
8
20.53
28
25.26
58
MS-I
A
Shri.M.V.Mutanal
At
Gokak.
Ph.08288-74363
463617
Prakask C.P.
No. 12, Railway
Qtrs Khanapur
Ph : 0831
455080
Suresh Naik
and Uday
Shetty
Date of
starting
-
Shri S. M. Patil,
Belwadi,
for
village Dodawad
Shri Abbubabakar
Mulla,
Belgaum
for village Hudli
Contd..
Financial Progress (Cumulative) in Rs. in Lakhs
Sr.
No
Packa
-ge
Name
BGM
Total
No. of
villages
Value of
the work in
Rupees in
Lakhs
1
2
3
4
12
24
1
241.00
14
25
1
11.32
Name and address
of the contractor
Name and
address of
the
contractor
personnel
Name and
address of
Assistant
Engineer
Date of
award
Date of
starting
Date of
completion
MS -I
T '___ A
11
12
MS - II_
T
A_
13
14
7
Shri S.M.Patil
Beawadi,
Bailhongal for
village Hosur
8
9
10
14-10-98
27-10-98
18 months
60
53.99
140
116.48
M/s
Suprada
Constructi
ons,
Dharwad.
Shri
S
Gummagol.
Ramadurg
R
3-5-99
4-6-99
6 months
4.5
2.9
11.32
2.9
Shri. Raju
Dharmann
var
Shri
L
Belgavi
Bailhongal
B,
24-9-98
24-9-98
18 months
100
240.37
300
335.30
M/s
Deepa
Constructi
ons
Co.H.No.
10
Shantara
m Nagar,
Bivholim,
Goa
Shri
Abbubakar
Mulla.
Belgaum.
25-3-99
^8-4-99
6 months
6.3
4.05
15.73
15.72
________ 5________
Shri
G.Krishna
Reddy,Hubli
6
Shri. Naik
Shri Suprada Cont.
Dharwad.
Rao
MS - III
J____ A
15
16
241.00
116.48
540.00
335.30
I
tn
I
15
26
5
540.00
16
28
1
15.73
M/s.
Construction
Bangalore
Deepa
M/s
Co.
Constructions
Bicholim, Goa
4
Contd..
Financial Progress (Cumulative) in Rs. in Lakhs
Sr.
No
Pack
age
Name
BGM
Total No.
villages
Value of
the work in
Rupees in
Lakhs
1
17
2
29
2
1
4
19.77
18
30
1
197.00
19
31
1
25.06
20
32
Note
Name and
address of the
contractor
Name and
address of
the
contractor
personnel
________5________ ____ 6
M/s.
Suprada Shri.
Constructions.
Jadhav.
Dharwad.
Yargatti.
Shri
H.P.Madhukar
M/s.
Rao
Construction
Shri.
Pralhad
Rao
Shri
Ganachari
Not
yet
given
Shri. G. Krishna Not
given
Reddy
The values in brackets shows the present months progress.
1
30.12
yet
Name and
address of
Assistant
Engineer
Date of
award
Date of
starting
Date of
completion
MS - II
T _____ A^
14
13
19.77
7
Shri.
Abbubakar
Mulla.
Belgaum.
Shri
Anil
Babu Rao.
Soundatti
8
07-8-99
9
20-8-99
10
6 months
MS-I
T _____A
11
12
8.00
5.24
9-10-98
25-10-98
18 months
30
114.49
100
154.03
Shri. L B.
Belgavi
Bailhongal.
Shri.S. M.
Patil. Belwadi
31-5-99
13-11-99
6 months
10
5.22
25.06
5.22
25-3-99
11-7-99
6 months
12
11.52
30.12
11.52
MS - III
A
15
16
197
154.03
(
-4
i
District Manager (South),
ICT. Pvt. Ltd.,
Belgaum.
t'orwaf - 5
Integrated Rural Water Supply and Environmental Sanitation Project
(World Bank Aided)
I 'illagennse Physical Progress
(Month - December - 99)
District: Belgaum (North)
Sr.
No.
Package
No.
Village
Name
TF
TM
AM
CA
5
Existing
Existing
2
6
7
8
'IT
TM
AM
CA
10
11
SSF-2
PWS-2
12
SSF1
PWS-1
13
SSF-1
OHT-2
0.70 km
RWS-4
PWS-1
2.0 km
OHT-2
1.50 km
RWS-4
BGM
2
BGM-02
1
1
2
3
1
4
BGM-03
BGM-03
BGM-03
3
4
Bellad
Bagexvadi
Jack well
Intake well
\TP
CP
RWL
5 .25 km
Settling Tank
Navilihal
Chikkalwad
Benadi
0}
00
I
5
6
BGM-03
BGM-06
Bambalwad
Katakbhavi
9
Filtration Plant
Pure Water Sump
PW - GM
1
2.59 km
O1 IT
1
0.90
DM
7.84 km
RWS
1
1.0
OHT-1
2.0 km
RWS-4
RM
1.97 km
4.03 km
1.07 km
1.0 km
0.2 km
0.4 km
1.1 km
2.0 km
Yes
0.232 km
4.58 km
7
2.4 km
5.95 km
0.232 km
1.38 km
7
2.4 km
1.9 km
0.232 km
0.7 km
7
0.232
4.58 km
7
Yes
0.2
4.7 km
2
1
1.5
ST4
ST-2
ST-2
OHT
1
OHT-7
OHT-8
OHT-8
SP
2
2
OHT
SP
Washing platform
OHT
SP
Existing
3
DM
RM
2
2
2
DM
BGM-06
Daddi
Surface
source
settled
10
21
21
1
OI IT-7
OHT-3
OHT-3
Dust Bins
RM
5
5
1
1
DM
1
RM
DM
0.96 km
0.96 km
0.2 km
0.1 km
0.1 km
0.1 km
1.65 km
RM
0.83 km
4.62 km
0.8 km
0.2 km
0.8 km
0.2
0.8 km
4.6 km
2
2.9 km
7.44 km
1.0 km
(Pr)
Yes
0.5 km
2(Pr)
1.0 km
6.2 km
1.2 km
1.28 km
1.2 km
0.28 km
1.0 km
Yes
Sump - 1
\'es
OHT
SP
3
OI IT-7
3
3
OHT-1
3
OI IT
1
OHT-7
OHT-7
OHT-7
OHT
Sump
SP
1
21
DM
7
Whether Source
Established
Yes/No
14
1
1
4
OHT-8
Sump-5
4
OHT-7
Sump-1
4
OHT-7
Sump-1
4
X_
CP
RM
DM
Yes
Yes
1.5 km
Yes
(Pr)
8
9
BGM-11
BGM-11
Belkud
OUT
Kadaklat &
Puttanwadi
SP
Sump (z\ddl)
OUT
SP
Existing
3
3
DM
1
SUM-2
I
OI IT 7
11
11
CP
Sump
RM
10.50 km
DM
12.61 km
RM
OHT-5
2
1
Sump - 4
2.0 km
1.2 km
10.3 km
1
2
3
4
5
6
7
8
9
10
10
BGM-11
11
Manuchiwadi
OHT
1
OUT-3
OHT-2
OHT-2
RM
0.98 km
0.5 km
SP
1
1
DM
1.075 km
0.3 km
11
12
13
14
15
16
17
BGM-11
BGM-13
BGM-13
BGM-13
BGM-14
BGM-14
BGM-14
12
13
14
Yes
0.3 km
1.0 km
0.10 km
0.95 km
Tapakarwadi
OHT
1
OHT-6
(Ham-3)
SP
2
2
Kannal
OHT
1
OHT-8
OHT-8
OHT-8
RM
1.5km
1.5 km
SP
2
2
2
2
DM
2.2km
2.2 km
GLSR (Repair)
1
Existing
RM
2.985 km
1.5 km
0.2 km
1.8 km
SP
2
2
2
2
DM
2.065 km
0.465 km
0.4 km
2.0 km
OHT
1
OHT-6
Ol IT-7
OI IT-7
RM
1.2 km
1.0 km
SP
3
3
DM
6.0 km
1.0 km
5.0 km
OHT
1
Existing
RM
1.75 km
1.25 km
0.5 km
Yes
SP
4
4
DM
3.38 km
3.38 km
GLSR
1
GLSR-5
RM
3.31 km
2.9 km
2.9 km
Yes
SP
3
3
DM
3.19 km
1.09 km
1.09
Dhulaganwadi
OHT
1
OI IT-8
0.42 km
(1 Iam-1)
SP
Nagcnwadi &
OI IT
1
OHT-3
Yadenwadi
SP
2
2
OHT
1
OHT-8
SP
4
4
OHT
1
OHT-8
SP
2
2
Jack well
1
JW-4
Parthan alii
Yelihadalagi
. Borgal
Nainglaz
OHT-6
OHT-6
OHT-8 (Up) OHT-8 (Up)
2
RM
0.45 km
0.45 km
DM
0.905 km
0.15 km
RM
0.42 km
DM
3.2 km
RM
0.335 km
0.335 km
DM
2.54 km
0.14 km
Yes
Yes
Yes
Yes
Yes
1.2 km
t
18
BGM-14
1
OHT-1
OHT-1
Yes
(I Iam-2&3)
19
20
21
BGM-14
BGM-14
BGM-16
Nesargi
Ankalgi
Kunnur
(SSI)
Intake well
1
VTP
2
RWL
1
Settling Tank
1
Raw water storage
1
Approach Bund
260m
1
OHT-7
OHT-8
JW-4
1 Up
1.0 km
RWS-4
RWS-4
OHT-7
RM
2.34 km
1.34 km
1.00 km
DM
7.205 km
3.2 km
4.0 km
Yes
RM
2.59 km
0.5 km
2.09 km y
DM
3.37 km
1.0 km
2.64 km
Filtration Plant
1
SSF-4 (Up)
Surface
Pure Water Sump
1
PWS-4
PWS-4
PWS-4
source
OHT
1
Ol IT-7
OHT-6
OHT-6
settled
1.0 km
RM
1.0 km
0.5 km
0.3 km
0.5 km
ST-4 (Up)
DM
7.6 km
1.0 km
1.0 km
7.0 km
RWS-4 (Up)
CP
4
OHT-8
JW-4
1 Up
Ctd.
2
Yes
1
22
23
2
BGM-17
BGM-18
3
Mangavati
(SSI)
Ainapur
(SSI)
24
25
BGM-19
BGM-19A
J
Jugul
(SSI)
Shiraguppi
(SSI)
O
I
26
BGM-20
Akkol
(SSI)
4
lack well
Intake well
SP
RWL
Settling Tank
Raw water storage
Jack well
Intake well
VTp
5
1
1
2
2.1 km
1
1
1
6
1
2
0.2 km
ST-2
RWS- 1
1
Existing
Existing
2
1.0 km
Existing
Existing
RWL
Settling Tank
Raw water storage
Jack well
Intake well
VTP
RWL
Settling Tank
Raw water storage
1
1
2
2.0 km
1
1
Existing
Existing
1
Existing
Existing
Jack well
Intake well
VTP
RWL
Setding Tank
Raw water storage
1
1.0 km
ST-4
RWS-2
2
5.09 km
1
1
1
1
2
2.8 km
1
1
8
JW-1
1
2
2.0 km
1
1
Jack well
Intake well
VTP
RWL
Settling Tank
Raw water storage
7
JW-4
2.0 km
Existing
RWS-3
JW-4
1
2
1 km
ST-4
RWS-3
ST-1
RWS - 1
2
1.80 km
ST- 1
RWS - 1
2
Existing
Existing
2(Pr)
0.7 km
2(Pr)
0.7 km
ST-1
2(Pr)
0.5 km
2(Pr)
0.5 km
RWS - 3
RWS - 3
JW- 1
JW-1
2(Pr)
2(Pr)
1.2 km
ST-3
RWS-2
9
Filtration Plant
Pure Water Sump
OHT
RM
10
11
1
SSF-3
1
PWS-3
OHT-5
1
DM
0.1 km
3.22 km
CP
2
Filtration Plant
Pure Water Sump
OHT
RM
1
1
1
12
SSF- 1
PWS- 1
OHT - 1
13
SSF - 1
PWS - 1
OHT-1
3.22 km
SSF-2
PWS-2
OHT-5
PWS-1
OHT-3
SSF-1
PWS-1
OHT-3
2.0 km
1.4 km
5.00 km
CP
0.2 km
13.00 km
2
Filtration Plant
Pure Water Sump
OHT
RM
DM
CP
1
1
1
0.2 km
10.52 km
2
SSF-4
PWS-4
OHT-6
SSF-1
PWS-1
OHT-5
2.0 km
5.5 km
1
SSF-3
1
PWS-3
OHT-6
DM
Filtration Plant
Pure Water Sump
OHT
RM
DM
CP
Filtration Plant
Pure Water Sump
OHT
RM
1
0.1 km
8.73 km
2
1
1
DM
1
0.1 km
6.7 km
CP
2
14
Surface
source
settled
PWS-4
SSF-1
PWS-4
OHT-5
2.0 km
6.5 km
SSF-3
PWS-3
OHT-5
SSF-1
PWS-1
OHT-1
1.7 km
5.0 km
2
Surface
source
settled
Surface
source
settled
Surface
source
settled
Surface
source
settled
1
2
3
________ 4________
5
6
27
BGM-21
Soundatti
Jack well
1
JW-4
(SSI)
Intake well
VTI’
1
1
2
RWL
1.59 km
28
BGM-22
Chinchali
(SSI)
Settling Tank
1
45
45
Raw water storage
1
RWS-4
Jack well
1
JW-4
1
29
BGM-23
Borgaon
VTP
2
3.06 km
Settling Tank
1
Raw water storage
1
6
(SSI)
30
BGM-27
Pachapur
Jack well
Intake well
Rustumpur
JW-5
2
PWS-5
PWS-5
source
OHT-8
OHT-8
settled
11
1
SSF-5
Up
Pure Water Sump
1
OHT
1
1.1
RM
0.43 km
0.21 km
ST-4
DM
12
12
45
CP
4
4
0.25 km
0.25 km
Filtration Plant
1
SSF-2
SSF-2
Surface
Pure Water Sump
1
PWS-2
PWS-2
PWS-2
source
OHT-1 (MV7)
1
OHT-6
OHT-7
OHT-7
settled
2.724 km
OHT-II (MBR)
1
OHT-2
ST-5
OHT-III (UK)
OHT-7
OHT-7
OHT-IV (CK)
1
1
OHT-7
RWS-3
OHT-4
OHT-6
OHT-6
5.87 km
1.0 km
1.2 km
6.9 km
0.8 km
8.8 km
JW-4
RWS-3
JW-4
JW-4
1
1
14
Surface
70
RM/GM
2
2
2
OHT-1
DM
17 km
2.3 km
Filtration Plant
1
SSF-3
SSF-1
Surface
Pure Water Sump
1
PWS-2
PWS-1
source
OHT
1
O1 IT-3
OHT-2
settled
OHT-2
RWL
2.8 km
1.0 km
1.0 km
RM
0.1 km
Settling Tank
1
ST-2
ST-1
DM
10.23 km
2.0 km
3.0 km
Raw water storage
1
RWS-2
RWS-1
CP
2
2
2
Jack well
1
1
Existing
Filtration Plant
1
SSF-3
SSF-2
Surface
Existing
Pure Water Sump
PWS-5
PWS-5
source
2
OHT
1
1
OHT-2
OHT-1
OHT- 1
settled
RWL
1.5km
GM
9.85km
2.85 km
2.13 km
9.13 km
Settling Tank
1
RM
1.79km
0.70 km
0.2 km
VTP
BGM-27
1
RWS-3
13
SSF-4
9
Filtration Plant
RWS-4
JW-4
0.336 km
VTP
Intake well
31
45
72
8
JW-3
1
RWL
CP
Up
0.6 km
Washing platform
Intake well
7
Existing
Raw water storage
1
RWS-5
RWS-5
DM
2.828km
GLSR (MBR)
1
GLSR-3
GLSR-3
GLSR-3
CP
6
out
1
OHT- 1
OHT - 1
OHT - 1 (SBC)
DM
0.51km
1.30 km
2.825km
2.825km
0.11 km
0.11 kn\
Surface
source
settled
32
BGM-27
Bagamal
OHT
1
OHT-5
33
BGM-27
Karguppi
GLSR
1
GI^R-4
34
BGM-27
Shindhihatti
OHT
1
OHT-8
OHT -4
OHT-4
DM
0.67km
0.5km
0.17 km
Surface
settled
GLSR-1
OHT-7
Sump
1
DM
1.69km
RM
0.60
DM
1.5km
SUMP-3
0.60
SUM - 2
0.60
SUM - 2
1.64km
0.60
Surface
1.45 km
Surface
source
settled
source
settled
1
35
36
37
38
39
2
BGM-33
BGM-34
BGM:35
BGM-36
BGM-37
3
U. Khanapur
Thana
Hattargi
Kanagale
Sidnal
Kottalgi
4
OHT
SP
OHT
SP
OHT
SP
Sump
OHT
SP
OHT
SP
DIU
5
1
4
6
OHT-8
4
1
8
OHT-8
8
1
8
1
1
2
OHT-8
8
Sum-2
OHT-8
2
1
3
2
OHT-8
7
OHT-7
OHT-5
8
OHT-7
OHT-5 (Up)
OHT-5
OHT-5
Sum-1
OHT-4
Sum-1
OHT-4
OHT-8
OHT-8
3(Pr)
Ctd.
9
RM
DM
10
5.0 km
7.0 km
11
2.0 km
2.0 km
12
13
14
0.9 km
5.4 km
Yes
RM
DM
9.54 km
8.6 km
9.54 km
8.6 km
0.6 km
6.4 km
Yes
RM
DM
2.5 km
4.5 km
2.5 km
2.0 km
0.5 km
0.8 km
0.5 km
4.5 km
Yes
RAf
DM
1.6 km
4.4 km
1.4 km
2.0 km
1.4 km
4.0 km
Yes
RM
DM
2.0 km
3.0 km
2.0 km
3.0 km
Yes
•istrict Manager (North),
ICT. Pvt. Ltd.,
Belgaum.
I
■J
Format - 5
Integrated Rural Water Supply and Environmental Sanitation Project
(World bank Aided)
Villagewise Physical Progress
(Month - December - 99)
District: Belgaum (South)
Sr.
Package
Village
No.
No.
Name
Whether Source
IT
TM
AM
C/\
5
6
7
8
OHT-8
OHT-8
I'M
AM
CA
9
10
11
12
13
14
Sump 1
1
80%
Yes
Sump 2
1
Yes/No
BGM
1
2
3
4
1
BGM-01
Sulebhavi
OHT
1
OHT-8
SP
3
3
CP
4
2
2
3
I
4
BGM-01
BGM-01
BGM-01
Pecranwadi
Marihal
Halga
U
I
5
6
7
8
9
BGM-04
BGM-04
BGM-04
BGM-05
BGM-05
Established
TT
Mache
Muchandi
1 longa
Turnur
Batakurki
RM
3.395 km
3.9 km
Ctd.
Ctd.
DM
8.00 km
7.6 km
Ctd.
1.35 km
8.00 km
0.05 km
OHT
1
Ctd.
RM
SP
2
2
2
2
DM
OHT
1
OHT-6
OHT-6
OI IT-8
Sump
SP
4
4
RM
CP
2
2
DM
1
1.36 km
5.50 km
GLSR
1
RM
3.76 km
DM
4.0 km
Ctd.
SP
3
OHT-1
1
OHT-8
OI IT-2
1
OHT-7
SP
6
6
GLSR
1
GLSR-5
RM
5.3 km
13.00 km
1.77 km
GI^R-5
GKSR-5
RM
4.35 km
1.0 km
DM
2.49 km
RM
DM
2.56 km
3.92 km
RM
1.8 km
DM
2.5 km
RM
DM
0.81 km
4.17 km
Sump
1
3
(Pr)
(Pr)
GLSR
1
GLSR-5
GKSR-5
GLSR-5
OHT
1
SP
2
OHT
1
SP
3
3
OI IT-6
2
OHT-8
3
Yes
Yes
3.6 km
DM
3
3
1.0 km
OHT-7
3
’les
5.1 km
OI IT-7
4
SP
Ctd.
0.5 km
OHT-7
SP
1.3 km
7.5 km
2.0 km
(1.00)
9.5 km
Yes
2.5 km
2.0 kni
Yes
2.56 km
0.92 km
3.00 km
Yes
1.5 km
0.3 km
2.5 km
0.67 km
Yes
0.81 km
Yes
3.0 km
But source under
review
1
2
3
4
5
6
7
8
9
10
11
10
BGxM-05
Hulkund
OUT
1
OHT-7
OHT-7
OHT-7
RM
2.715 km
2.715 km
SP
4
4
DM
4.57 km
2.07 km
Sump
1
50%
11
BGM-07
Godachi
OH'I’
1
SP
3
OHT-7
OHT-8
12
13
14
2.5 km
Yes
SUM-1
SUM-1
OHT-8
RM
3.05 km
1.45 km
1.0 km
3.00 km
3
DM
3.125 km
0.45 km
0.3 km
3.00 km
Yes
(Pt)
12
13
BGM-07
BGM-07
Bijaguppi
Nan dih al
SP
1
OHT
1
SP
1
1
OHT-8
OHT-8
RM
1.47 km
1.4 km
1.20 km
DM
0.8 km
0.2 km
0.8 km
OHT-8
RM
1.91 km
1.91 km
1.0 km
1
DM
0.8 km
0.4 km
0.5 km
Yes
Yes
(Pt)
14
15
16
17
BGM-07
BGM-08
BGM-08
BGM-08
Toranagatti
Gan digwad
Parishwad
Londa
I
I
18
19
20
21
22
23
BGM-08
BGM-09
BGM-09
BGM-09
BGM-10
BGM-10
K. Bekwad
Sopadla
Hooli
Hanchinal
OHT
1
SP
1
OHT-8
OHT-8
RM
0.73 km
0.73 km
0.4 km
0.5 km
DM
2.915 km
1.00 km
0.5 km
1.5 km
OHT
1
OHT-8
OHT-5
OHT-5
RM
3.45 km
0.45 km
3.5 km
SP
4
4
4
4
DM
6.0 km
1.0 km
6.0 km
CP
2
2
Sump
1
1
Ctd.
OHT
1
OHT-7
OHT-7
OHT-7
RM
3.6 km
1.1 km
2.5 km
SP
4
4
2(Pr)
2(Pr)
DM
4.56 km
1.5 km
3.1 km
GLSR
1
GLSR-5
GLSR-1
GLSR-1
RM
2.2 km
2.2 km
SP
3
3
3
3
DM
5.74 km
5.13 km
(Pt)
(Pr)
OHT
1
OHT-8
OHT-7
OHT-8
RM
3.5 km
3.5 km
SP
2
2
2
2
DM
1.5 km
1.8 km
OHT
1
OHT-8
OHT-8
OHT-8
SP
2
2
GLSR
1
GLSR-3
SP
3
3
OHT
1
OHT-8
SP
2
2
IW
2
GLSR-1
GLSR-1
OHT-8
Yes
Yes
Yes
Yes
RM
1.75 km
1.75 km
DM
3.79 km
3.79 km
2.38 km
2.38 km
3.74
3.74
RM
0.84 km
0.84 km
0.84 km
DM
4.22 km
1.5 km
2.3 km
Yes
3.0 km
Yes
RM '
DM
OHT-7
Yes
0.7 km
Yes
1.5 km
0.5 km
Yes
2
/Xrabhavi
GLSR
1
GLSR-4
GLSR-1
GLSR-1
RM
5.2 km
5.2 km
(MV)
SP
6
6
4
4
DM
4.015km
1.5km
2.0 km
1.451km
OHT
1
OHT-7
OHT-1
OHT-1
Arbhavi Math
OHT
1
OHT-7
OHT-8
OHT-8
RM
0.19km
0.186 km
(Ham-1)
SP
1
1
1
1
DM
0.485
0.45 km
(Pt)
(Pr)
Yes
1
2
3
4
5_
6
7
8
9
10
11
13
14
24
BGM-10
Sangankeri
OHT
1
OHT-4
OHT-3
OHT-3
RM
1.455km
1.455km
1.3 km
Yes
(Ham-2)
SP
3
3
3
3
DM
1.975km
1.5km
1.35 km
Jainarkodi
CS
.2
2
RM
1.20 km
1.2 km
1
1
Sump
Cancelled
RM
4.975km
2.0km
DM
4.075km
4.075km
3.57km
3.57km
RM
7.385km
3.0km
2.358km
2.358km
3.565km
25
BGM-10
(Ham-3)
26
BGM-10
Nagnoor
SP
1
1
OHT
1
OHT-8
SP
8
8
(Pt)
(Pr)
OHT-1
OHT-1
CP
27
BGM-10
Sindikurbet
OHT
SP
28
29
30
BGM-12
BGM-12
BGM-12
Nandgad
I lebbal
Kakkeri
)
31
32
33
34
BGM-12
BGM-15
BGM-15
BGM-24
Tolagi
Hudli
Dodwad
Ilosur
(SSI)
OHT
BGM-25
Gorbal
11
11
OHT-8
1
OHT-7
1
OHT-8
(31 IT-7
1
OHT-8
8
SP
8
CP
4
4
Washing platform
57
57
2
29
20
Cattle trough
7
7
OI IT
1
OHT-8
OHT-8
OHT-8
DM
Sump
1
Sump-1
1
Sump-2
1
RM
13.5 km
DM
7.7 km
3
2
Ctd.
1.5 km
0.5 km
13.0 km
0.25 km
0.25 km
2
7.6 km
RM
0.5 km
0.5 km
DM
1.24 km
0.24 km
2
2
3
3
Stand Post
3
3
Dust Bin
5
5
Washing platform
16
16
OHT
1
OHT-8
RM
1.56 km
3
DM
6.8 km
DIU
2
0.68 km
2
RM
1.26 km
0.01 km
SP
3
Washing platform
28
Cattle trough
4
4_
SP
2
2
Washing platform
14
14
DM
1.39 km
Dust Bin
5
5
5
Cattle trough
2
2
GLSR
1
GLSR-5
Ctd.
RM
1.35 km
1.35 km
SP
4
4
CP
2
GLSR
1
28
GLSR-3
4
4
Jack well
1
JW-4
1
VTP
2
RWL
5.0 km
1
2
JW-3
1
1.0 km
ST-3
Raw water storage
1
Existing
GLSR
1
Gl^R-4
SP
1
1
ST-3
GLSR-2
Yes
2
Yes
1.0 km
0.7 km
1.56 km
Yes
0.7 km
2
6.7 km
2
Commissioned
GLSR-2
JW-3
1 Up
Yes
1.39 km
Commissioned
Yes
3.00 km\
1
RM
1.65 km
1.65 km
DM
6.85 km
2.85 km
4.0 km
Yes
Filtration Plant
1
SSF-3
SSF-3
Surface
Pure Water Sump
1
PWS-2
PWS-1
source
OHT-7
OHT-6
settled
1.7 km
5.0 km
1.0 km
1.2 km
0.95 km
1.6 km
OHT
1
0.3 km
RM
0.2 km
ST-3
DM
6.0 km
CP
2
RM
1.425 km
GKSR-2
1.25 km
2
3.15 km
DM
GLSR-2
Yes
4
Sump_____
SP
Intake well
4
No
2.358km
Sump-5
SP
OHT-8
1.1 km
Sump-5
Sump-5
Cattle trough
OHT-8
1.1 km
Yes
3.565km
DIU
20
Dust Bin
Settling 'lank
35
OHT-7
1
12
DM
1.95 km
SSF-3
0.6 km
Yes
1
2
3
4
5
6
7
8
9
10
11
12
13
14
36
BGM-26
Neginhal
Jack well
1
JW-4
JW-4
JW-4
Filtration Plant
1
SSF-2
SSF-2
SSF-2
Surface source
Intake well
1
2
1
1 Up
1 Up
Pure Water Sump
1
PWS-2
VTP
OHT
1
OHT-8
OHT-8
OHT-8
RWL
5.0 km
2.0 km
GM
2.4 km
37
BGM-26
Sampagaon
yet to be
settled
2.1 km
Settling Tank
1
ST-3
ST-4
DM
5.3 km
Raw water storage
1
RW-5
RW-5
CP
4
OHT
1
OHT-8
OHT-8
RM
12.32 km
12.0 km
Surface
DM
5.5 km
5.5 km
source yet
5.9 km
2
to be settled
38
BGM-26
Sanikop
OHT
1
Existing
RM
DM
Surface
1.82 km
1.8 km
source yet
to be settled
39
BGM-26
Hole Hosur
OHT
1
Existing
RM
Surface
DM
3.845 km
4.0 km
source yet
to be settled
40
BGM-26
M.K.Hubli
OHT-I
1
OHT-8
OHT-8
OHT-8
RM
8.56 km
8.0 km
Surface
OHT-II
1
OHT-8
OHT-1
OHT-1
DM
7.0 km
7.0 km
source yet
GLSR
1
GLSR-5
Ctd.
RM
2.81 km
< ’1.0 km
0.61 km
2.905 km
0.37
3.77 km
to be settled
41
BGM-28
Budigoppa
1
o-
42
BGM-29
Kadabi
SP
2
2(Pr)
2(Pr)
DM
3.77 km
0.3 km
WP
14
14
14
DIG
2
2
OHT
1
OHT-2
RM
4.38 km
1.0 km
SP
2
DM
3.22 km
1.0 km
Yes
2
0.3
0.8 km
Source not
yet finalised
43
BGM-30
Asundi
Jack well
(SSI)
Intake well
1
1
VTP
2
RWL
13.05 km
Settling Tank
1
JW-5
1
ST-4
JW-6
1 Up
ST-4
JW-6
Filtration Plant
SSF-5
SSF-5
Pure Water Sump
1
1
SSF-5
1 Up
PWS-2
PWS-2
PWS-2
OHT
1
OHT-3
OHT-4
OHT-4
source
13.05 km
RM
0.45 km
0.45 km
settled
ST-4
DM
10.6 km
9.0 km
CP
2
Washing platform
44
BGM-31
Ambadgatti
1
5
OHT-8
OHT
1
OHT-8
SP
3
3
OHT
SP
45
BGM-32
Tigadi
OHT-5
OHT-5
OHT-5
OHT-5
RM
2.0 km
DM
4.5 km
4.5 km
RM
3.0 km
3:o km
DM
5.0 km
1.0 km
L
V.
District Manager (South),
ICT. Pvt. Ltd., Belgaum.
Surface
1.0 km
Yes
4.5 km
Yes
M/S. B. R. PATIL, NIPPANI.
INTERCONTINENTAL CONSULTANTS & TECHNOCRATS Pvt. Ltd.
KIRWS & ESP PHASE - II
(WORLD BANK ASSISTANCE)
MONTH : DECEMBER 99
DISTRICT BELGAUM.
LIST OF DEFICIT CONTRACTORS
Name of the
Contractor
3
Name of
Schemes
Villages
4
1
B. Bagewadi
Shri. B. R.
Patil.
Nippani.
95.74
Shri. B. R.
Patil.
Nippani.
93.36
Shri. B. R.
Patil.
Nippani.
99.34
No. of
No.
Package
No.
1
2
1
BGM-02
SI.
I
-J
BGM-18
Villages
1
Ainapur
1
3
BGM-19
1
Jugul
5
Contract
value Rs.
in lakhs
6
Date of
start
7
End of
Milestone
I/II/III
8
25-11-98 I. 25-4-99
II. 25-10-99
III. 25-4-2000
Financial Achivement
Cumulative I/II/III
Short fall *z«
A_
T
11
10
9
Target
Achieved
13
14
15
1. RM is delayed due to non employment
2
2
of labours by contractor.
2.9
5
2. PWS & SSF, poor progress
Head works Existing
ST-2 by contractor
ST-4
ST
RWS-4 RWS - 4 3. OHT delayed because of poor SBC.
RWS
SSF - 1 4. DM delayed as Distribution System
SSF - 2
SSF
PWS - 2 PWS - 1 completely revised.
PWS
OHT OH T - 6 OHT-2
3
7.84
DM
65%
1. RM / DM was slow due to villagers
obstruction initially and also non employment of labours by contractor.
Head works Existing
2. WTP components poor progress due to
Existing
ST
non-employment of appropriate labour &
Existing
RWS
SSF -1 also due to rocky strata. •
SSF - 3
SSF
PWS - 3 PWS - 1 3. Contractor has been issued further
PWS
OHT OHT - 5 OUT - 3 notice for expediting the work.
5
13
DM
12.35
68%
35.93
60.00
50.26
98.74
55.32
20.00
II. 25-10-99
50.00
III. 25-4-2000
93.36
25-10-98 I. 25-4-99
II. 25-10-99
III. 25-4-2000
20.00
50.00
99.34
20.65
32.26%
I. 25-4-99
Item
12
Remarks
44%
25.00
25.36
25.36
32.26
25-10-98
Physical status of works
PM
RM
PM
RM
1
2
2
1. RM delayed due to dispute for sharing
2
2
jack well.
0.7
2
2. Head work need modification & revised,
Head works Existing
ST - 1 design of steining wall in progress.
ST-4
ST
3. WIT components delayed due to non
RWS - 2
RWS
employment of labour as well poor SBC .
SSF
1
SSF - 4
SSF
PWS - 4 PWS - 1 Revised design based on under reamed piles
PWS
OUT - 6 OI IT - 5 for SSF. For other structure design awaited.
OHT
Contractor has been issued further notice
5.5
7.00
DM
for expediting the work.
PM
RM
_1_
4
I
CO
1
2
BGM-19^
2
1
4
Shiraguppi
5
Shri. B. R.
Patil.
Nippani.
6
7
79.30
25-10-98
8
I. 25-4-99
II. 25-10-99
III. 25-4-2000
40.00
79.30
22.06
I. 25-4-99
II. 25-10-99
III. 25-4-2000
20.00
50.00
117.10
26.75
49.54
53.74
54%
26.00
76.00
146.45
34.97
46.68
55.49
62%
5
BGM-20
1
Akkol
Shri. B. R.
Patil.
Nippani.
117.10
25-10-98
6
BGM-23
1
Borgaon
Shri. B. R.
Patil.
Nippani.
146.00
25-10-98 I. 25-4-99
II. 25-10-99
III. 25-4-2000
9
15.00
10
19.59
11
63%
29.56
12
PM
RM
13
1
3
PM
RM
3
14
___________________ 15________________
2
1. RM delayed due to dispute of sharing
jack well.
Head works
2. Head work need modification &
ST
Existing
problem of approach.
RWS
RWS-4 RWS-3 3. WTP components non-employment of
SSF
SSF-3 SSF-1 appropriate labour by contractor & also due
PWS
PWS-3 PWS-1 to hard rock excavation.
OHT OHT-7 OHT- 5 4. OHT slow progress due to non
DM
9.00
6.5
employment of skilled labours.
Contractor has been issued further notice
for expediting._______
PM
1
2
1. RM delay due to non-employment of
RM
3.00
2.8
labours.
Head works
1
20%
2. Approach and Jack well slow due to
ST
ST-4
ST-3 non-employment of labour and poor
RWS
RWS-3 RWS-2 organisation of contractor.
SSF
SSF-3 SSF -1 3. WTP component slow due to delay in
PWS
PWS-3 PWS-1 acquistion of land also slow progress.
OHT OHT-7 OHT -1 4. OHT capacity changed.
7.00*
DM
6.7
0.5
2 Up 1. Delay in progress of OHT & WTP was
0.7
due to land dispute.
I lead works
1
60% 2. Jack well site was disputed, hence delay
ST
ST - 3
ST - 1 in progress also delay caused due to back
RWS
RWS - 3 RWS - 11 water of barage.
SSF
SSF-3 SSF - 1 3. Revision in design of Raw water storage
PWS
PWS-3 PWS-1 required as existing GLSR has gone in
OHT OHT-3 OHT - 2 private land and its acquisition is pending.
DM
10.00
5.00
1
7
2
BGM-34
_3
1
4
T. Hattargi
5
Shri. B. R. Patil
Nippani
6
57.48
7
*26-3-99
7-7-99
8
I. 7-10.-99
II. 7-1-2000
9
22.00
57.48
10
4.25
10.49
11
80%
82%
(Ammended)
8
BGM-35
1
Kanagale
Shri. B. R. Patil
Nippani
29.08
*26-3-99 I. 19-10-99
19-7-99 II. 19-1-2000
11.00
29.08
7.0
7.0
36%
76%
(Ammended)
13
2
9.54
2*
14
_________________15_____________
12
PM
RM
SUMP
GLSR
OHT
DM
OHT - 8 OHT - 5 sources.
3. Sump cancelled due to revision of sources.
6.4
8.6
PM
RM
SUMP
3
2.50
SUM - 2
0.5
SUM -1
OHT
DM
OHT-8
4.5
OHT-5
4.5
sources.
PM
RM
OHT
DM
1
1.6
OHT-6
4.40
1.4
OHT-4
4.0
location of OHT site and delay caused by VWSC
1. Delay in intial handing over of site is due to
objection raised by school authorities & also
objection raised by VWSC
2 RM / PM delayed due to delay tn finalisation of
1. Delay in handing over of site is due to delay
purchase of private land and delays caused by
VWSC members.
2 RM / PM delayed due to delay in finalisation of
9
BGM-36
1
Sidnal
Shri. B. R. Patil.
Nippani
15.18
*26-3-99 I. 25-9-99
25-6-99 II. 25-12-99
6.00
15.18
4.04
4.04
73%
73%
1. Delay in handing over of site is due to changes in
2 Due to change in location of OHT, staging height
is increased from 9M to 12 M to maintain planned
hydraulic gradient.
I
1
M/S. B. T. PATIL & SONS, BELGAUM.
SI.
No.
Package
No.
No. of
Villages
1
10
2
_3
BGM-04
3
11
BGM-08
4
Name of
Schemes
Villages
4
Name of the
Contractor
Mache
Muchandi
Honaga
M/s. B. T.
Patil & Sons,
Belgaum.
Parishwad
Gandigwad
K. Bekwad
Londa
5
M/s B. T.
Patil & Sons,
Belgaum.
Contract
value Rs.
in lakhs
6
Date of
start
94.60
27-4-98
80.00
7
12-5-98
End of
Milestone
I/II/III
8
I. 27-10-98
II. 27-4-99
III. 27-10-99
I. 12-11-98
II. 12-5-99
III. 12-11-99
Financial Achivement
Cumulative I/II/III
A
Short fall %
9
10
11
20.00
18.32
58%
60.00
28.23
94.60
39.45
58%
Z
16.00
64.00
80.00
17.2
28.63
46.7
42%
42%
Physical status of works
Item
12
Target
13
Achieved
PM
RM
Sump
GLSR
5
11
5
2.5
OHT
2
DM
18
PM
RM
Sump
GLSR
OHT
10
10
1
1
1
DM
18
14
L
2
’
____________ 15____________________
1. Delay in progress of RM is mainly due to
delay in establishment of reliable water sources.
2. Delay in GLSR due to slow progress by
1C
contractor.
1 C
3. LD proposed.
1C
4. Sump site yet to be finalised at village Mache.
1 - 80%
15.5
10 Up
11.7
1
20%
1C
1 - 60%
16
I
As per review meeting held on 8-12-99, revised
Probable date of completion as under.
K - Bekwad - 31-12-99 - But progress not
satisfactory.
Gandigwad - 31-1-2000 But progress not
satisfactory
Parishwad - 15-1- 2000
Londa - 28 - 2 - 2000.
2. LD imposed.
o
1
Remarks
12
BGM-10
3
Arbhavi
(+3 Hamlets)
Sindikurbet
Nagnur
M/s B. T.
Patil & Sons,
Belgaum.
136
12-5-98
I. 27-11-98
II. 12-5-99
III. 27-11-99
25.00
80.00
136.30
9.72
17.56
49.37
63%
64%
I
PM
RM
Sump
GLSR
OHT
DM
22
16
1
1
5
14'
13
3.52
As per review meeting held on 8-12-99, the
revised probable date of completion as under.
Arbhavi Math & hamlets - 31-12-99
1 - 10% Arbhavi Main village - 28-2-2000
4 Up Sindhikurbet village - 15-3-2000
10.17 Nagnur village - 25-3-2000
work in progress but still slow. Contractor has
been asked to expedite the same.
13
BGM-11
2
x Khadaklat
(+ 2 Hamlets)
Belkud
M/s B. T.
Patil & Sons,
Belgaum.
73.80
22-5-98
I. 22-11-98
II. 22-5-99
III. 22-11-99
13.00
45.00
73.80
7.50
8.78
27.21
63%
63%
PM
RM
Sump
GLSR
OHT
DM
17
8
1
As per review meeting held on 8-12-99 the
revised probable date of completion as under.
1 Up
(a) Village Belkud - 31 - 1 - 2000
(b) Khadaklat - 28 - 3 - 2000.
3
16
3 Up
12.85
LD imposed.
Contractor has been issued notice to expedite.
M/S. COROMANDAL PRESTCRETE PVT. LTD. HYDERABAD.
SI.
No.
1
14
Package
No.
2
BGM-03
No. of
Villages
3
4
Name of
Schemes
Villages
4
Name of the
(Contractor
Chikkalwad
Navalihal
Bambalwad
Benadi
M/s.
Coromandal
Prescrete
Pvt. Ltd.,
Hyderabad.
5
Contract
value Rs.
in lakhs
6
53.20
Date of
start
7
21-3-98
End of
Milestone
I/II/III
8
I. 21-9-98
II. 21-3-99
III. 21-9-99
Financial Achivemcnt
Cumulative I/II/III
Short fall %
T
A
11
9
10
57%
12.00
12.00
36.00
53.20
16.61
38.43
28%
Remarks
Physical status of works
Item
12
Target
13
Achieved
14
PM
RM
Sump
GLSR
OHT
DM
8
5
5
0.732
15
1. Delay in OUT is due to slow progress by
contractor. Now new GPA has commenced the
work with all sincerity. LD is recovered in RAB.
During review meeting held on 18-9-99 at the
3
16
3 Up
12.38
office of Engineer-in-Chief, PHE Bangalore,
reviewed probable date of completion given.
Chtkkalwad commissioned / Navalthal - Jan 2t M M1.
Benadi - Dec -99, Bambalwad - 15-3-2(XX)
Chikkalwad commissioned on 30-10-99.
15
BGM-06 ’
2
Daddi
Katakbhavi
M/s.
Coromandal
Prescrete
Pvt. Ltd.,
Hyderabad.
46.85
21-3-98
I. 21-9-98
II. 21-3-99
III. 21-9-99
11.50
30.00
46.85
11.50
13.15
24.28
48%
48%
PM
RM
Sump
GLSR
OHT
DM
6
3
1
5
1.8
10%
1. As per renew meeting held on 8-12-99 at
office of Supenntendmg Engineer, PHE Belgaum.
with EIC revised probable date of completion
31 - 01 - 2000 & work is progressed accordingly
2
12
2 Nos. 95% 2. LD imposed.
10.6
I
oO
16
BGM-07
4
Godachi
Torangatti
Bijaguppi
Nandihal
M/s.
Coromandal
Prescrete
Pvt. Ltd.,
Hyderabad.
53.30
20-3-98
I. 20-9-98
II. 21-3-99
III. 20-9-99
13.00
35.00
53.30
11.42
16.87
33.22
37%
38%
PM
RM
Sump
GLSR
oirr
DM
6
6
3
5.7
1. As per review meeting held on 8 - 12-99
revised probable date of completion as under.
Village - Bijaguppi - 31-12-99
Village - Godachi -
3
8
1 c
1-70%
1 - 95%
5.8
31-12-99
Village - Nandilikl - 15-01-2000
Village - Torangatti - 31-01-2000.
work being progress accordingly.
