Government of Karnataka
Public Health Engineering Department

KARNATAKA : Integrated Rural Water Supply
and Environmental Sanitation Project
(World Bank Assistance)
Phase II - Package II

Consultancy Services for Construction
Supervision and Material Quality Control for
Rural Piped Water Supply Schemes

Progress Report - December 1999

Intercontinental Consultants and Technocrats Pvt. Ltd.

and

mm

Multimedia Consulting Engineers
11

CONTENTS
SI. No.

Particulars

Page No.
From

To

1.

Brief Note

1

-06

07
15
17
20

14
16
19
22

2.

ANNEXURE- I
ANNEXURE - II
ANNEXURE-III
ANNEXURE-IV
ANNEXURE- V
Organisation Chart

3.

Summary of Financial Progress for December 1999

25

4.

Summary of Abstract ( Milestone wise )

26

5.

Summary of Financial Progress (Format-01)

6.

23
24

a) Part - I

27

b) Part - 11

28

Summary of Physical Progress (Format-02)
a) Abstract (Batch I.II & III)
b) Batch-I & II
c) Batch - III
Summan- of Commissioning & Handing over schemes

29
31
33

8.

List of villages commissioned during the month

36

37

9.

Total commissioned village list to end of December'99

38

40

10.

List of villages handed over to VWSC

41

11.

Status report of commissioned of schemes to end of
December 1999

42

12.

Status Position of District wise commissioning of
schemes to end of December 1999

43

13.

List of villages awaiting Energisation

14.

Implementation As per Exit Policy

47

15.

Statement of Bottlenecks

48

16.
17.

Details of villages where work not started
Notations

49
50

18

District wise Progress Report

19

30
32
34

35

44

46

(i) Belgaum District

51

99

(ii) Bellary District

100

122

(iii) Bidar District

123

142

(iv) Gulbarga District

143

170

(vi) Raichur District

171

195

(v) Shimoga District
SSI - SSR Schemes

196
218

217
235

I

I

. ...

gg

j'X

<’'r

w
X

j?-

.$>

X

f

4:

■I

k

<

I1

1 \\ J

*

vu
I
£ : i .ii-X^^S. ^j

J

:;.....4 y .X
|•

||


■■

'

’ ■

iQ

(S.Ramadan)
Project Manager
LC.T. (P). Ltd.
Bangalore.

wx rw

i Wvt
I
-

I I

ys 1.

:iff::><<:Sy..

■I

cfc



i r.

iff

I ’C

y f:

.rSSSSfWff -?

J I

II 17

INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
Integrated Rural Water Supply & Environmental Sanitation Project, Karnataka

|

X

*.... ...

...



ir

fl

;:f

f



.

«SjSW»f^

-^*--

;
^***!

g

•"■1 r;?
1' F’/ Ii I■ 1 *"...
■i

I'w

|g

t

BRIEF NOTE:
The Rural Development and Panchayat Raj Department Government of Karnataka

is implementing an Integrated Rural Water Supply and Environmental Sanitation Project
with World Bank Assistance. The Intercontinental Consultants and Technocrats Private

Limited are the Consultants for Construction Supervision and Material Quality Control for
Phase-II Schemes in Six districts of Northern part of Karnataka.

The Progress Report as per the prescribed formats of Engineer-in-Chief PHED are
herein enclosed along with formats as per Aid Memoir of World Bank Review Mission of

November 1998 communicated by EIC to the Consultants.

ACTIVITIES:

Schemes so far awarded are for 145 Packages covering 424 villages

excluding dropped villages for non payment of required contribution by beneficiary
villages. Work in 12 villages is not yet started due to source not yet finalised. The list of

villages is furnished in this Progress Report. During the month 33 schemes have been

commissioned. A total of 107 schemes have been commissioned to end of December 1999.
During the month a total of 4 Schemes have handed over to VWSC. The up to date nos. of

schemes handed over so far are 26. In 66 villages physical work is completed however
energisation is awaited.