2. LD imposed.
SHRI. R. NAGARAJ, RAMADURG.
SI.
No.
I
No. of
Villages
1
2
3
17
BGM-05
3
18
&
P
Package
No.
BGM-13
3
Name of
Schemes
Villages
4
Name of the
Contractor
Tumur
Batakurki
I lulkund
Shri. R.
Nagraj.
Ramadurg.
Kannal
Yelihadgali
ParthanhaUi
5
R. Nagraj
Contract
value Rs.
in lakhs
6
Date of
start
53.70
21-1-98
38.42
7
24-5-98
End of
Milestone
I/II/III
8
I. 12-7-98
II. 12-1-99
III. 12-7-99
I. 24-11-98
II. 24-5-99
III. 24-11-99
Financial Achivement
Cumulative I/II/III
A
Short fall %
9
10
11
z
10.00
35.00
53.70
7.00
23.00
38.42
10.00
14.52
25.99
7.00
13.57
23.27
63%
52%
64%
39%
Physical status of works
Remarks
Item
12
Target
13
Achieved
14
15
PM
RM
Sump
GLSR
OHT
6
5
1.2
DM
11
PM
RM
Sump
GLSR
OHT
6
5
DM
10
1. Delay in progress of PM and RM due to
delay in finalisation of reliable water sources.
2 Batakurki source recendy finalised.
3.1-OHT work - court stay order recendy withdrawn.
3
1 C
4. LD imposed.
1 - Court Scope of work for transmission main increased
case at village Hulkund. New sump being provided.
1 - 70% Excavation completed.
8.5
5
3.1
1. Procurement, delay due to finalisation
of bore wells sources
2 However LD imposed.
As per review meeting held on 8-12-99, work
2
1 -95% is to be completed by 26 - 1 - 2(XX).
1 -60%
9.12
Shri. S. A. Magdum.
SI.
No.
Package
No. of
No.
Villages
1
19
2
2
BGM-14
4
Name of
Schemes
Name of the
Contractor
Contract
Date of
End of
value Rs.
in lakhs
start
Milestone
Financial Achivement
Cumulative I/II/III
A
Short fall %
T
Item
Target
Achieved
4
5
6
7
8
9
10
11
12
13
14
Ankalgi
Shri. S. A.
80.35
25-3-98
I. 25-9-98
15.00
15.00
49%
PM
13
Borgal
Magdum.
II. 25-3-99
55.00
29.44
RM
8.9
III. 25-9-99
80.35
40.59
49%
Sump
Villages
Nainglaz (MV)
I/II/III
GLSR
OHT
Dhulganwadi
(Ham - 1)
Remarks
Physical status of works
15
1. Slow progress of GLSR is due to delay in
4.59
acquisition of land. Delay by contractor.
2. Delay due to land problem tn acquistion of
1
4
land for OHT.
1 C
Work is likely to be completed by 15-3-2000.
1 - 85%
1 - 95%
Nagenwadi
1 -10%
(Ham-2)
Yadenwadi
DM
21.7
12.3
Head works
1
2
1.8
(Ham-3)
Nesargi
20
BGM-17
~ 1
Mangavati
M/s. Lathure
Bros, Lathur.
51.26
18-12-98 I. 18-6-99
II. 18-12-99
11.26
26.26
12.26
12.26
53%
RM
1. Jack well delayed due to collapse of the side
walls of the dug up trench. During monsoon season
area was under flood water. Contractor has been
advised to adopt sinking method to overcome this
III. 18-6-2000
I
oo
51.26
2
ST - 4
RWS
SSF
PWS
RWS - 3 RWS-1 (L’p) revised design based on SBC (BC - Soil) Contractor
SSF - 3 SSF- - 1 (Up) has been advised to adopt proper foundation (under
PWS - 3 PWS-1 (b'p) reamed piles) But he is still consultating the specialist
OHT-1 on the subject since it is a turnkey work of the
OHT-5
Contractor.
3.2
3.25
OHT
DM
U)
problem and the appropnate design also given.
PM
ST
ST - 1 (Up) 2. WTP delayed due to SBC and non submission of
3. OHT work is also progressing slowly. Contractor
1
has been issued notice to expedite the progress
considering the exit policy requirement
DISTRICT
I. C. T. Pvt Ltd.
Notations
A. Head Works
D. VTP — Vertical Turbine Pump
•
APC - Approach channel.
•
VTP — 1 — Procurement of pumps
•
APC - 1 - Approach channel earth work
•
VTP — 2 — Installation of pumps
•
APC - 2 - Approach channel RCC work.
•
ViP — 3 — Installation of electrical control system.
•
APC - 3 - Approach channel slope pitching.
•
VTP — 4 — Service connection
•
APC - 4 - Approach protective work
B. INT - Intake well
INT - 1 - Foundation
VTP — 5 — Commissioning / trial run.
E. ABrC - Approach Bridge - (RCC)
•
ABrC — 1 — Foundation
•
INT - 2 - Super structure
ABrC - 2 — Columns
•
INT — 3 - Finishes
ABrC -3-Deck
INT - 4 - Laying intake pipe
ABrC - 4 — Finishing.
!
INT - 5 - Intake protective works.
l
C.TW-TackweU
F. ABrS - Approach Bridge (Steel)
•
ABrS — 1 — Foundation
•
JW - 1 - Excavation
•
JW - 2 — Foundation
ABrS — 2 — Columns
•
JW - 3 - Steining wall / Inlet ports
ABrS — 3 — Launching of Girders
•
JW - 4 - Decking / Ladders
ABrS - 4 - Finishing.
•
JW - 5 — Pump house / hoist mechanism
•
JW - 6 - Finishes/provision of various valves.
K. PWS - Pure Water Sump
G. Abn - Approach Bund
•
EW - Earth work.
•
EWP - Pitching of Side slopes
•
PWS - 1 - Foundation
•
PWS - 2 - Side walls
PWS - 3- Dome
H. WTP - Water Treatment Plant
•
ST - Settling tank
•
ST - 1 - Foundation
•
ST-2-Side walls
•
ST - 3 - Finishing including provision of valves.
•
ST - 4 - Hydraulic testing.
I. RWS - Raw Water Storage Tank
RWS - 1- Foundation
•
RWS - 2 - Super structure
RWS - 3 — Finishes including provision of valves
1
co
RWS - 4- Hydraulic testing.
J. SSF - Slow Sand Filter
•
SSF - 1 - Foundation
•
SSF - 2 - Super Structure
•
SSF - 3 - Finishes & provision of valves
•
SSF - 4 - Hydraulic Testing
•
SSF - 5 - Filter Media - Loading.
•
SSF - 6 - Trial run / Commissioning.
PWS - 4 - Finishes/Provision of valves.
PWS - 5 - Hydraulic Testing.
1. OHT - Over Head Tank
4. PMC - Pumping Machinery (Centrifugal)
OHT - 1 — Foundation
•
PMC — 1 — Construction of pump house
•
OHT - 2 - G. L. Bracing Beam
•
PMC — 2 — Procurement of pumps
•
OHT - 3 - 2nd Bracing Beam
•
PMC — 3 — Installation of pumps
•
OHT - 4 - 3rd Bracing Beam
•
PMC — 4 — Installation of Electrical Control System / Testing.
•
OHT - 5 - Bottom Ring Beam & Slab (BRB & S)
•
PMC — 5 - Trail run / commissioning.
•
OHT - 6 - Side wall (SW)
OHT - 7 - Dome
OHT - 8 - Staircase & finishing
2. GLSR / SUM - Ground Level Service Resetvoir / Sump.
1
(F'
)
•
GLSR / SUM - 1 - Foundation
•
GLSR / SUM - 2 - RCC Beam
•
GLSR / SUM - 3 - Masonry
•
GLSR/SUM-4-Roof
•
GLSR / SUM - 5 - Finishing
5. DIU - Disinfection Unit
DIU — 1 — Construction room for installation of Disinfection
unit.
DIU — 2 — Procurement of DIU
DIU — 3 — Installation including electrical system.
DIU — 4 — Trail run and commissioning.
6. CT - (battle Trough
3. PMS - Pumping Machinery Submersible
•
PMS -1 - Erection of RCC Hume pump house.
•
PMS - 2 - Procurement of pumps
PMS - 3 - Installation of pumps
•
CT — 1 — Procurement of Catde trough
•
CT — 2- Installation & Finishing
7. STP — Public Stand Post.
PMS - 4 - Installation of Electrical panel / Automatic control
system (Robot) and Testing.
PMS - 5 - Trial run / Commissioning.
8. WP - Washing Platform
INTERCONTINENTAL CONSULTANTS & TECHNOCRATS Pvt. Ltd.
KIRWS & ESP PHASE - II
(WORLD BANK ASSISTANCE)
MONTH: DECEMBER 99
DISTRICT: BELGAUM.
2» List of agencies unlikely to Achieve Milestone I Targets
1
2
3
Name of
Schemes
Villages
4
1
BGM-25
1
Gorbal
SI.
No.
2
Package No. of
Villages
No.
BGM-31
1
Ambadgatti
Name of the
Contractor
M/s. Suprada
Constructions
Dharwad.
5
M/s. Rao
Constructions,
7
End of
Milestone
I/II/III
8
Financial Achivement
Cumulative I/II/III
Short fall %
A
Z
ii
10
9
*3-5-99
4-6-99
I. 4-9-99
II. 4-12-99
4.50
11.32
Contract
value Rs.
in lakhs
6
Date of
start
11.32
2.9
2.9
36%
75%
(Ammended)
25.06
*31-5-99
13-8-99
I. 13-11-99 10.00
II. 13-2-20 25.08
5.22
5.22
48%
80%
(Ammended)
1
co
-J
1
3
BGM-32
1
Tigadi
Shri. G.
Krishna reddy
30.12
*25-3-99
11-7-99
(Ammended)
I. 11-10-99 12.00
II. ll-l-20( 30.12
11.52
11.52
4%
Physical status of works
Remarks
Target
13
15
Item
12
PM
1
0.5
RM
SUMP
GLSR 1 - 50%
OHT
0.68
DM
PM
RM
SUMP
GLSR
OHT
DM
1
2.00
1%
PM
RM
SUMP
GLSR
OHT
DM
1
1.00
1
4.5
Achieved
14
GLSR slow progress due to hard rock strata
1.2
met in levelling the ground in hilly terrain for
foundation.
10%
0.8
1. Due to change of site of OHT and finally site was
decided on 13-8-99 by XWSC and were progressed.
20%
4.0
1. As the land was not available for construction of
OHT, the new land was donated by school
authority subsequently hence, site could be handed
over on 11-7-99.
1 - 50%
3.00
10%
2.5
2. RM delayed due to change tn source.
3. Delay in construcuonof OHT due to poor
progress by contractor.
4. Notice issued to contractor.
INTERCONTINENTAL CONSULTANTS & TECHNOCRATS Pvt. Ltd.
KIRWS & ESP PHASE - II
(WORLD BANK ASSISTANCE)
MONTH: DECEMBER 99
DISTRICT: BELGAUM.
2. List of agencies unlikely to Achieve Milestone I Targets
4
2
BGM-34
2
1
5
4
T. Hattargi Shri. B. R. Patil
Nippani
6
57.48
7
*26-3-99
7-7-99
8
9
I. 7-10-99 22.00
IL 7-1-200C 57.48
10
4.25
10.49
11
80%
82%
(Ammended)
5
BGM-35
1
Kanagale
Shri. B. R. Patil
Nippani
29.08
*26-3-99
19-7-99
I. 19-10-99 11.00
II. 19-1-20C 29.08
7.0
7.0
36%
76%
(Ammended)
I
90
cc
'6
BGM-36
1
Sidnal
Shri. B. R. Patil.
Nippani
15.18
*26-3-99
25-6-99
I. 25-9-99 6.00
II. 25-12-S 15.18
4.04
4.04
73%
73%
(Ammended)
12
PM
RM
SUMP
GLSR
OHT
DM
13
2
9.54
2
PM
RM
SUMP
GLSR
OHT
DM
3
1.00
2
PM
RM
SUMP
GLSR
OHT
DM
14
_________________ 15_______________
1. Delay in indal handing over of site is due to
objection raised by school authonhes & also
objection raised by VWSC.
2. RM / PM delayed due to delay in finalisation of
1
8.6
25%
6.4
sources.
1. Delay in handing over of site is due to delay
purchase of private land and delays caused by
VWSC members.
2 RM / PM delayed due to delay in finalisation of
50%
4.5
20%
4.5
1
1.00
50%
4.40
sources.
1. Delay in handing over of site is due to changes in
location of OHT site and delay caused by VWSC.
20%
4.2
4
District Manager (NorthJ,
District Manager (South),
ICT. Pvt. Ltd.,
ICT. Pvt. Ltd.,
Belga um.
Belga um.
* - Original date of start based on work order date.
* - Ammended date of start based on date of handing over of site.
INTERCONTINENTAL CONSULTANTS & TECHNOCRATS PVT. LTD.
KARNATAKA INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
(WORLD BANK PROJECTJ-PHASE -II
MONTH : DECEMBER 99
DISTRICT : BELGAUM
3. Statement of Bottlenecks
SI
No
1
s
No. of
villages
- flushing to be
done
No. of
villages
New bore
wells to
be drilled
No. of open
Wells
Shallow/ bore
wells to be
drilled
OHT sites
under
dispute
2
03 Nos.
3
03 Nos.
1. Hudli (1)
2. Daddi (2)
4
1 No.
Parthanalli -1
To be
establish fully.
5
2 Nos.
1. Arbhavi
College
2. Nagenwadi
1
1.
3.
Dhulganwadi
Sindhikurbct
Katakbhavi
District Manager (North),
ICT. Pvt. Ltd.,
Belgaum.
SBC
results
awaited
6
02 Nos.
Pachapur
Rustumpur
Sump sites to
be handed
over
7
Nil
GLSR
sites to
be
handed
over
Awaiting
Energisation
for
commissioning
T
A
8
Nil
(But
dispute in
Nainglaz)
9_____ 10
02 Nos.
Nil
1. Katakbhavi
2. Bekwad
11
Nil
Pressure testing
(RM+DM)
District Manager (South),
ICT. Pvt. Ltd.,
Belgaum.
INTERCONTINENTAL CONSULTANTS & TECHNOCRATS Pvt. Ltd.
KIRWS & ESP PHASE - II
(WORLD BANK ASSISTANCE)
MONTH: DECEMBER 99
DISTRICT: BEIdGAUM.
SSI / SSR SCHEMES
4. List ofagencies unlikely to Achieve Milestone II Targets
Name of the
Contractor
Date of
start
End of
Milestone
I/II/III
8
Financial Achivement
Cumulative I/II/III
T
A_
Short fall */•
9
10
H
1
2
3
1
BGM-02
1
B. Bagewadi
Shri. B. R.
Patil.
Nippani
95.74
25-11-98 I. 25-4-99
II. 25-10-99
III. 25-4-2000
25.00
60.00
98.74
35.93
50.26
55.32
44%
2
BGM-17
1
Mangavati
M/s. Rao
Constructions,
Bangalore.
51.26
18-12-98 I. 18-6-99
II. 18-12-99
III. 18-6-2000
11.26
26.26
51.26
12.26
12.26
53%
Package
No.
No. of
Villages
5
I
•J)
Contract
value Rs.
in lakhs
6
Name of
Schemes
Villages
4
SI.
No.
I
7
Physical status of works
Remarks
Target
13
15
Item
12
BGM-18
1
Ainapur
Shri. B. R.
Patil.
Nippani.
93.36
25-10-98 I. 25-4-99
II. 25-10-99
III. 25-4-2000
20.00
50.00
93.36
2
2
1. RM is delayed due to non employment
5
2.9 of labours by contractor.
Head works Existing
2. PWS & SSF, poor progress
ST
ST-4
ST-2 by contractor
RWS
RWS-4 RWS - 4 3. OHT delayed because of poor SBC.
SSF
SSF-2 SSF-1 4. DM delayed as Distribution System
PWS-2 PWS-1 completely revised.
PWS
OHT
OHT-6 OHT-2
DM
7.84
3
PM
RM
Head works
25.36
25.36
32.26
65%
14
PM
RM
ST
RWS
SSF
PWS
OHT
DM
3
Achieved
PM
RM
1
1
1
1.8
3.25
3.2
1
2
Head works Existing
ST
Existing
Existing
RWS
Existing
SSF
1%
PWS
1%
OHT
DM
13
2
5%
5%
5
1. Jack well delayed due to back water and
non employment of labour.
2. WTP delayed due to SBC and non
submission of revised design based on
SBC (BC - Soil)
3. OHT work is also progressing slowly.
Contractor has been issued notice.
1. RM / DM slow due to villagers
obstruction and also non - employment
of labours by contractor.
2. WI'P components poor progress due to
non-employment of labours.
3. Contractor has been issued further
notice.
4
5
I
6
2
BGM-19
BGM-19A
BC IM-20
2
4
1
Jugul
Shiraguppi
1
1
z\kkol
^0
I
5
Shri. B. R.
Patil.
Nippani.
Shri. B. R.
Patil.
Nippani.
Shri. B. R.
Patil.
Nippani.
6
99.34
79.30
117.10
8
7
25-10-98 I. 25-4-99
II. 25-10-99
III. 25-4-2000
25-10-98 I. 25-4-99
II. 25-10-99
III. 25-4-2000
25-10-98 I. 25-4-99
II. 25-10-99
III. 25-4-2000
9
20.00
50.00
99.34
15.00
40.00
79.30
20.00
50.00
117.10
10
12.35
20.65
32.26%
19.59
22.06
29.56
26.75
49.54
53.74
11
68%
63%
13
2
2
Head works Existing
25%
ST
25%
RWS
20%
SSF
20%
PWS
50%
OHT
7.00
DM
12
PM
RM
PM
RM
BGM-23
1
Borgaon
Shri. B. R.
Patil.
Nippani.
146.00
25-10-98 I. 25-4-99
II. 25-10-99
III. 25-4-2000
26.00
76.00
146.45
34.97
46.68
55.49
5%
5%
5%
5%
15%
5.5
54%
1. RM delayed due to dispute of sharing
10%
5%
jack well.
2. Head work need modification &
problem of approach.
3. WTP components non-employment of
labour by contractor.
4. OHT slow progress due to non
employment of skilled labours.
Contractor has been issued further notice
ST
RWS
SSF
PWS
OUT
DM
Existing
50%
25%
25%
50%
9.00
PM
RM
1
3.00
1
80%
2.8
20%
70%
50%
25%
50%
7.00
25%
10%
10%
6.7
1
3
1
25%
40%
25%
25%
50%
10.00
2 Up
0.7
60%
10%
20%
5%
5%
15%
5.00
Head works
62%
PM
RM
Head works
ST
RWS
SSF
PWS
OHT
DM
___________________ 15_______________
1. RM delayed due to dispute for sharing
jack well.
2. Head work need modification & there
is problem of approach to site.
3. WTP components delayed due to non
employment of labour as well poor SBC .
Revised design based on poor SBC (BCSoil) still awaited.
DM - delay due to B. C. Soil and also
villagers objection over using excavators.
Contractor has been issued further notice.
2
Head works
ST
RWS
SSF
PWS
OHT
DM
7
1
3
14
2
50%
6.5
2
1. RM delay due to non-employment of
labours.
2. Approach and Jack well slow due to
non-employment of labour and poor
organisation of contractor.
3. WIT component slow due to delay in
acquistion of land also slow progress.
4. OHT progress delayed due to land
acquisition problem.
1. Delay in progress of OH 1 & WI P was
due to land dispute.
2. Jack well site was disputed, hence delay
in progress also delay caused due to back
water of barage.
INTERCONTINENTAL CONSULTANTS & TECHNOCRATS Pvt. Ltd.
KIRWS & ESP PHASE - II
(WORLD BANK ASSISTANCE)
MONTH : DECEMBER - 99
DISTRICT: BELGAUM.
4. List of works, the agency not Achieved the Milestone Targets
SI.
No.
Package
No.
No. of
Villages
1
2
3
1
BGM-01
4
Name of
Schemes
Villages
4
Name of the
Contractor
Sulebhavi
Peeranwadi
Marihal
Malaga
K.
Ramakrishna
Hyderabad.
5
Contract
value Rs.
in lakhs
6
Date of
start
121.30
26-3-98
End of
Milestone
I/II/III
8
I. 26-9-98
II. 26-3-99
III. 26-9-99
Financial Achivement
Cumulative I/II/III
T
A
Short fall 0 o
9
10
TT
25.00 25.00
85.00 95.77
121.30 115.71
12%
5%
Physical status of works
Remarks
Item
12
Target
13
Achieved
14
PM
RM
Sump
GLSR
OHT
DM
16
8.0
3
1
2
22.00
5.5
contractor in respect Peeranwadi & Sulebhavi
2C + 1 Up village.
1C
2. Delay in rising main & pumping machinery
1 C + 1 Up for village Marihal is due to delayed approval
22.70
by client.
15
1. Delay in procurement of pumps is due to
3. Delay in rising main & pumping machinery
for village Halaga due to establishment of new
I
bore wells in place of Open well & delayed
U)
approval by client.
i
4. Delay of OHT at Marihal is due to demand
by VWSC for change in site.
2
BC.M-03
4
Chikkalwad
Navalihal
Bambalwad
Benadi
M/s.
Coromandal
Prescrete
Pvt. Ltd.,
Hyderabad.
53.20
21-3-98
I. 21-9-98
II. 21-3-99
III. 21-9-99
12.00
36.00
53.20
12.00
16.61
38.43
57%
28%
PM
RM
Sump
GLSR
OHT
DM
8
5
1 Up
0.732
1. Delay in OHT is due to slow progress by
contractor. Now new GPA has commenced the
work with all sincerity. LD is recovered in RAB.
During review meeting held on 18-9-99 at the
3
16
3 Up
12.38
office of Engineer-in-Chief, PHE Bangalore,
reviewed probable date of completion given.
Chtkkahvad commissioned / Navalihal - Jan 2(MX».
Benadi - Dec -99, Bambalwad - 15-3-200(1
Chikkalwad commissioned on 30-10-99.
1
3
4
I
-D
Cm
I
5
2
BGM-04
BGM-05
BGM-06
3_
3
3
2
4
Mache
Muchandi
Honaga
Tumur
Batakurki
Hulkund
Daddi
Katakbhavi
5
M/s. B. T.
Patil & Sons,
Belgaum.
Shri. R.
Nagraj.
Ramadurg.
M/s.
Coromandal
Prescretc
Pvt. Ltd.,
Hyderabad.
6
94.60
53.70
46.85
7
27-4-98
21-1-98
21-3-98
8
I. 27-10-98
II. 27-4-99
III. 27-10-99
I. 12-7-98
II. 12-1-99
III. 12-7-99
I. 21-9-98
II. 21-3-99
III. 21-9-99
9
20.00
60.00
94.60
10.00
35.00
53.70
11.50
30.00
46.85
10
11
12
13
14
18.32
28.23
39.45
58%
PM
RM
Sump
GLSR
5
11
5
2.5
2
oirr
2
DM
18
1 C
1 C
1 C
1 - 80%
15.5
PM
RM
Sump
GLSR
OHT
6
5
1.2
10.00
14.52
25.99
11.50
13.15
24.28
58%
63%
52%
48%
48%
15
1. Delay in progress of RM is mainly due to
delay in establishment of reliable water sources.
2. Delay in GLSR due to slow progress by
contractor.
3. LD proposed.
4. Sump site yet to be finalised at village Mache.
1. Delay in progress of PM and RM due to
delay in finalisation of reliable water sources.
2. Batakurki source recently finalised.
3.1 -OHT work court stay order recently withdrawn.
DM
11
1 C
1 - Court
case
1 - 70%
8.5
PM
RM
Sump
GLSR
OHT
DM
6
3
1
1.8
10%
3
4. LD imposed.
Scope of work for transmission main increased
at village Hulkund. New sump being provided.
Excavation completed.
1. As per review meeting held on 23-12-99 at
office of Superintending Engineer, PHE Belgaum.
with EIC revised probable date of completion
31 - 01 - 2000 & work is progressed accordingly.
2
12
2 Nos. 60% 2. LD imposed.
10.6
6
7
2
BGM-07
BGM-08
3_
4
4
4
5
6
7
8
9
10
11
12
13
14
Godachi
Torangatti
Bijaguppi
Nandihal
M/s.
53.30
20-3-98
I. 20-9-98
II. 21-3-99
III. 20-9-99
13.00
35.00
53.30
11.42
16.87
33.22
37%
PM
RM
Sump
GLSR
OHT
6
6
3
5.7
Parishwad
Gandigwad
K. Bekwad
Londa
Coromandal
Prescrete
Pvt. Ltd.,
Hyderabad.
M/s B. T.
Patil & Sons,
Belgaum.
80.00
12-5-98
I. 12-11-98
II. 12-5-99
III. 12-11-99
16.00
64.00
80.00
17.2
28.63
46.7
38%
42%
42%
15
1. As per review meeting held on 23 - 12-99
revised probable date of completion as under.
Village - Bijaguppi - 31-12-99
Village - Godachi - 31-12-99
3
DM
8
PM
RM
Sump
GLSR
OHT
10
10
1
1
1
DM
18
<
1 C
1-70%
1 - 95%
5.8
Village - Nandihal - 15-01-2000
10 Up
11.7
1
20%
1C
1 - 60%
16
As per review meeting held on 23-12-99, revised
Village - Torangatti - 31-01-2000.
work being progress accordingly.
2. LD imposed.
Probable date of completion as under.
K - Bekwad - 31-12-99 - But progress not
satisfactory.
Gandigwad - 31-1-2000 But progress not
satisfactory
Parishwad - 15-1- 2000
Londa - 28 - 2 - 2000.
2. LD imposed.
I
1
8
BGM-09
3
Sopadla
Hooli
Hanchina)
M/s.
Pochampad
66.00
13-4-98
I. 13-10-98
II. 13-4-99
III. 13-10-99
13.00
40.00
66.00
13.10
15.01
34.80
47%
47%
PM
RM
Sump
GLSR
OHT
1
2
DM
12
5
3
1. Contractor did not attend review meeting on
1.6
18-9-99 . Notice served on contractor for poor
20%
1C
1 - 70%
4.0
on 25-10-99, assuring to complete by 31-12-99.
progress. Now contractor has reported for work
1
2
2
9
BGM-10
3
4
Arbhavi
(+3 Hamlets)
Sindikurbet
Nagnur
5
6
7
M/s B. T.
Patil & Sons,
Belgaum.
136
12-5-98
8
9
I. 27-11-98 25.00
80.00
II. 12-5-99
III. 27-11-99 136.30
10
9.72
17.56
49.37
11
63%
64%
12
PM
RM
Sump
GLSR
OHT
DM
13
22
16
1
1
5
14
14
13
3.52
15
As per review meeting held on 23-12-99, the
revised probable date of completion as under.
Arbhavi Math & hamlets - 31-12-99
1 - 10%
4 Up
10.17
Arbhavi Main village - 28-2-2000
Sindhikurbet village - 15-3-2000
Nagnur village - 25-3-2000
work in progress but still slow. Contractor has
been asked to expedite the same.
10
11
BGM-11
BGM-13
2
3
I
Khadaklat
(+ 2 Hamlets)
Belkud
Kannal
Yelihadgali
Parthanhalli
M/s B. T.
Patil & Sons,
Belgaum.
R. Nagraj
73.80
38.42
22-5-98
24-5-98
I. 22-11-98
II. 22-5-99
III. 22-11-99
I. 24-11-98
II. 24-5-99
III. 24-11-99
13.00
45.00
73.80
7.00
23.00
38.42
7.50
8.78
27.21
7.00
13.57
23.27
63%
63%
64%
39%
-J)
‘-O
1
12
BGM-12
4
Nandgad
Hebbal
Tolgi
Kakkcri
Shri. S. A.
Magdum.
96.70
21-2-98
I. 21-8-98
II. 21-2-99
III. 21-8-99
19.00
59.00
96.70
19.00
51.45
74.8
23%
23%
PM
RM
Sump
GLSR
OUT
DM
17
8
1
1 Up
3
16
2 Up
12.85
Contractor has been issued notice to expedite.
PM
RM
Sump
GLSR
OHT
6
5
3.1
of bore wells sources
DM
10
1 -80%
1 -60%
9.12
PM
RM
Sump
GLSR
OHT
DM
18
14
2
15.2
2C
2
17
3C
16.45
As per renew meeting held on 23-12-99 the
revised probable date of completion as under.
(a) Village Belkud - 31 - 1 - 2(XX)
(b) Khadaklat - 28 - 3 - 2000.
LD imposed.
1. Procurement, delay due to finalisation
2. However 1.1) imposed.
As per review meeting held on 23-12-99, work
2
is to be completed by 26 - 1 - 2000.
1. Under procurement, delay due to drilling of
new bore wells.
2. Delay in acquisition of land for sump.
3. Delay in receipt of clearance for road cutting
from PWD.
4. Contractor has applied for extension of time.
Forwarded duly recommend upto 30-11-99 as
requested by contractor. But work likely to be
completed by 31-1- 2000.
1
13
2
BGM-14
2
4
4
Ankalgi
Borgal
Nainglaz (MV)
Dhulganwadi
(Ham - 1)
Nagenwadi
(Ham-2)
Yadenwadi
(Ham - 3)
Nesargi
5
Shri. S. A.
Magdum.
District Manager (North),
ICT. Pvt. Ltd.,
Belgaum.
I
6^
I
Note :
PM
RM
GLSR
OHT
DM
GPA
- Pumping Machinery
- Rising Main
- Ground Ixvel Service Reservoir
- Over Head Tank
- Distribution Main
- General Power of Attorney
6
80.35
7
25-3-98
8
I. 25-9-98
II. 25-3-99
III. 25-9-99
9
15.00
55.00
80.35
10
15.00
29.44
40.59
11
12
13
49%
PM
RM
Sump
GLSR
OHT
13
8.9
49%
DM
14
15__________________
1. Slow progress of GLSR is due to delay in
4.59
acquisition of land. Delay by contractor.
2. Delay due to land problem in acquisdon of
4
4
21.7
land for OHT.
2C
1 - 25%
1 -10%
12.3
3. Contractor has asked for extension of time
and forwarded, duly recommended upto
30-11-99 as requested by him. But the work is
likely to be completed by 15-3-2000.
District Manager (South),
ICT. Pvt. Lid,
Belgaum.
(5) List of Agencies on whom penal Action has been recommended.
SI.
No.
Package
No.
No. of
villages
Name of
Contractor
Contract
value
Date of
start
End of
Milestone
Name of Scheme/
Villages
I/II/III
1.
BGM-2
M/S B. R.
Patil
Nippani
13-10-98
II
25-10-99
53.20
21-3-98
III
21-9-99
M/s B. T.
Patil & Sons
Belgaum
94.60
27-4-98
II
27-4-99
Shri. R.
Nagraj
Ramadurg
53.70
2
M/s
Coramandal
Prestcrete,
Hyderabad
46.85
4
M/s
Coramandal
Prestcrete,
Hyderabad
4
M/s. B. T.
Patil &
Sons.,
Belgaum.
I
95.74
M/s.
2
BGM-3
4
3.
BGM-4
3
i
4.
5.
6.
7.
BGM-5
BGM-6
BGM-7
BGM-08
3
Cormandal
Prestcrete
Pvt. Ltd.,
Hyderabad
53.30
80.00
12-1-98
III
12-7-99
21-3-98
III
21-9-99
20-3-98
III
29-9-99
12-5-98
12-11-99
Financial cumulative for
Milestone I/1I/I1I____
T
A
Shortfall
%
1.
Bellad
Bagewadi
95.74
55.32
42%
1.
2.
Bambalwad
Benadi
Chikalwad
Navilihal
53.20
38.43
27%
Mache
Muchandi
Honaga
94.60
39.45
58%
53.70
25.99
52%
3.
Tumur
Batakurki
Hulkund
2.
3.
Daddi
Katakbhavi
46.85
35.85
23%
1.
2.
Godachi
Torangatti
Nandihal
Bijaguppi
53.30
33.22
38%
Parishwad
Gandigwad
K. Bekwad
Londa
80.00
46.07
42%
3.
4.
5.
6.
7.
1.
2.
3.
4.
1.
2.
3.
4.
Status of
works
RM :2 km
against 8.
DM just
started. OHT
raft slab laid.
1 OHT upto
bottom slab.
1 OHT upto
raft.
1 OHT yet to
start
l.OHT
completed
another slow
progress
GLSR slow
progress
OHT of
Tumur under
dispute.Found
ation Raft laid
at Hulkund.
DM started
but slow
progress
OHT slow
progress, DM
& RM started
but slow
progress
OHT finishing
slow. RM - 4.2
km against 6
km. DM-5.8
km against 8
____ Km.____
GLSR at
Londa very
slow. DM - 5
km against 11
kms.
Details of
penal action
Remarks
Liquidated
damage
proposed
Liquidated
damage
Imposed.
Liquidated
damage
proposed
Liquidated
damage
proposed
Under
extended
period
Liquidated
damage
imposed
Under
extended
period
Liquidated
damage
imposed.
Under
extended
period
Liquidated
damage
imposed
(5) List of Agencies on whom penal Action has been recommended.
Package
No.
SI.
No.
BGM-9
8
BGM- 10
9
10
11
BGM - 11
BGM - 18
No. of
villages
Name of
Contractor
3
M/s
Pochampad
Cement Pipe
Construction
Co.
Hyderabad
3
M/s B. T.
Patil & Sons
Belgaum
2
M/s B. T.
Patil & Sons
Belgaum
1
Shri. B. R.
Patil.
Nippani
1
Shri. B. R.
Patil.
Nippani
Oo
12
BGM - 19
Contract
value
66.00
66.00
136.00
93.36
99.34
Date of
start
End of
Milestone
Name of Scheme/
Villages
Financial cumulative for
Milestone I/II/III
1.
3.
4.
Sopadala
Hooli
Hanchinal
66.00
Arbhavi
Shindikurbet
Nagnur
Khadaklat
Belkud
13
14
BGM19A
BGM-23
1
1
Shri. B. R.
Patil.
Nippani
79.3
146.45
Details of
penal action
DM&RM
started but
slow progress
Liquidated
damage
imposed
OHT slow
progress. RM,
DM slow
progress
OHT slow
Progress. RM
not started.
DM slow
progress
OHT raft
foundation
laid. RM, DM
not started
OHT raft
foundation
laid.
RM not
started. DM 5.5 as against
7.0 km.
OHT upto
bottom slab
DM 3.4 km
against 4.0
RM not
started.
OHT under
excavation.
RM not
started. DM
3.0 km against
6.0 km
Liquidated
damage
imposed
Remarks
mi/ni
13-10-98
III
13-10-99
27-5-98
27-11-99
1
2.
5.
22-5-98
II
22-11-99
1.
2.
25-10-98
25-10-98
II
II
25-10-98
II
25-10-98
Ainapur
Jugul
136.3
73.8
93.36
99.34
34.80
49.37
27.21
32.26
32.26
47%
64%
63%
65%
68%
I
Shri. B. R.
Patil.
Nippani
Status of
works
25-10-98
25-10-98
II
25-10-98
II
25-10-98
Shhiraguppi
Borgaon
79.30
146.45
29.56
55.49
63%
62%
Liquidated
damage
imposed
LD. To be
imposed
II Mile
stone not
achieved
Liquidated
damage
proposed
II Mile
stone not
achieved
Liquidated
damage
imposed.
Liquidated
damage
proposed
II Mile
stone not
achieved
II Mile
stone not
achieved
(5) List of Agencies on whom penal Action has been recommended.
SI.
No.
15
Package
No.
BGM-24
No. of
villages
Name of
Contractor
1
Shri. G.
Krishna
Reddy,
Hubli
M/s.
Suprada
Construction
Contract
value
241.00
Date of
start
27-10-98
27- 4 -2000
Financial cumulative for Milestone
I/II/III
Hosur
241.00
116.48
52%
Gorbal
11.32
2.90
75%
11.32
4-6-99
19.77
20-8-99
II
2-2-2000
Kadabi
19.77
5.24
74%
M/s. Rao
Construction
25.06
13-8-99
II
Ambadgatti
25.06
5.22
79%
32
Shri. G.
Krishna
Reddy
30.12
13-11-99
II
1 1-1-2000
Tigadi
30.12
1 1.52
60%
BGM -33
1
Shri. S. A.
Magdun
43.20
19-6-99
II
19-12-99
43.20
17.55
59%
1
Shri. B. R.
Patil
57.48
7-7-99
II
7-1-2000
T. Hattargi
57.48
14.49
74%
1
Shri. B. R.
Patil
29.08
19-7-99
II
7-1-2000
Kanagale
29.08
7.00
76%
I
Shri. B. R.
Patil
15.18
25-6-99
II
25-12-99
Sidnal
15.18
4.04
73%
BGM - 25
1
17.
BGM-29
1
18
BGM-31
1
M/s.
I
II
Name of
Scheme/
Villages
II
4-12-99
16.
19.
End of
Milestone
I/II/III
BGM
Suprada
Construction
U)
13-2-2000
-I)
I
20.
21.
22.
23.
BGM-34
BGM-35
BGM
36
U.
Khanapur
Status of
works
WTP65%.
OHT slow
progress.
RWL very
slow.
GLSR slow
progress. DM/
RM not
achieved.
1 OHT slow
progress. DM/
RM not
achieved
1 OHT slow
progress. DM/
RM not
achieved
1 OHT slow
progress. DM/
RM not
achieved
1 OHT slow
progress. DM/
RM not
achieved
1 OHT slow
progress. DM/
RM not
achieved
1 OHT slow
progress. RM
not achieved.
Sump yet to
start.
1 OHT slow
progress. RM
not achieved
-J
-
Details of
penal action
Remarks |
Liquidated
damage
proposed
II Mile
stone not
achieved
Liquidated
damage
proposed
Liquidated
damage
proposed
Liquidated
damage
proposed
Liquidated
damage
proposed
Liquidated
damage
proposed
Liquidated
damage
proposed
II Mile
stone not
achieved
II Mile
stone not
achieved
II Mile
stone not
achieved
II Mile
stone not
achieved
II Mile
stone not
achieved
II Mile
stone not
achieved
Liquidated
damage
proposed
II Mile
stone not
achieved
Liquidated
damage
proposed
II Mile
stone not
achieved
-J
INTEGRATED RURAL WATER SUPPLY AND
ENVIRONMENTAL SANITATION PROJECT
KARNATAKA
(World Bank Assistance)
Phase II
Package II Villages
PROGRESS REPORT
of Bellary District
For the Month of DECEMBER 1999
INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD , NEW DELHI
CONSULTANTS FOR CONSTRUCTION MANAGEMENT AND QUALITY CONTROL
7
FORMAT - 03
PROGRESS PACKAGE WISE FOR THE MONTH OF DECEMBER 99
FINANCIAL & PHYSICAL
Name of District : BELLARY
SI.
Packag
No. of
Name of
Period Contra
Date
No.
e no.
villages in contractor
of
ct
of
package/p
comvalue
start
rogress
pletio
n
in
months
I
2
3
_______ 4
5
6
7
M/s. Mega
Mile
Stone
Financial
progress
in lakhs
cumulative in
Rs. Lakhs
T
z\
I
__ 9
27.01
10
24 16
II
58.72 ' 42.07
£
Physical progress
No of
schemes
commiss
ioned
Cumulative
During the month
S.P
in nos
Z
4
C.P
in nos
R.M
in Kms
T
19
A
20
Nil
18
2.0
Nil
nil
7.0
9.0
7.0
3
3
N.A
Nil
3
8.0 4 7.65
9.0
9.0
4
4
N.A
3
1
Nil
1
A
16
N.A
8.0
N.A I
A_
14
OHT
in Nos
Sump/
GLSR in
nos.
T
A
21
22
N.A
T
15
Nil
A
T
12
13
■ Nil N.A
D.S
in Kms
T
17
A
constructions
1
BLR-1
4/4
Engineers
tand
18
69.95
7-2-98
Contractors
Hyderabad
1
2
BLR-2
4/3
Mr.K.Maheswar
18
112.39 24-8-98
a Naidur. Hyd.
O
O
.... i...........
Ill J 69.95
52 89
-
40.00
i 35 18
2
I
II
II
3
4
5
BLE-3
BLR-4
BLR-5
3/3
8/8
5/5
112.39 j
7
I
37 47
Constructions.
II
123.97
66.84
Nellore
III
137.53
117 67 nil
I
81.22 ! 42 80 I
II
130.88
73.22
Hyderabad
III
157.23
I 14.79
M/s.Coramandal
I
30.00
12 02
II
70.00
■ 26.34
Ill
94.07
f 32.92 ’
M/s.K.Ramakris
hna. Engineers
Contractors.
Ltd.. Hyd.
18
18
18
137.53 23-3-98
157.23 23-4-98
94.07
12-3-98
Nil
2
•
1.7
4.2
5.0
1
Nil
5
8.5 f
1.7
16.7
10.8
2
2
1/0
4
3
2/0
10
51.08
M/s.Pinakini
Presticrctre (P)
Progressl.doc
47 75
90.00
f -
2
Nil
10.5
4
Nil Nil
......
1 6 | 16 4 ' nil
No. of Rem;
scheme
s
propose
d
9.29
21.0
0.5
2.99
7.8
1
Nil
nil
6.5
14.29
16.5
2
2
0/3
23
24
Nil
Nil
25
2
1/0
I
Nil
1
0/3
Nil
2
2/3
2
nil
nil
16
11.7
21
19.0
nil
Nil
2/3
nil |N.A ; -
2.86
Nil
12.0
6.6
2
nil
N.A
Nil
2
8
N.A
-
10.21
4.8
29.2 19.85
5
N.A
Nil
5
nil
nil
nil
11
13.3
33
24.85
0.5
8
6
4
8
Nil
N.A
I
Nil
3
Nil
1
Nil N.A
Nil
1
Contra
3
Nil
N.A
-
4
0.3
10
2.5
3
Nil N.A
Nil
2
term in
6
- ’ N.A'
-
6
0.42
17
7.59
5
Nil N.A
nil
nil
nil
nil
nil
2
8
Package
no.
SI.
No
No. of
villages in
package/
progress
5/5
BLR-6
6
Name of
contractor
M/s. Pinakini
{constructions.
Period
of
comple
tion
in
months
Contract
value
18
87.66
Date
of start
10-4-98
5/5
1
5/5
I
o
CC
r
9
!
4/4
BLR-9
To~T BLR-10
4/4
Mr. G.V. Pratap !
I Reddy, Engg. &
[Contractors, 11yd
I Mr. G.V. Pratap |
I_______ L
BLR-11 T
11 Jii ------Lx.
-------
I
12 J{
BLR-12 |
I
...
Progressl.doc
T
1/1
B.Ramesh.
12
[LIGT947 Bidair |
2/2
' M/s. Navarang |
I constructions, :
Raichur.
ir
18
f
51.66
30.84
nil
9.0
11.8
18
14.3
6
6 |
nil
[ nil
2
23^2-98
I
j 57.85
40.15
10
nil
nil
nil
0.78
0.60
1
nil :
nil
I nil
Nil
1
=::=4
II
I 9 7.65
U 15.27
64.96
102.6 | nil
8
10
jT
nil
5
3
nil
4
9
9.7
16.16 12.9
15.2
19
Nil
nil
:r:
6.52|10.60
3
1
I 85.51
i 5413
11 | nil
nil i 9
nil
nil
6.32
nil
8.48 8.0
113941 | 75.12
T
nil
9
6.8
16
15
II
/14 I‘103 73
i 150.44
ml. nil
nil
nil
15
11.5
26
19.8
30.00
II 10
I 7000- ’! 34.481
1
Nil I N.A |
2
Nil •
4 ’4.71 j
1
4
-.. iN.A 1
5.05
3.05
11 46.91 •
3
| 90.44
| 20.94
18
_5
1
111
21-3-98
^9-12-98 i
•i............. r
I
II
24-8-98
F........... |
I
II
—I
I HI
..........!..
1
4
nil
III
50.37
nil
Nil
nil
111
18
~ ~T
Sump/
OUT
GLSR in nos
in Nos.
T | A
A
T
nil | N.A
1
........
4
8
I90.44
DS
in Kins
j A
8.3
3.20
15
6.7
nil
II
18
R.M
in Kins
A
t
4.95 0.85
6.0 3.65
75.22
1
I Reddy, Engg. & i
{Contractors, Hydj
-
150.41
18
Hyderabad.
-
GT W
H.-’ C
M/s.K.Ramakris
hna, Engineers, j
CP
in nos.
T | A'
nil
nil
n’a
87.66
and contractors, |
i
c:
115.27
18
Hyderabad.
BLR-8
8
|M/s.K.Ramakris
hna. Engineers
I
and contractors,
SP
in nos.
T | A
j 44.32 | 18 $8
— [ nil
j 77.83 34 96 8! 5
111
J______
BLR.-7
I
11
Vellore.
7
A
T
Format 03 contd..
No of
No. of Reniarl
schemes
sche
mes
propose
com
d
imssi
oned
Physical progress
Financial
progress
in lakhs
Mile
Stone cumulative in
Rs. Lakhs
13-4-991
27-9-98
I
I[
I
11
II!
7
19 55
47 25
3
50.37 j 47.09
7
..... I
J 30.96
11.50
| 51.66
i 16.09. io.5O
, 27.46 1 15 16
30.84 [ 17 86 j
3
6
1
1
1
3
6
--
Nil
-
N.A
' N.A
11
1.8
4
5.82
3.6
12
13.4
14.0
N.A
1
3
N.A
5
i 3.9 | :20
0
4
™2”
11
5
12.5
N.A
N.A
•N.A
: 0.3 j
T
Nil
2
1.25
I
3
I" 5
4
4 | 4 | 2/0 j nil
nil
4
1
2
nil
2/11 o/i
| nil
-
nil
nil
1/1
nil
Nil
nil
1
2
r4
nil
i/i
nil
4
i nil i
i
j 1
- j
„■ r
nil
nil
£
0/1
nil
1
1
2
1
1
0/1
j
I
t
1
2
Nil
I
1
| - 1. I/O.. r-
Nil
1 f
1
2
Nil
N.A
-
1
N.A
-
Nil
Nil
1
I
■
1.6
j
1
nil
1
I
I N-A i "
Nil I
9
13.
14.
15.
BLR-13
BLR-14
BLR-15
1/1
2/2
2/2
M/s. Rao
Constructions,
Bangalore.
M/s. K.S.C.C.
Bellary
Mr. B.R. Meli
Lingasanoor.
12
84.97
14-6-99
12
12
17-4-99
46.01
28-4-99
48.96
25.33
1I_ 84.97
I ' 11.80
29.48
'
27.60
i
46.01
33 65
I
n_
n
1_____
16.
BLR-17 I
4/4
N.A. - Not Applicable
J
o
Progressl.doc
Rajendra Andral
Gulbarga.
12
41.04
17-4-99
I
II
29.64
41.04
C.C.S. - Corrected Construction Schedule
5.57
12.05
12 37
5.4
| Nil
5.4
1
1
1
3
3
6
Nil
N.A
N.A.
0
2
2.3
3.6
2
4.4
1
3
Nil N.A
NX
2.0
4.2
C.S. - Construction schedule
2
4.5
4
10.2
Nil
1.0
4.0
1
3.0
15
1
2.0
1
4.2 2.0
2
12.6 '76
| 1.2 j
0/1
1/0
1/1
Nil
1
- | Nil
0/1 Nil!
Nil[
---
Nil
Nil
-
C.S noi
subinilte
10
FINANCIAL PROGRESS PACKAGE WISE FOR THE MONTH OF DECEMBER 1999
District : BELLARY
Si.
No
2
2
BLR-1
l
I
Package
No.
Total
no. of
villages
3
4
FORMAT-04
Value of work
in Rs.
4
69,95,128-00
2
BLR-2
4
1,12,39,402
3
BLR-3
3
1,37,53,664-00
4
BLR-4
8
1,57,230-00
o
Cm
I
5
BLR-5
Progressl.doc
5
94,07,745-00
Name & Address
of contractor
Name & Address of
contractor personal
Name and
address of
assistant
Engineer
”__________ 7
Financial progress (Cumulative) in Rs. Lakhs
Date of
award
Date of
starting
8
9
Date of
comple
tion
10
T
11
_________ 6________
S M Mruthyunjaya
Sri P V.Ranga Reddy
• H.No. 24,
G.P.A. Holder,
13-06-97 07-02-98 06-08-99 27.01
M/s. Mega Constructions Sanjay Gandhi
Tilak Nagar, Cantonment Nagar,
_______ Bellary______ Bellary - 583 104.
Sri.
Sri P.Bhagat Dutt
Mr. K.Maheswara 1
B M.Rajasekharaih,
G P A. Holder,
Naidur, Engineers
06-04-98 24-08-9823-2-2000 40.00
Sandur
Visweswara Nagar,
and Contractors,
_______ Bellary.______
Hyderabad._____
Sri. V Balaswamy,
Sri. Dhanunjaya Rao,
M/s Pinakini Cons.
C/o.
Manjunath
G.P.A. Holder
16/1726, Ram murthy
23-09-97 23-03-98 22-09-99 51 08
Gowda, Kurugodu
Near old post office.
Nagar, Nellore
______ Kurugodu_____ Bellary dist._______
Sri. H M Renukaiah
Sri. S Pravas Dutt,
M/s. K.Ramakrishna
C/o. Sridhara Shetty
G P A Holder,
Hyderabad.
25-1 1-97 23-04-98 22-10-99 81.22
Kudligi Circle,
Visweshwara Nagar,
Ramnagar,
Kappagal Road,
H.B.Halli, taluk.
_______ Bellary.______
S Shivakeri,
Sri. Suresh Kumar
M/s. Coramandal
C/o Chandrasekhar
Vijaya Mary Hospital
Prcsticre (P) Ltd.,
Co-operative
Siruguppa
Aurora Colony,
28-10-98 12-03-98 I 1 -09-99 30 00
developemtn
Hyderabad.
officer, Opp. Sri
Ram
Medical
Store, Siruguppa.
5
M/s. Mega
Constmctions,
Hyderabad.
MS 1
A
12
24 16
MS
Ta__ I
T___
13
58 72
Remarks
14
111
T_____
15
A
16
42 07
69 95
52.89
MS 11
C C S. is not
given. Target
is considered
as per N.C.B.
35.18
90.00
47 75
112.39
37 47
123 97
66 84
137.53
HL67
27 51
130.88
73.22
157.23
114 79
7 88
42 80
Contract
terminated
12 02
70 00
26.34
94.07
32 92
is
11
________ ___ ______ Format 04 contd..
SI.
No
Package
No.
6
BLR-6
BLR-7
7
BLR-8
8
BLR-9
9
10
I
Total
no. of
villages
5
11.
BLR-10
BLR-1 I
Value of work
in Rs.
87.65,700-00
1,15,27,417-00
5
1,50,40.995
5
4
4
I
90.44 lakhs
50,36,904
51.66
I
12.
BLR-12
2
30,84,188
13.
BLR-13
I
84.97
14.
BLR-14
2
2948
15.
BLR-15
2
4601
16.
BLR-17
4
41 04
C.C.S.
Progressl.doc
Name and
Date of
address of
Name & Address
award
assistant
of contractor
Engineer
H.B.V. Appaji
Sri. Dhanunjaya Rao,
M/s. Pinakini Const.
C/o. BasavannSnaur
G.P.A. Holder
16/1726, Ram murthy
27-11-97
Depot manager,
Near old post office.
nagar, Nellary.
Kudligi_____________
_______ Kurugodu
V.Narendra Kumar
Sri. C.H.Subba Rao,
M/s. K.Ramakrishna
C/o. Manithi,
G.P.A. Holder,
Engineers & Contractor
21-01-98
G. P.Travels,
I lospet.
I lyderabad.
Hospet,____________
C.Mallikarjuna
and
Sri. S Pravas Dutt,
-doL.Hanumanathappa
G.P.A. Holder,
21-01-98
H. No. 46,
Visweswara Nagar,
Kappagal Road, Bellary. S.G. Nagar,
Bellary.____________
' Sri.
Sri. Sekhar Babu
Mr. G.V.Pratap
B.M.Rajasekharaiaha,
G.P.A. Holder,
Reddy, Engineers
28-07-98
11arapanahalli
Harapanahalli
and Contractors,
Hyderabad._____
Sri H.S.Shaik
Sri Sidda Reddy
Mr. G.V.Pratap
Mahaboob Basha
G P A. Holder,
Reddy, Engineers
23-01-98
Bellary
and Contractors,
Hyderabad._____
Sri. H.V.V. Appaji
B Ramesh,
L.l.G. 94, KHB Colony
13-4-99
Bidar - 585 401.
Name & Address of
contractor personal
M/s. Navarang
Constructions,
Raichur.
M/s. Rao
Constructions,
Bangalore.
M/s. K.S.C C
Bellary
Mr B.R Meti,
Lingasonoor
Sri S.Subramanyam.
GPA.Holder,
_____ Bellary._____
Sri. H.B.V Appaji,
Harapnahalli
Sri. AJagan Mohan
31-03-99
Reddy,
Siruguppa.__________
Sri.P.G.Shanta Kumar 14-06-99
Bellary
Sri.
Kumar
Mr Rajendra Andral
Engineers &
Contractors,
Gulbarga._____ ______________
Date of
comple
tion
MSI
A
T
IT
MS II
Remarks
MS 111
I T
| A
10-04-98 09-10-99
44.32
18.58
77.83
34.96
87.66
75.22
9.21
23-02-98 22-08-99
57.85
40.15
97.65
69.54
115.27
102.68
9.84
21-03-98 20-09-99
85.51
54.13
139.41
75.12
150.41
103.73
1.25
09-12-98 08-6-2000
30.00
11.10
70.00
34.48
12.63
90.44
24-08-98 23-2-2000
20.94
19.55
47.25
36.0
50.36
30.96
11.50
51.66
27-9-98 08-3-2000
16.09
9.27
27.46
15.16
17-4-99 16-4-2000
48.96
25.33
84.97
32.65
7.99
8-8-2000
11.80
9-8-99
47.09
3.94
Contractor has to
Submit
construction
schedule
16-6-2000
17-6-99
30.84
17.86
1.61
29.48
-do-
V.Narendra
Sri.
H.S.Shaik
Mahaboob basha
Sri. H.V.V. Appaji
Sri. H.M.Renukaiah
Corrected construction schedule
02-06-98
Financial progress (Cumulative) in Rs. Lakhs
Date of
starting
28-04-99
28-4-99 27-4-2000
27.6
5.57
46.01
17-4-99
30-5-99 29-5-2000
29.64
12.37
41.04
C.S.
Construction schedule
12.05
6.48
12
FORMAT - 05
VILLAGEWISE PHYSICAL PROGRESS
For the month of DECEMBER 1999
District : Bellary
SI. No.
Package No.
Village name
1
BLR-1
K.Bevinahalli
(MS 2)
2
3
4
5
6
BLR-1
BLR-1
BLR-1
BLR-2
BLR-2
c>
7
8
9
10
Progressl.doc
BLR-2
BLR-2
BLR-3
BLR-3
Start date
Completion date
07-02-98
06-08-99
P.D.Halli
(MS 2)
Y.Kaggal
(MS 3)
Kamarchedu
(MS 3)
Susheelnagar
(MS 2)
24-08-98
23-2-2000
Krishnanagar
(MS 1)
Bommaghatta
(MS 2)
A.S.Gudi
(MS 2)
Kyadigihal
(MS 1)
D.Kaggal
(MS 2)
23-03-98
22-09-99
Status
OHT 7 - Completed
RM- 5.1 Km(C)
CP - Procured
OHT 7 - Completed
DS - 2.2 Km(C)
RM - 0.9 Km(C)
CP - Procured
OHT 7 - completed
DS - 2.5 Km(C)
RM - 1.15 Km(C)
CP - Procured
OHT 7 - Completed
DS - 1.2 Km(C)
RM - 1.9Kms(C)
CP - Procured
OHT 7 - Completed
DS - 2.5 Kms(C)
RM - Not started (0.6)
SP - Not procured
OHT 1 - Foundation
DS - 3.5 Kms (5.4)
RM -Not started (3.9)
SP - Not procured
OHT 7 - Completed
DS -Not started (5.0)
RM -3.2 Kms (C )
SP - Procured
OHT 7 - completed
DS - 5.6 Kms (C )
RM-1.0 (2.9)
SP - Procured
OHT 7 - Completed
DS - 3.5 Kms (4.8)
RM - 1.7 Km (C)
SP - Procured
OHT 7 - Completed
DS - 2.0 Km(C)
RM - 2.5 Kms (C )
SP - Procured
DS - 2.5 Km (C)
Whether source established
Yes/No.
YES
1 No.
YES
1 No.
YES
1 No.
YES
1 No.
YES
1 No.
YES
1 No.
YES
3Nos.
YES
5No.
YES
1 No.
YES
4 Nos.
13
SI. No.
Package No.
Village name
11
BLR-3
Kurugodu
(MS 2)
12
13
14
15
16
I
o
17
BLR-4
BLR-4
BLR-4
BLR-4
BLR-4
BLR-4
(T'
S.L.Halli
(MS 1)
23-04-98
22-10-99
Kanninahalli
(MS 2)
B.G.Halli
(MS3 )
I'ambrahalli
(MS 2)
Hakkandi
(MS 2)
N.Basapura
( MS 2 )
I
18
19
20
21
22
BLR-4
BLR-4
BLR-5
BLR-5
BLR-5
Kuruvathi
(MS 3)
Ambli
(MS 2)
Ibraliimpura
(MSI)
Nagalapura
( MS 3 )
Deshnur
(MS 3)
Status
Start date
Completion date
12-03-98
1 1 -09-99
GLSR - 3 Nos. completed.
KM-7.5 km (12.0)
SP - Procured
OHT 5 - Completed
DS- 14,5 Kms (16)
RM - 0.6 (C)
SP - Procured
OHT 7 - Completed
DS- 1.4 Kms (C)
RM - 4.9Kms (C)
SP - Procured
OHT 7 - Completed
DS- 2.9 Kms(C)
RM - Not started (2.6)
SP - Procured
OH 17 - Completed
DS - 5.5 Kms (NC)
RM -2.0 Kms(2.2)
SP - Procured
OHT 7 - Completed
DS- 8.5 Kms.(9.3)
RM - 2.2kms(C )
SP - Procured
OHT 7 - Completed
DS -2.5 Kms(C )
RM - 3.5 Kms (C)
SP - Procured_________
OHT 3 - 2nd Bracing beam
DS-3.3 Kms (C )
RM - 1.4 (2.9)
SP - Not procured
OHT 7 - Completed
DS-2.0 Kms (3.1)
RM - Not started (2.7)
SP - Not procured
Oll i' 6 -Side wall
DS-3.0/0.5 Kms (3.0)
RM - Not started (1.2)
SP - Not procured
OHT 2 - GL Bracing beam
DS-3.0 (C )
RM-0.12 (0.4)
SP - Not procured______
OHT 2 - GL Bracing Beam
DS-0.19 (2.2)
RM - Not started (3.0)
- Not procured
DS - 3.0 Kms (5.5)
SP
Progressl.doc
Whether source established
________Yes/No.________
YES
11 Nos.
YES
2 Nos.
(1 No. Existing)
YES
1 No.
YES
3 Nos.
YES
4 Nos.
YES
2 Nos.
(1 No. Existing)
YES
1 No.
YES
1 No.
YES
2 Nos.
YES
I No. SBW
YES
1 No. SBW
YES
1 No. SBW
SI. No.
Package No.
Village name
23
BLR-5
24
BLR-5
Kottalachinta
(MS 2)
Bagewadi
(MS 2)
25
26
27
28
I
28 (a)
BLR-6
BLR-6
BLR-6
BLR-6
BLR-6
Chirasthahalli
(MS 2)
10-04-98
09-10-99
Eshapura
(MSI)
Harakanahal
(MS 2)
Anekal
( MS 2 )
Anekal Tanda
(MS2
o
i
29
30
31
32
33
34
Progressl.doc
BLR-6
BLR-7
BLR-7
Madur
(MS 2)
Suggenahalli
(MS 2)
Malpanagudi
( MS2 )
BLR-7
Kondanayakanahalli
(MSI)
BLR-7
Gudiobalapura
( MS 2)
BLR-7
Hampi
(MS3 )
Status
Start date
Completion date
23-02-98
22-08-99
OHT 6 - Side wall
SP - Not procured
OHT 2 - GL Bracing beam
RM - 0.3 Kms (0.7)
DS-1.4 Kms. (2.3)
RM - Not started (0.4)
SP - Not procured
OHT 7 - Completed
DS - Not started (3.5)
RM -2.0/0.2Km (C)
SP - Proemed
OHT 7 - Completed
DS - 3.5 KM(C )
RM-0.85 km(C )
SP - Procured
OHT7 - Completed
DS - 1.5 Kin(C)
RM-2.85 Kins (3.45)
SP - Procured
OHT 7 - Completed
DS-1.2 Kms(1.5)
RM - 2.0 Kms (C)
SP - Not procured
OUT 7-Completed
DS - 1.0 Kms(2.3)
RM-2.6(C)
SP - Not procured
OHT 7 - Completed
DS - 2.0 Kms (C)
RM-2.0 (0.5)
SP - Not procured
OHT 7 - Completed
DS - 6.6 Kms (C)
RM-5.5 Kms (C)
SP - Procured
OI IT 7- Completed
DS - 4.2 Kms (C)
RM-1.7Kms (C)
SP - Procured
OHT 7 - Completed
DS - 3.5 Km(C )
RM - 0.7 km(C )
SP - Procured
OHT 7- Completed
DS - 3.2 Km(C )
RM-0.5Kms(C)
SP - Procured
GLSR 4- Completed
SP - Procured
DS - 3.2 Km (C )
RM-2.0 Kms (3.0)
DS-2.2 km (2.9)
Whether source established
Yes/No.
YES
1 No. SBW
YES
1 No. SBW
YES
1 No.
YES
1 No.
YES
3 Nos.
YES
1 No.
YES
1 No.
YES
1 No.
YES
1 No.
YES
5 Nos.
YES
2 Nos. ( 1 No. Existing)
YES
2 Nos.
YES
3 Nos.
15
SI. No.
Package No.
Village name
35
BLR-8
Y.Budihal
(MSI)
36
37
38
39
40
41
BLR-8
BLR-8
BLR-8
BLR-8
Start date
Completion date
21-03-98
20-09-99
Karichedu
( MS2 )
Sindhavala
(MS 2)
Yesh wanthanagar
( MS 2 )
Bandri
( MS2)
09-12-98
08-06-2000
09
42
43
44
45
46
RM - 2.0 Kms (2.85)
SP - Procured
OHT7-Completed
DS - 5.8 Km (C )
RM - 1.0 Kms (1.1)
CP - Procured
GLSR 4 - Completed
DS - 2.0 Kms (C )
RM - Not started (2.0)
CP - Procured
OHT 7- Completed
DS - 1.3 Kms (3.5)
RM 4.0/1.5 Kms (4.6)
SP - Procured
OHT 7 - Completed
DS-6.5 Km(C)
RM - 4.5 Kms (C )
SP - Procured________
OHT 4-3rd Bracing beam
DS - 5.0 Kms (5.8)
RM 3.0/1.8 Kms (4.8)
Nandi bevoor
BLR-9
Konganahosur
SP - Not procured
OHT 1 - Foundation
DS - 4.5/0.5 Kms (5.0)
RM 0.5 (1.0)
BLR-9
Nagarakatte
SP - Not procured
OHT 7 - Completed
DS - 2.4 Kms (C)
RM - 0.5 (0.6)
SP - Not procured
OHT 7 - Completed
DS - 2.0/0.7 Kms (2.4)
RM-2.25/0.25 Kms (2.5)
SP - Not procured___________
OU T 5 Bottom ring beam and
slab
SP - Not proc med___________
GLSR 4- Completed
DS-3.5/1.5 Kms (4.0)
RM - Not started (3.0)
SP - Procured_________
OHT 4 - 3rd bracing beam
DS - 3.5 Kms (C)
RM - 1.2 Kms (2.0)
SP - Procured
OHT 7 - Completed
DS-3.0/0.6 Kms (3.7)
RM - 1.0 Kms (C)
I
42 (a)
OHT 7 - Completed
BLR-9
I
<5
Status
BLR-9
BLR-9
BLR-10
BLR-10
BLR-10
Kurubanahalli
(Hamlet)
I lallikere
Old Daroji
(MSI)
Garga
(MS 2)
Honnahalli
(MS 2)
24-08-98
23-02-2000
SP
Progress 1 .doc
- Procured
DS-3.0/1.0 Kms (3.4)
RM - 1.0 Kms (C)
DS-2.5 Kms(C)
Whether source established
________ Yes/No._________
YES
5 Nos.
YES
2 Nos.
(1 No. Existing)
YES
1 No.
YES
2 Nos.
YES
4 Nos. (1 No. Existing)
YES
4 Nos.
YES
1 No.
YES
1 No.
YES
1 No.
YES
2 Nos.
YES
1 No.
YES
2 Nos.
YES
2 Nos.
16
c>
J)
i
Package No.
Village name
47
BLR-10
48.
BLR-11
Muddathnur
(MS 3)
Hire Hadagali
49.
BLR-12
Sattur
50.
BLR-12
Hosakote
51.
BLR-13
Ravihal
17-04-99
52.
BLR-14
Sidiginamola
14-06-99
53.
BLR-14
Kodal
54.
BLR-1 5
Metri
55.
BLR-15
Kakubalu
56.
BLR-17
Ladakanabavi
57.
BLR-17
Haragondanahalli
58.
BLR-17
Hagaranoor
59.
BLR-17
Angoor
NOTE : OHT 1 - Foundation
OHT 2 - GL Bracing Beam
OHT 3 - 2,,d Bracing Beam
OHT 4 - 3rd Bracing Beam
OHT 5 - Bottom Ring Beam and Slab
O1 IT 6 - Side wall
O1 IT 7 - Dome
Progressl.doc
Status
Start date
Completion date
SI. No.
27-09-98
26-03-2000
28-04-99
17-04-99
OHT 7- Completed
SP - Not procured__________
OHT 2- GL Bracing beam
SP
- Not procured
OHT 5- Bottom ring beam & slab
SP - Not procured__________
OHT 7 - Completed
SP - Not procured__________
Sump - Not started
Reservoir - Excavation
OHT6 - Sidewall
SP - Not started_______
GLSR - Completed
SP - Not started
GLSR - Not started
SP
- Not procured
OHT3 - 2nd bracing beam
SP - Not started
RM - 1.3 Kms (1.5)
DS - 3.5 Kms (4.0)________
RM-3.5 Kms (11.0)
DS - Not started (12.5)
RM - 1.25(1.5)
DS - 1.2 Kms (1.3)________
RM - Not started (0.9)
DS - 2.3 Kms (C )_________
G.M - 4.64 (4.7)
R.M.-0.8 (0.95)
Treatment Plant - Not started
RM - Not started (2.3)
DS - 2.0 Kms (2.2)
RM - Not started (1.3)
DS -2.0 Kms (2.4)
RM - Not started (2.3)
DS - Not started (6.6)
RM-2.0 (2.1)
DS -3.0 Kms (3.5)
DS -4.2 Kms (C)
Whether source established
________Yes/No.________
YES
________ 3 Nos.________
NO
6 nos.
YES
________ 2 Nos.________
2 Nos.
From Canal
YES
1 No. SBW
YES
1 No.
YES
3 nos.
YES
3 nos.
Nil
YES
RM - 1.0 Kms (2.0)
OHT1 - Foundation
1
No.
DS
1.2
Kms(3.2)
_______________
SP - Not procured
YES
RM - Not started (2.2)
GLSR 3 - Masonry
1 No.
DS -2.2 Kms (3.0)_______________
SP - Not Procured
YES
RM
Not
started
(0.1)
OHT 1 - Foundation
1
No.
DS
Not
started
(2.3)
____________
SP - Not Procured
MS
1
First
Mile
Stone
BB
Bracing
Beam
GLSR - 1 Foundation
MS 2 - Second Mile Stone
GL- Ground Level
GLSR - 2 RCC Bed
MS 3 - Third Mile Stone
PSBW - Proposed shallow Bore Well
GLSR - 3 Masonry
BRB & S - Bottom Ring Beam and Slab
GLSR - 4 Roof
Nearing
Completion
(
)
Figure
in
Bracket
shows total quantity
NC
C
- Completed
17
STATUS POSITION OF OHT, GLSR & SUMP UNDER WORLD BANK ASSISTANCE - PHASE-11.
52
Package No.
Name of Village
BLR-02
Ci
‘1
BLR-03
BLR-07
a
BLR-08
BLR-09
BLR-11
BLR-13
BLR-15
I
c>
i
n
Hampi
Bandri
Naudi Bevoor
Hire Hadagali
Ravihal
L,; Metri
"
SI. No.
Package No.
L
2.
. 3. .
BLR-03
BLR-07
BLR-08
BLR-10
BLR-15
BLR-17
BLR-14
•
«
•
■
7.
god
-^'Total " ■’"*
Name of Village
____ _____________
Kurugodu
Hampi
Wrr -
Hasoor
Total
Progressl.doc
No. of OHT’s under
_____ progress_____
16
No. of OHT’s
completed
35
No. of OHT’s
No. of Sumps
1
1
2
1
1
1
1
1
1
1
11
No. of GLSR
No. of Sumps Nearing
Completion
No. of Sumps
Completed
No. of OHT’s Not
started
No. of Sumps Under
Progress
: r-.:
i
No. of Sumps
Not Started
-
1
1
1
1
-
1
4
■ 5’"
No. of GLSR Nearing
Completion
No. of GLSR
Completed
3
1
1
1
1
1
SsW
i
-
9
No. of OHT Nearing
completion
1
7
<
■
2
No. of GLSR Under
Progress
-
No. of GLSR
Not Started
1
1
_______
1
•
1
18
WATER SUPPLY COMPONENTS
Water supply components
Package
SI.
No.
1
2
1
2
BLR - 1
BLR-2
FORMAT - 06
FOR THE MON 1 11 OF DECEMBER 1999
Remarks
HP
T ___ A
4
3
ST
T__ A
6
5
N.A
N.A.
15nos.
8 nos.
40
10
Nil
CS
T ___ A
8
7
N.A
N.A
WP
CT
DB
T
9
A
10
T
11
A
12
I 21 nos.
Nil
Nil
I 13 nos.
I7nos.
Nil
Nil
; 31 nos.
T
13
A
14
61 nos. [
108nos
Nil
3
BLR-3
N.A |
4
BLR-4
N.A !
34nos
30
5
BLR-5
N.A.
62nos
Nil
■“i
3 8 nos.
30
19nos.
15
124nos
50
N.A 1
37nos i
10
2 2 nos
10
| 11 Onos
70
N.A.
33nos i
Nil
? N.A
....
Contract is terminated
80
34nos
34
16nos. [
16
N.A !
' 39nos
Nil
19 nos |
Nil
125
50
N.A
N.A. |
j 21 nos !
I 16nos. •
Nil
5
11 nos |
10 nos |
Nil
Nil
68
57nos. ;
Nil
20
N.A
1912nos.
.... 1j Nil
6 nos. !
Nil
40nos.
Nil
N.A.
DB
WP
C.C.S.
Not applicable.
Dust Bins
Washing plat forms
Construction schedule
16
N.A
7
BLR-7
N.A |
32 nos
26
| N.A
8
BLR-8
N.A
30nos-
15
BLR-9
BLR-10
N.A
N.A.
! 37nos
| 25nos.
Nil
5
)
Progressl.doc
102
8
44
HP
ST
CT
CS
58nos |
25
1 Inos. |
N.A I
BLR-12
Nil
19
BLR-6
11
90nos.
19nos
6
■
Nil
16 nos
J
9
10
i Contractor has not furnished
the C.C.S. and target is
I considered as per N.C.B
I
f
I 91nos
16
15
N.A.
Hand Pump
Stand Post
Cattle troughs
Cisterns
1 .. J
.
I
All the works are
proposed under
III Milestone
L
■
25 nos Nil
C.S.
Construction schedule
28
INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.,
KIRWS & ESP
PHASE D
PACKAGE - II
(WORLD BANK ASSISTANCE)
MONTHS: DECEMBER 99
DISTRICT: BELLARY
1. Hydraulic testing of PVC pipes
SI.
No.
Date of
testing
1.
21-6-99
to
30-6-99
Name of
Village
BLR.-07
Kondanayakan
alialli
RM in Km
A
T
A
0.73
0.73
3.10
3.0
30 RM
Nil
33 RM
Nil
3.2
Nil
28 RM
Nil
| 30 RM !
Nil
0 to 0.37
BLR.-07
24-6-99
) BLR-07
to
29-6-99
Suggenahalli
3.5
I 29-6-99 !
to
| 30-6-99 I
BLR-07
4.
&
| 6-7-99
to
I 8-7-99 !
Malpanagudi
0.37
i
j...-..... I'
t
2.19
I 1-747 | 1.547
4.0
2.72
4.437! 4.137
33 RM
I 30 RM
Nil
35 RM
Nil
Nil
33 RM |
Nil
. 26-6-99 |
to
6.
7.
| 28-6-99 i BLR-07
&
I 10-7-99 |
I 12-7-99 |
BLR-04
to
I 13-7-99 I
15-7-99
BLR-04
!
10
1 18-7-99
Hampi
OK/not OK
OK
r
t
0.5
5.
Remarks
T
Gudi
Obalapura
3.
Components testes
OH I _____
inlet pipes
outlet pipes
A
T
T
A
DM in Km
Chainages
(for RM)
0 to 0.5
0.5 to 0.73
I
21-6-99
I
Package
no.
0.952 I 0.932
1.826
0 to 0.5
0.5 to 1.0
1.0 to 1.5
1.5 to 2.19
0 to 544
0 to 487
Oto 516
0 to 242
Oto 210
0 to 200
1.811
OK
OK
OK
OK
0 to 280
t
Hakkandi
1.0
0.75
2.5
2.0
32RM
Tambrahalli
2.0
1.8
5.0
4.112
28 RM
32 RM . 33 RM
Nil
30 RM
33RM
Nil
0 to 500
500 to 750
0 to 500
500 to 950
500 to 850
OK
OK
Contd..2
Progressl.doc
29
#2#
Date of
testing
SI.
No.
Package
no.
Name of
Village
RM in Km
T
19-7-99
to
29-7-99
21- 7-99
to
22- 7-99
21-7-99
to
22- 7-99
8.
9.
10.
I
S3
A
DM in Km
T
A
Components testes______
OHT _________
inlet pipes
outlet pipes
A
T
T
A
B.G.Halli
5.5
2.838
25RM
Nil
26 RM
Nil
OK
BLR-04
Kannihalli
2.7
1.890
28 RM
Nil
29 RM
Nil
OK
BLR-04
Ambli
1.5
0.2
24 RM
Nil
26 RM
Nil
OK
24-7-99
BLR-08
Y eshwanthanagar
6.0
2.4
6.5
33RM
Nil
35 RM
Nil
12.
24-7-99
to
27-9-99
BLR-08
Bandri
4.5
4.04
4.5
30RM
Nil
32 RM
Nil
13.
28-7-99
to
30-7-99
BLR-02
Bommaghatta
3.2
1.65
5.6
1.867
33 RM
Nil
35 RM
Nil
14. | 31-7-99
BLR-02
Susheelnagar
3.5
2.119
30RM |
Nil
32 RM
Nil
18-8-99
to
20-8-99
BLR-03
Kyadigihal
1.7
1.5
2.25
1.9
BLR-03
D.Kaggal
2.5
1.4
2.5
2.4
15.
- 22-8-99
16' I
to
26-8-99
Progressl.doc
OK/not OK
BLR-04
11.
t-
Remarks
Chainages
(for RM)
0 to 500
500 to 1100
1100 to 1800
1800 to 2400
Oto 180
0 to 600
600 to 1150
1150 to 1650
0 to 650
650 to 1250
1250 to 1850
1850 to 2390
Oto 450
450 to 1000
1000 to 1650
OK
OK
OK
OK
0 to 350
350 to 850
850 to 1350
1350 to 1500
0 to 487
0 to 440
440 to 942
OK
30
#3#
SI.
No.
Date of
testing
17.
20- 7-99
to
21- 7-99
BLR-06
18.
22- 7-99
to
23- 7-99
19.
20.
24- 7-99
to
25- 7-99
28- 7-99
to
29- 7-99
Package
no.
Name of
Village
RM in Km
DM in Km
T
A
T
A
1 larakanal
2.77
2.77
2.8
1.2
BLR-06
Chirasthahalli
2.0
1.8
3.5
1.6
BLR-06
Eshapura
0.9
0.9
1.5
1.5
BLR-06
Anekal Tanda
2.6
2.0
2.0
1.2
BLR-06
Anekal
2.0
1.2
2.3
BLR-06
Madur
2.5
1.2
6.6
1.0
BLR-04
N.Basapura
3.5
3.5
3.3
3.3
Components testes______
OL1T _________
inlet jipes
outlet pipes
T
A
T
A
26- 7-99 t
I
21.
to
27- 7-99 |
30-7-99 '
I
22.
to
01-8-99
1-10-99 I
t°
23.
5-10-99 :
24.
25.
t
6- 10-99
( BLR-04 '
to
7- 10-99 !
f
8- 10-99 '
to
BLR-04
10-10-99,
Progressl.doc
S.L.Halli
0.6
0.6
1.4
1.4
Remarks
Chainages
(for RM)
0-5.00
500-1000
1000-1500
1500-2125
0-500
500-1000
1000-1500
1500-1800
6-500
500-900
OK/not OK
OK
OK
OK
0-500
500-1000
1000-1500
1500-2000
0-500
500-1000
1000-1200
0-500
] 500-1000
1000-1200
0-500
500-1000
1000-1500
1500-2000
2000-2500
2500-3000
3000-3500
OK
0-600
OK
0-500
500-1000
OK
OK
OK
OK
p.
Kanninahalli
4.9
3.0
T
31
RM in Km
Name of
Village
Package
no.
SI.
No.
Date of
testing
26.
10- 10-99
to
: BLR-10 |
11- 10-99:
DM in Km
T
A
T
A
Old Daroji
1.2
1.2
5.5
5.5
I lonnahalli
1.0
1.0
2.5
2.5
Muddathnur
2.5
1.5
4.0
2.5
Components testes______
OHT _________
outlet pipes
inlet pipes
A
T
A
T
12- 10-99
to
BLR-10
13- 10-99|
27.
14- 10-99
BLR-10 \
to
28.
15- 10-99
| 10-10-99|
4.64 •
(G.M)|
4.64
N.A I
0.90
Ravihal
(SSI Scheme) i (R.M)
0.80
N.A. :
Ravihal
to !: BLR-13
—
,I
(SSI
Scheme)
| 22-10-99)
29.
I
t-
17- 11-991
30.
lo
> BLR-13 ;
18- 11-991
31.
Tambrahalli
:
4.00 |
3.20
9.30
4.8
4.8
2.6 .
.. .
I
'
| 17-10-99:
32.
BLR-01
to
K.Bevinahalli
: 18-10-991
i
Progress 1 .doc
14 RM
14RM | 14RM ’
OK/not OK
OK
0-500
500-1000
0-500
500-1000
1000-1500
0-500
500-1160
1160-1460
1460-1960
1960-2510
2510-2990
2990-3590
3590-4010
4010-4640
OK
j
|
|
!
|
|
|
!
48-584
630-900
i
02-11-99
BLR-04
to
04-ll-99j
14RM
Remarks
Chainages
(for RM)
0-500
500-1000
1000-1200
2.6
0-500
500-1000 I
1000-1500 I
1500-2200 |
0-500
500-1000
1000-1500
1500-2000
2000-2500
2500-3000
3000-3500
3500-4000
4000-4500
4500-4800
OK
OK
OK
t
OK
OK
32
33.
19-10-99 BLR-01 |
P.D.Halli
0.9
0.9
2.3
2.3
34.
20- 10-99
to
BLR-01
21- 10-99
Kammarchedu
1.9
1.9
2.3
2.3
0-500
500-900
0-500
| 500-1000
I 1000-1500
|
1500-1900
0-500
35.
22-10-99i BLR-OI
Y.Kaggal
1.8
1.8
1.2
1.2
| 500-1000
! 1000-1500
1500-1800 ■
G.M. Gravity Main.
Progressl.doc
OK
OK
33
INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.,
KIRWS & ESP
PHASE D
PACKAGE - II
(WORLD BANK ASSISTANCE)
MONTHS: DECEMBER 99
DISTRICT: BELLARY
2. List of deficit Contractors in I Milestone.
SI.
No.
Package
No.
No. of villages
1
2
3
1.
BLR-9
2.
BLR-15
I
Progressl.doc
Name of the
Contractor
Contract
value Rs.
In lakhs
Date of
start
5
6
Target for I
MS Rs. In
Lkahs
End of I
MS Rs. In
laklis
Achievements
to end of MS
Cumulative
7
8
9
Shortfall in Progress in MS
Cumulative
Amount Rs. In
lakhs
10
4
________ 4________
Mr. G.V.Pratap Reddy,
Engineers &
Contractors, Hyderabad.
90.44
9-12-98
30.00
11.10
11.62
18.38
2
M/s. B.R. Meti
Lingsugur.
46.01
28-4-99
27.66
5.57
5.57
22.03
Shortfall in
Physical status of
works
Delay attributed
to Department/
Contractor
12
13
%
11
63.22
OHT - 1/ Nil
R.M - 2/ Nil
Contractor
79.8
RM-2/Nil
DS - 4/2
-do-
34
INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.,
K1RWS & ESP PHASE-II. PACKAGE-11
3. Statement of Bottlenecks
Month : DECEMBER 99
District : Bellary.
SI.
No.
Package
No.
No. of
villages
flushing to
be done
No. of villages
New
Borewells to
be drilled
No. of open
wells
Shallow/Borew
ells to be
drilled
OUT sites
under dispute
SBC results
awaited
Sump sites
to be handed
over
GLSR sites
to be handed
over
Awaiting
Energisation
for
commissioned
Pressure testing
(RM + DS)
T
1
I
I
BLR-1
2
BLR-2
3
BLR-3
4
BLR-4
5
BLR-5
6
BLR-6
DO
1
Progressl.doc
A
35
SI.
No.
Package
No.
No. of
villages
flushing to
be done
No. of
villages
New
Borewells to
be drilled
No. of open
wells
Shallow/Borew
ells to be drilled
OUT sites
under dispute
SBC results
awaited
Sump sites
to be handed
over
Cd.SR sites to
be handed
over
Awaiting
Energisation for
commissioned
Pressure testing
(RM + DS) "
T
I
7
BLR-7
8
BLR-8
9
BLR-9
10
BLR-10
11
BLR-12
12
BLR-14
O
i
Kodal
1
13
BLR-17
NOTE : List of villages Package wise to be appended.
Progress 1 .doc
A
AGENDA FOR THE MEETING CONDUCTED BY
ENGINEER-IN-CHIEF, RHE ZONE, BANGALORE, ON 06-01-2000
i)
Bottlenecks
latest
position,
including
alternate BW’s to be drilled, Open wells or
Shallow BWs to be provided, OHTs/GLSR sites
to be handed over etc.,______________________
ii) Awaiting Energisation
iii) Approval for design and modifications
awaited from the E.E.s______ _______________
iv) Extension of time proposals awaiting
I
g
v) Permission pending from other departments
for R.M., DM laying.
vi) Any other pending Proposals
Horizl
1) Kodal - Since the existing borewell is rejected by
villagers.
1) Anekal
2) Anekal Tanda
3) Providing Transformer to Eshapura
Nil
Proposals are being processed
1) Hampi Sump site - By Archeological Department
2) Malapanagudi (R.M.) - By railway Department.
3) A.S. Gudi (R.M & D.S) -doand P.W.D.
36
INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.,
KIRWS & ESP
PHASE-II
PACKAGE - II
(WORLD BANK ASSISTANCE)
MONTHS: DECEMBER 99
DISTRICT: BELLARY
4. List of works, the agency is unlikely to Achieve the Milestone target::s____________
SI
No.
Package
No.
No. of
villages
Name of the Contractor
1
2
3
4
z-,ontract
. .
C
value Rs In
lakhs
DateMile
of
start
5
6
- - -
End of
Milestone
l/ll/lll
Name of
Schme/Villages
7
8
23-02-99
Bommaghatta
23-08-99
A.S.Gudi,
Susheelnagar
Ill
23-02-2000
Krishnanagar
112.39
I
22-10-98
S.L.Halli,
81.22
42.80
47.30
II
22-04-99
Hakkandi, N.Basapura,
Tambrahalli, Kuruvathi,
Kannehalli.
130.88
73.22
55.90
II
22-10-99
Ambli, B.G.Halli.
157.23
114.79
I
11-09-98
Ibrahimpura
30.00
12.02
61.34
11
11-03-99
Kottalachinta,
Nagalapura,
70.00
26.34
64.0
III
11-09-99
Bagewadi, Deshnur.
94.07
32.92
I
20-09-98
Y.Budihal
85.51
54.13
36.69
II
20-03-99
Karichedu,
Yesh wanthanagar,
Bandri
139.41
75.12
43.52
III
20-09-99
Sindhavalam
15041
103.73
Stone
I
1.
2.
BLR-2
BLR-4
4
8
Mr. R.Maheswara Naidu,
Hyderabad.
M/s. K. Ramakrishna,
Engineers & Contractors,
Hyderabad.
112.39
24-08-98
II
157.23
23-04-98
I
V
i
3.
4.
5.
BLR-05
BLR-08
BLR-09
Progressl.doc
5
5
4
M/s. Coramandal
Presticrete (P) Ltd.,
Hyderabad
M/s. K. Ramakrishna,
Engineers & Contractors,
Hyderabad.
M/s. G.V. Pratap Reddy,
Engineers & Contractors,
Hyderabad
94.07
150.40
90.44
12-03-98
21-03-98
09-12-98
|
I
08-06-99
Nagarakatte,
II
08-12-99
111
08-06-2000
Hallikere,
Konganahosur,
Nandi Bevoor.
Financial cumulative for l/ll/lll
Status of works
X
A/T
______ 12
OUT - Nil/I
R.M. - 2/2
D.S. L 5.0/4
OHT - Nil
R.M - Nil
D.S. - Nil
A
10
Shorfall %
9
40.00
35.18
12 05
90.00
47.75
//
t
30.00
11 10
70 00
34.48
Remarks
13
In II M S.
OHT-Nil/1
R.M -Nil/3
D.S. -6.6/12
OHT-4/5
R.M. -3.3/7.35
D.S. - 12.5/17.2
In 111 M S
\ OHT-Nil/1
| R.M. -Nil/1
j D.S. -Nil/3
OHT-Nii/3
R.M. - Nil/3
D.S. - 1.1/7.00
Contract is
tenninated
| OHT-Nil/1
| R.M. -Nil/3
! D.S. -8.00/8.48
I OHT- 3/4
| R.M. -5.2/12.00
J D S. - 8/17.30
I
In III M.S
i OHT-Nil/1
| R.M. -Nil/2
I DS<117^4
90.44
In II M S.
INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.,
KIRWS & ESP
PHASE D PACKAGE - 11
(WORLD BANK ASSISTANCE)
MONTHS: DECEMBER 99
DISTRICT: BELLARY
_____ fL
List of Agencies on whom penal action has been recommended.
SI.
No
Package
No.
No. of
villages
Name of the
Contractor
Contract
value Rs.
In lakhs
Date of
start
1
2
3
4
5
6
Mile
Stone
End of
Milestone
I/II/III
Name of
Schme/Villages
7
8
Financial cumulative for
I/II/III
2
1.
BLR-2
4
Mr R.Maheswara
Naidu, I lyderabad
112.39
24-08-98
Mr. K.Ramakrishna
2.
BLR-04
8
Engineers &
Contractors
157.23
23-04-98
Hyderabad.
1
A
10
9
Shorfall %
11
3.
BLR-05
5
M/s. Coramandal
presticrete (P) Ltd.,
Hyderabad
94.07
12-03-98
Bommaghatta
40.00
35.18
II
23-08-99
A.S.Gudi,
Susheelnagar
90 00
47.75
III
23-02-2000
Krishnanagar
112.39
is to be completed
81.22
47.30
By the end of 2nd M.S.
29 Kms of Distribution i
55.90
j system is to be achived
12.05
42.80
I
22-10-98
II
22-04-99
III
22-10-99
I
11-09-98
I brah impura
30.00
12-02
61 34
II
11-03-99
Kottalachinta
Nagalapura
70.00
26.34
72.00
III
11 -09-99
Bagewadi. Deshnur
94.07
32.92
Y.Budihal
85.51
54.13
S.LHalli
.... t
' Hakkandi, N.Basapura ] 130.88 i 73.22
i Tambrahalli, Kuruvathi I
I Kannenahalli, Ambli, j 15723
114 79
I
B.G.Halli
|
|
t
4
5.
6.
BLR-08
BLR-09
BLR-12
5
4
2
Mr. G.V. Pratap
Reddy
Engineers &
Contractors
Hyderabad
M/s. Navarang
constructions
150.40
90.44
30.84
21-03-98
09-12-98
27-09-99
I
II
20-03-99
Karichedu,
Yeshwanthanagar,
139.41
75.12
III
20-09-99
Bandri , Sindhavakun
50 41
| 103.73
08-06-99
Nagarakatte,
30.00
!
II
08-12-99
Hallikere,
Konganahosur,
70 00
.........
I'
34.48
III
08-06-2000
Nandi Bevoor
90.44
1
26-03-99
Sattur
16.09
9.27
II
26-09-99
Hosakote
27 46
15.16
30.84
17.86
III
Progressl.doc
20-09-98
J
26-03-2000
|
iiio
Details of
penal action
taken
Remarks
13
14
j By the end of I s’i
L.D. clause
j milestone as per target |
levied
One Ol IT are to be from 23-02-99
completed and One sump
23-02-99
|
Mr. K.Ramakrishna
Engineers &
Contractors
Hyderabad.
A/T
12
I
L.D. caluse
levied
from 23-04-99’
I
By the end of II
milestone 3 OHTs are to j
be completed, DM I I :
Kins is achieved instead \
of 10 Kms.
L.D. clause
levied from
12-03-99
36 69
By the end of II M.S.
L.D. Clause i
43.53
I GLSR & 9 Km of
Rising main is to be
levied from |
22-03-99' |
P
N»
I
Status of works
I achieved.
18 90
34.74
! By the end of 1 M.Sj
i One OHT is to be
"l................
)
■ achieved
L.D. Clause
I By the end of I M.S.
: One OHT is to be
L.D. clause j
Levied from :
28-63-99
i achieved.
I
levied from J
9-6-99
Contract is
terminated
INTEGRATED RURAL WATER SUPPLY AND
ENVIRONMENTAL SANITATION PROJECT
KARNATAKA
(World Bank Assistance)
Phase II
Package II Villages
PROGRESS REPORT
of Bidar District
For the Month of DECEMBER 1999
INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD., NEW DELHI
CONSULTANTS FOR CONSTRUCTION MANAGEMENT AND QUALITY CONTROL
FORMAT-3
FIINANCIAL&PHYS1CAL PROGRESS PACK A G E WIS E
NAME OF DISTRICT :BIDAR
SI. Pack No.of Name of
No ages Villag Contractor
No
es
m
packa
ges/
progr
ess
For the month of December-99
Peri Contract
od
value in
Of Rs.
com I .akhs
pleli
on
in
moni
h
Date of Mi lest Financial
start
one Progress
Physical progress (cumulative)
Cumulative
In
Rs. Lakhs
T
schdsche ks
me mes
com prop
mis^osed
ione
d
A
CP in
Nos.
SP in
Nos.
<u
I
->
1
I
2
3
6
2
6
4
Satish V
Guttedar
H.A Phulse
6_____
18
18
165.59
107.77
7
25.3.98
9.1.98
1
T
9
10
11
38.52 38.52 6
11
111
55.19 55.19
71.88 71.79
I
II
111
I
II
111
1
55.80 55.80
35.92 21.90
16.05 15.9(
27.08 27.08
44.67 44.6;
62.28 69.60
52.97 52.97
37.38 19.75
21.80 26.19
40.21 40.21
11
III
37.71 37.71
35.22 32.63
8
11
111
3
4
5
3
A
5
3
5
5
H.A Phulse
Meera & ceiko
Satish V
Guttedar
18
134.03
18 1 12.15
18
No. No. Re
of of mar
9.1.98
23.3.98
1 13.14 5.3.98
1
A
12
8
A
13
14
I
4
6
A
2
2
2
4
2
T
3
i
5
4
2
5~
1
11
4_
2
11
1
RM
in Kms
T__ A____
15
16
6.15
6.15
x_
8.57
7.76
7.79
9.18
6.80
6.55
A
3.73
8.06
A
T
19
20
21
JZ
1
7.79
16.24
12.91 12.91
6.33 6.68
SUMP/GLSR
in Nos.
T
18
10.91 10.92
9.41 9,41
I 1.68 1 1.68
2.81 2.81
6.60 6.60
1.72 0.90 6.27
5.82
2.24
2.24
5.38 5.38
10.20 10.20
3.09 3.09
1.25
3.94
3.23 3.77
4.75 4.75
16.27 1 6.29
4.0
4.0
7.38
2.26
1.25
1.25 5.49 7.38
4.38 4.38 10.81 10.81
3.73
7.31
OUT
in Nos.
DM
in Kms
1
23
0/1
£_
1/1
1
0/1
1
A
22
2
0/2
1/1
2
2
n
0/1
->
0/1
1
2
24
2
£
I
1
1
0/1
2
£
0/1
2
T
2
1
2
0/1
0/1
1/1
0/1
T
2
£
1
1
2
1
T
25
2
2
6
7
8
9
10
I
X?
4>
I I
12
13
14
15
2
4
7
8
9
10
3
4
2
1
11
12
13
14
15
4
The General
Manager
KSCC ltd
R.Maheshwar
Naidu
The General
Manager
KSCC Ltd.
B .Ramesh
Dhanraj S.
Talampalli
K.l I Phulsc
I
2
I
1
R.Mahesh war
Naidu
Basawaraj
R. sajjan
Basawaraj
R. sajjan
R. Mahesh war
Naidu
_5
1
8
I
8
1
8
1
8
1
8
1
8
1
8
1
8
1
8
1
8
6
87.24
68.40
104.7
83
48.10
66.24
87.40
43.52
49.65
47.85
132.8
9
2
9
33.91
10
33.91
22
i
29.08
24.25
53.29
20.89
8.65
41.27
2
2
2.3.98
11
111
I
6.4.98
11
111
1
8.80
6.31
68.20
20.00
64.19
9.1.98
11
111
I
12
24.58
35.74
26.36
35.74
9.3.98
11
111
I
5.00
7.36
22.08
11
111
I
__ 7
6.4.98
17.2.9
8
12.3.9
8
16.3.9
8 '
11.3.9
8
25.3.9
8
2
7
12
4
1
13
14
2
I
15
3.72
16
3.72
17
6.27
18
6.27
19
2
20
1
4.80
1.14
3.12
5.10
0.61
3.00
4.03
4.86
1 1.89
4.28
2.87
1 1.89
2_
2_
1
2
2
4.60
1
2
1
1.1 I
5.10
4.60
1.37
5.10
5
2.22
0.60
2.22
5
5
5.97
4.24
1.29
5.97
2.85
1.29
4.26
3.00
2.42
4,26
4,42
2.42
1_
1
3
1 up
1.0
3.50
4,42
22.08
->
2
5.40
6.61
4.37
4.17
1
1
22.08
22.08
24.68
22.08
31.84
24.68
4
4
3.52
4.00
10.76
13.00
1
5
2.25
2.25
3.49
3.49
1
11
III
31.36
31.36
31.36
36.78
4
4'
2
2.01
2.07
2.01
1.99
6.28
6.28
6.28
7.15
1
1
30.00
30.00
4
4
4.38
3.42
10.49
1 1.55
1
1
11
111
1
13.52
29.22
6.57
4.1 1
29.22
2
4
5.50
5.50
5.41
5.41
1
1
11
111
I
10.21
10.21
40.00
10.21
4.22
40.00
2.09
1.50
3.90
1
1 up
5.56
5.50
1 1.03
3.90
1.79
1 1.03
11
111
I
7.85
44.29
2.26
1.73
44.29
11
111
44,29
44.31
23.54
34.18
4
2_
2
2
2
21
22
23
24
2
1
2
2
1/0
2
1/0
1
2
2
_1_
£
i
1/0
1
2
1
0/1
0/1
1
1
1
!_
1
1
2
6
6
2
1
I
1
1
0.97
1/0
1/0
1
1
3
8.32
25.83
19.00
2
I 8.00 | -
2
2
i
25
1
16
17
18
19
20
2
76
17
18
2
3
BidarKLAC
3
3
19
20
4
G.S Kubcrappa
B.Ramesh
B.Ramesh
3
Salish V.
Guttedar
18
18
18
18
18
6
122.54
7
17.2.98
63.88
20.6.98
43.65
20.6.99
25.3.98
53.97
53.48
25.3.98
25.3.98
I
21
22
23
24
25
26
Kolarki Shanker
21
I lainunanth Rao
Klniba
22
Dhamaj
Talainpalli
23
I lainunanth Rao
Khuba
24
25
26
9
2
P.Basaiah &
Sons
I’ennanenl
Prestress Pvt.
Ltd.
12
12
12
12
12
12
43.83
25.76
50.06
20-5-99
40.89
70.61
26.31
25-6-99
25-5-99
£
11
9
27.95
47.29
10
27.95
47.29
11
3
6
111
47.29
34.54
2
1
11
111
1
11
111
1
11
111
21.29
21.29
21.29
28.56
7.54
7.54
30.15
1 1.91
1 1.91
15.82
2_
1
32.89
28.56
3.34
6.90
30.15
7.97
4.24
1
17.83
17.83
3
11
111
I
17.83
17.83
21.915
17.54
15.89
2
II
21.915
1
12
6
5
13
14
2
2
n
2
2
2
i
2
2
T
2
2
18
4.04
11.81
19
1
1
20
I
1
21
1.66
17
4.04
1 1.8
1
2.23
1.64
1
1
1/
0
2.69 1.80
0.80
1.22
1.67 3.19
0.33 0.33
0.33 0.55
5.49 5.49
1.78 1.98
5.35
5.88
4.83
6.10
1.84
1.84
3.60
0.41
5.35
5.55
0.80
6.10
1.84
0.70
3.60
0.41
7.99
2
2
2
2.84
2.84
1
2.50
6.52
6.92
9
6.92
9
2.50
75
2.50
75
3.00 5.53
2.50
6.20
15
4.29
5.05
16
4.29
5.05
1.56
1.68
1.37
1.39
0.54
8.26
12.88
0.54
4.1 1
1.13
75
1.13
75
0.78
11
12.88
0.78
I
25.03
1
25.03
20.445
II
20.445
I
35.305
II
35.305
I
13.155
II
13.155
35.55
4.92
7
1.25
1.25
2.33
05
2.33
05
3.82
25
3.82
25
2.28
5
128
5
5.53
3.7
2
1
23
24,
1
I
I
□
1
2
2
1
_1_
2
T
2
i
2
1/
0
1
2
£
1 up
1
1
1
I
1
3.00
22
0.4
0.7
1
0/
I
3.7
6.30
8
6.30
8
2.86
1
2.86
1
1
I
1
28
29
2
3
4
27
9
P. Basaiah &
Sons
28
29
Kolarki Shankcr
Satish.V.
Guttedar
5
6
7
57.25
12
12
46.31
24.76
8
9
1
28.625
2.14
II
28.625
2.14
1
23.155
II
23.155
3.67
75
3.67
75
1
12.38
10
II
12
13
14
15
16
1.32
12.38
1.32
15
total
1
29
19 Contractors
18
pac
kag
cs
20.91
I
721.77
733.60
II
500.86
III
142
16
10
20
21
0/
I
I
I
1
1
130.3
375.57
60.3
3
109.3
483.48
472.90
21.7
I
192.89
62.50
II
192.89
i
19
I
67.9
crores
N
(T'
1 1
9
18
4.47
I
4.47
I
5.65
5
5.65
5
3.56
85
3.56
85
15
II
17
7
51.79
4
2091.8
9
Total No. Of Packages/ villages
renders finalised Packages
renders called for packagesA illages
Note: SP- Submersible pump
Ol IT - Over Head tank
UP- Under progress
18.7
47
18.7
47
41.5
29
41.5
29
1644.57
29/77
29/77
0/0
CP - Centrifugal pump
Cd.SR - Ground level storage
RM - Rising Main
T- Target
DM - Distribution
A- Achievement
BiO
DISTRICT MANAGIiR
IC I (P) LI D
BIDAR.
22
23
24
2
5
FORMAT -4
District: Bidar
SI.
No
Packa
ge
No.
Total
No. of
village
Value of
work in
lakhs
Name & Address
of contractors
proposed
Name &
Name &
Address of Address of
Contractor^' Asist.
personal
Engineer
Date of
Award
Date of
starting
Name of Address of DM:-P.V. Naik
MICi -32
KI IB Colony
____________________ Bidar________
Date of
Financial Progress (cumulative) in Rs.
Completion
Lakhs
MS-1
2
A
16
71.79
10
24.9.99
11
38.52
9.1.98
8.7.99
55.80
55.80
35.92
21.90
16.05
15.9
8.1.98
9.1.98
8.7.99
27.08
27.08
44.67
44.67
62.28
69.60
20.1.98
23.3.98
22.9.99
52.97
52.97
37.38
19.54
21.79
26.19
20.1.98
5.3.98
4.9.99
40.21
40.21
37.71
37.71
35.22
32.63
I
3
2
2
6
107.77
3
3
3
134.03
4
4
5
112.15
Meera & Ceiko
Pumps Pvt Ltd Regd.
Office D.No 4-3-161.
215.315. Hill street
Ranigunj Secunderabad
Abdul
Khadeer
H.No 4-1135/1 Noor
Khan Talim
Bidar________
Mallikarjun
Bi radar C/o
Baburao Mugla
Near New water
tank Bhalki
5
5
5
1 13.14
Satish.V Guttedar
Excise & PWD
Classi Contractor
H.O: Trishnu
Building Gulbarga
Basawaraj
Malkappa C/o
Pola .S Near
Balaji Temple
I lumnabad
I
P
15
71.86
___ 9
25.3.98
1
6
MS-3
7
8
Jagadev S
20.1.98
Jeevangi C/o
Pola. S. Near
Balaji temple
I lumnabad____
Joseph. S/Subash 9.10.97
Padsale Bidar
4
165.59
_________ 5
Satish V Guttedar
Excise&PWD
Classi Contractor
H.O: Trishnu
Building Gulbarba
K.H Phulse
Classi Contractor
8-9-191. Gurunagar
Bidar -585401
H.A.Phulse PWD
Class I Contractor
8-9-191. Gurunagar
Bidar-585401
MS-2___
T
A
13
14
56.19 55.19
A
12
38.52
r
_1_
6
2
7
2
4
4
87.24
7
3
68.40
8
8
4
104.78
9
9
2
48.10
5
I'he General
Manager KSCC
Ltd No.3
Goduthai Nagar
Gulbarga______
R.Maheshwar
NaiduEngineer
& Contractor GI plot No.4
uday Ki ran
Apartment
Srinagar colony
Hyderabad500073_______
The General
Manager KSCC
Ltd Goduthai
Nagar Gulbarga
B.Raniesh
Classi
Contractors
I
LIG-94. KHB
Colony Bidar
I
10
10
I
66.24
1I
II
2
87.40
12
12
I
43.52
13
13
2
49.65
14
14
I
47.85
Dhanraj S.
Talampalli
Calssl
Contractor
Hallikhed (B)
Tq.l himnabad
K.ll Plmlse8-9191. Gurunagar
Bidar-585401
R.Maheshwar
NaiduContracto
rs G-l.plotNo.4
Srinagar colony
I lyderabad
Basawaraj R.
Sajjan Classi
Contractor Raj
Nanda Nivas
Vasanthanagar
Gulbarga
— DO —-
6
7
Jagadev S
Jewargi C/o
Pola.S. Near
Balaji temple
I himnabad
Syed Mujtaba
Hussain
Basavakalyan.
8
9
10
13
14
16.4.98
5.10.99
I 1
33.91
12
16.2.98
33.91
29.08
20.84
20.1.98
2.3.98
1.9.99
53.29
41.27
16.2.98
6.4.98
5.10.99
68.20
8-1-98
9-1-98
8-7-99
31-1-98
9-3-98
B.G sriniva
slab Gurunagar
Bidar________
Joseph Samuel
H.No.12-1-56
Nazareth
Colony Bidar
16.2.98
15
24.25
8.65
8.80
6.31
20.00
64.19
12.00
24.58
26.36
35.74
35.74
5.00
3.50
7.36
10.02
8-9-99
22.08
22.08
22.08
22.08
22.08
31.84
17.2.98
16.8.99
24.68
24.68
31.36
31.36
31.36
36.78
9-3-98
12-3-98
1 1.9.99
30.00
30.00
13.52
6.57
Basawaraj
Malkappa C/o
I’ola S Near
Balaji Temple
I himnabad
9-3-98
16.3.98
15.9.99
29.22
29.22
10.215
10.22
-—Do—-
9-3-98
1 1.3.98
10.9.99
40.00
40.00
7.85
2.26
Narendra
N.D. H.No 82-140
Shahgunj
Bidar_______
Narendra
N.D. H.No 82-140
Shahgunj
Bidar_______
Jagadev S
Jewargi C/o
Pola.S. Near
Balaji temple
Humnabad
16
4.1 1
10.21
4.22
1
15
2
15
2
16
16
3
17
17
3
4
132.89 R.Maheshwar
Naidu
Contractors G1 .plotNo.4
Srinagar colony
Hyderabad
122.54 G.S Kuberappa
CIass-I
Contractor
Dattatri Nilaya
Basaveshwar
colony shahapur
63.88 K.1..A.C Bidar
18
18
3
43.65
19
19
2
53.97
20
20
3
21
21
2
22
22
2
23
23
I
Satish.V
Guttedar Excise
& PWD Classi
Contractor 11.0:
Trishnu Build
ing Gulbarga
43.83 Shankar Kotarki
Engineers &
Contractors
Venkadi ri
Upstair 4-7-137.
Gandhi Gunj
Bidar - 585 401
25.76 I lanumanth Rao
Khuba Class-1
Contractor
Aurad________
50.06 Dhanraj
I Talampalli
1
2
p
B.Ramesh
C lass-1
Contractors
1.IG-94. KHB
Colony Bidar
B.Ramesh
Class-1
Contractors
1.IG-94. KHB
Colony
i
53.48
6
7
Joseph Samuel
H.No. 12-1-56
Nazareth
Colony Bidar
8
24.3.98
9
25.3.98
10
24.9.99
11
44.29
12
44.29
13
44.29
14
23.54
15
44.29
16
34.18
Shivpuie
Shrimanth
C/o Yuviaj
patil
Kainalnagar
16.2.98
17.2.98
16.8.99
27.95
27.95
47.29
47.29
47.29
34.54
Subash
M.Padasale
KI IB Colon)’
Bidar
Shiva Kumar
Patil H.No 91-443 Nandi
colony Bidar
10.6.98
20.6.98
19.12.99
21.29
15.82
21.29
21.29
32.89
24.3.98
25.3.98
24.9.99
28.56
28.56
7.54
3.34
7.55
21.48
24.3.98
25.3.98
24.9.99
30.15
30.15
11.91
7.97
11.91
20.39
24.3.98
25.3.98
24.9.99
17.83
17.83
17.83
17.54
17.83
15.89
Kuppana
Shangond
85-6
15-4-99
21-6-99
20-6-2000 21.91
5
21.91
5
Kuppana
Shangond
928
10-6-99
21-7-99
20-7-200
12.88
12.88
Shivaraj Palleii
399
6-5-99
20-5-99
5-5-2000
25.03
Narendra
N.D H.No. 82-140
Shahgunj
Bidar_______
Subash
M.Padasale
KHB Colony
Bidar
35.55
25.03
r
1
24
2
24
2
2
4
40.89
25
25
T
70.61
P. Basaiah &
Sons
Shivaraj Palleri
26
26
2
26.31
Permanent
Prestress Pvt.
Tariq Nayeem
27
27
2
57.25
28
28
2
46.31
29
29
5
I lanumanth Rao
Khuba
6
7
Tariq Nayeem
Ltd.________
1
24.76
P. Basaiah &
Sons
Kotarki Shankar
Ijigineers &
Contractors
Venkatidri
I-stales 9-7-131.
Gandhi Gunj
Bidar 585 401
Satish V
Guttedar
Syed Mujtaba
Ilussain
Syed Mujtaba
Ilussain
Shiviaj Palleri
8
934
10-6-99
994-998
17-6-99
76
15-4-99
9
27-7-99
10
11
26-7-2000 20.44
25-6-99
24-6-2000
999-1004
17-6-99
79-6
15-4-99
21-7-99
274
3-5-99
26-7-99
25-5-99 24-5-2000
23-7-99
5
35.30
5
13.15
5
20-7-2000 28.62
5
22-7-2000 23.15
5
25-7-2000
12.38
12
13
20.445
13.33
35.305
4.92
13.155
14
15
28.625
23.155
12.38
I
Remarks: In Column No. 12 .14 & 16 the figure above is cumulative and below is for present month
A- —• k-
DIS TRIC T MANAGER
1CT(P) LTD..
BIDAR.
16
FORMAT-5
VILLAGE WISE PHYSICAL PROGRESS
FOR THE MONTH OF December- 99
DISTRICT : BIDAR
[
Status
Village Name
SI No.
Package No.
1
2
BDR-1
______ 3
Betgera
________ 4
GLSR Completed
2
BDR-1
Kitta
OHT-7- Completed
3
BDR-1
Ghotala
4
BDR-1
Ladwanthi
OHT-7 Completed
Sump Completed
GLSR Completed
5
BDR-1
Algood
GLSR Completed
6
BDR-1
Hirangaon
OHT-7 Completed
7
BDR-2
Hedgapur
OHT-7 Completed
8
BDR-2
Santhpurl
GLSR Completed
9
BDR-2
Dapaka
OHT-7 Completed
10
BDR-2
Kathagaon
OHT-7 Completed
11
BDR-2
Khed
OHT-7 Completed
12
BDR-2
Donagaon
OHT-7 Completed
13
BDR-3
Aliamber
OHT-7 Completed
14
BDR-3
Hangarga
OHT-7 Completed
15
BDR-3
Eklar
GLSR Completed
16
BDR-4
H. Tugaon
OHT-7 Completed
17
BDR-4
Bhatambra
OHT-7 Completed
18
BDR-4
Dhannura
OHT-7 Completed
3 \
- 131-
RM-2.70Kms/2.97
DM-5.80Km/5.80
RM-2.65KM/2.65
DM-7.50Km/7.50
3.80___________
RM-3.80 Km/3.50
DM-7.50KM/6.90
RM-2.95KM/2.95
DM-3.25KM/3.25
RM-Nil
DM-3.50KM/3.80
RM-6.90KM/6.70
DM-7.50KM/7.10
RM-4.14Km/5.19
DM-5.0KM/5.24
RM-4.36Km/4.36
DM-6.2KM/6.440
RM-1.2Km/1.2
DM-3.8KM/3.8
RM-1.6Km/1.6
DM-2.7KM/2.71
RM-l.OKm/l.O
DM-2.60KM/2.64
RM-0.82KM/0.80
DM-4.00KM/4.00
RM-2.24Km/2.24
DM-5.385KM/5.385
RM-11.7Km/l 1.7
DM- 2.54KM/2.2
RM-1.25Km/1.25
DM-3.23KM/3.23
RM-1.0KM/0.993
DM-5.28KM/5.523
RM-4.10Km/4.10
DM-10.50KM/10.50
RM-1.20KM/1.30
DM-6.0KM/6.135
Whether Source Established
_______ Yes / No______
___________ 6_________
Yes (PBN-2)
Yes (PBW-4), (PBW-5) KEBYes Except Pump erection
ready for Commissioning
Yes (PBW-1) Yes (PBW-2)
(PBW-3) New Borewell
Yes (PBW-4) KEB-No
New Bore well drilled KEBNo.____________________
Yes (PBW-1) KEB-Yes
Yes (PBW-1)
No (PBW-3)__________
Yes (PBW-1), (PBW-7),
KC-7
No (PBW-5). KC-3
Yes (PBW-3)
Yes (PBW-4)
Yes (KC-4)
(BW-5)_____________
NEW BOREWELL
DRILLED___________
Yes (PBW-1). (PBW-2)
Open Well
Yes (PBW-3)
Yes (PBW-2), KC-2
Yes(PBW-l), (PBW-3)
Yes (PBW-5), (BW-F)
3
1
19
2
BDR-4
_______ 3
Wanjarkhed
_________ 4
OHT-7 Completed
20
BDR-4
Chalkapur
GLSR- Completed
21
BDR-5
Madargi
OHT-7 Completed
22
BDR-5
Kodambal
OHT-7 Completed
23
BDR-5
Bemalkhed
24
BDR-5
Waddankera
GLSR completed.
Sump Completed
OHT-7 Completed
25
BDR-5
Mangalgi
OHT-5
26
BDR-6
Shamtabad
OHT-7 Completed
27
BDR-6
Nagankera
OHT-7 Completed
28
BDR-6
Aurad (S)
OHT-7
29
BDR-6
Kanaji
OHT-7
30
BDR-7
Muchalam
OHT-7 Completed
31
BDR-7
Rajola
32
BDR-7
Jajanmugali
OHT-7 Completed
Sump Completed
OHT-7 Completed
33
BDR-8
Murki
OHT-7 Completed
34
BDR-8
Kherda (B)
OHT-7 Completed
35
BDR-8
Hokrana
OHT-7 Completed
36
BDR-8
Nidoda
OHT-5
37
BDR-9
Saigaon
OHT-7 Completed
38
BDR-9
K. Jawalga
OHT-7 Completed
39
BDR-10
K. Chincholli
GLSR completed
40
BDR-11
Nagoora
OHT-7 Completed
41
BDR-11
Kamthana
OHT-7 Completed
42
BDR-12
Manhalli
OHT-7 Completed
43
BDR-13
Kohinoor
OHT-7 Completed
J
J
RM-1.95Km/2.50
DM-1.20KM/1.69
RM-1.0KM/1.26
DM-4.25KM/5.345
RM-2.80KM/2.80
DM-2.981 KM/2.98
RM-2.2KM/2.2
DM-7.965KM/7.965
RM-3.46KM
DM-10.665KM/10.65
RM-4.90Km/2.51
DM-2.51KM/10.49
RM-2.81 Km/2.81
DM-6.426KM/6.4
RM-1.53Km/1.53
DM-3.185KM/3.185
RM-2.19Km/2.19
DM-3.10KM/3.10
RM-3.95Km/4.80
DM-3.50KM/4.038
RM-0.8Km/1.14
DM-3.00KM/4.86
RM-1.845Km/l. 845
DM-6.66Km/6.664
RM-1.25Km/2.95
DM-6.60KM/6.60
RM-Nil DM4.60Km/4.60________
RM-1.6KM/1.655
DM-4.62KM/4.625
RM-0.34KM/0.57
DM-2.35KM/2.35
RM-5.00Km/5.97
DM-4.26KM/4.26
RM-4.135KM/4.24
DM-2.9KM/3.0
RM-5.4Km/5.4
DM-4.37KM/4.37
RM-1.29Km/1.2
DM-2.42Km/2.42
RM-4.0Km/3.695
DM-13.0KM/10.76
RM-2.25Km/2.25
DM-4.38KM/3.49
RM-4.0Km/4.0
DM-13.00KM/12.46
RM-3.42Km/3.42
DM-11.55KM/10.49
RM-4.8Km/4.80
DM-5.6KM/5.60
- /3A -
___________ 6
Yes (PBW-1). FAIL
Open Well
Yes (PBW-5)
(PBW-1)_________________
(PBW-4)
(PBW-2). (PBW-3). (PBW5)_______________________
Yes(PBW-7). Yes KC-4,
PBW-8
Yes (PBW-3)
Yes(PBW-l). KC-3
Yes KC-1
Yes (PBW-2)
Yes(PBW-3).
Yes KC-1
Open Well
Yes KC-l.KC-2. (PBW-4)
yes KC-1 (PBW-2)
Yes KC-2. (PBW-4)
New Bore well drilled but
under dispute___________
Yes (PBW-1). (PBW-2)
(PBW-3)______________
Yes(BW-1.2)
Open Well
Yes KC-3
KC-2_____________________
Yes (PBW-1). (PBW-2). (PB).
(PBW-4) KC-2. 3___________
Yes KC-l.KC-2
Yes KC-1. (PBW-4).
KC-2___________
Yes KC-1.(BW-12)
Yes KC-5. KC-2. KC-3.
KC-9 No (PBW-3)
Open Well
Yes (PBW-1)
Yes (PBW-6)
o
1
44
2
BDR-13
______ 3_
Kherda (B)
OHT-6
45
BDR-14
Nima
46
BDR-15
Hailikhed(B)
47
BDR-16
Wadgaon-I.
OHT-7 Completed
Sump Completed
OHT-7 Two OHT
Completed______
OHT-7 Completed
48
BDR-16
Kamalnagar
OHT-7 Completed
49
BDR-16
Kalgapur
OHT-7 Completed
50
BDR-17
Gadgi
OHT-7 Completed
51
BDR-17
Chillargi MS 2
OHT-7 Completed
52
BDR-17
Chimkod
OHT-7 Completed
53
BDR-18
Hippalgaon
OHT-7 Completed
54
BDR-18
Markal
OHT-7 Completed
55
BDR-18
Byalhalli
OHT-7 Completed
56
BDR-19
Sonala MS 1
OHT-7 Completed
57
BDR-19
Nittur(B) MS 1
OHT-7 Completed
58
BDR-20
Yarandgi
OHT-7 Completed
59
BDR-20
G. Chincholli
OHT-7 Completed
60
BDR-20
Warwatti (B)
OHT-6
61
BDR-21
Bagdal
Land Dispute
62
BDR-21
Yadlapur
OHT-5
63
BDR-22
Bellura
OHT-1
64
BDR-22
Satholi
OHT-3 z
65
BDR-23
Rajeshwar
OHT-5
66
BDR-24
Chintaki
67
BDR-24
Chondi Mukhed
68
BDR-25
Belura
/
y-.
L
)
i
a*
4
6
i
1
RM-2.2Km/2.2
DM-4.5KM/4.5
RM-5.5KnV5.5
DM-12.0KM/12.0
RM-Started
DM-27.00Km/25.83
RM-4.30Km/4.30
DM-4.04Km/4.04
RM-5.04Km/5.04
DM-11.86Km/11.86
RM-2.0Km/2.0
DM-2.23KM/2.23
RM-2.124KM
DM-1.9KM______
RM-0.61/0.800
DM-5.80/5.885
RM-1.10/1.20
DM-4.0/4.840
RM-1.03Km/1.03
DM-2.55KM/2.55
RM-0.75Km/0.69
DM-2.99KM/3.02
RM-0.8Km/0.79
DM-3.1KM/______
RM-6.15Km6.15
DM-3.75KM/3.60
RM-1.78Km/l .70
DM-8.40KM/8.40
RM-1.200 KM/1.375
DM-3.400 KM/3.54
RM-0.620 KM/0.620
DM-3.00KM/3.115
RM-4.00 Km/4.15
DM-6.00 Km/6.525
RMDM-_____________
RMDM-_____________
RMDM-_____________
RMDM-_____________
RM- 3.00Kms
DM- 3.00Kms
RMDMRMDMRMDM-
OHT-1
- /33-
Yes (PBW-1), (BW-1)
Yes KC-1. (PBW-8). KC-3
(PBW-5) KC-4. (PBW-7)
Open Well
Yes KC-3. (PBW-1),
(PBW-2)___________
Yes (PBW-4). (PBW-1)
(PBW-7). (PBW-1).
(PBW-3). (PBW-5)
Yes KC-1 (PBW-1)
Yes(PBW-2). (PBW-1)
New Borewell is drilled
Yes(PBW-3)
Yes KC-1
Yes HP-4.
Yes (BW-1)
Yes (PBW-1.2)
Yes KC-2. KC-3
Yes KC-1. KC-3
Yes KC-2__________
Yes BW-(pp). (PBW-3)
No (PBW-2)________
Yes (PBW-1)
Yes (PBW-1). (PBW-3)
Yes KC-2_____________
KC-2. KC-3. KC-4 KC-5.
PBW-5 Sump 1CP
BW-8 (Newly drilled)
PBW-2. PBW-4. BW-1
PBW-1
PBW-3. KC-l.KC-2. KC-3. 1
Sump. KC-4. KC-5. KC-6.
KC-7. KC-8______________
PBW-1.PBW-2.PBW-3 SumpINo.____________________
PBW-2. PBW-3
PBW-LPBW-2. PBW-3.
PBW-4. Sump -INo.
2
BDR-25
Sastapur
OHT-1
70
BDR-26
Ladha
OHT-2
71
BDR-26
Ucha
OHT-5
72
BDR-27
Rolla
OHT-1
73
BDR-27
Naryanapur
OHT-1
74
BDR-28
Beeri (B)
OHT-1
75
BDR-28
Mehkar
OHT-5
76
BDR-29
Sonkera
77
BDR-29
Warwatti (K)
1
2
2
3
(
2
Noie:
5
4
69
OHT-1
OHT-1 :OHT-2:OHT-3:OHT-4:OHT-5:OHT-6:OHT-7:-
Foundation
G.L Bracing Beam
2nd Bracing Beam
3rd Bracing Beam
Bottom Ring Beam & Slab
Side Wall
Dome
MS 1
MS 2
MS 3
First Mile Stone
Second Mile Stone
Third Mile Stone
BB
GL
PSBW
BRB&S
Bracing Beam
Ground Level
Proposed Shallow Borewell
Bottom Ring Beam & Slab
RMDMRMDMRM- 0.9
DM- 2.6
RMDMRMDMRMDMRMDMRMDMRMDM-
___________ 6_
POW-l.POW-2
PBW-l.PBW-2, PBW-3
PBW-1.PBW-2.PBW-3
PBW-2
PB W-4.KC-3.PO W-1 .POW-3.
1 Sump. 1 CP_____________
PBW-1. PBW-3
PBW-2. KC-1. KC-2. KC-4.
KC-5_____________
PBW-2.KC-2. BW-1
KC-l.KC-2
DISTRICT MANAGER
ICT PVT LTD
BIDAR.
d
FORMAT-6
PHYSIC AL PROGRESS FOR REMAINING WATER SUPPLY COMPONENTS
For the month of December-99
District: Bidar
SI.
No
Package
HP
I
1
I
3
4
3
4
6
7
8
9
J
CP
In
i
hT
ii
12
13
14
15
16
17
18
19
20
REMARKS
WATER SUPPLY COMPONENTS IN NOS
__ CS
ST
A
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Total
T
25
42
33
62
32
26
18
23
30
26
31
24
48
26
84
65
36
17
9
7
664
T
35
32
46
32
3
5
16
30
26
25
24
48
26
84
55
17
9
7
512
1
4
4
23
A
DB__
T
j\_
11
35
32
40
16
16
43
40
29
23
23
23
23
17
17
13
13
19
19
24
24
16
16
16
16
38
38
26
26
18
16
16
15
15
20
20
449 363
HP - I land pump
S T - Stand post
CS - C istern
CT - Cattle 1 rough WP - Washing Platform DB - Dust bin
CT
T
5
17
8
22
22
_1_8
J2
8
TT
ii
ii
8
7
11
10
7
9
19
14
1
9
7
12
221
8
7
11
10
9
9
19
14
9
7
12
180
WP
T___ A
34__ 58
82
100
51___
63
135
70
127
75__
75__
70__ 58
58__
44
50
72
72
60
64
50
56
60
128
95
95
65
All works are proposed
under milestone 1.2 & 3
51__ ’
47
70
1467
40
708
ft;,_ i
DISTRlCTMANAGi-R
ICT PVT L TD
BIDAR
INTERCONTINENTAL CONSULTANT AND TECHNOCRATS PVT. LTD.
KIRWS AND ESP PHASE-II PACKAGE-II
(WORLD BANK ASSITANCE)
1. Hydrauli testing of PVC Pipes.
SI.
No.
1
1
2
3
4
5
6
7
8
I
Vo
(T'
I
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
Date of
testing
2
29-11-98
29- 11-98
3-12-98
3-12-98
28-11-98
3- 12-98
5-11-98
5- 11-98
To 8/11/98
7-11-98
10- 12-98
9-12-98
1- 12-98
4- 12-98
5- 12-98
6- 12-98
9-12-98
6- 12-98
2- 12-98
4-12-98
14- 12-98
15- 12-98
15-12-98
28-11-98
25-11-98
30- 11-98
11- 12-98
11-12-98
Package
No.
Name of
Village
3
4
RM in
km
__ 5
T
DM in
km
6^
A
7
8
A
BDR-2
BDR-2
BDR-2
BDR-2
BDR-2
BDR-2
BDR-3
BDR-3
Hedgapur
Santhapur
Dapka
Kathagoan
Khead
Doangoan
Aliamber
Hungarga
5.19 4.14
4 36 4.31
1.23 1.2
1.59 1.6
1.9 1
0.85 0.25
2.4 2.24
12.0 10.5
5.24
6.44
3.89
2.71
2.64
4.04
5.38
2.54
BDR-3
BDR-6
BDR-6
BDR-6
BDR-6
BDR-9
BDR-9
BDR-19
BDR-10
BDR-11
BDR-11
BDR-16
BDR-16
BDR-16
BDR-18
BDR-18
BDR-18
BDR-19
BDR-19
Eklar
Shamthabad
Nagankara
Aurad(s)
Kanaji
Saigaon
K.Jawalga
Nittur ’B"
K. Chincholi
N agora
Kamthana
Wadagaon
Kalagapur
Kamalnagar
Hippalgaon
Markal
Byalahalli
Sonal
Nittur ’B"
1.25 1.15
1.63 1.5
3.3 3.3
4.8 3.94
1.14 0.5
5.5
3.7
1.29 1.2
3.1
1.5
3.00 3.00
2.25 2.00
4.03 2.0
4.29 4.0
2.56 2.0
5.5 2.0
6’9 1.03
9.68 0.69
6.75 0.73
5.4
3.6
3.1 1.5
3.23
3.00
4.93
3.00
3.39 2.00
6.19
3.00
4.98
2.75
4.37 I. 3
2.42 2.2
8.4
7.80
10.00 10.00
3.49 3.00
12.46 II. 00
4.04
3.0
2 23 2.25
11.86 11.00
2.7
2.55
3.38 2.23
3.69 3.1
3.6
2.65
8.4
7.8
, ,a
District Manager ICT PVT LTD Bidar
2.1
2.0
3.8
2.7
2.5
3.9
4.9
1.5
T
Components tested
OHT
Inlet
outlet
pipes
pi| )es
9
10
12
11
A
RM
KM
13
Chainages
DM
KM.
14
DISTRICT : Bidar
OK/
not OK
15
0to4.14
0. to 2.1
Oto 2
0 to 1.6
Oto 1
0 to 0.25
0 to 2.24
Oto 10.5
O.to 2.1
Oto 4.3
Oto 1.2
0 to 2.7
Oto 2.5
0 to 3.9
0 to 4.9
Oto 1.5
OK
OK
OK
OK
OK
OK
OK
OK
Oto 1.25
Oto 1.5
Oto 3.30
0 to 3.94
0 to 0.5
Oto 3.7
0 to 3.00
0 to 3.00
0 to 2.00
0 to 3.00
0 to 2.75
Oto 1.3
Oto 2.2
0 to 7.8
Oto 10.00
0 to 3.00
Oto 11.00
0 to 3.00
0 to 2.25
Oto 11.00
O.to 3.1
Oto 2.65
O.to 3.1
Oto 2.65
0 to 7.8
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
Oto 1.29
Oto 1.5
0 to 3.0
0 to 2.00
0 to 2.00
0 to 4.00
Oto 2
Oto 2
0 to 0.73
0 to 3.65
Oto 0.73
0 to 3.65
Oto 1.5
Remarks
16
Comm./HO
Comm./H.O
-do-
Comm./HO
Comm./H.O
Comm./H.O
Comm./H.O
INTERCONTINENTAL CONSULTANT AND TECHNOCRATS PVT. LTD.
KIRWS AND ESP PHASE-II PACKAGE-II
MONTH : December 1999
DISTRICT : Bidar
2. List of deficit Contractors
SI. Package
No. No.
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
2
BDR-5
BDR-6
BDR-8
BDR-13
BDR-2Q
BDR-21
BDR-22
BDR-23
BDR-24
BDR-25
BDR-26
BDR-27
BDR-28
BDR-29
L
i
District Managar
ICT Pvt. Ltd
Bidar
No. of
Villages
_3
1
4
_4
2.
_3
2
2
2
2
2
2
2
2
2
Name of the
Contractor
Contract
value
Date
Start
Target as Achievement Shortfall in
24-9-99
to end of MS Progress in
Cumulative MS Cumulative
Amount
_________ 4_________
Satish Guttedar
__
KSCC
______ KSCC
Baswaraj R Sajjan
Satish Guttedar
Kotarki Shankar
Hanumant Rao Khoba
Dhanraj Tallampally
Hanumant Rao Khoba
P.Basaiah & Sons
Premanent Prestress
P.Basaiah & Sons
Kotarki Shankar
Satish Guttedar
5
113.14
87,24
104,78
49.65
53.48
43.83
25.76
50.06
40,86
70.61
26.31
57,25
46.31
24.76
6
25/3/98
06/04/98
06/04/98
16/3/98
25/3/98
20/5/99
25/6/99
25/5/99
7
113.14
87,24
104,78
49.65
53.48
43.83
25.76
50,06
40,86
70,61
26.31
57.25
46.31
24.76
9
102.12
63.45
79.84
43.67
35.28
13.65
13.33
10
Shortfall in
Delay attributed
Physical status
to Department
of work
/Contractor
%
11
12
OHT Mangalgi
OHT at Kanji
OHT Nidoda
OHT Kherda
OHT Warwatti(B)
All works
All works
All works
All works
All works
All works
__ All works
All works
All works
13
Contractor
Contractor
Contractor
Contractor
Contractor
Contractor
Contractor
Contractor
Contractor
Contractor
Contractor
Contractor
Contractor
INTERCONTINENTAL CONSULTANT AND TECHNOCRATS PVT. LTD.