Review meeting with the Director PPMU:

The Director PPMU conducted a review meeting on 28-12-99 wherein the Engineer­
in-Chief PHED, the Superintending Engineers PHE Circles, the Executive Engineers

DPMU (WBP), District Managers ICT, Project Manager and other consultants attended.

1

The review by the Director focussed on the World Bank Review Mission NovemberDecember 1999 Aide Memoire observation as indicated below:

(a) On handing over of schemes in a complete manner and observing its
performance for another two to three months by visiting these handed over
schemes and invoking construction liability defects clause of contractor for
rectification of defects noticed.
1

(b) Physical progress unsatisfactory
(c) Exit Policy 1st Visit and 2nd Visit has been elaborated by the World Bank Review
Mission for a joint inspection by all concerned.

(d) If the Disinfectant unit (DIU) is not energized or not functioning the schemes
cannot be taken as completed for handing over.

The Director PPMU later had a review meeting on energisation of schemes with the

KPTCL Officers. After observing contratory statements on the joint statement of Executive

Engineer DPMU and KPTCL Officers on the energisation of schemes. The Director
instructed that all the Executive Engineers should sign the joint statement of energisation
only after the Executive Engineers are convinced of the complete energisation by KPTCL.

The Director hinted that the next meeting will be held by 15th January and above subject
will be the main Agenda.

District Managers Meeting:
A meeting of all District Managers ICT (P) Ltd. was conducted by the Project
Manager on 28-12-99 after noon. The Project Manager reviewed the status position on the

pendency of obtaining approvals for extension of time for packages where the packages

could not be completed by the contractors as per the Agreemental period of commissioning

and needs extension of time as per the provision of contract agreement by competent
authority. The Engineer-in-Chiefs letter No.3405 dt.4-10-99 in this regard was brought to

their knowledge.

2

The Project Manager further sought immediate action by the District Managers in

obtaining final bills, record drawings and getting up revised estimates as and when villages
are completed and not to allow this work to be kept pending till end and get it accumulated.

Once the AEs posts are reduced as per the completed schemes by the Government, the
District Managers will face difficulty. As already instructed if the Contractors fail to

respond, these may be got attended by the concerned AEs and service charges claimed from
the Executive Engineer for deducting from the Contractor’s Bill under intimation to the

Project Manager.

The Project Manager also directed the District Managers to submit and obtain
approvals for modifications from the Executive Engineer for all technical deviation as per
the prescribed World Bank format. They should not submit proposals in piece meal

manner. Modifications proposals in such Packages should be submitted in a complete
manner indicating financial implications for entire package to avoid delay in obtaining
approvals, these modifications work may be taken up with the contractor after approval

from the Executive Engineer.

The Project Manager also brought to the notice that the District Managers should
adhere to the physical completion programme prepared by them in consultation with the
Contractors and submitted to the Government and the Engineer-in-Chief PHED. The

Contractors should be committed to the programme. The Contractors should adhere to
this programme scrupulously and not changed fortnightly or monthly as it well have no

credibility. The District Managers should also take up proactive action with the Contractors
for completion of schemes as per the schedule. The Superintending Engineers may also be
persuaded to conduct management meetings for coercing the Contractors to keep the

schedule of physical completion.

3

Inspection visit by the Project Manager
1.

Shimoga District from 1/12/1999 to 5/12/199 and from 15-12-1999 to 19-121999. The Inspection details are enclosed vide Annexure-I.

ii.

Belgaum District from 6-12-199 to 9-12-1999: Copy of the contents of the

report submitted to the Director PPMU reproduced for needful of

concerned at Annexure-II

iii.

Gulbarga District from 10-12-199 to 13-12-1999: The inspection report vide
Annexure-III

Delay in implementation of schemes: (News Report)
It is a matter of great resentment that the World Bank has communicated to the

Government of India, the delay in implementation of these World Bank aided Water
Supply Schemes in Karnataka as per News Paper reports on the discussions on state issues

in Lok Sabha in last session . This unhappy situation is entirely due to non performance of
these Contractors as per their own Agreemental commitment. The Consultants are taking

all possible efforts to motivate these Contractors. In order to bring this lethargic attitude to
their notice and its repercussion on the in coming World Bank Project, I have issued

Circular instructions to all District Managers to bring to their personal notice and
constantly reminding them the need to improve their performance. The details are
indicated in Annexure-IV.