KIRWS AND ESP PHASE-II PACKAGE-II
(WORLD BANK ASSISTANCE)
MONTH : December 1999
DISTRICT : Bidar
SI.
No.
Package No. of
No.
Villages
(5) List of Agencies on Whom penal action has been recommended.
Name of
Contract Date of
End of
Name of Financial cumulative
Contractor
Value
Start
Milestone
Scheme/ for Milestone WWIII
IWIII
1
sOfc
1
BDR-4
5
Meera & Ceiko
2
BDR-2
6
3
4
5
6
7
8
9
10
11
12
13
14
15
16
BDR-5
BDR-6
BDR-8
BDR-13
BDR-20
BDR-21
BDR-22
BDR-23
BDR-24
BDR-25
BDR-26
BDR-27
BDR-28
BDR-29
hvA
_4
4
_2
_3
2_
2
£
District Manager
ICT Pvt. Ltd., Bidar
2_
2_
2_
2_
2
112.15
Villages
^23/3/98
H.Tugaon
Bhatambra
Dhannura
Wanjarkhed
Chalkapur
H.A.Phulse
107.77 01/09/98
Hedgapura
Santhapur
Khed
Kathagaon
Donagaon
Dapka
Satish Guttedar
KSCC
KSCC
________
Baswaraj R Sajjan
Satish Guttedar
Kotarki Shankar
Hanumant rao Khoba
Dhanraj Tallampally
Hanumant rao Khoba
P.Basaiah & Sons
Premanent Prestress
P.Basaiah & Sons
Kotarki Shankar
Satish Guttedar
113.14 25/3/98
87.24 06/04/98
104.78 06/04/98
49.65
16/3/98
53.48
25/3/98
43.83
25.76
50.06
20/5/99
40,86
25/6/99
70,61
HI
26.31
25/5/99
57,25
46.31
zxLUlL
24.76
S' \A-‘
-4
-M-
V
2
J
t)
2
_J_
J
v
2
Z
2
T
52.97
status of
x
worke^-
Details of
Penal
action
Remarks
OHT
completed
‘ Rs.25000/-
Recovered
OHT
Completed
Rs. 25000/- Recovered
A
Shortfall
%
31.51
40.77
2 S'
113.14 102.12
87.24 63.45
104.78 79.84
49.65 43.67
53.48 35.28
43.83
25.76
50.06 13.65
40.86
70,61 13.33
26.31
1
57.25
46.31
24.76
mA ■
9.74
27.27
23.81
12.05
34.04
72.74
81.13
MO"/
is H
OHT Mangalgia fl
OHT atKanji !,
OHT Nidoda -1
OHT Kherda >
OHT Warwatti(B) y
All works_____
All works_____
All works_____
All works_____
All works_____
All works_____
All works_____
All works_____
All works
INTERCONTINENTAL CONSULTANT AND TECHNOCRATS PVT. LTD.
KIRWS AND ESP PHASE-II PACKAGE-II
{WORLD BANK ASSISTANCE)
MONTH : December 1999
DISTRICT : Bidar
(6) Ranking of Contractors.
SI. Package
No. No.
No. of
Villages
Name of
Contractor
Contract
Value
Date of
Start
Financial cumulative
for Milestone l/ll/lll
T
A
Shortfall
Physical
targets
Achieved
%
1
BDR-1
6
Satish V
Guttedar
165.59
25-Mar-98
165,59 170.20
-o
1
3-OHT is completed
2-GLSR Completed
R.M - 18.80 KMs
D M - 34.45 KMs
2
BDR-2
6
H A Phulse
107.77
09/Jan/1998 107,77 92 38
14.20
RANKING
asper item No.7
of W.B.Aide
Memoire_______
1 GLSR Completed
1
Remarks on
Quality of works
05-OHT's Completed
Maintain
Quality at the
Instance ofthe
Consultants
B
B
1-GLSR Completed
RM - 13.94 kms
DM - 24.1 kms
3
BDR-3
3
H.A . Phulse
134.03
09/Jan/1998 134,03 144.82
2-OHT completed
B
1 -GLSR Completed
R.M - 16 38 kms
D M - 12.24 kms
4
BDR-4
5
Meera & Ceiko
112 15
23-Mar-98
112,15 117.54
21 58
4-OHT Completed
1-GLSR Completed
R.M - 10.00 kms
D M - 25.93 kms
B
SI. Package
No. No.
No. of
Villages
Name of
Contractor
Contract
Value
Date of
Start
Financial cumulative
for Milestone l/ll/lll
T
A
Shortfall
Physical
targets
Achieved
%
Remarks on
RANKING
Quality of works
asper item No.7
of W.B.Aide
Memoire
5
BDR-5
5.
Satish V.
Guttedar
113.14
113 14
110.14
2.65
3-OHT’s completed
1 -OHT Bottom slab
1 GLSR completed
R.M - 15.29 km
D M - 30.40 km
B
06April/1998 87.24
55 84
35.99
2-OHT Completed
B
5-Mar-98
I
6
BDR-6
4
KSCC Ltd
87.24
1-OHT Top Dome
R.M - 9.13 kms
D M - 13.-17 kms
1
o
7
BDR-7
3.
R. Maheswar
Naidu
68.40
2-Mar-98
68.40
71.63
3-OHT completed
B
R.M - 3.60 kms
D M - 17.92 kms
8
BDR-8
4.
KSCC Ltd.
104.78
06/April/1998 104.78
80.55
13.52
3-OHT Completed
1-OHT Side wall
R.M -11.04 kms
D.M - 14.13 kms
B
9
BDR-9
2.
B.RamOsh
48.10
09/Jan/1998 48,10
47.84
0.55
2-OHT completed
B
R.M - 6.60 kms
D M -6.79 kms
10
BDR-10
1.
Dhanraj S.
Talampalli
66.24
9-Mar-98
66,24
76 00
1- GLSR completed
R. M - 4.00 kms
D M -13.00 kms
B
SI. Package
No. No.
No. of
Villages
Name of
Contractor
Contract
Value
Date of
Start
Financial cumulative
Physical
for Milestone l/ll/lll
____ targets
"A
T
Shortfall
Achieved
%
11
BDR-11
2
K.H Phulse
87 40
Remarks on
Quality of works
asper item K5.7
of W.B.Aide
Memoire
RANKING
2-OHT Completed
17-Feb-98
87.40
92 04
B
R.M - 6.25kms
D M - 17.38 kms
12
BDR-12
1.
R. Maheshwar
Naidu
43.52
12-Mar-98
43.52
40.62
1-OHT completed
R.M-3.42
D M - 11.55
B
2
Baswaraj
R Sajjan
49.65
16-Mar-98
49,65
55.49
1-OHT Completed
1-OHT Side wall
R.M - 7.0kms
D M - 10.10 kms
B
BDR-14
1
Basawaraj
R Sajjan
47.85
11-Mar-98
47.85
49.58
1 OHT completed
R.M - 5.5km
D M - 12.00 km
B
15
BDR-15
1
R.Maheshwar
Naidu
132 89
25-Mar-98
132.89
115.73
12.92
2-OHT completed
R.M - Started
D M - 27.04kms
B
16
BDR-16
3
G S. Kuberappa
122.54
17-Feb-98
122.54
103.96
15.16
3-OHT Completed
B
13
14
BDR-13
I
I
R.M - 11.30kms
D M - 18.07 kms
17
BDR-17
3
KLAC Ltd
63.88
20-Jun-98
63.88
47.82
18
BDR-18
3
B Ramesh
43 65
25-Mar-98
43.65
45.53
25.14
2-OHT Completed
1-OHT Top Dome U/P
R.M - 2.724 kms
D M - 14.00 kms
B
3-OHT Completed
R.M - 2.85 kms
D M - 8.64kms
B
SI. Package
No. No.
No. of
Villages
Name of
Contractor
Contract
Value
Date of
Start
Financial cumulative
for Milestone l/ll/lll
T
A
Shortfall
Physical
targets
Achieved
%
19
BDR-19
2
B.Ramesh
53.97
25-Mar-98
53.97
58.38
2-OHT Completed
I
20
BDR-20
3.
Satish.V
Guttedar
53.48
25-Mar-98
District Manager
ICT Pvt Ltd.
Bidar.
RANKING
B
R.M-9.15 kms
D M - 12.00 kms
53.48
44.96
15.94
2-OHT Completed
1-OHT Top Dome
R.M - 9.91 KMs
D M - 10.75 KMs
1
Remarks on
Quality of works
asper item No.7
ofW.B.Aide x
Memoire
B
INTEGRATED RURAL WATER SUPPLY AND
ENVIRONMENTAL SANITATION PROJECT
KARNATAKA
(World Bank Assistance)
Phase II
Package II Villages
PROGRESS REPORT
of Gulbarga District
For the Month of DECEMBER 1999
INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT LTD . NEW DELHI
CONSULTANTS FOR CONSTRUCTION MANAGEMENT AND QUALITY CONTROL
FORMAT - 3
PHYSICAL PROGRESS PACKAGE WISE FOR DECEMBER 1999
NAME OF DISTRICT : GULBARGA Phase-B
SI Package No.of
No
1
2
1
£
3
4
5
6
7
No.
GLB-1
GLB-2
GLB-3
GLB-4
GLB-5
GLB-6
GLB-7
villa
-ges
4
4
4
3
3
3
1
Name of
contractor
S.V.Guttedar
Period Contract Date of Mile
of compl values
start stone
-etion in in Rs.
months lakhs
18
M/s Coramandel
PresTcrete
Pvt Ltd.
18
H.A.Phulse
18
S.M.Amerkhed
H.A.Phulse
S.V.Guttedar
B.R.Sajjan
18
18
18
18
62.2
53
88
66.5
95.8
68.4
66.3
22-1-98
7-4-98
4-4-98
3-2-98
8-4-98
11-4-98
1-2-98
Physical Progress
Financial
Progress
T
A
in lakhs
I
S.P
C.P
R.M
DM
OHT
T | A
T | A
T | A
T | A
T | A
I
II
III
18
18
36
37.7
62.2 55.18
9
I
II
III
11
32
53
7.4
16.2
35.9
3.
5
I
II
III
17
53
88
39.6
2
54.9
2
69
8
I
II
111
13
13
28.5
33
66.5 43.50
I
II
III
I
II
III
I
II
III
3_
5
9
£
6
6
7
7
6
2
10
1.6
4,9
5
3
8
15
4.3
12.3
14
2
7
12
2
4.5
11
2
2.1
5.7
6.2
8.6
9.2
4
13
21
11.7
18.4
18.4
2
2 2
3.6
2.5
2_
4
2_
4
OHT 1 up
4.0
2
3
2
OHT 1 up
2
1
7
4.2
4.3
46
20
58 62.5
95.8 77.28
3_
5
2
2
2
5
9.5
1.6
6
8.5
2
7
12
3.5
6.8
11.6
2
13
40
68.4
10.6
36.1
58.5
3_
5
2
7
2
5_
8
2
6
8.6
2
7
12
2.7
5.2
11.7
_1_
2
15
40
66.5
21.4
34,6
46.0
_1_
2
3
2
5.
9
3_
_8
8
1
£
2
2
2
1
4
6.4
OHT 1 up
2_
4
4
6
£
2_
4
5
2
5_
9
1
Sump/
GLSR
T | A
No.of No. of
schemes scheme) Remarks
commis Prop
-sioned -sed
3.6
1
Ji
1
1/Nil
1/Nil
OHT 1 up
FORMAT - 3
PHYSICAL PROGRESS PACKAGE WISE FOR DECEMBER 1999
NAME OF DISTRICT : GULBARGA Phase-II
SI Package No.of
villa
No No.
-ges
8
9
GLB-8
GLB-9
10 GLB-10
11 GLB-11
12 GLB-12
13 GLB-13
14 GLB-14
2
3
3
4
3
2
4
Name of
contractor
M/s K.S.C.C
H.A.Phulse
S.V.Guttedar
G.S.Kuberappa
K.H.Phulse
B.Ramesh x
K.H.Phulse
Period Contract Date of Mile
start stone
of compl values
-etion in in Rs.
months lakhs
18
18
18
18
18
18
18
88.8
63
75.9
107
59
73.3
58.8
26-4-98
16-4-98
27-3-98
10-4-98
12-5-98
8-5-98
9-5-98
Physical Progress
Financial
Progress
T
A
in lakhs
I
S.P
C.P
R.M
D.M
OHT
T | A
T | A
T | A
T | A
T | A
I
II
III
33
18
54 67,2
88.8 90.32
2_
5_
8
2
I
II
III
12
36
63
42,9
49
59.3
2
4
2
4
I
II
III
26
13
40
38
55.20
75.9
3
8
13
I
II
III
46
22
64 680
107 90.63
I
II
III
18
36
59
25
41,4
41.44
4_
I
II
III
15 280
44 47,2
73.3 56.98
_1_
4_
7
I
II
III
23
11
35 29.3
58.8 49.68
4_
8
2
2
2
2
5
8.3
4.5
5
7.9
3
3
10
12
16 14.20
2
2
2
3
2
3
2
7
12
5,5
9.5
10.7
2
3.2
5,5
5.9
2
4_
7
2.
2
3.2
3
8.2
13
3.6
10.3
11.9
7,8
11
11
2
2
4
7
6.9
2
2
8.5
4
7
6
10
10
10
2
8
13
TT
1
4
4.2
2
7
11
2.2
5
8.7
2. £
6
6
13
7
4
4_
4
6
2
1
2
4
2
4_
8
4.
5
2
7
11
5.2
5,2
7
2.
2.9
3,8
4.5
2
7
11
6,4
6.4
9
3_
6
2
3
2
3
2
3
2
Nil/1
1
1
Nil/1
OHT 1 up
OHT 1 up
1
1/Nil
1/Nil
2
2
4
OHT 2 up
2
2
2.
1/nil 1/nil
1/ml 1/nil
1
2.
2
Sump/
GLSR
T | A
No.of No. of
schemes scheme Remarks
commis Prop
-sioned -sed
OHT 2 up
2
3
OHT 1 up
FORMAT - 3
PHYSICAL PROGRESS PACKAGE WISE FOR DECEMBER 1999
NAME OF DISTRICT : GULBARGA Phase-II
SI Package No.of
villa
No No.
-ges
15 GLB-15
4
Name of
contractor
k.H.Phulse
Period Contract Date of Mile
start stone
of compl values
-etion in in Rs.
months lakhs
18
56
20-5-98
I
17 GLB-17
3
3
S V Guttedar
G.S Xuberappa
18
-18
47
62.5
4-7-98
26-4-98
1
18 GLB-18
19 GLB-19
20 GLB-20
21 GLB-21
22 GLB-22
23 GLB-23
3
3
3
3
4
3
HSKumbar
K.H.Phulse
18
12
Rajemdra.
Andral.
12
G.V.Pratapreddy
18
M/s Pannanent
Prestress(P)Ltd?
12
M/s Pannanent
Prestress(P)Ltd.
12
55
43.40
56
57
54.7
50.40
9-7-98
15-7-99
5-7-99
4-9-98
21-3-99
2-5-99
S.P
C.P
R.M
D.M
OHT
T | A
T | A
T | A
T | A
T | A
2.5
4,5
4.9
2
7
11
6.3
9.8
2
2
10.2
4
3
1.2
3.2
3.7
3
9
15
7.2
9.2
11.6
2
2
2
2
2
6
10
3,5
6.7
6.7
2
7
11
3
8.2
9.5
11
34
56
23.0
31.2
49.38
II
III
13
38
47
11.7
35.6
41.5
I
II
III
30
12
37 37,9
62.5 58.66
2
2
2
2
4
9
5.5
5.8
I
II
III
11
33
55
11
17,5
30
2
2
2
2
2
2
2
2
8
4
I
II
III
16 GLB-16
Physical Progress
Financial
Progress
T
A
in lakhs
I
2
2
3
4
2
2
2
2
2
6
8
5
2_
4
5
II
22,00 14.0
43.40 -
4
I
III
28
56
40.30
2
I
II
III
I
5
5
9.4
0.5
1.5
_2
4
5
13
11.4 14.5
34 22.75
57 37.80
2
2
2
2
2
I
III
27,34 14.51
54.70 16.30
2
2
8
6
I
III
25.40 12.30
50.40 13.62
2
1
4.6
7
4
2
7
2
2
3
10.9 9.5
4
5
2
3.5
OHT 1 up
Nil/1
2
2
3
3
2
2
1
Nil/1 Nil/1 Nil/1
OHT 1 up
3
2
OHT 1 up
2
3
2
2
9.5
2
2
2
12
2
1
4
10.6
2
1
2
7
Sump/
GLSR
T | A
No.of No. of
schemes scheme Remarks
comm is Prop
-sioned -sed
2
1/0
1/1
1/1
1/1
OHT 1 up
OHT 3 up
4
6
2
12.4
3
OHT 2 up
FORMAT-4
Name & address of DM :- J.D.Boii
C/o B.N.Patil
H.No 1-867/3-D
Venkatesh Nagar
Gulbarga. Ph. 35780
District: Gulbarga phase-II
For the month of December 1999
SI Package Total Value
No. of of w ork
No. No.
villages in Rs
GLB-1
1
2
GLB-2
4
4
62.2
53
I
(T*
)
3
4
5
GLB-3
GLB-4
GLB-5
4
3
3
Name & address of
contractor
Sri S.V.Guttedar
PWD Class I contractor
Trishul building .MSK
Mill road,Gulbarga.
M/s Coramandel
Prestcrete Pvt Ltd.
No.8-2-268/l/B/18.plot
No 18.Aurora colony-11
Road No 3.Banjara hills
Hyderabad - 500034.
Sri H.A.Phulse
PWD Class I contractor
H.No 8-1-191.
Guru Nagar. Bidar.
66.5 Sri S.M.Amerkhed
Engineer & Contractor
MIG 32. Rampur road .
Nijalingappa Nagar.
Raichur - 584 101_____
95.8 Sri H.A.Phulse
PWD Class I contractor
H.No 8-1-191.
Guru Nagar. Bidar.
88
Name and
address of
contractor
personal
Name & address of
Assistant Engineer
Er. Ram.Hanumanthrao
H.No. 2-609,Navaranga
Challi Jagat Gulbarga.
Date of Date of Date of
award starting comple
-tion
Financial progress
( Cummulative in Rs. Lakhs)
Ml
M2
M3
T
A
T
A
T
A
13-1-98 22-1-98 22-7-99
18
18
36
37.7 62.2 55.18
7-10-99
,11
7.43
32
16.20 53
4-10-99
17
•39.6
53
54.9
3-8-99
13
13
33
28.5 66.5 43.5
8-10-99
20
46
58
62.5 95.8 77.28
1. Er. D.S.Phadnis
C/o M.D.Farooq
D.No 1-1-13/1. Badi Darga
Street. Chincholi.
2. Er. Shaliendra.Shahapur 31-3-98 7-4-98
C/o Prathviraj Gowda
Mansangal Gopan Gowda
Mailapur base. Yadgir.
3. Rajeshkumar
C/o M.D.Farooq
D.No 1-1-13/1, Badi Darga
Street. Chincholi._______
Er. S.B.Badiger
C/o Mailarappa. Zamadar 28-1-98 4-4-98
Kanina Nivas . Diggi base
Shahapur.______________
Er. Ravindra.G.Kalagi
C/o Sharanbasappa. Patil
Post : Javali (D) Tq: Aland 13-1-98 3-2-98
Dist : Gulbarga.
Er. S.B.Badiger
C/o Mailarappa. Zamadar
Kanina Nivas . Diggi base
'Shahapur.
29-1-98 8-4-98
Expendit
-ureduring
the month
in lakhs
35.9
88 69.00
7.30
FORMAT-4
District: Gulbarga phase-11
For the month of December 1999
SI Package Total Value
No. No.
No. of of work
villages in Rs
6
7
GLB-6
GLB-7
3
1
68.4
66.3
I
1
8
9
GLB-8
GLB-9
10 GLB-10
11 GLB-11
2
3
3
4
88.8
63
75.9
107
Name & address of
contractor
Sri S.V.Guttedar
PWD Class I contractor
Trishul building .MSK
Mill road.Gulbarga.
Sri B.R.Sajjan
PWD Class I contractor
H.No.l-31/lA.Rajendra
Nivas. Near Govl press
Station road . Gulbarga.
General Manager
M/sK.S.C.C
Vivikanand Nagar .
Gulbarga___________
Sri H.A.Phulse
PWD Class I contractor
H.No 8-1-191.
Guru Nagar, Bidar.
Sri S.V.Guttedar
PWD Class I contractor
Trishul building .MSK
Mill road.Gulbarga.
Sri G.S.Kuberappa
PWD Class I contractor
Parvati Nilay.Baswesh
-war colony. Behind
tahsil office Shahapur.
Name and
address of
contractor
personal
Name & address of
Assistant Engineer
Date of Date of
award starting
Name & address of DM :- J.D.Boli
C/o B.N.Patil
H.No 1-867/3-D
Venkatesh Nagar
________________ Gulbarga. Ph. 35780
Date of
Financial progress
Expendit
comple
-ureduring
( Cummulative in Rs. Lakhs)
-tion
Ml
M2
M3
the month
T
A
T
A
A
T
in lakhs
1. Er. Rajashekhar.R.Mulge
17-2-98 11-4-98 11-10-99
At post : Jawalga (J)
Tq: Aland . Dist: Gulbarga.
2. Er. Mallikarjun.Madani
Plot.No274.ClB colony.Gib.
Er. Ravindra.G.Kalagi
C/o Sharanbasappa.Patil
Post : Javali (D) Tq: Aland 13-1-98 1-2-98 1-8-99
Dist: Gulbarga.
Er. Sanjecv.Tirmal
16-3-98 26-4-98 26-10-99
C/o Prakash.R.Biral
Station area. Nalwar
Tq: Chittapur . Dist : Gib.
Er. Rajashekhar.Konek
21-2-98 16-4-98 16-10-99
C/o Arun.Shantappa
H. No 2-1-101/A
Jewargi, Dist : Gulbarga.
I. Er. Rajashekhar.R.Mulge
At post: Jawalga (J )
Tq: Aland , Dist: Gulbarga.
27-2-98 27-3-98 27-9-99
2. Er. Ravindra.G.Kalagi
C/o Sharanbasappa.Patil
Post : Javali (D) Tq: Aland
Dist : Gulbarga._________
1. Er. D.S.Phadnis
C/o M.D.Farooq
D.No 1-1-13/1. Badi Darga 27-3-98 10-4-98 10-10-99
Street.Chincholi.
2. Er. Rajeshkumar (-do-)
13
10.6
40
36.06 68.4 58.50
15
21.4
40
34.60 66.3 46.0
18
33
54
67.2 88.8 90.32
12
42.9
36
49
13
26
38 40.00 75.9 55.20
22
46
64
68
63
59.30
107 90.63
5.1
FORMAT-4
Name <& address of DM :- J.D.Boli
C/o B.N.Patil
H.No 1-867/3-D
Venkatesh Nagar
Gulbarga. Ph. 35780
District: Gulbarga phase-II
For the month of December 1999
SI Package Total Value
No. of of work
No. No.
villages in Rs
12 GLB-12
13 GLB-13
3
2
-b
Cp
1
14 GLB-14
15 GLB-15
16 GLB-16
4
4
3
Name & address of
contractor
Sri K.H.Phulse
PWD Class I contractor
H.No 8-1-191.
Guru Nagar. Bidar.
73.3 Sri B.Ramesh
PWD Class I contractor
LIG 94 . KHB colony
Bidar.______________
58.8 Sri K.H.Phulse
PWD Class I contractor
H.No 8-1-191.
Gum Nagar. Bidar.
59
56
47
Sri K.H.Phulse
PWD Class I contractor
H.No 8-1-191.
Guru Nagar. Bidar.
Sri S.V.Guttedar
PWD Class I contractor
Trishul building .MSK.
Mill road.Gulbarga.
Name and
address of
contractor
personal
Name & address of
Assistant Engineer
Date of Date of
award starting
Date of
comple
-tion
Er. Vijaykumar. Srivastava
4-5-98 12-5-98 12-11-99
C/o Gajanand Traders
Hshanapur APMC
Market yard , Shorapur.
Er. Sanjeev.Tirmal
C/o Prakash. R.Biral
4-5-98 8-5-98 8-11-99
Station area. Nalwar
Tq: Chittapur . Dist: Gib.
1. Er. Shaliendra.Shahapur
C/o Prathviraj Gowda
Mansangal Gopan Gowda
Mailapur base . Yadgir.
4-5-98 9-5-98 9-11-99
2 Er. Chanappa.B.Kindiger
C/o Basalingappa.Manager
New siddeshwar lodging
Station Bazar. Yadgir.
1. Er. Sanjeev.Tirmal
C/o Prakash.R.Biral
4-5-98 20-5-98 20-11-99
Station area. Nalwar
Tq: Chittapur. Dist : Gib.
2. Er. Mallikarjun.Madani
Plot.No274.CIB colony.Glb
Er. Vijaykumar. Srivastava
27-2-98 27-3-98 27-9-99
C/o Gajanand Traders
Hshanapur APMC
Market yard . Shorapur.
Financial progress
( Cummulative in Rs. Lakhs)
Ml
M2
M3
T
A
T
A
T
A
18
25
36
41.4
15
28
44
47.2 73.3 56.98
II
23
35 29.30 58.8 49.68
11
23
34
31.2
13
11.7
38
35.6 47.0 41.5
Expendit
-ureduring
the month
in lakhs
59 41.44
56 49.38
o-yo
FORMAT-4
Name & address of DM :- J.D.Boli
_
C/o B.N.Patil
H.No 1-867/3-D
Venkatesh Nagar
Gulbarga. Ph. 35780
District: Gulbarga phase-II
For the month of December 1999
SI Package Total Value
No. of of work
No. No.
villages in Rs
17 GLB-17
18 GLB-18
3
3
I
j
19 GLB-19
3
20 GLB-20
3
21 GLB-21
3
Name & address of
contractor
Sri G.S.Kuberappa
PWD Class 1 contractor
Parvati Nilay.Baswesh
-war colony. Behind
tahsil office Shahapur.
Sri
H.S.Kumbar.
55
PWD Class I contractor
C/o S.V.Seelvant
H.No 10-E-1049 .
behind Indira hospital.
Public Garden road
Gulbarga.____________
43.40 Sri K.H.Phulse
PWD Class 1 contractor
H.No 8-1-191.
Gum Nagar. Bidar.
56 Rajesndra.Andral
Engineer & contractor
Behind Hotel Lake view
Sharan Nagar.Gulbarga.
57 Sri G.V.Pratapreaddy
Engineer & contractor
opp: A.P.Chest hospital
S.R.Nagar.
Hyderabad.
62.5
Name and
address of
contractor
personal
Name & address of
Assistant Engineer
Er. Rajashekhar.Konek
C/o Arun.Shantappa
H.No 2-1-101/A
Jewargi, Dist: Gulbarga.
Date of Date of
award starting
Date of
comple
-tion
17-4-98 26-4-98 26-10-99
Financial progress
( Cummulative in Rs. Lakhs)
M3
M2
Ml
A
T
A
T
T
A
12
30
37 37.93 62.5 58.66
1. Er. Rajeshkumar
C/o M.D.Farooq
33 17.5 55
11
D.No 1-1-13/1, Badi Darga 19-6-98 9-7-98 9-1-2000 11
Street.Chincholi.
2. Er. Joyti BabuRao.K
At Post: Keriambalga
Tq : Aland. Dist: Gulbarga.
1. Er. Shaliendra.Shahapur
2-7-99 15-7-99 15-7-200 22.00 14.0 43.40
C/o Prathviraj Gowda
Mansangal Gopan Gowda
Mailapur base , Yadgir.
Er. Santoshkumar.Totnalli
5-7-99 5-7-2000 28 40.30 56
C/o Venkatesh Marketing
1-194 ,Behind old I.B Station.
road. Gulbarga - 585102.
1. Er. Sharanbasappa.
M. Jampani.
1-9-98 4-9-98 4-3-2000 114 14.5 34 22.75 57
Brahampur.
Gulbarga.
Expendit
-ureduring
the month
in lakhs
8.11
30
37.80
■
‘-I
FORMAT-4
Name <& address of DM :- J.D.Boli
C/o B.N.Patil
H.No 1-867/3-D
Venkatesh Nagar
Gulbarga. Ph. 35780
District: Gulbarga phase-II
For the month of December 1999
o
I
SI Package Total Value
No. of of w ork
No. No.
villages in Rs
Name & address of
contractor
M/s Paramenent
Prestress Pvt Ltd.
Opp Shivasharan
Sankiran. Court road
Gulbarga.
22 GLB-22
4
54.7
23 GLB-23
3
50.40 M/s Paramenent
Prestress Pvt Ltd.
Opp Shivasharan
Sankiran. Court road
Gulbarga.
Name and
address of
contractor
personal
Name & address of
Assistant Engineer
Date of Date of
award starting
Date of
comple
-tion
Financial progress
( Cummulative in Rs. Lakhs)
M2
M3
Ml
T
A
T
A
T
A
1. Er. Sadashiva.Yelgod
13-3-99 21-3-99 21-3-200 27.34 16.30 54.7
S/o Y.L.Siddramappa
H. No 1-1495/2 (C)
Godutai Nagar. Jewargi rd.
Gulbarga.
2 Er. Chanappa.B.Kindiger
C/o Basalingappa.Manager
New siddeshwar lodging
Station Bazar, Yadgir.
I. Er. Sadashiva.Yelgod
S/o Y.L.Siddramappa
26-4-99 2-5-99 2-5-2000 25.4 13.62 50.4
H.No 1-1495/2 (C)
Godutai Nagar. Jewargi rd.
Gulbarga.
2. Er. Ram.Hanumanthrao
H.No. 2-609.Navaranga
Challi .Jagat. Gulbarga.
(Er. J.D.Boli)
DM, ICT Pvt Ltd
Gulbarga.
Expendit
-ureduring
the month
in lakhs
FORMAT-5
VILLAGEWISE PHYSICAL PROGRESS FOR DECEMBER 1999
DISTRICT : GULBARGA.
SI. Package
No.
No.
1 '
GLB-I
Whether source
established
Yes / No
Hydraulic
testing of
pipes laid
Yes
A
1
OHT2- Completed
Sump- Nil
Nil
CPDMT
A
6.2
6.0
Hydraulic
testing of
pipes laid
done.
Yes
A
1.30
OHT2- Completed.
Sump- Nil
Nil
CPDMT
A
3.15
3.00
Yes
A
1.3
OHT2- Completed
Sump- Nil
Nil
CPDMT
A
1.5
1.5
Yes
A
1.40
OHT2- Completed
Sump- Nil
Nil
CPDMT
A
3.60
3.50
Yes
A
2.8
OHT2- Completed
Sump- Nil
Nil
CPT
DMA
3.10
3.0
OHT2- Completed
Sump- Nil
Nil
CPA
DMT
A
0.50
2.22
2.0
Yes
Status
Village
Name
S.Saradagi
2 nd in.stone
OHT1 -
SP- 3
RM-T
1.3
GLB-1
Kuinsi
3rd ni.stone
OHT1 -
SP- 2
RM- T
1.2
GLB-1
Dasatapur
1st m. stone
OHT1 -
(Commissioned)
RM-T
SP- 2
1.3
GLB-1
Arunkal
3rd m.stone
OHT1 SP- 2
RM-T
1.40
2
GLB-2
Ranjole
2nd m.stone
OHT1 -
SP- 1
(Commissioned)
RM-T
2.85
GLB-2
Dugnoor
T' in.stone
OHT1 -
SP- 2
RM- T
0.660
GLB-2
Kallur raod
3rd in.stone
OHT1 -
OHT2- Completed.
Sump- Nil
SP- 1
RM-T
0.18
GLB-2
Degal madi
3'*1 m.stone
A
0.40
CPDM-
SP- 2
CP-
Nil
DM-
T
3.50
A
2.00
- do -
- do -
- do --
Yes
A
3.0
OHT2- Completed
2.29
- do -
Nil
T
3.3
OHT1 -
RM-T
-- do --
- /5/-
e 130
079 34
A
3.00
Yes
FORMAT - 5
VILLAGEWISE PHYSICAL PROGRESS FOR DECEMBER 1999
DISTRICT : GULBARGA.
SI. Package
No.
No.
3
GLB-3
Kakkasagera
2 nd m.stone
OHT1 -
SP- 1
RM-T
2.17
GLB-3 Gundhalli tanda
I8' m.stone
1.0
Mudbole
3rd m.stone
4
GLB-4
Mudnoor K
3rd in.stone
Tadakal
3,d m.stone
Keriambalga
I81 m. stone
Tcerth
2lld m.stone
Yes
Hydraulic
testing done
A
3.06
OHT2- Completed
Sump- Nil
Nil
CPT
A
DM2.40
2.30
- Yes
A
0.20
OHT2- Completed
Sump- Nil
Nil
CPA
T
DM2.3
2.0
Yes
A
2.80
OHT2- Completed
Sump- Nil
Nil
CPA
T
DM6.0
6.76
- do -
- do -
Yes
No
A
Nil
OHT2- Bottom slab in
Sump- Nil progress.
Nil
CPA
T
DM4.80
Nil
Yes
A
4.3
OHT2- Completed
Sump- Nil
Nil
CPA
T
DM2.4
2.0
Yes
A
Nil
OHT2- Completed.
Sump- Nil
Nil
CPA
T
DM1.60
2.20
OHT1 -
OHT1 -
SP- 1
RM-T
4.24
GLB-4
Hydraulic
testing of
pipes laid
done.
OHT1-foundation OHT2- Staging in
Sump- Nil progress
completed.
Nil
CPSP- 2
A
DMT
A
RM-T
5.00
6.70
1.52 0.90
SP- Nil
RM- T
1.60
GLB-4
Yes
OHT1 -
SP- 2
RM- T
2.56
GLB-3
OHT2- Completed
Sump- Nil
Nil
CPT
A
A DM3.0
2.20
' 3.30
OHT1 -
SP- 1
RM-T
GLB-3
Hydraulic
testing of
pipes laid
OHT1 -
SP- 1
RM-T
2.56
GLB-3 Gundhalli main
I1” m.stone
Whether source
established
Yes / No
Status
Village
Name
OHT1 -
SP- Nil
RM-T
0.69
- do —
No
Hydraulic
testing of
pipes laid
done.
- do -
FORMAT - 5
VILLAGEWISE PHYSICAL PROGRESS FOR DECEMBER 1999
DISTRICT : GULBARGA.
SI. Package
No.
No.
Village
Name
Status
4______
5
GLB-5
Rajankollur
2 nd m.stone
OHT1 -
SP- Nil
RM-T
5.92
GLB-5
Gundalgera
3rd m.stone
Bapparga
1st m. stone
GLB-6
Badadal
I81 in. stone
(Commissioned)
GLB-6
Mashal
3rd m.stone
Astaga
2nd m.stone
8
GLB-7
GLB-8
Khajuri
All 3 m.s
D.Tegnoor
3 rd m. stone
A
1.40
SP- 1
RM-T
A
1.20 1.10
OHT1-
Yes
No
A
2.6
OHT2- Completed
Sump- Nil
CPNil
DMT
A
2.04
2.00
Yes
No
Yes
Sump- Nil
CPNil
DMT
2.68
No
A
2.70
Yes
A
2.00
OHT2- Completed
Sump- Roof slab in progn ss
CP2
DMT
A
6.47
6.30
Yes
A
5.50
OHT2- Side wall in Sump- Nil
progress.
CPNil
DMT
A
3.07
2.70
Yes
SP- Nil
RM-T
A
6.35 Nil
OHT2- Completed
Sump- Side wall in
CP- Nil
progress
DMT
A
8.60
8.00
OHT1 -
SP- 1
RM-T
4.26
7
Hydraulic
testing of
pipes laid
done.
Existing GLSR
SP- 5
RM-T
2.82
GLB-6
Yes
OHT2- Completed.
Sump- Nil
CPNil
DMT
A
7.02
7.0
Sump- Nil
CPNil
A
DMT
1.20
2.65
OHT1 -
SP- 2
RM-T
1.36
6
Hydraulic
testing of
pipes lard
Existing GLSR
SP- Nil
RM-T
2.25
GLB-5
A
5.90
Whether spurce
established
Yes / No
OHT1 -
OHT1 -
OHT2- Completed
Sump- Nil
SP- 2
CPNil
RM- T
A
DMT
A
1.29 0.50
3.30
2.00
-
No
Hydraulic
test condu
-cted for the
pipes laid.
- do -
Yes
Hydraulic
testing of
pipes laid
done.
FORMAT - 5
VILLAGEWISE PHYSICAL PROGRESS FOR DECEMBER 1999
DISTRICT : GULBARGA.
SI. Package
No.
No.
Village
Name
GLB-8
Nalwar main
1sl m.stone
Status
Nalwar hamlet
2nd m. stone
GLB-9
Kukunoor
2nd m.stone
Yelwar
1“ m.stone
Halgadla
3rd m.stone
Yes
A
1.70
OHT2- OHT Completed
Sump- Nil
CPNil
DMT
A
3.96
4.20
OHT2SumpCPDM-
Yes
A
2.00
OHT1 -
SP- 2
RM-T
7.67
GLB-9
Hydraulic
testing of
pipes laid
done.
OHT1 -
SP- 2
RM-T
2.19
GLB-9
Yes
A
5.70
OHT2- OHT Completed
Sump- Completed
CP2
DMT
A
8.85
8.00
OHT1 -
SP- 2
RM-T
0.975
9
Hydraulic
testing of
pipes laid
OHT1 -
SP- 4
RM-T
5.80
GLB-8
Whether source
established
Yes / No
A
7.50
OHT1SP- Nil
RM-T
A
1.70 1.20
10
GLB-10
GLB-10
Nimbal
I” m.stone
GLSR-Completed
(Commissioned)
SP- 5
RM-T
3.67
Kadganchi
3rd m.stone
GLB-10
Madaki
2nd m.stone
Yes
- do -
OHT2-Sidewall in progres;
Sump- Nil
Nil
CPDMT
A
1.43
1.50
No
. - do -
Yes
A
3.50
Yes
A
Nil
OHT2- Completed.
Sump- Nil
CPNil
DMT
A
4.60
3.60
OHT2- OHT completed.
Sump- Nil
CPNil
DMT
A
4.05
4.00
Yes
OHT1 SP- 2
RM-T
3.46
OHT2- Completed
Sump- Nil
Nil
CPDMT
A
3.20
3.00
- do --
Sump- Nil
CPNil
DMT
4.07
OHT1 -
SP- 6
RM-T
2.60
Top dome in
Nil
progress
Nil
T
A
1.87
1.40
-- do -
A
3.40
- do -
A
4.30
— do -
- do -
FORMAT - 5
VILLAGEWISE PHYSICAL PROGRESS FOR DECEMBER 1999
DISTRICT: GULBARGA.
SI. Package
No.
No.
Village
Name
Status
11' GLB-11
Ainapur
3 rd m.stone
GLSR- Roof slab in progress.
SumpSP- 2
CP2
RM-T
A
DMT
3.46
3.60
5.82
GLB-11
Nagaidalai
2nd m. stone
OHT1 -
Rudranoor
3rd m.stone
Yes
2.10
Yes
A
0.80
OHT2-Staging in progres;
Sump- Nil
CPNil
DMT
A
1.50
1.55
Yes
A
3.3
OHT2- Completed.
Sump- Nil
Nil
CPDMT
A
4.17
4.00
Yes
SP- 2
RM-T
A
3.21 0.20
OHT2- Completed
Sump- Nil
Nil
CPDMT
A
3.17
2.00
A
0HT1 -
SP- 1
RM-T
0.72
GLB-11
Chimmaidalai
I’1 m. stone
OHT1 -
SP- 2
RM-T
3.34
12
GLB-12
GLB-12
GLB-12
13 GLB-13
Balwandagi
3rd m.stone
Jeeratagi
2nd m.stone
Ankalga
1st m.stone
Ravoor
1” & 2nd m.s
A
3.50
OHT1-
OHT-PCC laid OHT2land under dispute. Sump- Nil
SP- 1
Nil
CPRM-T
A
DMT
4.84
4.0
3.72
OHT1-foundation OHT2excavation done Sump- Nil
SP- 1
CPNil
RM-T
T
A
DM0.270 Nil
3.91
OHT1 i
SP- Nil
RM-T
1.54
A
1.00
— do -
- do -
- do -
No
Yes
A
3.50
Hydraulic
testing of
pipes laid
done
Yes
No
A
3.20
OHT2- Top dome in
Sump- Nil
progress.
CPNil
DMT
A
2.20
6.40
- /irr -
Hydraulic
testing of
pipes laid
Hydraulic
Partly cstablishcc testing of
pipes laid
done.
OHT2- Completed
Sump- Nil
progress.
Nil
CPT
A
DM1.86
1.80
SP- 2
RM-T
2.19
GLB-11
Whether source
established
Yes / No
No
Hydraulic
testing of
pipes laid
done.
FORMAT - 5
V1LLAGEWISE PHYSICAL PROGRESS FOR DECEMBER 1999
DISTRICT : GULBARGA.
SI.
No.
Package
No.
Village
Name
GLB-13
Bhimanhalli
3 rd m. stone
Status
OHT1-
SP- 1
RM-T
5.45
14
GLB-14
Killankera
2nd m.stone
(Commissioned)
GLB-14
Kotagera
1st m. stone
Balched
3rd m.stone
2.00
GLB-14
Kudlur
3rd m.stone
0.30
15
GLB-15
GLB-15
2.0
Nil
Hagargundagi
3rd m.stone
B.Tegnoor1st m.stone
SP- 1
RM-T
1.54
OHT1 -
No
- do -
Yes
1.50
Yes
SP- 2
RM- T
A
2.00 2.00
OHT2- Completed.
Sump- Nil
CPNil
DMT
A
2.75
2.50
A
OHT1 -
Hydraulic
testing of
pipes laid
Hydraulic
Partly establishec testing of
pipes laid
done.
OHT2- Completed.
Sump- Nil
CPNil
DMT
A
3.86
3.20
- do -
— do —
OHT1-PCC laid OHT2- Staging in
Yes
Sump- Nil
progress
SP- Nil
CPNil
Flushed yiled &
RM-T
A
DMT
A
water test not
0.30
Nil
1.81
1.10
received.
- do -
OHT-Foundation OHT2- Staging in
excavation done Sump- Nil
progress
SP- Nil
CPNil
RM-T
A
DMT
A
2.93 2.90 .
3.35
3.40
Yes
- do -
OHT1-
Yes
A
0.50
OHT2- Completed.
Sump- Nil
CPNil
DMT
A
. 2.295 2.00
Yes
A
0.60
OHT2- Completed.
Sump- Nil
CPNil
DMT
A
1.71
1.90
SP- 1
RM-T
0.165
GLB-15
A
1.00
OHT2- Completed
Sump- Nil
CPNil
DMT
A
2.26
2.20
OHT1 -
SP- 1
RM-T
1.75
GLB-14
A
4.00
OHT2- Bottom slab in
Sump- Nil progress.
CPNil
DMT
A
4.76
4.00
Whether source
established
Yes / No
Melkunda
2nd m.stone
OHT1 -
(Commissioned)
SP- 1
RM-T
0.285
- do -
- do -
FORMAT - 5
VILLAGEWISE PHYSICAL PROGRESS FOR DECEMBER 1999
DISTRICT : GULBARGA.
SI. Package
No.
No.
GLB-15
Mudbule
2 nd m.stone
OHT1-
SP- 1
RM-T
0.60
16
GLB-16
GLB-16
Devatkal
3rd m.stone
Devapur
2nd m.stone
Arkera
1” m.stone
(Commissioned)
17
OHT1 -
SP- 2
RM-T
0.43
A
1.00
OHT2- Completed
Sump- Nil
Nil
CPA
T
A
DM4.37
0.70
4.60
Yes
No
Kondagalli
2nd m.stone
OHTl-PCClaid OHT2-Completed.
Sump- Nil
Nil
SP- Nil
CPRM- T
A DMT
A
0.795
Nil
2.53
1.00
GLB-17
H.Allapur
I81 m. stone
OHT1-
Aurad
3rd m.stone
OHT1-
SP- Nil
RM-T
1.475
GLB-18
Padasawwali
I81 m. stone
A
5.80
A
Nil
OHT1 -
SP- 2
RM-T
2.10
■ A
2.00
Hydraulic
testing of
pipes laid
done.
- do --
Yes
A
3.00
Hydraulic
testing of
pipes laid
Yes
GLB-17
GLB-17
Yes
OHT2- Completed
Sump- Nil
Nil
CPT
A
DM7.285 6.00
OHT1 -
SP- Nil
RM-T
7.65
18
A
0.60
OHT2- Completed
Sump- Nil
Nil
CPDMT
A
3.15
2.90
GLSR- Masonry in progress.
Sump- Nil
Nil
SP- 2
CPT
RM-T
A
DM1.64
Nil
2.66
SP- 4
RM-T
2.90
GLB-16
Whether source
established
Yes / No
Status
Village
Name
OHT2- Completed
Sump- Nil
Nil
CPT
DMA
4.44
3.20
- do -
- do --
K.C-7 to be
flushed
OHT2- Completed.
Sump- Nil
Nil
CPDMT
A
2.50
2.50
Yes
Water test
awaited for
PBW-3.
OHT2- Completed.
Sump- Nil
Nil
CPDMT
A
3.20
3.63
Yes
Hydraulic
testing of
pipes laid
done
- do -
- do -
FORMAT - 5
VILLAGEWISE PHYSICAL PROGRESS FOR DECEMBER 1999
DISTRICT : GULBARGA.
SI. package
No.
No.
GLB-18
GLB-18
Village
Name
Status
Whether source
established
Yes / No
Hydraulic
testing of
pipes laid
Kolakunda
3 rd m.stone
GLSR- Completed.
Sump- Nil
SP- 2
CP1
RM-T
A
DMT
243
1.00
5.225
Yes
Hydraulic
testing of
pipes laid
done.
Raikod
2nd m.stone
OHT1-
SP- 1
RM-T
1.675
19
20
A
1.00
A
3.80
OHT2- Staging in progres 5
Sump- Nil
CPNil
DMT
A
2.07
2.50
Yes
-- do -
GLB-19
Rampurhalli
OHT1-Excavation OHT2- Staging in
in progress.
Sump-Nil
progress
SP-Nil
CPRM- T
A
DM- T
A
0.47
Nil
1.57
Nil
Yes
GLB-19
Honagunta
OHT1-Excavation OHT2in progress.
SumpSP- Nil
CPRM-T
A
DM- T
0.305 Nil
4.995
No
A
Nil
GLB-19
Jogur
OHT1-Excavation OHT2- Staging in
in progress
Sumpprogress
SP- Nil
CPRM-T
A
DM- T
A
0.720 Nil
2.805 Nil
GLB-20
Itga
OHT1-Excavation OHT2in progress.
SumpSP- Nil
CPRM-T
A
DM- T
0.180 Nil 2.815
GLB-20
K.Bhosaga*
OHT1-
SP- Nil
RM-T
6.76
GLB-20
Magangera
SP- Nil
RM-T
6.435
Partly established
A
Nil
A
5.0
OHT2- Completed
SumpCPDMT
A
3.115
1.00
A
5.90
OHT2-Completed
SumpCPDMT
A
3.60
1.00
OHT1 -
- /re
Yes
Yes
Partly established
1
{
FORMAT - 5
VILLAGEWISE PHYSICAL PROGRESS FOR DECEMBER 1999
DISTRICT : GULBARGA.
Si. Package
No. \ No.
21
Village
Name
Status
Hydraulic
testing of
pipes laid
Hydraulic
testing of
pipes laid
done.
GLB-21
Chichansoor
2 nd m.stone
GLSR- Completed.
Sump- Completed.
SP- 4
2
CPRM-T
A
DMT
A
2.13 2.00
5.87
5.00
Yes
GLB-21
Sawaleshwar
1” m.stone
OHT1-
Yes
A
0.90
OHT2- OHT completed.
Sump- Nil
CPNil
DMT
A
2.65
2.60
OHTl-Raft
in progress.
SP- 2
RM-T
A
1.72
1.00
OHT2- Bottom slab in
Sumpprogress
CPDMT
A
4.32
1.9
Yes
OHT1 -
OHT2-Top dome in prog
Sump- Nil
-ress.
Nil
CPDMT
A
3.925 1.00
Yes
OHT2- Completed.
Sump- Nil
Nil
CPDMT
A
1.00
2.55
Yes
OHT2- Staging in progresp
SumpCPDMA
T
2.175 Nil
Yes
SP- 1
RM-T
1.00
GLB-21
22
Whether source
established
Yes / No
GLB-22
Polakpalli
3 rd m.stone
Hirolli
SP- Nil
RM-T
1.915
GLB-22
Buragapalli
A
1.50
OHT1SP- Nil
RM-T
A
2.28
2.00
GLB-22
Chintakunta
OHT1-
SP- Nil
RM-T
1.110
GLB-22
Cliintapalli
A
1
OHT1-Excavation OHT2in progress
SumpSP- Nil
CPRM-T
DM- T
. A
0.635
Nil
1.90
-
- do -
- do -
No
A
Nil
FORMAT - 5
VILLAGEWISE PHYSICAL PROGRESS FOR DECEMBER 1999
DISTRICT : GULBARGA.
SI. Package
No.
No.
23
GLB-23
Village
Name
Kalgurthi
Status
OHT1-
SP- Nil
RM-T
1.44
GLB-23
Salahalli
GLB-23
Bagodi
Yes
A
Nil
OHT2- Bottom slab in
Sump- Nil ]progress.
CPNil
DMT
A
3.595 Nil
No
A
Nil
OHT2-Staging completed.
Sump- Nil
CPNil
DMT
A
2.665 Nil
OHT2Sump- Nil
CPNil
DMT
12.375
Yes
0HT1SP- Nil
RM-T
2.34
Whether source
established
Yes / No
OHT1-
SP- Nil
RM- T
A
4.795 Nil
Hydraulic
testing of
pipes laid
A
Nil
( Er. J.D.Boli)
DM, ICT Pvt Ltd
Gulbarga.
FORMAT -6
PHYSICAL PROGRESS OF REMAINING WATER SUPPLY COMPONENTS
Phase -II Gulbarga District
For the month of December 99
\S1
Package
No.
No.
1 GLB-1
2 ' GLB-2
3 ' GLB-3
4 GLB-4
5 GLB-5
6 GLB-6
7 GLB-7
8 GLB-8
9 GLB-9
10 GLB-10
11 GLB-11
12 GLB-12
13 GLB-13
14 GLB-14
15 GLB-15
16 GLB-16
17 GLB-17
18 GLB-18
19 GLB-19
20 GLB-20
21 GLB-21
22 GLB-22
23 GLB-23
HP
T
WATER SUPPLY COMPONENTS ( TARGET)
ST_
CS
DB
CT
WP
A
T
A
T
A
T
A
T
T
A
A
36
24
31
48
26
45
24
68
33
44
26
12
53
24
31
27
17
16
39
19
09
26
26
14
16
10
08
10
08
/
50
07
30
15
18
13
08
06
06
26
24
23
20
26
32
13
27
13
10
21
14
30
17
17
17
12
19
21
12
17
18
14
20
08
12
06
16
08
10
15
06
04
10
12
08
04
06
04
13
12
12
12
08
14
06
14
07
08
10
07
13
10
09
09
07
12
09
07
08
14
07
08
06
06
02
06
04
04
04
04
02
06
06
04
04
04
02
75
71
73
76
45
56
40
84
41
64
64
43
87
61
51
56
41
60
58
28
58
64
43
34
30
40
10
30
20
20
60
20
40
40
40
20
30
40
10
(Er. J.D.Boli)
DM , ICT Pvt Ltd
Gulbarga.
t
- /6/-
Remarks
All works
proposed
under 3rd
mile stone.
INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD
KIRWS & ESP PHASE-II PACKAGE
(WORLD BANK ASSISTANCE )
Month : December 1999
District: Gulbarga
1.
SI
No.
1
2
11/98
11/98
11/98
11/98
GLB-1
11/98
GLB-3
11/98
11/98
11/98
I
1
Date of Package
testing
No.
Name of
village
RM in
Km__
T
A
Hydraulic testing of PVC pipes.
DM in
Km
V A
6.0
5.0
3.2
2.5
1.5
1.6
3.7
2
1) S.Saradagi
2) Kumsi 1.
3) Dasatapur
4) Arunkal
0.92
1.4
1.2
0.9
1.0
1) Gundhalli main
Gundhalli tanda
2) Mudbole
3) Kakkasagera
4) Mudnoor.K
0.2
3.5
2.5
2.2
1.53
0.2
2.5
2.8
2.2
0.9
2.5
2.4
6.7
3.3
6
3.0
5
1.3
1.2
0.6
Components tested ■
OHT
Inlet
Outlet
~T
A
T
A
Chainages
OK/
not OK ©
O.K
1
1
1
1
1.57
2.4
O.K
O.K
O.K
O.K
O.K
O.K
O.K
6.0
3
1/99
GLB-4
1) Keriambalga
2) Teerth
4.2
0.62
4.0
2.0
2.2
1.5
1.60
4
11/98
8/99
GLB-5
1) Rajankollur
2) Bapparga
3) Gundalgera
5.9
1.4
2.25
5.27
0.86
7
2.1
2.65
5.3
2.0
OK
O.K
O.K
5
3/99
GLB-7
1) Khajuri
6.3
8.7
6.0
O.K
6
12/98
v GLB-8
1) Nalwar
2) D.Tegnoor
6.8
12.9
3.3
8.5
0.6
1).K
1) Yelwar
2) Kuknoor
3) Halagadla
8.0
2.2
GLB-10 1) Nimbal
2) Madaki
3) Kadganchi
7
8
11/98
11/98
GLB-^
4.2
1.3
7.5
2.0
1,7
3.2
2.0
1.5
1.45
3.7
4
3.5
2.6
4.6
1
1
1
1
O.K
O.K
O.K
3.0
O.K
O.K
O.K
2
2
1
1
O.K
Remarks
1.
SI
No.
Name of
village
Components tested
RM in
Km
T
A
DM in
Km
T
A
OHT
Inlet
T
Outlet
T
A
A
Chainages
OK/
not OK ©
9
11/98
11/98
11/98
GLB-11
1) Nagaidalai
2) Chimmaidalai
3) Ainapur
2.2
3.4
3.5
2.14
3.3
3.5
1.8
4.2
5.8
1.6
3.7
3.5
O.K
O.K
O.K
10
11/9^
& 12/98
GLB-12
1) Jeeratagi
2) Ankalga
3) Balwandagi
4.8
0.3
3.2
4
3.7
3.9
3.2
3.5
1.0
O.K
O.K
11
12/98
GLB-13
1) Ravoor
2) Bhimanhalli
TF
6.4
4.8
1.4
3.0
O.K
O.K
1) Kudlur
2) Kotagera
3) Balched
4) Killankera
1) Hagargundagi
2) B.Tegnoor
3) Melkunda
4) Mudbule
oT
TF
1.7
2
1.5
2.9
0.2
0.6
0.6
0.60
3.9
2.8
2.3
3.4
2.3
1.7
3.2
0.9
2.0
1.5
1.0
3.4
2.0
1.5
2.9
O.K
O.K
O.K
O.K
O.K
O.K
O.K
O.K
12
£
Date of Package
testing
No.
Month : December 1999
Hydraulic testing of PVC pipes.
13
11/98
12/98
GLB-14
GLB-15
i
5.4
4.0
0.8
2.0
0.8
2.9
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
14
3/99
GLB-16
1) Arkera
2) Devapur
0.43
2.9
0.60
2.5
4.4
7.3
4.2
5.5
15
11/98
GLB-17
1) H.Allapur
2) Aurad
7.6
5.5
4.4
2.8
3.2
2,5
O.K
O.K
16
2/99
GLB-18
27/7/99
26/7/99
8/99
GLB-21
1) Raikod
2) Padasawali
3) Kolkunda
1) Chichansoor
2) Savaleshwar
3) Polakpalli
1) Ranjole
2) Dugnoor
1) Mashal
2) Badadal
1.6
2.5
2.43
2.1
1.0
1,7
2.85
0.6
2.82
1.20
1.0
2.0
1.0
2.0
0.9
1.0
1.9
0.5
2.0
1.0
2.0
3.6
5.2
5.8
2.6
4.3
3.1
2.2
6.47
268
1.5
2.5
2,8
5.0
2.0
1.9
3.4
2,0
6.3
2.70
O.K
O.K
O.K
O.K
O.K
O.K
O.K
O.K
O.K
O.K
17
18
19
17/9/99 GLB-2
18/9/99
1/10/99 to GLB-6
3/10/99
5/10 to 6/10/99
1
1
1
1
Remarks
O.K
O.K
------------ (^^7^
, MgrjCT.Guibarga-Z
INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD
KIRWS & ESP PHASE-H PACKAGE
(WORLD BANK ASSISTANCE )
3.
Statement of Bottlenecks.
Month : December 1999
District: Gulbarga
SI.
No.
Name of
package /
village
1
GLB-1
1) S.Saradagi
2) Kumsi
3) Dasatapur
4) Arunkal
2
is
o
I
3
4
5
No of villages
flushing to be
done
No. of villages
New borewells
to be drilled
SBC
results
awaited
Sump sites
to be
handed
over
GLSR sites
to be handed
over
Awaiting
Energisation
for
commissioned
Pressure
testing
(RM + DM)
T
A
Hydraulic test
conducted for the
laid PVC pies vide
format No 1.
Nil
-do -
GLB-3
1) Kakkasgera
2) Gundhalli main
Gundhalli tanda
3) Mudbole
4) Mudnoor K
Nil
Hydraulic test
conducted for the
laid PVC pies vide
format No 1
t
GLB-4
1) Teerth
2) Keriambalga
3) Tadakal
3) Gundalgera
OHT sites
under
disputes
Nil
GLB-2
1) Rajole
2) Dugnoor
3) Kallor road
4) Degalmadi
GLB-5
1) Rajankollur
2) Bapparaga
No. of open
wells Shallow
borewells to
be drilled
Nil
Tadakal
- do -
Nil
Redrilling to be
done for PBW-2
- do -
3.
SI.
No.
6
7
Name of
package /
village
GLB-6
1) Badadal
2) Mashal
3) Astaga
No of villages! No. of villages
flushing
~ to *beJ J New borewells
done
to be drilled
Statement of Bottlenecks.
Month : December 1999
District: Gulbarga
No. of open
wells Shallow
borewells to
be drilled
Nil
GLB-7
1) Khajuri
OHT sites
under
disputes
SBC
results
awaited
Sump sites
to be
handed
over
GLSR sites
to be handed
over
Awaiting
Energisation
for
commissioned
Pressure
testing
( RM + DM )
T
A
Hydraulic test
conducted for the
laid PVC pipes
vide fonnat No 1.
— do —
8
I
9
I
10
11
GLB-8
1) D.Tegnoor
2) Nalwar main
Nalwar tanda
Nil
GLB-9
1) Kuknoor
2) Yelwar
3) Halgadla
Nil
GLB-10
1) Nimbal
2) Kadaganchi
3) Madaki
GLB-11
1) Ainapur
2) Nagaidalai
3) Rudranoor
4) Chimmaidalai
- do -
Halgadla (1)
- do --
Nil
- do Nil
— do -
3.
Statement of Bottlenecks.
Month : December 1999
District: Gulbarga
SI.
No.
Name of
package /
village
12
GLB-12
1) Balwandagi
2) Jeeratagi
3) Ankalga
13
14
GLB-13
1) Ravoor
2) Bhimanhalli
GLB-14
1) Killankera
2) Kotagera
3) Balched
No of villages
flushing to be
done
No. of villages
New borewells
to be drilled
No. of open
wells Shallow
borewells to
be drilled
OHT sites
under
disputes
SBC
results
awaited
Sump sites
to be
handed
over
GLSR sites
to be handed
over
Awaiting
Energisation
for
commissioned
Pressure
testing
(RM + DM )
T
A
Hydraulic test
conducted for the
laid PVC pipes
vide format No 1.
Nil
Jeeratagi
Ankalga
-- do -
Bhimanhalli
Bhimanhalli
Nil
- do -
4) Kudlur
th
i
15
16
17
GLB-15
1) Hagargundugi
2) B.Tegnoor
3) Melkunda
4) Mudbule
GLB-16
1) Devatkal
2) Devapur
3) Arkera
GLB-17
1) Kondagalli
2) H.Allapur
3) Aurad
Nil
-- do -
Nil
-- do --
Nil
- do -
3.
Statement of Bottlenecks.
Month : December 1999
District: Gulbarga
SI.
No.
Name of
package /
village
18
GLB-18
1) Padasawali
2) Kolkunda
3) Raikod
19
20
21
I
Ox
22
23
GLB-19
1) Rampurhalli
2) Hunagunta
3) Jogur
GLB-20
1) Itga
2) K.Bhosaga
3) Magangera
GLB-21
1) Chichansoor
2) Savaleshwar
3) Polakpalli
GLB-22
1) Hirolli
2) Burgapalli
3) Chintkunta
4) Chintpalli
GLB-23
1) Kalgurthi
2) Salalialli
3) Bagodi
No of villages
flushing to be
done
No. of villages
New borewells
to be drilled
No. of open
wells Shallow
borewells to
be drilled
Nil
OHT sites
under
disputes
SBC
results
awaited
Sump sites
to be
handed
over
GLSR sites
to be handed
over
Awaiting
Energisation
for
commissioned
Pressure
testing
( RM + DM )
T
A
Hydraulic test
conducted for the
laid PVC pipes
vide format No 1.
Hungunta
Nil
Nil
Hydraulic test
conducted for the
laid PVC pipes
vide format No 1.
Nil
Nil
DM, ICT Pvt Ltd Gulbarga.
INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD
KIRWS & ESP PHASE-H PACKAGE
( WORLD BANK ASSISTANCE )
Month : December 1999
District: Gulbarga
4.
SI Package No. of
villages
No. No.
Name of
contractor
List of works , the Agency is unlikely to achieve the mile stone targets.
Contract
value
Date
of
start
End of
Mile stone
I / II / III
Name of
scheme /
villages
Financial cummulative
for Mile stone I / II / III
T
A
Shortfall %
Status of
works
No Such Agencies are at pn sent.
1
<r*
00
1
DM, ICT Pvt Ltd
Gulbarga.
Remraks
INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD
KIRWS & ESP PHASE D PACKAGE
(WORLD BANK ASSISTANCE )
5. List of Agencies on whom penal action has been recommended.
Month : December 1999
District: Gulbarga
SI Package No.of
No No.
villa
-ages
Name of
contractor
Contract Date
value
of
Rs. in start
lakhs
End of
Mile stone
I / II / III
Name of
scheme /
villages
Financial cummulative in
lakhs for Milestone I/II/III
T
A
Short
fall %
1 GLB-2
4
M/s Coramandal
Prestcrete(pvt)
Ltd. Hyderabad
53.00
7/4/98 I- 7/10/98 1) Ranjole
I- 11
II- 7/4/99 2) Dugnoor
II- 32
III- 7/10/99 3) Kallur rd III- 53
4) Degalmadi
7.4
16.2
35.9
2 GLB-3
4
Sri H.A.Phulse
Pwd class I cont
Bidar.
88.00
4/4/98 I- 4/10/98 1) Kakkasgan I- 17
II- 4/4/99 2) Gundahalli II- 53
III- 4/10/99 main & tanda III- 88
3) Mudbule
4) Mudnoor k
39.6
54.9
69.0
21.59%
10.6
I- 13
36.6
II- 40
III- 68.4 54.0
18%
7.6 %
21%
J
£
i
3 GLB-6
3
Sri S.V.Guttedar 68.4
Gulbarga.
11/4/98 I- 11/10/98 1) Badadal
II- 11/4/99 2) Astaga
III- 11/10/9^ 3) Mashal
32.72%
49.37%
32.26%
Status of
works
Details of
penal action
Remarks
In three (3)villages work is The contractor has been Fine not
completed in all respects. In informed to leavy the L.D recovered
another one (l)village work in T.OfflettNo. DM/ICT so far.
is nearing completion. One /GLB/2849-52 dt 23-9-99
village is commissioned.
till commissioning of all
One village will be commis villages & again infomred
-sioned during Nov 99 and inT.OfflettNo. DM/ICT/
balance one village will be GLB/2987-89 dt 27-10-99.
commissioned during Dec 99
OHT, RM & DM completed The contractor has been Fine not
in 3 villages, one village is
informed to leavy the L.D recovered
commissioned. Another two inT.OfflettNo. DM/1CT so far.
villages are yet to be comm /GLB/2843-46 dt 23-9-99
-issioned. In Mudnoor village from 4-10-99 to till comm
OHT just started. RM & DM -ssioning of all villages.
X
completed except in rocky
out crop area.
Lumpsump
Out of three villages one is L.D of Rs. 5000/- is
fine of Rs
commissioned. RM & DM recovered in the R.A
5000/bill
submitted
during
Oct
except in rocky out crop &
recovered.
OHT in Mashal village is 1999.
completed. RM and DM in
Astga village completed &
sidewall of OHT in progress
Continued.
5. List of Agencies on whom penal action has been recommended.
Month : December 1999
District: Gulbarga
SI Package No.of
villa
No No.
Name of
contractor
-ages
4 GLB-11
4
G.S.Kuberrappa
Pwd class I cont
Shahapur.
Contract Date
of
value
Rs. in start
lakhs
End of
Mile stone
I / II / HI
Name of
scheme/
villages
107.00 10/4/981- 10/10/98 1)Rudranoor
n- 10/04/9* 2) Ainapur
Financial cummulative in
lakhs for Milestone I/II/III
T
A
Short
fall %
I- 22
II- 64
46
68
in-10/10/9< 3)Chimmaid|im-107 90.5
4)Nagaidalai
15.42%
Status of
works
Details of
penal action
(
Remarksss
RM & DM in all the villages The contractor has been Fine not
are completed. OHT in Chim informed to leavy the L.D recovered
-mmidalai & Nagaidalai
in T.OfflettNo. DM/ICT so for.
completed.OHT in Rudranoor / GLB / 2930-2932 dated
is nearing completion.
13-10-99, from 10-10-99
GLSRat Ainapur is nearing till commissiong of
completion.The Chimmidalai scheme.
village will be commissioned
by the end of 1999.
I
2»
(Er. J.D.Boli)
DM, ICT Pvt Ltd
Gulbarga.
INTEGRATED RURAL WATER SUPPLY AND
ENVIRONMENTAL SANITATION PROJECT
KARNATAKA
(World Bank Assistance)
Phase II
Package
II
Villages
PROGRESS REPORT
of Raichur District
For the Month of DECEMBER 1999
INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT LTD NEW DELHI
CONSULTANTS FOR CONSTRUCTION MANAGEMENT AND QUALITY CONTROL
FORMAT-3
F1NANCIAL & PHYSICAL PROGRESS PACKAGE WISE
NAME OF THE DISTRICT : RAICHUR.
si
No
1
Pack
age
No
2
Numb
er of
Villag
es in
packa
ge/pro
gress
3
1
1
5/5
I
2
2
4/4
I
3
3
5/2
Name of
contract
or
4
N. S.
Prakas
-4i
N.S.
Prakas
h
M/s
Malu
Constr
Peri
od
of
com
pleti
on
in
mon
ths
5
18
18
18
actions
4
4
4/4
K.L.A.
C.
18
Contra
ct
values
in Rs
lakhs
Date of
Start
Mi lest
one
For the month of Dec’99
Financial progress
cumulative during
the month in Rs.
lakhs
T
6
78.93
7
23.1.9
8
A
T
A
CP in
Nos.
T
/A
12
13
SP in Nos.
8
9
10
11
I
24
24
3
II
56
78.9
3
56
171.1/
15.97
I
25
II
14
OHT
109.2
6
64.48
5.12.9
8
22.5.9
8
17
18
19
20
21
3.87
3.87
5
5
1
1c
5.64
24.2
2
9
9
18.3
5
2
2c
Nil
2
5
5c
Nil
5
Nil
1
Nil
2
Nil
4
2
7.31
25
5
5
2
2
4.5
4.5
4
4
1
1c
1/-
59
59
7
7
2
2
7
7
10
10
2
2c
1/-
III
83.6
103.8/
9.78
10
11
4
4
10.3
17.8
7
16.2
16.6
4
4c
2/-
I
33
5
5
3
2
2
II
76
8
8
4
9.2
6
3
1
2c
2c+
2 up
2c+
4up
1 c
2c +
lup
' 2c +
45
III
64.4
8
1
16
2
II
1
15
10
13.37
13.37/
Nil
-/-
A
11
I
25
T
5.64
109.
26
19
24
A
2
III
23
T
2
33
70.83/
10.45
22
A
6
8
Rem
arks
T
15
17.2.9
83.60
No.
of
sche
mes
prop
osed
SUMP/
GLSR_
T
A
DM
RM
3
P
6p
III
No
of
sche
mes
com
miss
tone
d
Physical progress (cumulative)
2
4
4
12
12
2
4
4
18
16
6
2
2
0.87
0.87
11.1
0
3
6
6
2.51
2.51
7
7
3
8
8
4.71
4
9.52
9.51
4
1c
/1c
/1c
+
lu
p/-
1
3
5
-/-
Nil
1
Nil
3
Nil
4
1
i
2
3
4
5
6
7
8
9
10
11
12
13
I
36
.36
7
7
2
I
5
6
5
6
5/5
5/5
N.S.
Prakas
h
Amara
gundap
pa A
Meti
18
18
121.4
6
7
7
5/4
M/s
Coram
andal
88.13
S. M.
P
8
9
10
8
9
10
4/4
2/2
16/1
6
Amark
bed
K.
R^mak
rishna
M/s
Main
Constr
actions
18
18
18
139.1
9
61.28
579.0
7
25.2.98
27.10.9
8
7
5
3
3c
1/-
23.
84
27.1
0
5
5c
3/-
5
7
.7 :
1
1 c
9
11
11
3
3c
2
15.7
9
2
14.
6
3
14.5
2
3
6/74
6.74
5
5
9.31
8
12
155.46/
12.64
12
15
6
6
12.2
I
32
32
4
80.89/
Nil
26
97
26
8
8
P
2
2
9
13
14
2
2
11
2
2
II
62
62
III
88.1
3
72.16/
16.37
13
42
42
6
8
8
2
10
4
6
2
2p
1
1 up
5
Nil
1
1/-
Ip
/-
Nil
3
1/-
Ip
/-
Nil
5
Nil
1
I
1
Nil
2
Nil
1
1/
1
1c
/I
c
1c
/2
c
1c
/2
c
27.9
4
2
2up
1/
2
2
3
3
5
5
1
1c
4
6:
6
10.2
13
2
2c
-/-
Nil
2
7
13
17.
18
18.8
7
2
2c
-/-
Nil
2
17
17
13
13
6
6 up
Nil
6
39
39
30
30
13
Nil
13
Nil
19
2p
I
18
42
61.2
8
18
42
56.08/
2
II
4
4
4
111
18
Nil
30.
4
2
451.23/
Nil
18
1 up
3
18.2
6
10
579.
07
12
4c+
Nil
65
122.84/
10.17
5.12.98
5
1
16.3
139.
19
405
14.2
3
1
1/
2
III
405
14.
22
1/-
1c
/1c
/-
5
1 up
2p
II
10.5
6
Nil
-/1/-
3
1
2
174
3
Nil
23
9
174
8.1
1c
/3c
/-
1
23
97
I
8.1
24
14
97
Nil
1
3c+
2 up
1c
~3c~
23
15
II
III
5
22
Nil
14
III
105.
21
14
121.
46
74
20
1 c
2
74
19
1
2
4
18
8
8
I
I
11.1
6
16.6
17
8.0
10
II
1.3.98
10
84
HI
18
10.0
84
18.2.98
16
2
II
I
7
15
11.1
6
17.2.98
105.8
14 |
2
10
18
9.59
55.4
0
44.
3
42.5
5
19
13
up
15
up
1/
1
2/
1
2/
1
25
1
11
12
2
11
12
3
5/5
3/3
4
Amar
gunda
ppa
A.
Meti
S. M.
Amar
khed
5
18
18
6
96.18
141.7
6
1
14
15
15
Praia
13
14
15
Ko
ppa
1
15
Rai
chu
r
5/5
2/2
1/1
2/2
TOTAL for
Package RCR 15
3/3
P
reddy
K.
Rama
krishn
a
M.
Mahu
r
M.
Mahu
r
18
18
75.42
63.84
23.23
18
19
20
21
6
6
8
8
I
1 c
1/-
7
7
12
12
3
3c
1/-
9.05
21.3
4
17.3
2
18.1
8
3
3c
1/
2
2p
4
4
14
14
1
1 c
2
2p
9
9
21
21
3
3c
2
2p
12.7
7
_3_
8
14.7
0
3
8
9
10.7
4
10.7
4
19
2
3
37/Nil
10
2
8
10
2
4
10.2
6
2.90
2.90
2.90
2.90
4
2.90
8.7
11
12
I
29
29
6
6P
II
67
63.96
8
III
96.18
101.26/
Nil
12
I
43
43
2
2
II
99
99
9
9
11
141.7
6
23
53
114.34/
Nil
23
53
III
75.42
60.47/
8.21
I
19
II
43
III
63.84
£
16
38
£
II
16
38
4
8.4.98
III
54.2
46.58/
4.58
4
7
7
8.4.98
I
II
III
16
23.23
16
26.94/N
il
23
73.52/"
3.3.98
25.2.9
8
17.10.
98
27.10.
98
18
77.48
17
10
54.2
18
16
9
III
£
13
15
8
7
I
II
2_1
III
77.43
54
8.4.98
' ml
13
14
2
2
11
2
6
22
1c
-/2
L1P
/I
c
+1
up
23
24
Nil
I
Nil
3
Nil
5
Nil
1/-
1c
/-
Nil
Nil
25
1
3
32.8
6
5
11
6
6c
£
1 c
3c
Nil
Nil
£
16.1
16.1
4
5
4c+
lup
Nil
5
3
4
4
1
1c
1/-
Nil
1
4
10
10
2
2c
1/-
Nil
2
14
2
2c
1/-
Nil
2
13.8
13.8
11.9
6
13.3
13.3
£
1 c
2c
Nil
Nil
£
2
13.8
13.3
2
2c
xNil
2
30.3
5
11
3
1c
/1c
/1c
/-
6
3
2
Nil
Nil
Nil
£
2
1c
2c
13.8
16.3
I
3
1 c
3c
Nil
Nil
£
20.2
7
4
4c
Nil
4
2.0
3.73
2.5
4.1
2.5
7.58
£
5
2.0
2.90
6
2.90
4.90
2.9
4.90
13.8
16.3
9
5.80
12.5
17.9
2
3
-/-
2
3
1
16
2
16
3
3/3
4
K.L.A.
C.
5
18
6
60.47
7
27.5.9
8
M/s
17
17
1/1
Navara
ng
Raichu
12
16.79
15.6.9
8
8
I
9
10
Ts
u
Ts
4
II
42
6
Tn
604
~6
I
7
5
24.33
27.53/
Nil
5
n
12
in
16.7
9
12
16.87/
12
13
14
15
16
17
4.60
TV
2
6.5
4
8.7
y
6J
18
1.9
4
19
20
1 c
21
1/-
22
1
23
Nil
24
2
8.7
3
y
3c
3c
1ZTa
-/-
8.1
Nil
NiT
J
7
3
2
1
3.4
3.4
T6
1.6
1
1 c
2
Nil
1
1
3.4
3.4
3.4
3.4
1.6
1.6
1.6
1
1
-/-/-
Nil
4.1
2
1 c
1c
2
Nil
i
5
8
8
1
I c
TT
2
2c"
-/Ta
-/-
nil
Nil
1
11
I
25.
78
2.2
25.
78
2.2
4
1/-
-/-
Nil
4
1
2c+2
P
1c
Nil
1
6.4
6
6.4
6
6.4
6
6.3
1
1c
-/-
Nil
2
2
lc+
lp
-/-
Nil
2
2
Nil
r
18
1
C
i
i
I
1
19
18
19
3/3
2/-
Amara
gundap
pa
Meti
B.R.
Meti
12
12
161.4
1
34.93
16.12.
98
15.4.91
9
I1
48
IT
TH
III
I
161.
41
11
II
24
3
2
3.4
III
34.9
3
5
2
3.4
48
68.70/
5.48
8.85/
5.71
4
10
2
5
10
15
2
15.4
2
0.37
4
25
FORMAT-4
Name & Address of DM
District : RAICHUR
Sl.No.
1
2
3
Pack
age
No.
Tot
al
No.
of
Vill
age
s__
5
1
2
4
3
5
For the month of Dec*99.
Value
of work
in Rs. in
lakhs
78.93
83.60
109.26
I
1
4
5
6
7
4
4
5
5
5
6
7
5
I
Sri. V.G.Khened
Khened Complex.No. 11-13-77.Netaji Road
RAICHUR. Ph. No. (08532)41527 office
(08532)43889 Residence
64.48
121.45
105.97
88.12
Name & Address of
Contractor
N.S.Prakash
H.No.1-11-154/8
Venkatesh Nagar
Raichur
Ph:(08532)20979
N.S.Prakash
H.No.1-11-154/8
Venkatesh Nagar
Raichur
Ph: (08532)20979
M/s Malu
Constractions
Gulbarga
Deputy Director
Land Army
Corporation Ltd.
Raichur____________
N.S. Prakash
H.No.1-11-154/8
Venkatesh Nagar
Raichur
Ph:(08532)20979
Amaragundappa Meti
Nagarhal (Post)
Tq : Lingasugur
Dt: Raichur
Ph:No.(08537)57099 pp
M/s Coramandala Pvt.
Ltd.
HYDERABAD
Name & Address of
Assistance Engineer
Nandagiri.S.C.
C/o Mohammad Ali
Building Near
Mazoor Road
Date of
award
Date of
starting
Date of
completio
n
Financial Progress(cumulative) during the
month in Rs. Lakhs. currcnt
M2
Ml
M3
T
A
T
A
T
A
8.8.97
23.1.98
22.7.99
24
24
56
56
78.93
171.1/
15.97
30.8.97
17.2.98
16.8.99
25
25
59
59
83.60
103.8/
9.78
19.9.98
5.12.98
4.6.2000
76
70.83/
10.45
109.26
6.4.98
22.5.98
21.11.99
19
13.37
/Nil
45
23.9.97
17.2.98
16.8.99
36
36
84
18.2.98
17.8.99
32
32
28.2.98
27.8.99
26
26
MANVI
Ph: (08538)20267 pp
Ghokhale Gurupaddappa
Bannigol Automobiles
Mohan Complex NH 13
Road, KUSTAGI
Ph. No. 67276(08536)pp
Sri. Madhu
C/o B Veeranna
Advocate, Near Govt,
girls high school
Deodurg___________
Santosh Kumar Mishra
C/o R C K. Constraction
Near S.V.E.M. School
Bus Stand Road, Koppal
Ph: No. 30485(08534)
Devanna
Bannigol Automobiles
Mohan Complex NH 13
Road. KUSTAGI
Ph No 67276(08536)pp
Shankara Naik
C/o Pampal Bhimayya
Main Bazar
l.ingasugur
Santosh Kumar Mishra
C/o R C K. Constraction
Near S V E M School
Bus Stand Road, Koppal
Ph No 30485(08534)
16.12.9
7
33
33
64.48
13.37/Nil
84
121.46
155.46/
12.64
74
74
105.9
62
62
88.13
_____
80.89/
Nil
72.16/
16.37
SI.
No
8
9
10
11
Packag
e No.
8
9
10
11
Tot
al
No.
of
Vill
age
s__
4
2
16
5
Value
of work
in Rs. in
lakhs
Name & Address of
Contractor
139.19
S.M. Amarakhed
MIG 32, Rampur
Road Nijalingappa
Colony RAICHUR
Ph:
No.40981,23971
K. Ramakrishna
61.28
579.07
96.17
1
o
1
12
13
14
12
13
14
3
5
2
141.76
75.42
63.84
Name & Address of
.Assistance Engineer
Date of
award
Date of
starting
Date of
completion
Financial Progress(cumulative) during the month in
Rs. Lakhs.
currcn‘
Ml
M/s Malu
Constractions
Amaragundappa A
Meti
Nagarhal (Post)
Tq : Lingasugur
Dt: Raichur
Ph:No.(08537)5709
9 pp___________ _
S.M. Amarakhed
MIG 32, Rampur
Road Nijalingappa
Colony RAICHUR
Ph:
No.40981,23971
Pratap Reddy
K. Ramakrishna
N. Muniraj
H.No. 5-6-72
Saibhani Chowk
RAICHUR
Ph:No. 42412(08532)
;Sri Vidya Sagar
C/o Abdul Aziz
Anchi,
J.P. Nagar Karatagi.
Sri. Umaprasad
Sri. Umesh N.Bulla
Sri. Suresha
Shankar Nayak
Earanna
C/o Kalayan Mandap,
Herur Village
Gangavati
Ph:No. (08533)
72349,732266 ___
Sri. Sharanabasavaraj
Sri. Hamiduddin
6.1.98
25.2.98
27.10.98
21.9.98
13.1.98
27.11.9
7
M2
A
T-
24.8.99
42
42
97
26.4.2000
18
18
174
A
M3
T~
A
97
139.19
42
42
61.28
174
405
405
579.07
29
29
67
67
96.18
101.26/
Nil
43
43
99
141.76
114.34/
Nil
23
23
53
53
19
19
43
37/
Nil
122.84/
10.17
56.08/
Nil
5.12.98
3.2.98
25.2.98
17.10.98
27.10.98
2.9.99
24.8.99
99
75.42
63.84
451.23/
Nil
60.47/
8.21
37/Nil
1(
SI.
No
Packag
c No.
15
Raich
ur
15
16
15
Koppa
1
lot
al
No.
of
Vill
age
s__
2
1
Value
of work
in Rs. in
lakhs
Name & Address of
Contractor
Name &. Address oT
Assistance Engineer
23.23
Malleshappa S.
Mahar
Lal Bahadur Shastri
Nagar Jewargi
Road
Gulbarga-585102
Malleshappa S.
Mahur
Lalbahadur Shastri
Nagar Jawargi
Road
Gulbarga-585102
Earanna
C/o Kalayan Mandap.
Herur Village
Gangavati '
Ph:No. (08533)
72349,732266
Earanna
C/o Kalayan Mandap,
Herur Village
Gangavati
54.19
Total
3
77.42
16
3
60.46
Deputy Director
Land Army
Corporation Ltd.
Raichur
J
17
17
1
16.79
18
18
3
161.41
19
19
2
34.93
M/s Navarang
Construction
Company Raichur
Amaragundappa
Meli ___
B.R. Meti
N. Muniraj
H.No. 5-6-72
Sheti Bowdi Chowk
Raichur
Ph:No. (08532)
42412____________
Nandagiri S.C.
C/o Mohammed Ali
Building Near IB,
Mastoor Road
Manvi
Ph:No. (08538)
20267 pp_______
Shankar Naik
Sri. Hameeduddin
Sri. Gokhale
Date of
award
Date of
starting
Date of
completion
18.2.98
8.4.98
30.9.99
Financial Progress(cumulative) during the month in
Rs. Lakhs.
tl,rren'
7
7.00
18.2.98
8.4.98
-do-
-do-
6.4.98
27.5.98
26.11.99
26.11.9
8
23.23
26.94/
Nil
38
54.20
46.58/
4.58
16
16
38
23
23
54
54
77.43
42
27.53
/Nil
60.47
18
15.6.98
16
30.9.98
-do-
6.4.98
16.0
0
18
73.52/
4.58
27.53/
Nil
14.6.99
5
5
12
12
16.79
16.87/
Nil
16.12.98
48
44
112
68.70
/ 5.48
161.41
68.70/
5.48
15.4.99
11
24
8.85/
5.71 |
34.93
_______
FORMAT - 5
District ; Raichur
SI.
r
i No.
2
VILLAGE WISE PHYSICAL PROGRESS
For the month of Dec'99
Package
No.
RCR-1
|Sadapur (MSI )|
RCR-1
■Mustuil
RCR-1
Galag (MS2&3)
Village Name
Start
Date
23.1.98
[(MS1&21
4
RCR-1
5
RCR-1
Status
Weather power supply is
given Yes/No
Commissioned on 25.7.99
Yes
Commissioned on 23.11.99
Yes
OHT 7- completed
SP-2 Procured
RM-completed
CP-2 Procured
DM-completed
Commissioned on 31.12.99
6
7
Jambaldinni
(MS 3)
RCR-2
RCR-2
OHT7-completed
SP-Not Procured
17.2.98
■Nelogall
FMS1&21
8
9
RCR-2
RCR-2
10
RCR-3
11
RCR-3
Hiregonnagar
(MS 2&3)
Challgera
(MS 3)
5.12.98
(MS 1&2)
!
12
RCR-3
13
RCR-3
14
RCR-3
15
RCR-3
16
RCR-4
17
RCR-4
18
RCR-4
i___ L
Herur
(MS 1&2)
Yatgpl
(MS 2&3)
Itagi
(MS 3)
Gugal
(MS 3)
Guladahalli
(MS 1&2)
Budugumpa
(MS 1)
Vanaballery
(MS 1&2)
Yes
Yes
Commissioned on 22.11.99
Yes
OHT7-completed
OHT3- 2nd BB
OHT7- completed
DM-completed
RM-completed
DM-completed
DM-completed
GM-completed
DM-Completed
OHT2-GLBB
22.5.98
WUP
Commissioned on 17.10.99
OHT 7- completed
DM- completed
SP- Procured
RM -Completed
OHT 7-completed
SUMP-under
1 SP-Procured for
progress
PBW3
2 CP- procured
RM-5/8
DM-completed
Intake well- cofferdam laid
Connecting pipeline - 42/105 m
Jack well-steining completed
Pumping main - completed
Gravity main - Completed
WTP - under progress
MBR - under progress
Head works &
Pumping
Machinery
Kirkihalli
DM-completed
RM-5/10
WUP
OHT1-GLBB
MBR3- 2nd BB
OHT 7- completed
SP-Not Procured
OHT7-completed
SP-Not Procured
OHT7-completed
SP-Not Procured
DM- completed
RM- 2.17/UP
DM-2.675/UP
RM-Completed
DM-completed
RMT/A = 0.76/UP
DM-completed
- IIS'-
Yes
WUP
Yes
WUP
WUP
WUP
WUP
Yes
Yes
Yes
Package
No.
19 ' RCR-4
SI.
No.
20
RCR-5
21
RCR-5
Status
Start
Date
VillageName
I
Commissioned on 17.10.99
17.2.98
planumanaj
|(MS1&2)|
Hulgera
(MS 2&3)
RCR-5
RM-0.97/UP
DM-2.15/Nil
OHT7-completed
SP- Not procured
Kunikera
(MS2)
[Vanageri (MSI )|
i Weather power suppl}
is given Yes/No
Yes
WUP
4-
Commissioned on 31.10.99
RM-completed
DM-completed
SUMP-under
progress
OHT7-completed
SP-procured.