Potability of drinking water
The presence of lead in drinking water beyond permissible limits which is highly
toxic substance is a health hazard. A write up on the deliberations of international
t

conference on lead poisoning held in Bangalore is appended at Annexure-V for information

and appraisal of all concerned.

4

Bottlenecks:
66 Schemes have been physically completed and awaiting energisation. There is no

immediate required action by KPTCL (KEB) to reduce the monthly pending list to nil. This

has also been brought to the notice by the consultants to the Director PPMU vide

Consultants letter No. DO.NO.ICT/WB-KAR/PRM/TA-I/F-26/65/00-2000 dt. 30-12-1999.
This has to be taken at the top appropriate level at the Government. Further there are 8

villages where sources have to be established. In 5 villages OHT sites has to be handed over.

Early action from the Client is requested.

Slow Progress by the Contractors
The Contractors continue with the slow progress despite lot of inducement,
persuasion and motivation and finally levying liquidated damages. These particulars are

being regularly brought to the notice of the Client in the Progress Reports, for further
drastic action. The Clients department have to take up timely action as per the conditions of

contract or terminate their contract in cases of most incorrigible contractors or otherwise
the completion of schemes will be delayed.

Welcome to the New Engineer-in-Chief PHED
I on behalf of the consultants heartily Welcome our new Engineer-in-Chief PHED

Sri. B.Srinivasa. He being a dynamic result oriented man, I am sure the Project will further
gain immensely under his command and able guidance in accelerating the commissioning

of schemes.
We extend full cooperation and services in fulfilling the assigned tasks in the

Project.

5

Welcome to the New Additional Director (Administration)
I also welcome Sri. Pande, the new Additional Director (Administration) PPMU we
assure our full cooperation, towards project implementation. The Consultants also record
with gratitude the outgoing Additional Director (Administration) Sri. C.M. Shirol for his
services rendered to this project.
The Monthly Progress Report for the month of November 1999 is herewith

submitted to the Director PPMU and Special Secretary to Govt. RD & PR Department
Government of Karnataka for kind information and needful action.

io
(S.Ramadas)
Team Leader & Project Manager
ICT (P) Ltd., Bangalore.

10/01/2000

6

ANNEXURE -1

Inspection Notes Of Sri S. Ramadas, Project Manager, ICT (P) Ltd.,
Bangalore During His Inspection Of Works Of KIRWS, Phase-II Works In
Shimoga District On 02-12-99 to 03-12-99.
-:The inspection of works in Phase-11 w orks under Package SMG-2 in Shimgoa taluk
On 2nd Dec’99
Officer^ and Engineers Present

Sri S T Krishnamurthy. District Manger. ICT (P) Ltd.. Shimoga
2. Sri B Shivakumar & Sri L.S. Manjunath, Assistant Engineer, ICT (P) Ltd.. Shimoga.
3. Contractor / Representative not present.
1.

1. Village : Haramaghatta This scheme has been approved under package SMG-2

entrusted to Sri S. Umesh, Class I

Contractor. Shimoga. In this village water supply works have been completed and commissioning
could not be done due to delay in energisation by the KEB authorities, inspite of continued persuatioii
with them. It was instructed to obtain power supply and commission the scheme. Then OHT to be

filled up with water and hydraulic test to be conducted. If there are any leakage in the container of
the OHT, then the defects should be attended immediately and rectified. If every thing is O.K. trial

run the scheme for 7 days and then arrange to hand over the scheme to VWSC.