I
Yes
WUP
1
23
1
RCR-5
Commissioned on 29.12.99
WUP
24
f RCR-5
Commissioned on 29.11.99
WUP
25
RCR-6
Commissioned on 9.2.99
Yes
26
RCR-6
Commissioned on 23.12.99
Yes
RM-completed
OHT 3-2nd BB
DM-completed
I SP-Procured
Commissioned on 31.11.99 & handed over ,
on 2.1.2000 1
RM- completed
' OHT4-3rd BB
DM-completed
SP-Not Procured
WUP
RCR-6
I
28 f RCR-6
u
|
Hulgunchi
(MS 2&3)
Bassapur
| MS 3)1
Gonwatla
(MS 2&3)
RCR-6
29a
30
RCR-6
FT8.2.98
I
1.3.98
31
32
33
____ L
34
RCR-7
Commissioned on 11.12.99
Yes
RCR-7
Muddaballi
(MS2&3)
I OHT“-Topdome
i SP- Procured
| RM- completed
RCR-7
lyadaganalj
RCR-8
BGabbui|
■iMSlfl
36
RCR-8
Bacal wad
(MS1&2)
37
RCR-8
38
RCR-8
Gonal
(MS2&3)
T ura kun dona
(MS 3)
39
RCR-9
25.2.98
RCR-9
27.10.98 J
1 1 SP-
WUP
Commissioned on 25.7.99
Yes
RM-6.93/3 Km
! DM- completed
WUP
Yes
WUP
Commissioned on 30.12.99
WUP
RM-completed
D M-completed
WUP
! OHT7-conipleted
I
WUP
WUP
i OHT 7-Top dome | RM-3.16/Nil
DM-completed
________ I SP-Not Procured
, OHT 7-completed RM-completed
DM-completed
i SP-Not Procured
leeralkalgudu
Singhnol
(MS1&2)
RM- completed
DM-completed
SUMP-under
progress_______
SUMP-completed
CP-Not Procured
DM-completed
Commissioned on 9.12.99
| GLSR-completed
j 1 SP- procured
■(MSlW
40
WUP
, OHT7-completed
SP- Not procured
|(MS3)g
35
Commissioned on 10.9.99
Karamudi
(MS1&2)
RCR-7
WUP
Commissioned on 30.12.99
RCR-7
____
-/75 -
I
SI.
41
I Package
'
No.
1 RCR-10
42
RCR-10
43
RCR-10
” 44
RCR-10
l5~1 RCR-10
46~ I
47
I
RCR-10
RCR-10
48
|
RCR-10
49
RCR-10
50
RCR-10
51
RCR-10
52
RCR-10
53
RCR-10
54
RCR-10
55
RCR-10
56
RCR-10
57
RCR-10
58
RCR-11
-------- ]------------------
59
I
RCR-11
60
RCR-1 1
61
RCR-11
Village Name
I lead works &
Pumping
Machinery
Start
Date
5.12.98
H. Akkur
(MS 2&3)
’ Tigeri
(MS 2&3)
Mattur
(MS2&3)
Nceralagi
(MS 2&3)
Bellur
(MS 2&3)
Domabarahalli
(MS 1&2)
Budihal
(MS2&3)
Hiresindogi
(MS 2&3")
Chikksindogi
(MS 2&3)
Bisarahalli
(MS 2&3)
Bikkenhalli
(MS 2&3)
Maina halli
(MS2&3)
Handaral
(MS 2&3)
Hanwal
(MS 2&3)
Kathralli
(MS 2&3)
Kolur
(MS 2&3)
LXnkasdoddj
[(MS2&3)|
[YerajentiB
■ (MS3)H
Medinapur
(MS 1)
3.3.98
RCR-11
63
RCR-12
64
RCR-12
Intake channel- 90% completed
Jack well- 17m steining done (95%)
VTPPumping main - 10.338/3
Gravity main-45.07/31
WTP- 9/4
MBR- 3/Sump- 3/1
OHT2-GLBB
DM-completed
2CP__________
OHT6-BRB
DM-completed
SUMP-_________
2CP-_________
OHT7-Top dome
DM-completed
OHT6-BRB
SUMPOHT3-2nd BB
DM- completed
2CP-_________
DM-completed
OHT7-completed
DM-completed
OHT1-foundation
excavation_____
OHT4-3rd BB
DM-completed
DM-completed
OHT2- GLBB
DM-completed
OHT5-BRB&S
OHT7-completed
DM-completed
2CP-_________
DM- completed
OHT3-2nd BB
DM-completed
OHT3^rT BB
DM-completed
OHT5-BRB&S
DM-completed
OHT2-GLBB
DM-completed
OHT5-BRB&S.
DM-completed
Santekallur
SNS
WUP
WUP
WUP
WUP
WUP
WUP
WUP
WUP
WUP
WUP
WUP
WUP
WUP
WUP
WUP
WUP
Yes
Commissioned on 30.11.99
Yes
J DM-completed
! Sump-under
; progress
Commissioned on 26.9.99
OHT7-Completed
SP-Not Procured
Karadigudda
(MS 3)
Weather power suppl}’ I
is given Yes/No
Commissioned on 29.1.99 & handed over
on 7.2.99
OHT 7-Completed
SP-Not Procured
RM-completed
|(MS 1&2)|
62
Status
I RM-Completed
DM-completed
WUP
SNS
Yes
25.2.98
Commissioned on 4.2.99
Yes
Commissioned on 20.8.99
Yes
SI.
No.
65
Package
No/
Village Name
RCR-12
67
RCR-12
—
68
RCR-12
69
RCR-13
70
RCR-13
71
RCR-13
Hosakera Diggi
Camp
(MS1&3)
[Hosakera SoulJ
■CampH
■<MS 2<V3)M
72
RCR-13
M(MS2)Mp
Commissioned on 31.8.99
Yes
■(Ms nni
Commissioned on 26.11.99
WUP
J
■i iiilix apui-iM 17.10.98
Navalahalli
(MS 1&2)
OHT7-completed
SP- not procured
Kvdiuuppa
RCR-14
Ojanahalli
(MS 2)
Bhagx’anagar
(MS 2)
I Herur
80
81
82
------------------ L
RCR-15
RCR-15
RCR-15
RCR-16
RCR-16
RCR-16
OHT7-completed
SP- not procured
RCR-17
27.10.98
8.4.98
[ms2:a__
85
86
8~
88
RCR-18
RCR-18
RCR-18
RCR-18
RCR-19
OHT7-completed
SP- not procured
OHT7-completed
SP- not procured
RM- 5.33/Nil
DM- completed
RM- 4.93/Nil
DM- completed
Commissioned on 18.10.99
Herur Camp
(Bapureddx
camp)
(MSI)
Hullur
(MS3)
OHT7-completed
SP-Not Procured
RM-0.46/Nil
DM-completed
OHT7-completed
SP-Not Procured
RM-completed
DM-completed
Kannur
(MS 3)
Katlatkur
(MS 2)
OHT7-completed
SP-Not Procured
OHT7-completed
SP-Not Procured
OHT7-completed
SP-Not Procured
RM-3.0/Nil
RM-2/Nil
DM-completed
RM-2.92/Nil
DM-completed
27.5.98
Bijangera
(MS3)
[RamathnaL
[Sannahosur
15.6.98
■(MS 1)|
84
RM- 1.8/Nil
DM- completed
CP-
Commissioned on 11.12.99
B(MS l)j
83
RM- completed
I DM- completed
| CP-
Commissioned on 24.12.99
Nidasheshi
(MS 2&3)
'
RCR-15
WUP
J
iMBevinalBtS
KalalbandH
■ MS’2)B
76
RM-2.24/Nil
DM-completed
Yes
RCR-13
RCR-14
79
Yes
Commissioned on 20.8.99
)
75
78
Commissioned on 31.8.99
OHT 7-completed
SP-Not Procured
■(MS 311
-j-;
Weather power supph [
is given Yes/No
RCR-12
66
74
Status
Start
Date
Kota
(MS 1)
K. Hosalli
(MS 3)
Satyanarayan
camp
Tavaragera
(MS 2)
Kandkur
16.12.98
i
SUMP-Site to be
finalised
CP-Not Procured
DM-3.94/Nil
WUP
WUP
WUP
WUP
WUP
SNS
Yes
WUP
Yes
Yes
Yes
SNS
Commissioned on 31.10.99
Yes
Commissioned on 26.10.99
Yes
OHT7-completed
OHT4-3'd BB
OW-not stalled_
OHT4-3,d BB
DM-completed
RM-9.9/3
DM-completed
RM-2.3/Nil
DM-completed
OW-not feasible
RM-2.3/Nil
OHT7-completed
SUMPOHT5-BRB&S
RM-3.16/Nil
DM-completed
RM-3.(Wil
- IS/-
SNS
SNS
SNS
SNS
SNS
SI.
i No.
89
Package
No.
Village Name
RCR-19
Veerapur
Start
Date
15.4.99
Status
0HT7- completed
NOTE : OHT 1 - Foundation
OHT 2-Gl. Bracing Beam
OHT 3 - 2nd Bracing Beam
OHT 4 - 3rd Bracing Beam
OHT 5 - Bottom Ring Beam & Slab (BRB &S)
OHT 6-Side Wall (SW)
OHT 7 - Dome
BB - Bracing Beam
GL - Ground Level
PSBW - Proposed Shallow Bore Well
F & YT - Flushed & Yield Tested
WUP - Work Under Progress
SNS-
RM- 3.2/Nil
DM- completed
MS 1 - First Mile Stone
MS 2 - Second Mile Stone
MS 3 - Third Mile Stone
Weather power supply I
is given Yes/No
WUP
FORM ATE-6
PHYSICAL PROGRESS FOR REMAINING WATER SUPPLY COMPONENTS
District : Raichur
For the month of Pecs99.
PAC KAGE
SI . No.
IIP
T
1
2
3_
4
5
____3_
4
2
6
7
8
- 9
__ 10
7
8
2
12
JJ_
ij_
12
13
14
J2
13
_1£
I
115
16
15
” 17
17
18
19
7
To
H
19
Total
Raichur
Total
[. Koppal
Cross
A
WATER SUPPLY C OMPONENT IN NOS
CT
DB
SP
CS
T
A
A
T _A_
A
T
T
13
6
22
31_ £8
14
24
23
15.
5
10
28
10
20
37_
14
24
29
24
31
4
11
22
9
17
34
11
2.1
39 _ _ 22
61 ~
18
26
36
49
2
6
12
6
12
27
27
32
56
35_
2
15
14
26
19
3£
12
3
30
26
29
42
19
40
2f
12
19
9
19
~14
14
3
26 ~ " 26
P7
27
8
12
6
25
3
II
II
14
5
111
41
’
14
16
239
134
154
72
70
14
451
155
10
304
179
161
126
66
6
924
411
17
543
313
315
198
136
20
1198
566
I Total
HP
WP
T__ jA
75___ 20
79___ 48
30___
70
73
92
37
64
31
66
40
108
38__ 38
176
91___ 42
81 ~ 86
23
61
59
53
53
Hnad Pump
C'T - Cattle Trough
SP
Stand Post
CS
Cistern
WP
Washing Platform
DB
Dust Bin
REMARKS
INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
KIRWS & ESP PHASE-II PACKAGE-H
(WORLD BANK ASSISTANCE)
i
i
ii
District: Raichur
Month : Dec'99
1. Hydraulic testing of PVC pipes.
SI.
No.
Date of
testing
Packa
ge No.
Name of
Village
1
2
28.2.99
3
RCR-9
4
1
Components tested
DM in Km
RM in km
T
5
Singhanal
4. .
A
8
6.396
T
7
6.024
A
6
4^ t
t
: 7.74
f 3.000
T urukundona
1.5
0.6
5.915 i 3.5
Bagalwada
6.935
4.5
7.59
3.8.99
RCR-9
Singhnal
2
27.11.98
RCR-8
3
28.11.98
RCR-8
1
os
7.0
■
j
OHT________
Chainages
OK/
Remarks
Inlet
Outlet
not
pipes(mm pipes(mm
OK
dia)
dia)
A
___
T
A
X
9
10
11
12
13
14
15
63
■
N(^e
27-28
OK
lOkg/cnr
LI Node 31 -29
OK
. 12kg/cm2
Node 65-63
OK
9.5kg/cm2
j OHT-PBW
OK
12 KSC
110mm dia
PB W6 RMOK
300Rm
1
17-I8(70m)
OK
(DM)
131-148(125m) OK
(DM)
I
139-144(80m)
OK
(DM)
PBW6RMOK
250Rm
63
Node 1-8 (DM) OK
(115m)
63
Node 8-9(DM) OK
(75m)
63
Node 10-11
OK
(75m) (DM)
63
Node 247-249
OK
(70m) (DM)
I
Packa
ge No.
13.1.99
4
18.1.99
5
30.1.99
6
RCR-12
RCR-12
RCR-12
Name of
Village
4
Hosakera
(Kottai camp)
Components tested
RM in km
T
5
1.775
A
6
1.775
Soul camp
DM in Km
T
7
A
8
6.045
6.016
0.866
0.758
3.878
3.572
1.965
Elcganoor camp
OHT_________
Outlet
Inlet
pipes(mm
pipes(mm
dia)
dia)
A
T
A
I
12
9
10
11
2.478
0.130 ‘ 0.312
I
7
27.1.99
RCR-12
00
Eleganoor
village
3.020
2.674
0.07
0.066
5.325
5.402
1
8
9
10
23.1.99
2.2.99
2.2.99
RCR-12
RCR-15
RCR-15
Bevinal
1lerur
Bapureddy
camp
0.22
0.22
1.533
1.533
8.19
0.48
8.04
0.48
0.414
3.81
0.410
3.61
0.055 i 0.055
■
Chainages
QK/
not
OK
Remarks
14
13
PBW3toOHT
OK
1.775Rm(RM) I
15
75mm dia 6KSC
OK
309 to 310
(25Rm)(DM)
OK
44 to 45
(70Rm)(I)M)
OK
54 to 55
j (60Rm)(DM)
’ 1 to 29
OK
(155Rm)(DM)
| 107 to 124
OK
(1104Rm)
(DM)
116toll7
OK
(176Rm)(DM)
OK
46-47 (66Rm)
(DM)
OK
3-4 (66Rm)
; (DM)
' 75 to 74
OK
(75Rm)(DM)
OK
PBW13 to
Sump (RM)
PBW1 to Sump OK
OK
13-109(DM)
OK
ll-16(39Rm)
(DM)
OK
7-6 (DM)
' 266 to 267
OK
(DM)
OK
266 to 268
(DM)
63mm dia 4KSC
110mm dia 4KSC
63mm dia 4KSC
63mm dia 4KSC
63mm dia 4KSC
75mm dia 4KSC
63mm dia 4KSC
90mm dia 4KSC
63mm dia 4KSC
75mm dia 4KSC
90mm dia 6KSC
63mm dia 4KSC
75mm dia 4KSC
110mm dia 4KSC
63mm dia 4KSC
75mm dia 4KSC
-I
SI.
No.
1
11
Date of
testing
230.3.99
Packa
ge No.
Name of
Village
3
4
Jeerkalgudi
(camp)
RCR-9
RCR-9
29.5.99
RCR-9
2.6.99
Components tested
T
5
1.85
OK/
not
OK
Remarks
15
63mm dia
12.5KSC
2.148
13
14
' Node 126-127 ' OK
T.115 A. 104
.
(m)
OK
Node 129-131
T.65 A.67 (m)
_L__ (2.055 Km)
Node93-113 OK
f 0.358
Node 73-76
OK
Node 96-97
1 OK
Node 111-112
OK
2.512
Node 61-62
OK
0.114
Node 8-7
OK
OHT_______
Inlet
Outlet
pipes(mm pipes(mm
dia)
dia)
T
A_
T
A
9
10
11
12
DM in Km
RM in km
T
7
11.44
A
6
Nil
Jeerkalgudi
A
8
11.44
;
1.576
Jeerkalgudi
-t
I
RCR-9
28.6.99
09
Os
Jeerkalgudi
Chainages
I
-
i
Node 9-8
-
RCR-9
30.6.99
Jeerkalgudi
I
12
22.7.99
RCR-9
Jeerkalgudi
5.4.99
14
Bhagyanagar
1.05
OK
’ 0.996
Node 2-3
t OK
0.030
Node 2-OHT
OK
OHT-Sump
OK
Node 58-59
65mtr (DM)
Node 11-12
80mtr (DM)
OK
1.05
6.660
!
4.810
63
63
OK
63mm dia
10KSC
90mm dia
12KSC
75mm dia
10.5KSC
63mm dia
12KSC
63mm dia
10.5KSC
63mm dia
10.5KSC
75mm dia
11KSC
90mm dia
11KSC
110mm dia
12KSC
140mm dia
12KSC
110mm dia
6KSC
4KSC 10.5
kg/cm2
4KSC 12.5
kg/cm2
m
2
3
4
5
6
7
8
9
r io pi 1 Tn
63
14
6.4.99
4.015
Bhagyanagar
63
2.235
63
63
13
43.2.99
2
Nilogal
14.2.99
2
Nilogal
15.2.99
2
Nilogal
0.12
0.48
0.05
0.01
0.035
0.04
0.07
0.315
0.078
5.0
63
63
63
75
90
160
110
110
63
63 j
0.4
0.24
0.02
0.01
0.025
0.025
0.03
07035
0.040
5.0
63
(
oo
75
T4
90
I
110
160
20.4.99
21.4.99
14
11.4.99
2
2
2
Nilogal
Nilogal
Hiregonnagar
12.4.99
2
Hiregonnagar
2.82
90
2.315
1.625
|
75
2.070
1.30
1.5
Node 96-97
40mtr (DM)
Node 254-255
200mtr (DM)
Node 224-222
35mtr (DM)
Node 205-206
150mtr(DM)
120m
48m
50m
10m
35m
240m
75m
315m
78m
Node 1-2
(170m)
Node 11-9
(30m)
Node 61-14
(10m)
Node 14-13
(35m)
Node 5-6
(35m)
Node 1-4
(240m)
■
’
75
90
2.74
13
2070m
63
63
63
1300m
Node 123-134
(110m)
Node 125-135
(I25m)
Node 11 l-l 12
(90m)
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
15
4KSC 12.5
kg/cm"
4KSC 12.5
kg/cm2
4KSC 12.5
kg/cm2
4KSC 12.5
kg/cm2
7.0 KSC
7.5 KSC
7.6KSC
8.2KSC
9.5KSC
10.0 KSC
9.5KSC
10.2 KSC
7.5KSC
7.5KSC
OK
7.ZKSC
OK
8.3 KSC
OK
9.5KSC
OK
9.5KSC
OK
9.8KSC
OK
OK
OK
OK
OK
10.5KSC
11.2KSC
10.5 KSC
10.9KSC
7.2KSC
OK
7.5KSC
OK
8KSC
14
OK
OK
OK
OK
17.2.99
15
4
3
2
8
3.675
Tuggaldona
5
7
6
5
5.673
Hanumanal
5
I
j
12.4.99 |
75
110
140
63
6.614
r
5
Hanumanal
1.9
•"i—*“
140 T
75
2.73
90
14
70
0.390
Bhagyanagar
30
30
17.6.99
RCR-18
0.388
Tavaragera
5)
DO
I
0.578
4.6.99
13.6.99
....
28.6.99
0.231
7.6.99
4.298
i
4
I
I
r
I
10.6.99
1
110 t
20.5.99
18
!
90
*
I
75
'[ n o r
]
J-- 4.
17
63
’
J
r--- i----------- t
63
s
tzzx
14.2.99
| 10 Til i 12 I
4.202
-L
16
r
I
0.238
13
15
I 14 |
Node 123-124
OK
8.5KSC
(30m)
I—-- k
Node 4-5
OK
10.5KSC
Node 31-35
OK
10.5KSC
OK
Node 1-3
11KSC
OK
Node 0-1
11KSC
OK
Node 34-38
10.5KSC
' Nocje 27-29 I
10.5KSC
Node 2-4_ . OK
10.5KSC
Node 0-1
OK
11KSC
Node 10-14
OK
1 1KSC
OK
13.4KSC
OK
13.5KSC
OK
13.5KSC
1 Okg/cm2
: 2 to 108
j OK
75 mm
70mtr DM
' 8 TO 108
Ok
10 kg/cnr
30mtr DM
90mm
245 to 261
OK 7.5 kg/cnr
I 30mtr DM
1 110mm.
' 57 to 56
OK
i 9.5kg/cnr
I 140mm
30mtrsDM
‘ 39 to 58
9.Okg/cm2
OK
96.5mtrs DM
140mm
9.Okg/cm2
OK
59 to 60
44mtrs DM
140mm
OK
10.Okg/cm
2 to 3
29.5mtrs DM
160mm
9.5kg/cm2
4 to 5
OK
160mm
66.5mtrs DM
9.5kg/cm2
2 to 6
OK
160mm
100 mtrs DM
OK
4 to 60
9.5kg/cm2
231.0 mtrs-DM
200mm
OK
5 to 10
9.5kg/cm2
177mtrs DM
i 63mm
6 to 14
OK
10.0kg/cm2
131.5mtrs DM
i 63mm
OK
12 to 11
i 9.5kg/cm2
63mm
51 .Omtrs DM
88 to 87
OK
i 9.5kg/cm2
90mm
1 19.5mtrs DM
1
ok
1
r1
3
4
I
6
5
I
7
8
I 97 101 11 f 12 r ~ '3
1
I
I
15.6.99
1.435
■■
19
30.8.99
Gravity main
RCR-10
I 3.05
(GM)
31.8.99
Gravity main
RCR-10
I 1.17
I (GM)
OK
67 to 87
96.5mtrs DM
OK
75 to 83
15.0mtrs DM
OK
8 to 4
121.5mtrsDM
OK
5 to 9
150mtrs DM
OK
5 to 33
138.5mtrs DM
Node 4-7
I OK
(Zone-Ill) 60m. j
30m
OK
i OK
45mtrs
1 OK
Sump-2 to
Node-1 (Zone- i
II) 60m
I 90 mtrs
1.9.99
2.9.99
RCR-10
Gravity main
RCR-10
Gravity main
0.953
I (GM)
2.702
(GM)
f
I
20
9.1 1.99
RCR-1
Mustur
I 6.52
I
4.7
I
I
10.11.99
I
I
I
11.11.99
12.1 1.99
13.11.99
14.11.99
15.1 1.99
RCR-1
Mustur
2.2
0.8
I
I*
10.0kg/cm2
90mm
9.0kg/um2
90mm
9.5kg/cm2
110mm
10.0kg/cm2
1 10mm
9.5kg/cm2
110mm
110mm dia
110mm dia
110mm dia
160mm dia
Node 1-2
Zone-II 70mtrs
OK
160mm dia
140mm dia
I 40m
i OK
OK
140mm dia
140mm dia
Node 2-3
( Zone-II 40m
! 70m
| Jn.Pt. to OHT
1 34m length
28m length
31m length
18m length
23m length
49m length
40m length
24m length
’ Node 17-21
30m
Node 24 to 25
44m
’ Node 29 to 30
22m
Node 32 to 34
32m
Node 9 to 10
18m
OK
OK
OK
■ 140mm dia
90mm dia 6KSC
OK
OK
OK
OK
I OK
OK
90mm dia 6KSC
' 90mm dia 6KSC
90mm dia 6KSC
' 90mm dia 6KSC
90mm dia 6KSC
90mm dia 6KSC
90mm dia 6KSC
63mm dia 4KSC
OK
63mm dia 4KSC
OK
63mm dia 4KSC
OK
63mm dia 4KSC
OK
63mm dia 4KSC
OK
' OK
I
I
EZ
2
7.12.99
.3
RCR-1
■__________ 4
Jambaldinni
5
9.9
6
5.6
7
8
I
8.12;99
9.12.99
t'
10.12.99
I
[ 19.12.99
! 20.12.99 f
L______L
xO
Ok
I
r-
-L
9
10
11
12
13
Jn.Pt. to OHT
15m length
45m length
216m length
1
length
150m length
i 90m length
f 100m length
30m length
1
length
124m length
23m length
14
OK
i_______ 15
110mm dia 6KSC
OK
OK
110mm dia 6KSC
I 110mm dia 6KSC
' OK
' 110mm dia 6KSC
OK
110mm dia 6KSC
OK
OK
110mm dia 6KSC
110mm dia 6KSC
|
INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
KIRWS & ESP PHASE-II PACKAGE-II
2. List of deficit Contractors in III Milestone
SI.
No.
Pack a
ge
No.
Villages
JI
2
3
1
No. of'
4
Name of the
Contractor
________4_______
M/s KLAC Raichur
Contract
value
( Rs. In
Lakhs)
Date of
___ 5
64.48
___ 6
Start
22.5.98
T arget
for 3 MS
(Rs. In
Lakhs)
___ 7_
64.48
End of
I MS
8
Achievement
to end of MS
Cumulative
(Rs. In
Lakhs)
9
21.11.99
13.37
J
i
Month : Dec’99
District : Raichur
Shortfall in
Shortfall in
Physical status of
progress in MS
works
Cumulative
%
Amount
(in lakhs)
12____
10
11
OHT & RM are
completed in 3
7‘) 26
villages, DM
51.11
completed in all
villages.
Delay
attributed to
department/
Contractor
13
Contractor
INTEGRATED RURAL WATER SUPPLY AND ENVIRONEMENTAL SANITATION PROJECT.
KARNATAKA INTEGREATED RURAL WATER SUPPLY AND ENVIRONEMNTAL SAINTATION PROJECT. (WORLD BANK
ASSISTED) PHASE-II PACKAGE-II
3. Statement of Bottlenecks
Month : Dec'99
District: Raichur
SI.
No.
I
I
Kj
No. of
villages
flushing to
be done
No. of
villages New
Bore wells to
be drilled
No. of Open
Wells Shallow/
bore wells to be
drilled
Nil
4
Nil
OHT
Sites
under
dispute
SBC
results
awaited
Sump
sites to be
handed
over
GLSR
sites to be
handed
over
Awaiting
Energisation for
commissioned
1
1
Nil
6
I
1. New Bore wells yet to be drilled.
Pack
age
No.
No.
9
1
16
18
~"4
19
TOTAL
SI.
Village
No. of
borewells to
be drilled
Singnal
Bijangera
K.Hosalli
Kandkur
PE
V
Note: PE - Partlv Established
2) SBC Results yet to be handed over by the EE
SI.
Package
No.
No.
OHT
Kolur
1 Villages
10
Total
Remark
Village
4) SUMP Sites yet to be handed over by the EE
SI.
I No.
IT"'
Package
No.
14
Village
Remark
Bhagyanagar
Site is to be finalised
Land acquilsition for OHT on private Land
1 Package No.
I SI. No.
4
1
’ 4
6
4
’ 7
6
’ 10
7
' 8
9
10
' 15
15
11
12
13
19
10
13
18
18
19
8 Packages
I Village
Vanaballery (MS 1&2)
Buduguntpa (MS 1)
Hulgunchi (MS 1&2)
Wadaganal
Niralgi
Chikkasindogi
Navalahalli
Hullur(MS 1)
Konnur (MS 2)
Kota
K. Hosalli
Veerapur
Kandkur
13 villages
- |
I Action taken
Not paid
Not paid
Not paid
Not paid
Not paid
Not paid
Not paid
Not paid
Not paid
Not paid
Not paid
Not paid
Not paid
INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
KIRWS& ESPPHASE-II PACKAGE-II
( WORLD BANK ASSISTANCE )
4. List of works, the Agency is unlikely to Achieve the Milestone targets.
District: Raichur
SI.
No.
Pack
age
No.
No.
of
villag
es
Name of
contractor
Contract
Value
(Rs.
Lakhs)
Month : Dcc'99
Date of
Start
End of
Milestone
III
Name of
Scheme/Villa
ges
Nil
I
Financial cumulative for
Milestone l/II/IH
T
A
Short f
all %
Status of works
Remarks
INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
KIRWS & ESP PHASE-II PACKAGE-II
( WORLD BANK ASSISTANCE )
5. List of Agencies on whom penal action has been recommended.
District : Raichur
Month : Dec'99
SI.
No.
Pac
kag
e
No.
No.
of
villa
ges
Name of contractor
Contrac
t Value
(Rs.
Lakhs)
Date of
Start
1
4
4
M/s KLAC Raichur
64.48
22.5.98
End of
Mileston
e III
21.11.99
-O
2
7
5
M/s Coramandal
88.13
1.03.98
31.8.99
3
16
3
M/s KLAC Raichur
60.47
27.5.98
I
L
26.11.99
Name of
Scheme/Villa
ges
Financial cumulative for
Milestone 1/II/I1I
A
Short f
T
all %
1 .Budugumpa
2. Vanabellary
3. Kunikeri
4. Guldhalli
64.48
13.37
1 .Koradakera
2. Karamudi
3. Ncrabenchi
4. muddaballi
5. Vadaganal
88.13
1 .Bijangera
2. Katlatkur
3. Ramthnal
60.47
Status of works
Details of penal
action
79.26
OUT & RM are completed in
3 villages & DM are
completed in all villages
72.16
15.97
27.53
54.47
WSS at Koradakera
Nerebenchi and vadagnal are
commissioned. OHT & sump
are in progress at Muddaballi
and Sump is in progress at
Karmudi._________________
Water supply scheme at
Ramathnal village is
commissioned, OU T & DM
are completed in other two
villages & RM is to be started.
Liquidated
damages are
proposed from
22.11.98 at the
rate of Rs.
600/day______
Liquidated
damages are
being recovered
at the rate of
Rs.600 per day
from 1.9.98.
Liquidated
damages are
proposed from
26.1 1.98 at the
rate of Rs. 600/per day
INTEGRATED RURAL WATER SUPPLY AND
ENVIRONMENTAL SANITATION PROJECT
KARNATAKA
(World Bank Assistance)
Phase II
Package II
Villages
PROGRESS REPORT
of Shimoga District
For the Month of DECEMBER 1999
INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD., NEW DELHI
CONSULTANTS FOR CONSTRUCTION MANAGEMENT AND QUALITY CONTROL
Format - 3.
PHYSICAL PROGRESS PACKAGEWISE FOR THE MONTH OF December’99
PART-I - Villages
District: SHIMOGA
si.
NO.
2
1
SMG-1
1
2
I
3
4
i
Package
No
5
SMG-2
SMG-3
SMG-4
SMG-5
C - Completed,
No.
of
villag
es in
pack
age/
prog
ress
r-
6/6
4/4
6/6
4/4
7/7
Name of the
contractor
4
R.
Maheswara
Naidu
S. Umesh
S.V Bandi
V.
Narasimhan
A.S.
Rangappa
Peri
od of
com
pleti
on in
mont
hs
5
18
18
18
18
18
Contrac
t value
6
96.17
66 41
81.29
68.44
109.33
Up - Under progress
Date of
start
7
13-2-98
24-8-99
28-2-98
4-4-98
13-2-98
Mile
ston
e
Physical progress
Financial
progress in
lakhs
commutative in
Rs. Lakhs
Cumulative
During the month
CP in
nos^
SP in
nos.
RM in Kms
OHT in Nos
DS in Kms
Sump/GL
SR in Nos
_A_
T
22
21
Commission
ed
No. of
schem
es
propo
sed
23
24
2- Handed
over
1
T
A
T•
A
T
9
10
111
12
13
18.78
26.72
2
II
43.73
36.12
4
III
33.66
38.21
4
16.72
29.40
1
II
24.99
13.65
2
III
24.70
9.08
2
I
18.74
18.74
2
2
1.0
1.00
6.0
II
43.46
40.50
3
7
2.0
4.212
11.0
III
19.10
38.10
4
02
2.0
4.585
12.0
8.292
2
2C
17.44
18.40
1
2
1.0
1.70
3.0
6.00
1
1C
1- Handed
over
1
27.48
18.13
2
2
1.0
7.0
3.56
1
1C
01
1
II
III
23.52
11.02
2
03
1.0
2.50
7.0
7.51
2
1 C/1 up
18.59
36.82
2
2
2.0
2.00
6.0
6.00
1
1C
II
50.86
43.74
5
5
5.0
5.00
11.0
11.00
3
3C
III
39.88
8
14
T
A
T
A
T
A
15
16
17
18
19
20
1.0
3.40
5.0
6.20
1
1C
10
3.0
2.80
9.0
8.73
2
2C
01
3.0
3.77
9.0
8.205
2
2C
1.0
5.00
4.0
12.32
1
1 C
3.0
0.58
9.0
7.514
1
10
2
1 C/1 up
10.40
1
1C
12.94
2
2C
04
2
02
9.0
2.0
1
3
1C
1
02
1
2
2- Handed
over
1
2
03
3
2
3- Handed
over
1
3
04
23.52
4
7
5.0
7.01
11.0
15.47
3
2C-1 up
3
Remark
s
25
Format-3 Con. .
SI.
NO
1
6
7
1
8
9
10
Package
No.
2
SMG-6
SM G-7
SMG-8
| SMG-9
SMG-10
No.
of
villag
es in
pack
age/
prog
ress
Name of the
contractor
3
4
1/1
4/4
3/3
1/1
1/1
M.S Suprada
Constructions
S. Umesh
KC.
Shivaram
V.
Narasimhan
M s Suprada
Constructions
Peri
od of
com
pleti
on in
mont
hs
Contrac
t value
5
6
18
18
18
18
18
41.67
76 32
81.97
60.15
Date of
start
7
7-11 -98
25-8-98
1 -11 -98
1-11-98
42.76 | 7-11-98
J____
C - Completed,
Up - Under progress
Mile
ston
e
Financial
progress in
lakhs
commutative in
Rs. Lakhs
T
A
9
10
10.00
18.13
II
20.00
10.53
III
11.67
8
Physical progress
Cumulative
During the month
SP in
nos.
CP in
nos._
RM in Kms
T
A
T
A_
I
12
13
14
02
1
1
T
15
T
17
A
T
A
16
18
19
20
1.0
2.25
2.0
8.90
1
1C
A
1
1.0
3.0
1
1.0
3.0
2
8.00
4.0
1
1C
1
5.0
1.20
8.0
1
1C
1
5.0
1.00
1.00
8.0
1
1 Up
3.12
1.0
3
3.0
7.70
III
23.32
10.44
3
01
3.0
20.73
35.73
2
4
3.0
II
30.64
26.38
3
02
III
30.60
III
17 55
13.50
15.51
II
15.00
11.62
III
14.28 |
1.0
1
1
2
1
01
1 C/1 up
18.96
1
20.0
2
25.68
1
1
8.0
II
9.64
25
1
4.0
23.70
24
2C
4.02
II
22
2
1.0
2
23
_A_
9.0
2
27.67
T
21
Remark
s
1C
32.80
18.90
Sump/GL
SR in Nos.
No. of
scheme
s
propos
ed
1
27.32
3
OHT in Nos.
DS in Kms
No. of
schemes
commissio
ned
2.0
1.0
2.0
3 50
1
-
2.0
1.0
19.53
6.00
1
1
2.0
2.00
9.00
1
1
1.0
5.0
1
1
1.0
5.0
1C
1
J
1C
1 UP
1
(
Format-3 Con. .
SI.
NO.
1
11
12
13
J
Package
No.
2
SMG-11
No.
of
villag
es in
pack
age/
prog
ress
Name of the
contractor
3
4
5/5
R.Maheswara
naidu
SMG-11A
SMG-12
M/s Maloo
Constructions
2/2
Subbareddy
Peri
od of
com
pleti
on in
mont
hs
Contrac
t value
5
6
18
06
18
183.01
105.08
21.17
Date of
start
7
1-11-98
Mile
ston
e
T
A
8
9
10
I
35.60
97.00
II
88.00
58.34
III
59.41
18-11-99
4-9-98
Financial
progress in
lakhs
commutative in
Rs Lakhs
Physical progress
Cumulative
During the month
SP in
nos.
RM tn Kms
DS in Kms
OHT in Nos
Sump/GL
SR in Nos^
No. of
schemes
proposed
Remark
s
23
24
25
T___ A
T
A_
T
A
T
A
T
A
T
11I
13
14
15
16
17
18
19
20
21
3.0
18.50
6.0
19.30
1
10
4.156
11.0
12.83
2
2C
1
10
5
12
1
5
7.0
1
5
6.0
105.08
11.0
22
Impounding reservoir Under progress.
I
10.81
3.63
1
II
10.36
7.45
1
III
CP in
nos._
No. of
schemes
commissi
oned
0.22
1
0.2
0.10
1.0
1.05
1
1UP
1
0.4
0.40
3.0
2.50
1
1UP
1
2.0
•O
1
C - Completed. Up - Under progress.
rLcfc
Distrk
ICT Pvt. Ltd.,
Shimo^a-577 204.
Format - 3.
PHYSICAL PROGRESS PACKAGEWISE FOR THE MONTH OF December’99
Part - II - Villages__________
District: SHIMOGA
si.
NO.
1
1
Package
No.
2
SMG-13
No.
of
villag
es in
pack
age/
prog
ress
Name of the
contractor
3
4
2/2
S Umesh
Peri
od of
com
pleti
on in
mont
hs
Contrac
t value
5
6
12
26.52
Date of
start
7
Mile
ston
e
2
SMG-14
2/2
12
28.83
I
^5
o
4
SMG-15
SMG-16
2/1
2J2
i
5
SMG-17
3/2
S. Umesh
V.
Narasimhan
R Mahes'Aara
naidu
12
12
12
29.26
37.06
47.21
6
SMG-18
2/2
12
27.58
7
SMG-19
2/2
12
22.64
CP in
nos.__
RM in Kms
DS in Kms
A
T
A
14
15
16
T
17
T
A
T
10
11I
12
13
13.20
Nil
1
1.0
4.0
13.32
Nil
1
1.0
4.0
14.83
10.22
2
0.50
9.0
14.00
4.27
1
0.50
8.0
14.00
1
1.00
II
15.27
1
1.00
I
17.06
30.24
1
II
20.00
2.37
3
3.0
23.61
18.69
1
1.00
2.48
4.00
23.60
2.47
3
1.00
0.70
9.00
14.00
11.36
2
3.00
2.97
4.00
5.00
13.59
2.92
2
3.00
0.78
4.00
1 50
12.00
11.38
1
1.00
4.0
5.60
10.64
3.34
1
3.0
0.45
OHT in Nos.
Sump/GLS
R in Nos.
No. of
scheme
commts
sioned
No. of
schemes
proposed
Remark
s
23
24
25
A
T
18
19
A
20
T
21
_A_
22
1
Up
1
1UP
10.50
1
1UP
1
5.90
1
1UP
1
4.50
1
1 Up
1
4.50
1
20-8-99
01
17-3-99
0.72
17-6-99
06
1.0
3.50
4.0
11.22
1
1
1C
1
1
1C
1
1
1UP
1
26-3-99
9.0
3.00
7-5-99
04
2
2
1
1
1UP
17-3-99
II
V.
Narasimhan
SP in
nos.
9
8
II
M/S Suprada
Constructions
Cumulative
During the month
A
II
3
Physical progress
T
II
M/S Supra da
Constructions
Financial
progress in
lakhs
commutative in
Rs. Lakhs
1
1
1C
1
1UP
1
10-3-99
II
C - Completed, Up - Under progress
0.50
1
Format - 4
District: SHIMOGA
SL
No
Package
No.
SMG-1
1
2
SMG-2
Total
no. of
villages
06
04
Value
of work
in Rs.
Lakhs
96.17
66.41
FINANCIAL PROGRESS PACKAGE WISE for the month of December’99
PART-I - Villages
Name & Address of
contractor
Name & Address
of contractor
personal
Financial progress (Cumulative) in Rs. Lakhs
Name & Address of
assistant Engineer
Date of
award
Date of
start
Date of
completion
_____ 1------------
R. Maheshwara Naidu,
Engineers & Contractors,
H. No. 1911,
Somashekarappa Lay
out, Basaveshwara
Nagar,
Bangalore - 79_________
Sri Umesh. S.
Engineers & contractors
•Sourabh"
A.N.K. Road, 5^ Cross
V.M. Rajaguru,
GPA Holder for
R.M Naidu,
#743, lO^Main,
PJ extension,
Davanagere.
S. K. Muralidhara &
S.B. Manjunath
Assistant Engineers,
Opp. Ranganatha Book
Depot, Taluk office road,
Honnali.
I MS
II MS
III MS
T
A
T
A
T
A
29-1-98
13-2-98
12-08-99
18.78
26.72
43.73
36.12
33 66
38.21
10-08-98
25-08-98
24-02-2000
16.72
29.40
24.99
13.65
24 70
9.08
13-02-98
28-02-98
28-08-99
18.74
18.74
43.46
40.50
19.10
38.10
3-4-98
04-04-98
03-10-99
17.44
18.40
27.48
18.13
2352
11.02
29-01-98
13-02-98
12-08-99
18 59
36.82
50.86
43.74
39 88
23.52
S.V. Sateesh
22-10-98
6-11-98
05-05-2000
10.00
18.13
20.00
10.53
11.67
L.S. Manjunath,
SridharT.D.&
SB Manjunath
10-8-98
25-8-98
24-2-2000
27 32
32.80
25.68
18.96
23 32
17-10-98
01-11-98
01-05-2000
20.73
35.73
30.64
26.38
30 60
S.V. Sateesh
LS. Manjunath,
B.Shivakumar.
Shimoga
3
SMG-3
06
81.29
Somashekar. V. Bandi,
Engineers & Contractors,
Plot NO. BCTS 669 - B,
Vishal Nagar, Behind
KSRTC, Bijapur.
4
SMG-4
04
68.44
V. Narasimhan,
Contractor
M.M. compound,
Tarikere Road,
Bhadravathi
5
SMG-5
07
109.33
A.S. Rangappa, Class I
contractor, Garden area,
II Cross, Shimoga
I
N
o
o
R. Paramesh,
GPA holder for
SV Bandi,
Nallur Post,
Channagiri Taluk,
Davanagere Dist
L. S. Manjunath,
& T. D. Shridhar
Assistant Engineers,
Gowramma road, Opp
Rajarajeshwari Convent,
Channagiri - 577 213.
E.B. ChandraShekar
C/O Bhogeshwarappa
BhavaniRao Keri,
Shikaripura,
Shimoga Dist__________
S.V. Satheesh
Assistant Engineer,
Sri Madava Nilaya,
5th Cross, Gndi Nagara
Shimoga
6
7
SMG-6
SMG-7
01
04
41.67
76.32
M/s Suprada
Construction Co.
behind Vijaya Talkies,
Vijaya Road, Dharwad.
Mohamad Imam,
GPA holder for
M/s Suprada
Construction Co.
Rajendra Prasad
Road , Sagar.
Sri Umesh. S.
Engineers 4 contractors
‘Sourabh*
A.N.K. Road, 5*h Cross
Shimoga
8
SMG-8
03
81.97
Sri K.C. Shivaram
Engineer & Contractor
No. 109, 8th main road,
4th Block, A0' Stage,
Basaveswara Nagar,
Bangalore
Basheer Khan.
GPA holder for
KC Shivaram
#2603/3,
MCC A’ Block.
Church Road,
Davanagere.
T.D. Shridhar &
B. Shivakumar
10.44
Remar
ks
____________________________________ Format-4 Con
SL
No
9
SMG-9
01
Value
of work
in Rs.
Lakhs
60.15
M/s Supra da
Construction Co.
behind Vijaya Talkies,
Vijaya Road, Dharwad.
SMG-10
01
42.76
11
SMG-11
05
183.01
13
105.08
SMG-11 A
SMG-12
02
Name & Address of
contractor
V. Narasimhan,
Contractor
M.M. compound,
Tarikere Road,
Bhadravathi
10
12
J
Package
No.
Total
no. of
villages
21.17
Name & Address
of contractor
personal
Mohamad Imam,
GPA holder for
M/s Suprada
Construction Co.
Rajendra Prasad
Road , Sagar
M/S Maloo constructions,
23/1 and 2, 3rd Cross,
1* floor, Gandinagar,
Bangalore - 9.__________
. Maheshwara Naidu,
ngineers & Contractors,
. No. 1911,
omashekarappa Lay-out,
asaveshwara Nagar,
angalore - 79___________
Sri T. Subbareddy,
Engineers & contractor,
s/o T.RamakrishnaReddy
Tadamari Village,
Ananthapura Dist,
ANDRA PRADESH
Name & Address of
assistant Engineer
Date of
award
Date of
start
Date of
completion
E.B. Chandrashekar
17-10-98
01-11-98
22-10-98
D.Raghu, C/O Gururaj,
PWD contractor,
’ Guru Krupa",
Behind Commercial tax
office
Vinoba Nagar, Sagar,
______Shimoga Dist.
Sri T Prakash
C/O KB. Eshwar,
Swamy Rice Mill,
Rippenpet
Sri L.S. Manjunath & Sri
S.K. Muralidhar.
E. Yangaiah, S/o
E. Narasimhjaiah
Kappanahalli,
Shikaripura taluk,
Shimoga Dist.
E.B. ChandraShekar &
T.D. Sridhar
I MS
Financial progress (Cumulative) in Rs. Lakhs____________
Rem
III MS
II MS
arks
T
A
T
27.67
23.70
9.64
17.55
13.50
15.51
15.00
11.62
14.28
01-04-2000
35.60
97.00
88.00
58.34
59.41
11-11-99
11-4-2000
105.08
04-09-98
03-03-2000
10.81
3.63
10.36
7.45
TOTAL
332.21
360.55
403.90
295.06
T
A
01-05-2000
18.90
07-11-98
05-05-2000
17-10-98
01-11-98
11-10-99
19-08-98
A
0.22
297.69
130.59
O
1
in 2 TOT
ICT F’vt. Ltrl.,
Shimo^-577 204.
)
Format - 4
District: SHIMOGA
SL
No
13
Package
No.
SMG-13
Total
no. of
villages
02
Value
of vwsrk
in Rs.
Lakhs
26.52
FINANCIAL PROGRESS PACKAGE WISE for the month of December’99
PART-II - Villages
Name & Address of
contractor
Name & Address
of contractor
personal
Sri Umesh. S.
Engineers & contractors
“Sourabh"
A.N.K. Road, 5th Cross
Name & Address of
assistant Engineer
Date of
avsard
Date of
start
Date of
completion
Financial progress (Cumulative) in Rs. Lakhs
IMS
’ II MS
T
A
T
Remarks
A
E.B. Chandrashekar
& B.S. Annappa
06-05-99
20-8-99
5-5-2000
13.20
D. Raghu
16-03-99
17-03-99
16-03-2000
14.83
S.B. Manjunath &
D.Umlanaik
12-05-99
17-6-99
12-5-2000
14.00
S.V Sateesh
19-03-99
26-03-99
25-03-2000
17.06
30.24
20.00
2.37
S.K. Muralidhar &
Ravi K.V
22-04-99
07-05-99
06-05-2000
23.61
18.69
23.60
2.47
T.N. Shashidhar
16-03-99
17-03-99
16-03-2000
14.00
11.36
13.59
2.92
L.S Manjunath
02-03-99
10-03-99
09-03-2000
12.00
11.38
10.64
3.34
Total
108.70
81.90
110.42
15.37
13.32
Shimoga
14
15
16
SMG-14
SMG-15
SMG-16
02
02
02
28.83
29.26
37.06
1
C>
17
SMG-17
03
47.21
r
18
19
SMG-18
SMG-19
02
02
M/s Suprada
Construction Co.
behind Vijaya Talkies,
Vijaya Road, Dharwad.
Mohamad Imam,
GPA holder for
M/s Suprada
Construction Co.
Rajendra Prasad
Road , Sagar.
Sri Umesh. S.
Engineers & contractors
‘Sourabh’
A.N.K. Road, 5* Cross
Shimoga_______________
V. Narasimhan,
Contractor
M.M. compound,
Tarikere Road,
Bhadravathi____________
R. Maheshwara Naidu,
Engineers & Contractors,
H. No. 1911,
Somashekarappa Lay
out, Basaveshwara
Nagar,
Bangalore - 79
27.60
M/s Suprada
Construction Co.
behind Vijaya Talkies,
Vijaya Road, Dharvwad.
22.64-
V. Narasimhan,
Contractor
M.M. compound,
Tarikere Road,
Bhadravathi
V.M. Rajaguru,
GPA Holder for
R.M Naidu,
# 743, 10,h Main.
10.22
14.00
4.27
15.27
PJ extension,
Davanagere.
Mohamad Imam.
GPA holder for
M/s Suprada
Construction Co
Rajendra Prasad
Road , Sagar.
lO't I vt. J - ■
VILLAGE WISE PHYSICAL PROGRESS
(PART-I & PART-II VILLAGES)
District
.
P
si
No
Package
No
1
SMG-1
2
I
N-
£
SHIMOGA.
SP/CP
OHT/GLSR
Name of the village
Start date
completion date
13-2-98
12-8-99
Chirdoni*
t---------
Rising main in Km
A
Cumulative
T
during the month
Distribution main
A
Cumulative
T
during the month
Whether sources
established OR not
T
A
T
A
01
01 C
03
03
3.60
4.94
6.80
7.48
YES
01
01 C
01
01
1.37
1.37
4.30
4.30
YES
SMG-1
Bannikodu
3
SMG-1
Mukthenahalli
Scheme Was Handed Over To VWSC On 4th November’99
YES
4
SMG-1
Beeragondanahalli
Scheme Was Handed Over To VWSC On 2tJh October'99
YES
5
SMG-1
Kamsagara
01
01 C
01
01
0.371
0.371
1.61
1.00
YES
6.
SMG-1
Hosakere ( GLSR )
01
01 C
02
02
1.35
1.35
3.87
3.87
YES
7
SMG-2
Haramaghatta*
01
01 C
02
02
4.01
4.01
5.90
5.90
YES
8.
SMG-2
Holalur*
01
01 C
02
02
1.12
1.12
7.205
7.131
YES
9.
SMG-2
Barandur
01
010
01
NIL
0.485
0.45
6.126
6.803
YES
10.
SMG-2
B.Beeranahalli
j------------
01
01 UP
01
SMG-3
Kanchiganahal*
01
01 C
02
11.
25-08-98
24-02-2000
YES
02
1.641
1.641
4.311
4.311
YES
----------------- i--------------------------------
28-02-98
28-08-99
Scheme Was Handed Over To VWSC On 29th October'99
12.
SMG-3
Kagathur
13.
SMG-3
Vaddanal*
01
01 C
02
02
3.521
3.521
5.056
5.056
YES
14.
SMG-3
Hodigere*
01
01 C
04
04
1.315
1.315
8.890
8.890
YES
YES
j------------------------------------
15.
SMG-3
Somalapura
16.
SMG-3
Devarahalli
i
Scheme Was Handed Over To VWSC On 13th December’99.
NIL
_____
NIL
02
NIL
1.270
1.27
YES
3.605
3.92
Note ;
T-Target,
A - Achievement,
P - Procured,
UP - Under progress,
C - Completed.
★
Commissioned
YES
OHT/GLSR
SI
No.
Package
No.
17.
SMG-4
Gama *
18.
SMG-4
Thyagarthi *
Name of the village
SP/CP
Rising main in Km
Start date
completion date
T
A
T
A
T
04-04-98
03-10-99
01
01 C
02
02
1.67
01
01 C
01
01
0.97
*
Cumulative
______ during the month
Distribution main
T
A
Cumulative
______ during the month
Whether sources
established OR not
1.67
2.064
3.40
YES
0.92
6.75
7.60
YES
—i—
I
N
o
i
19.
SMG-4
Kappanahalli
01
01 C
01
02
0.51
0.51
3.295
4.070
YES
20.
SMG-4
Kuppagadde
01
1UP
01
02
0.582
1.10
5.045
2.00
YES
21.
SMG-5
Attigunda
22.
SMG-5
Veerapura
23.
SMG-5
Kudligere*
01
01 C
01
01
1.89
2.64
5.535
5.948
YES
24.
SMG-5
D.B.Halli*
01
01 Up
02
02
1.63
1.63
2.37
2.37
YES
25.
SMG-5
Timmalapura*
01
01 C
02
02
3.10
3.10
4.32
4.32
YES
26.
SMG-5
Marashettyhalli*
01
01 C
02
02
2.195
2.195
5.93
5.93
YES
27.
SMG-5
Thattehalli
28.
SMG-6
Melinakuruvalli
(SSI)
29.
SMG-7
Billahalli*
30.
SMG-7
Pandomatti
31.
SMG-7
32.
SMG-7
Scheme Was Handed Over To VWSC On 2dh July’99
13-02-98
12-08-99
Scheme Was Handed Over To VWSC On 2ffh July’99
Scheme Was Handed Over To VWSC On 22nd October’99
06-11-98
05-05-2000
01
01 C
SP-02.
CP-02
SP-02
2.25
2.25
8.90
8.90
YES
(Tonga river)
01
01 C
01
01
0.725
0.725
3.30
3.30
Shortage of
source
01
01 C
04
NIL
7.10
6.50
9.95
9.95
YES
Belimallur
01
01 UP
Maravanji
01
01 C
01
NIL
1.50
1.50
3.50
3.50
YES
Maravanji Hamlet
01
01 C
02
NIL
3.00
3.00
3.25
3.25
YES
25-08-98
24-02-2000
YES
Note ;
T - Target,
A - Achievement,
P - Procured,
UP - Under progress,
C - Completed.
Commissioned
1
N
O
OHT/GLSR
Rising main in Km
A
SP/CP
Distribution main
T
A
Cumulative
during the month
Whether sources
established OR
not
8.0
15.63
15.63
YES
1.20
3.90
3.90
YES
Start date
completion date
T
A
T
A
T
Cumulative
during the month
01-11-98
01 -05-2000
01
01 C
04
04
10.980
Arabilachi
01
01 C
02
02
1.20
SMG-8
Kudli
01
01 UP
02
NIL
36.
SMG-9
Chandragutti (SSI)
01-11-98
01-05-2000
01
01 C
SP-02,
CP-02
SP-02,
CP-02
3.125
3.125
5.20
6.0
YES
(Varada river)
37.
SMG-10
Keladi (SSI)
07-11-98
05-05-2000
02
1 C/1 up
SP-02,
CP-02
NIL
3.50
3.50
11.00
11.00
YES
(Ml Tank)
38.
SMG-11
Anandapuram
01-11-98
01 -05-2000
01
01C
SP-02,
CP-02
02 CP
7.50
8.24
8.655
10.00
39.
SMG-11
Achapura
(SSR)
01
01 C
02 CP
02 CP
5.0
5.30
6.085
6.46
40.
SMG-11
Yadehalli
01
01 C
02 CP
02 CP
3.50
3.70
6.00
6.93
41.
SMG-11
Malandur
01
01 C
02 CP
02 CP
5.22
5.40
5.160
6.30
42.
SMG-11
Khyra
NIL
NIL
NIL
NIL
NIL
NIL
2.50
2.50
43.
SMG-11 A
Impounding
reservoir
11-11-99
10-4-2000
44.
SMG-12
Udagani
04-09-98
03-03-2000
45.
SMG-12
Humcha
si.
No.
Package
No
33.
SMG-8
Haranahalli
34.
SMG-8
35.
Note ;
T-Target,
Name of the village
A - Achievement,
P - Procured,
YES
YES
(Nandi hole)
Impounding reservoir-Jungle clearance completed.
01
01 UP
01
01
01
01 UP
01
NIL
UP - Under progress,
0.395
0.50
C - Completed.
2.495
2.55
YES
1.25
YES
VILLAGE WISE PHYSICAL PROGRESS
PART - II - Villages
District: SHIMOGA.
SI.
No.
Package
No.
Name of the village
1.
SMG-13
Kodakani (GLSR)
2.
SMG-13
Sigga
I
N
O
'7'
I
SMG-14
OHT/GLSR
SP/CP
Rising main in Km
A
T
Cumulative
_______ during the month
Distribution main
A
T
A
01
01UP
01
01UP
01
01 UP
5.00
5.00
Hirenallur Hamlet
(Kagodu)
01
01 UP
7.00
6.90
Nil
Nil
5.00
4.50
Hirenallur
3.
Start date
completion date
4.
SMG-14
Mudugoppa
5.
SMG-15
Kulagatte
6.
SMG-15
Kyasinakere
7.
SMG-16
Nidige
8.
SMG-16
Antharagange
9.
SMG-17
Kumblur
10.
SMG-17
Suragondanakoppa
11.
SMG-17
Chilur
12.
SMG-18
Hunsekatte
13.
SMG-18
Hosudi
14.
SMG-19
Joladal
15.
SMG-19
Malahal ( GLSR )
20-8-99
5-5-2000
17-03-99
16-3-2000
17-6-99
12-5-2000
26-03-99
25-03-2000
07-05-99
06-05-2000
T
A
T
Cumulative
______during the month
YES
YES
01
01
0.72
0.72
01
01 UP
01
01 C
02
03
1.97
1.95
6.100
6.82
YES
01
01C
01
02
0.575
1.55
3.935
4.40
YES
01
01 UP
01
0.505
2.984
6.41
3.00
Potability established
balance 1200 LPH requred
YES
0.70
YES
Proposed to drop by E.E, DPMU
10-03-99
09-03-2000
Shortage of source
Proposed to drop by E.E, DPMU
01
17-03-99
16-03-2000
Whether sources
established OR not
01
01 UP
NIL
NIL
NIL
01
01C
01
01 UP
YES
2.05
0.30
4.59
4.00
YES
NIL
1.08
1.50
3.49
2.50
YES
01
NIL
0.60
0.50
2.11
2.11
YES
03
NIL
1.85
NIL
3.94
3.94
YES
Note ;
Work under progress in 17 villages,
2 villages proposed to drop by E.E, DPMU
T-Target
A - Achievement,
P - Procured,
UP - Under progress,
C - Completed.
HABITAT DEVELOPMENT (Components)
PART - I - Villages
District : SHIMOGA
si
No
I
N>
Package
No
Water supply components
HP
T
ST
A
CS
T
A
47
T
CT
DB
A
WP
T
A
T
A
T
41
41
17
17
129
1
SMG-1
47
2
SMG-2
07
3
SMG-3
11
20
39
31
21
4
SMG-4
05
10
31
31
14
5
SMG-5
24
54
36
36
6
SMG-6
7
SMG-7
8
SMG-8
9
SMG-9
04
06
SMG-10
04
10
05
26
11
SMG-11
22
26
11
65
12
SMG-12
8
4
25
08
6
10
10
07
06
15
03
Remarks
A
24
24
13
124
125
03
90
61
18
103
65
2
14
03
06
02
21
10
20
o
i
10
---------- [
C- Completed,
03
18
Up - Under progress.
jCT Pvt. L J ■
Shimo^a-S^
HABITAT DEVELOPMENT (Components)
PART - n - Villages
District: SHEMOGA
Water supply components
SI.
No.
Package
No.
13
SMG-13
14
SMG-14
15
SMG-15
16
T
CS
ST
HP
A
A
T
DB
A
T
CT
A
WP
A
T
T
06
27
12
06
38
10
11
58
10
05
18
06
08
30
2
10
SMG-16
03
12
17
SMG-17
4
17
I
18
SMG-18
9
C>
OD
19
SMG-19
11
Remarks
A
rufci
ICT Pvt. 1'
Sbimoga-577 2A
/
DETAILS OF HYDRAULIC TEST CONDUCTED PACKAGE WISE
(PART - I VILLAGES)
Month : DECEMBER’99
District: SHIMOGA
1
5
--0
Total
Target
To end
of
prev.
Month
21.135
21.135
5
19.834
13.102
13.102
03
9.797
31.632
30.512
30.512
05
1.63
1.63
17.07
3.622
3.622
03
14.01
14 01
14.01
32.47
32.47
32.47
06
SMG-6
2.25
2.25
2.25
8.90
8.90
8.90
01
SMG-7
11.72
0 72
0.72
20.00
14.84
14 84
8.
SMG-8
9.20
1 20
1.20
19.53
19.598
9
SMG-9
3.12
3.12
3.12
6.00
10.
SMG-10
3.50
3.50
3.50
11.
SMG-11
22.656
22.656
22.656
12.
SMG-12
0.50
Totals
96 503
Target
To end
of
prev.
Month
SMG-1
9.97
2.
SMG-2
3.
SI
No
Package
No.
1.
Total
Target
To end
of prev.
Month
9.97
9.97
23.135
5.58
4 30
4.30
SMG-3
9.797
9.797
4.
SMG-4
4.20
5.
SMG-5
6.
During
month
I
During
month
GLSR
OHT
Distribution main
Rising main
Durin
g
mont
h
Total
Target
03
03
01
03
03
01
01
04
01
01
19.598
02
01
01
6.00
600
01
11.00
11.00
11.00
01
32.13
32.13
32.13
04
To end of
previous
month
During
the
month
Remarks
Total
Laying of pipe line
under progress
3 55
73.153
73.153
225.251
193.309
193.309
35
09
09
01
DETAILS OF HYDRAULIC TEST CONDUCTED PACKAGE WISE
(PART-II VILLAGES)
SI
No
Package
No.
Target
To end
of
prev.
During
month
Total
Target
Month
I
5
To end
of prev.
Month
During
month
Total
Target
To end
of
prev.
Month
GLSR
During
month
Total
Target
To end of
previous
month
During
the
month
Remarks
Total
Pipe line work not
started
1
SMG-13
2
SMG-14
3
SMG-15
4
SMG-16
3.50
5
SMG-17
3.184
6
SMG-18
3.75
6.50
7
SMG-19
0.50
6.05
Total
10.95
*
OHT
Distribution main
Rising main
Pipe line work
under progress
16.40
0.72
Pipe line work not
started
11.22
2.484
2.484
2.484
2.484
3.00
43.17
Pipe line work
under progress
02
2.980
2.980
Pipe line work
under progress
01
2.980
2.980
- - do - -
03
ABSTRACT
(Part-I & Part-II)
Target
To end
of
prev.
Month
Part - I
96 503
Part -II
SI
No
Package
No.
1
2
Total
Target
To end
of prev.
Month
193.309
193.309
35
43.17
002.980
002.980
03
268 421
196.289
196.289
38
Total
Target
To end
of prev.
Month
73.153
73.153
225.251
1095
2.484
2.484
107.453
75.637
75.637
During
month
OHT
Distribution main
Rising main
During
month
GLSR
During
month
Total
Target
09
09
01
09
09
01
To end of
previous
month
During
the
month
Remarks
Total
ICT Pvt. Lt
a
r * •
INTER CONTENT INENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
KIRWS & ESP
PHASE - H PACKAGE(WORLD BANK ASSISTANCE)
District
Month
SHIMOGA
: December’99
LIST OF DEFICIT CONTRACTORS IN 1st MILESTONE
End of lrt
MS
Achievement to
end of 1“ MS
cumulative in lakhs
Shortfall in
progress in lrt MS
cumulative
Amount
%
m lakhs
Shortfall in
physical status of
works
Delay attributed
to Department/
Contractor
78%
01 - OHT
Contractor
Nil
100%
01-OHT
Contractor/
due to site
dispute.
Nil
100%
01-OHT
Contractor
SI
No
Package
No./Village
No. of
villages
Name of the contractor
1.
SMG-12
/Udagani
02
E. Yangaiah, GPA
holder of
Sri T. Subba Reddy
21.17
4-9-98
10.81
4-3-99
3.63
7.18
2.
SMG-13
02
S. Umesli
26.52
20-8-99
13.20
19-2-2000
Nil
2
----r 02
SMG-15
S.Umesh
29.26
17-6-99
14.00
16-12-99
Nil
I
S’
Date of
start
Target for
1“ MS in
lakhs
Contract
value in
lakhs
l
r vt i' :-
LIST OF DEFICIT CONTRACTORS IN 2nd MILESTONE
SI
No
Package
No./Village
No. of
villages
Name of the contractor
Contract
value in
lakhs
1.
SMG-12/
Humach
02
E. Yangaiah, GPA
holder of
SriT. Subba Reddy
21.17
Date of
start
Target for
2nd MS in
lakhs
End of 2nd
MS
Achievement to
end of 2"* MS
cumulative in lakhs
4-9-98
10.36
3-09-99
7.67
Shortfall in
progress in 2nd MS
cumulative
Amount
%
in lakhs
7.67
25%
Shortfall in
physical status of
works
Delay attributed
to Department?
Contractor
Ol-OHT
Contractor
i
N
N
ICT Pvt. Ltd.,
Shimoga-577 204,
INTER CONTLNTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
KIRWS & ESP
PHASE - H PACKAGE(WORLD BANK ASSISTANCE)
SHIMOGA
District
Month : December’99
STATEMENT OF BOTTLENECKS
1
SI No.
Package No.
No. of
villages
flushing to
be done
1.
SMG-1
NIL
2.
SMG-2
3.
SMG-8
4.
SMG-ll
TOTAL |
No. of
villages New
Borewells to
be drilled
No. of Open
wells
shallow
OHT sites
under
dispute
NIL
NIL
SBC
results
awaited
Sump
sites to be
handed
over
OHT
sites to be
handed
over
Awaiting
Energisation
for
commissioning
NIL
NIL
02
Road cutting
PWD/Highway
Railway
crossing
01
01
01
01
01
Nil
01
Nil
Nil
Nil
Nil
03
01
02
NOTE : List of Villages Package wise Appended.
N
03
1
ICT Pvt-
Pressure testing
( RM + DSM )
T
A
BOREWELL TO BE DRILLED
I
I
I
1
SMG-2
B.Beeranahalli
I
LIST OF VILLAGES AWAITING ENERGISATION
I
SI. No.
Package No.
Village
1.
SMG-1
Kama sagar
2.
SMG-1
Hosakere
3.
SMG-8
Arabilachi
LIST OF VILLAGES AWAITING PERMISSION FOR ROAD CROSSING
N
c
1.
I
SMG-2
Barandur
LIST OF VILLAGES AWAITING PERMISSION FOR RGA&CRtOSSING
SI. No.
Package No.
Village
1.
SMG-8
Haranahalli
2.
SMG-11
Anandapuram & other
villages (SSR).
v
---- Manager
ICT Pvt. Ltd.,
Shimo<ja-5?7 234.
INTER CONTINTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
KIRWS & ESP
PHASE - H PACKAGE(WORLD BANK ASSISTANCE)
District : SHIMOGA
Month : December’99
ST
MILESTONES.
LIST OF WORKS, THE AGENCY IS UNLIKELY TO ACHIEVE THE 1
SI
No.
1
2.
I
b’
<9
3.
Package No.
SMG-12
SMG-13
SMG-15
No. of
villages
02
02
02
Name of Contractor
E. Yangaiah, GPA
holder of
Sri T. Subba Reddy
S. Umesh
S.Umesh
Contract
valve
21.17
26.52
29.26
Date of
start
4-9-98
20-8-99
17-6-99
End of 1“
milestone
4-3-99
19-2-2000
16-12-99
Name of
scheme/village
Udagani
Kodak ani
Kyasinakere
Financial cumulative for
milestone^___
Shortfall %
A
T
10.81
13.20
14.00
3.63
Nil
Nil
Status of
works
Remarks
78%
1 - OHT
Notices has been
issued to the
contractor to make
gwd the shortfall &
Liquidated damages
proposed.
100%
1 - OHT
Notices has been
issued to the
contractor to make
good the shortfall.
1 - OHT
Notices has been
issued to the
contractor to make
good the shortfall.
100%
1
ICT Pvt. Ltd .
Shimo$a-5i7 201.
V
LIST OF WORKS, THE AGENCY IS UNLIKELY TO ACHIEVE THE 2nd MILESTONES.
SI
No.
2.
Package No.
SMG-12
No. of
villages
Name of Contractor
E. Yangaiah, GPA
holder of
Sri T. Subba Reddy
02
Contract
valve
21.17
Date of
start
4-9-98
End of 2nmilestone
3-9-99
Name of
scheme/village
Humcha
Financial cumulative for
milestone II___
Shortfall %
A
T
10.36
7.67
25%
Status of
works
Remarks
1-OHT
Notices has been
issued to the
contractor to make
good the shortfall
Liquidated damages
proposed.
1
i
V
(?'
I
ICT Pvt. Ltd., Shimo^l-Si 1204.
INTER CONTINTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
KIRWS & ESP
PHASE - II PACKAGE(WORLD BANK ASSISTANCE)
District
LIST OF AGENCIES ON WHOM PENAL ACTION HAS BEEN RECOMMENDED.
SI
No.
Package
No.
SMG-12
1
No. of
villages
02
Name of Contractor
T. Subba Reddy
Contract
valve
21.17
Date of
start
4-9-99
End of 1”
milestone
03-03-99
Name of
scheme/village
Udagani
Note : Liquidated damages proposedfor 220 days @ Rs. 200/- per day as per
i.e Rs. 44000/-.
Financial cumulative for
milestone I__
Shortfall %
A
T
10.81
3.63
78%
Status of
works
SHIMOGA
Details of penal
action
Remarks
Liquidated
damages
1-OHT Proposed
for 220 days
NCBfrom the date of completion of V milestone period
)
I
SI
No.
1.
Package
No.
SMG-12
No. of
villages
02
Name of Contractor
T. Subba Reddy
Contract
valve
21.17
Date of
start
4-9-98
End of 2n,'
milestone
04-09-98
Name of
scheme/village
Humcha
Financial cumulative for
milestone II___
Shortfall %
A
T
10.36
7.67
25%
Status of
works
Details of penal
action
l-OHT
Liquidated
damages
Proposed
for 38 xdays
Remarks
Note : Liquidated damages proposedfor 38 days @ to. 300/- per day as per NCBfrom the date of completion of 2"“ milestone period.
i.e. Rs. 11400/Total amount levied Rs. 55400/-. The same has been proposed to recover liquidated damages in the
Part bill of the tender
contractor.
ICT T\ t. C .
?-4.
o
INTEGRATED RURAL WATER SUPPLY AND
ENVIRONMENTAL SANITATION PROJECT
KARNATAKA
(World Bank Assistance)
Phase II
Package
II
Villages
PROGRESS REPORT
of SSI-SSR Schemes
For the Month of DECEMBER1999
INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT LTD NEW DELHI
CONSULTANTS FOR CONSTRUCTION MANAGEMENT AND QUALITY CONTROL
PROGRESS REPORT FORMAT FOR SSI / SSR SCHEMES
abstract
Type o’ Scheme
Sr
No.
Name of the
District
No of Packages
/ Villages
Tender
cost
No. of
contrctor
SSR
SSI
Expenditure to end of 12 /
99 (Rs. In lakhs)
I
River/lntake well
T
A
X
Y
X
Y
1
2
1
2
8
9
10
11
12
13
14
15
1
2
14
5
5
1
2
3
4
5
6
7
1
Belgaum
14/22
2330.46
14
233046
1317.12
12
2
Bellary
1/1
84.97
1
8497
32.65
1
3
Raichur
2/21
688.33
2
481.00
511.61
4
Shimoga
4/9
327.59
4
250.44
248.44
TOTAL
21/53
3431.35
21
3145.9
2109.82
Y - No. of schemes (work under progress)
1 = Work started and under progress to be ticked
2 = work completed to be ticked
1
1
2
2
1
3
1
4
4
16
5
21
10
i
Ch
Status of permission for
drawal of water
5
PROGRESS REPORT FORMAT FOR SSI / SSR SCHEMES
Raw water pumping machinery
Approach Channel
Approach
Bund/Bridge
Jack well work
Pumps procured
cleared
Pumps
procured
KEB approached
for power
Power
sanctioned
Erection done
Commissioned
25
26
27
1
2
1
2
1
2
16
17
18
19
20
21
22
23
24
6
2
10
3
11
3
8
6
14
4
4
2
10
18
2
1
1
1
1
1
2
1
2
I
4
£
-o
8
3
15
4
4
15
5
11
1 = Work started and under progress to be ticked
2 = work completed to be ticked
Pr_sk
2
Water Treatment Plant
A
B
C
D
E
G
F
OHT/Sump
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
14
2
14
4
s
20
15
I
A - Aerator
B - Flash Mixer
C - Clariflocculator
D - Rapid/ Slow Sand Filters
E - Clear Water Sump
F - Pure Water Sump House
G - Pure Water Pumping Machinery
1 - Work started
2 - Work completed
14
14
1
i
Pr sir
Length of RM laid in Kms
2
1
3
4
15
3
20
T
A
Length of DM laid in kms
T
A
44
45
46
47
14
98.55
54.1
154.15
106.66
1
4.70
0.95
4.64 (GM)
0.08
2
73.4
50.00
55.40
54.80
4
26
31.52
53.00
58.00
4
202.65
0.95
136.52
0.08
262.55
219.46
17
Impounding
Reservoir
%of
Progress
48
Bottlenecks
if any.
49
PROGRESS REPORT FORMAT FOR SSI / SSR SCHEMES
District : Belgaum
Expenditure to end of
(Rs. In lakhs)
T
A
9
8
54.86
95.74
Name of the
package
Name of the Village/
Villages
Tender
Cost
Name of the
Contractor
Date of
Start
Date of
completion
2
7
2
BGM - 02
3
Bellad
Bagewadi
4
95.74
5
Shri. B.R. Patil
Nippani
6
13/10/99
7
25/4/2000
2
BGM-16
Kunnur
116.11
M/s. Suprada
Constructions
Dharwad
8/12/98
08/6/2000
116.11
83.11
3
BGM-17
Mangavati
51.26
Shri. Lathure &
Brothers Lathur
18/12/98
18/6/2000
51.26
12.36
4
BGM-18
Ainapur
93 36
Shri. B.R. Patil
Nippani
25/10/98
25/4/2000
93.36
25.36
5
BGM-19
Jugul
99 34
Shri. B. R. Patil.
Nippani
25/10/98
25/4/2000
99.34
20.65
6
BGM-19A
Shiruguppi
79.3
Shri. B. R. Patil
Nippani
25/10/99
25/4/2000
79.3
29.56
7
BGM-20
Akkol
117.10
Shri. E3 R. Patil
Nippani
25/10/98
25/4/2000
117.10
53.74
8
BGM-21
Soundatti
126.80
M/s. Suprada
Constructions
Dharwad
23/9/98
23/3/2000
126.80
91.39
9
BGM-22
Chmchali
225
Shri. H. P.
Madhukar, Hubli
27/10/98
27/4/2000
225
152.41
13
BGM-23
Borgaon
146 45
Shri. B.R. Patil
Nippani
25/10/98
25/4/2000
146.25
55.49
11
BGM-24
Hosur
241
Shri. G.
Krishna Reddy
Hubli
27/10/98
27/4/2000
241
116.48
12
BGM-30
Asundi
197
Shri. H P.
Madhukar, Hubli.
25/10/98
25/4/2000
197
154.03
• Sr. No.
1
Types of Scheme
H
SSI
X
10
Y
11
SSR
X
12
y
13
Status of permission
for drawal of water
1
2
14
15
✓
Sr. No.
1
13
Name of the
package
Name of the Village/
Villages
Tender
Cost
Name of the
Contractor
Date of
Start
Date of
completion
2
BGM-26
3
4
540
5
6
24/9/98
7
24/3/2000
16/12/98
26/6/2000
Neginhal
Sampgacn
M. K. Hubii
Hole Hosur
Sanikop
14
202
BGM-27
Pachapur
Sindhihatti
Rustumpur
Bagamal
Karaguppi
M/s. Rao
Constructions
Bangalore.
Shri. H. P.
Madhukar, Hubli.
Expenditure to end of
(Rs. In lakhs)
T
A
8
9
540
335.30
202
SSI
X
10
Types of Scheme
. |
SSR
Y
11
X
12
y
13
Status of permission
for draws I of water
1
j
2
14
|
15"
132.38
X - No. of schemes where work is over till water treatment plant:
Y - No. of schemes (work under progress)
1 = Work started and under progress to be ticked
2 = Work completed to be ticked.
)
P
b»
r
District Manager,
ICT. Pvt Ltd.,
Belgaum.
PROGRESS REPORT FORMAT FOR SSI / SSR SCHEMES
River / Intake well
1
16
2
17
Approach Channel
1
18
2
19
Approach Bund / Bridge
1
20
2
23
Pumps
procured
cleared
24
Pumps
procured
25
______ Raw water pumping machinery
Power
Errection
KEB approached for
Power
sanctioned
done
26
z
z
z
z
z
1
22
z
z
z
2
21
Jack well work
z
z
z
z
z
z
z
z*
z
z
I
z
N
N
z
z
z
W
z
z
z
z
z
z
z
z
z
z
■/
z
z
V
z
J
7
27
28
Commissioned
29
River / Intake well
1
2
16
17
Approach Channel
1
18
2
19
Approach Bund / Bndge
•1
20
2
21
Jack well work
1
22
2
23
Pumps
procured
cleared
24
z
z
Pumps
procured
25
______ Raw water pumping machinery
KEB approached for
Power
Errection
Power
sanctioned
done
26
27
Commissioned
28
z
z
1= Work started and under progress to be ticked
2 = Work completed to be ticked
District Manager,
ICT. Pvt Ltd.,
Belgaum.
l
V
I
29
PROGRESS REPORT FORMAT FOR SSI / SSR SCHEMES
30 |
0
B
A
2
31
1
32
2
33
1
34
2
35
1
36
0
Z
Z
<8>
I
P
Length of RM laid in Mtn
Water Treatment Plant
D
E
2
37
1
38
2
39
1
40
2
41
_1_
42
Z
Z
0
0
o
0
0
Z
0
0
0
0
0
0
Z
0
0
0
0
0
0
0
0
0
0
0
0
Z
0
0
0
0
0
0
Z
0
0
0
0
0
0
Z
0
0
0
0
0
0
0
0
0
0
0
0
Z
0
0
0
0
0
0
Z
0
0
0
0
0
0
Impounding
Reservoir
.% of Progress
Bottlenecks
50
51
OHT/Sump
T
44T 45
46
47
48
z
5.25
1.1
10.5
5.0
NA
2.25
2.0
8.3
7.3
NA
2.20
1.8
3.22
3.22
NA
2.20
13
5.0
NA
2.20
10.5
5.5
NA
Z
’ z
z
5.2
0.5
8.73
6.5
NA
2.9
2.3
6.7
6.2
NA
Z
1.85
1.1
12.0
12.0
NA
Z
8.9
8.4
24.0
8.5
NA
Z
2.9
1.0
10.2
3.0
NA
0.39
60
5-0
NA
13.5
11 0
9.0
NA
Z
Z
z
Z
-
Z
Z
2
43
A
A
Z
0
z
G
F
Length of DM Laid in Kms
T
z
Z
5.2
z
140
if any. Q
I
1
30
C
5
A
2
31
1
32
2
33
1
34
2
35
<8>
A - Aerator
B - Flash Mixer
C - Clariflocculator
D - Rapid I Slow Sand Filter
E - Clear Water Sump
F - Pure Warer Sump House
G - Pure Water Pumping Machinery
1 - Work Started
2 - Work Completed
I
s
»
1
36
2
37
1
38
OHT / Sump
T
A
T
A
Impounding
Reservoir
% of Progress
Bottlenecks
if any.
2
45
46
47
48
49
50
51
29.^
22-10
23 0
24-x0
7
6.24
Length of RM laid in Mtre
Water Treatment Plant
E
D
G
F
2
39
1
40
z
z
z
Z
2
41
1
42
Z
2
43
1
44
14.50
Length of DM Laid in Kms
Survey in progress
NA
District Manager,
ICT. Pvt. Ltd.,
Belgaum.
PROGRESS REPORT FORMAT FOR SSI SCHEMES
District : Bellary
Type of Scheme
Sr.
No.
Name of the
Package
Name of the
Village
1
2
3
1
BLR -13
Total
1
1
Tender cost
4
84.97
84.97
Name of the
Contractor
5
Date of
Start
6
1
1 = Work started and under progress to be ticked
2 =■ work completed to be ticked
i
P
i
7
M/s. Rao
Constructi
ons
17-4-99 16-4-2000
Bangalore
Y - No. of schemes (work under progress)
N
Date pf
Completion
Expenditure to end of 12
/ 99 (Rs. In lakhs)
SSI
SSR
Status of permission River/lntake well
for drawal of water
T
A
X
Y
X
Y
1
2
8
1
2
9
10
11
12
13
14
15
16
17
84.97
32.65
1
84.97
32.65
1
PROGRESS REPORT FORMAT FOR SSI / SSR SCHEMES
Raw water pumping machinery
Approach Channel
Approach Bund/Bridge
Jack well work
1
2
1
2
1
2
18
19
20
21
22
23
Pumps procured
cleared
Pumps
procured
KEB approached
for power
Power
sanctioned
Erection
done
24
25
26
27
28
Commissioned
29
T
1
1
I
N
£
1 = Work started and under progress to be ticked
2 = work completed to be ticked
Water Treatment Plant
I
b»
OHT/Sump
G
F
E
D
C
B
A
Length of RM laid in Kms
1
2
1
2
1
1
2
1
2
1
2
1
2
1
2
30
31
32
33
34
36
37
38
39
40
41
42
43
44
45
A - Aerator
B - Flash Mixer
C - Clariflocculator
D - Rapid/ Slow Sand Filters
E - Clear Water Sump
F - Pure Water Sump House
G - Pure Water Pumping Machinery
1 - Work started
T
A
46
47
4.70
7.64
4.70
7.64
Length of DM laid in kms
T
48
A
49
Impounding
Reservoir
% of
Progress
50
Bottlenecks
if any..
51
PROGRESS REPORT FORMAT FOR SSI / SSR SCHEMES
Month : Nov'99
SI.
No.
I
N
w
9
Name of
the
package
Tender cost
Name of the Village
in Rs.
Lakhs
Name of the
contractor
Date of
start
Date of
completion
Expenditure to end
of Nov'99 (Rs. In
lakhs)
Type of Scheme
SSI
SSR
T
A
X
Y
X
Y
1
2
12
13
14
15
1
2
3
4
5
6
7
8
9
10
11
1
RCR-3
Kurkehalli & other
4 villages
109.26
M/s Malu
Constructions
5.12.98
4.6.2000
76
60.38
Nil
Nil
2
RCR-10
H. Akkur & other
15 villages
579.07
M/s Malu
Constructions
5.12.98
4.6.2000
405
451.23
X - No. of schemes where work is over till water treatment plant:
Y - No of schemes (work under progress)
1 - Work started and under progress to be ticked
2 - Work completed to be ticked
Status of
permission for
drawal of water
1
1
PROGRESS REPORT FORMAT FOR SSI / SSR SCHEMES
Raw water Pumping Machinery
River/lntake well Approach Channel
Approach
Bund/Bridge
Jack well work
Pumps
procured
KEB
approached
for power
Power
sanctioned
Erection
done
Commissioned
1
2
1
2
1
2
1
2
Pumps
procured
cleared
16
17
18
19
20
21
22
23
24
25
26
27
28
29
Nil
Nil
Yes
No
Yes
under
progress
No
No
Yes
No
Yes
under
progress
No
No
I
N
Cj
7
1 - Work started and under progress to be ticked
2 - Work completed to be ticked
1
Length of RM
laid in mtrs
Water Treatment Plant
T
A
T
A
Impounding
Reservoir %
of Progress
46
47
48
49
50
Nil
18
16
11.1
10.5
Nil
Nil
55.4
34
44.3
44.3
Nil
C
B
A
E
D
F
OHT /
Sump
G
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
I
VJ
p
A - Aerator
B - Flash Mixer
C - Clariflocculator D - Rapid/Slow Sand Filters
E - Clear Water Pump
F - Pure Water Sump House
G - Pure Water Pumping Machinery
1 - Work started
2 - Work completed
Length of DM
laid in mtrs
A
Bottlenecks
if any
51
PROGRESS REPORT FORMAT FOR SSI/SSR SCHEME
Date of
start
Sr.
No.
Name of
the
package
Name of the villages
2
3
4
_________ 5_______ __
6
1
1
SMG-6
Melinakururvalli
41.67
M/s Suprada
Construction Co.
2.
SMG-9
Chandragutti
60.15
SMG-10
SMG-11
4.
Tender
cost
Name of the
contractor
Date of
completion
Expenditure to end of
Dec’99
(Rs. in Lakhs)
Month : DECEMBER’99
Status permission for
drawal of water
Type of scheme
SSI
X______
10
SSR
x
1
2
14
Ts
T
A
7
8
9
6-11-98
5-5-2000
37.50
28.66
1
1
V. Narasimhan
1-11-98
1-5-2000
46.84
37.31
1
1
7-11-98
5-5-2000
30.00
27.13
1
Keladi
M/s Suprada
Construction Co.
1
42.76
Anandapuram
& other 4
villages_____
183.01
M/s Maloo
Constructions.
1-11-98
1-5-2000
136.10
155.34
Y
11
12
Y
13
1
1
_
I
N
)
x - No. of Schemes were works is over till water treatment plant
V- No. of schemes ( Work under progress)
1
2
Work started and under progress to be ticked
work completed to be ticked.
Contd.
.2.
I
-2-
i
River/Intake
well
Package
No.
1
16
I
N»
2
17
Approach
channel
1
18
2
19
Approach
bund/bridge
1
20
2
21
Jackwell work
1
22
2
23
Raw water pumping machinery
Pumps
procured
cleared
Pumps
procured
24
25
KEB
approached
Power
sanctioned
Erectio
n done
Commissioned
power
26
27
28
29
for
SMG-6
1
1
1
YES
YES
YES
NO
NO
SMG-9
1
1
1
YES
YES
YES
NO
NO
SMG-10
1
1
1
YES
YES
NO
NO
NO
SMG-11
1
1
1
YES
YES
NO
NO
NO
V)
1
1 Work started and under progress to be ticked
2 = work completed to be ticked.
NOTE : KEB work completed for SMG-6 & SMG-10 connection not availed.
Contd
3.
- 3 -
Length of RM lain
in Kni
Water Treatment Plant
Package
No.
B
A
1
30
SMG-6
2
31
1
32
l
-
SMG-9
SMG-10
2
1
2
i
2
33
34
35
36
37
2
1
42
T
A
T
A
2
43
44
45
46
47
__<8_
49
50
51
1
2
38
39
1
40
2
1
I
2
3.0
2.25
8 00
8 Q0
NIL
NIL
1
1
2
4.0
3 12
5.00
6.00
NIL
NIL
1
2
3.0
3.50
12.00 |
11 00
NIL
NIL
2
16.00
22.656
28.0
32.13
NIL
NIL
1
41
-b
4-
i
1
SMG-11
2
1
1
2
1
J
i
1
A - Aerator
B - Flash Mixer
C - Clariflocculator
D - Kapid/Slow sand filters
E - Clear water Sump
F Pure water sump 1 louse
G - Pure water pumping machinery.
1 - Work stalled
2 - Work completed.
1
1
C
Impounding Bottlene
cks
reservoir %
of progress , IF ANY
OHT/
Sump
2
1
G
F
E
D
C
Length of DM lain
in Kin
i
Position: 1792 (3 views)