2. Village : HolalurThis scheme has been approved under package SMG-2 &, entrusted to Sri S. Umesh, Class I
Contractor. Shimoga. In this \ illage water supply works have been completed'and it was informed.

that commissioning could not be done due to delay in energisation by the KEB authorities, inspite of
continuous persuation with them

It was instructed to obtain power supply and commission the

scheme. Then OHT to be filled up w ith water and hydraulic test to be conducted. If there are any
leakage in the container of the OHT. then the defects should be attended immediately and rectified

If

every thing is O.K trial run the scheme for 7 days and then arrange to hand over the scheme io

vwsc.
Could.

- 7-

-1-

-^The inspection of works in Phase-11 works under Package SMG-8 in Shimgoa taluk.:On 2"d Dec’99

3. Village : Kudli
Officers and Engineers Present.

1. Sri S.T. Krishnamurthy, District Manger, ICT (P) Ltd., Shimoga.

2. Sri B.Shivakumar & Sri L.S. Manjunath, Assistant Engineers, ICT (P) Ltd., Shimoga
3. From contractor side Sri Vasudev, Site Engineer presented.
This scheme has been approved under package SMG-8 & entrusted to Sri K.C. Shivaram,

Class I Contractor. The OHT site was inspected, the bottom raft slab was laid and concrete columns
have come upto G.L brace beams.

The reinforcement for the brace beams at G.L was tied and

centring work was in progress. It was observed that for the bottom of the brace beam, centring plates

were not provided and they were getting ready to lay the concrete on the earthen surface only, which

is not desirable, and highly objectionable. When questioned vyith the site engineer of the contractor.
he was unable to justify the action taken by him. He was warned and instructed to provide centring
for the bottom and sides of the brace beams and after the inspection of the same by the District

Manger, then concrete may be laid. In this regard the engineer incharge from the ICT. side was also
warned for not instructed the contractor properly and instructed to see such .mistakes should not be

allowed to occur in future.

Contd.
-8-

3

-3-

-:The inspection of works in Phase-ll works under Package SMG-16 in Shimgoa taluk*:On 2nd Pec,99

4. Village : Nidige

Officers and Engineers Present.

1 Sri S T. Krishnamurthy. District Manger, ICT (P) Ltd., Shimoga.
2. Sri S.V. Sateesh, Assistant Engineer, ICT (P) Ltd.. Shimoga.
3. Contractor Sri V. Narasimhan present.

This scheme has been approved under package SMG-16 & entrusted to Sri V. Narasimhan,

Class 1 Contractor. The water supply works has been completed, except some minor works such as
providing fencing alround the OHT area, fixing of gauge plates, lightening arrestor and Disinfection

unit etc.

The contractor has been instructed to obtain power supply from KEB authorities and

commission the scheme immediately. Further he was also instructed to fill up the OHT with water

and observe for leakages if any. If so immediate action to be taken to rectify the defects and if every
thing is O.K. then the scheme should be trial run for 7 days and action to be taken to hand over the
scheme to VWSC after its successful trial run.

The contractor Sri Narasimhan has promised to

complete all the balance works and habitat development works by end of December’99.

5. Village : Antharagange
Officers and Engineers Present.

1 Sri S T. Krishnamurthy. District Manger, ICT (P) Ltd., Shimoga.
2. Sri S.V. Sateesh, Assistant Engineer, ICT (P) Ltd., Shimoga.
3 Contractor Sri V. Narasimhan present.

This scheme has been approved under package SMG-16 & entrusted to Sri V. Vlarasimhan,
Class 1 Contractor. The water supply works has been completed, except some minor works

Contd.
-9-

4

- 4such as providing fencing alround the OHT area, fixing of gauge plates, lighting arrestor and
Disinfection unit etc.

The contractor has been instructed to obtain power supply from KEB

authorities and commission the scheme immediately.

OHT with water and observe for leakage if any.

Further he was also instructed to fill up the

If so immediate action to be taken to rectify the

defects and if every thing is O.K. then the scheme should be trial run for 7 days and then action to be
taken to hand over the scheme to VWSC after its successful trial run. The contractor Sri Narasimhan

has promised to complete all the above mentioned minor works and habitat development works by
end of December'99.

-:The inspection of works in Phase-11 works under Package SMG-8 in Shimgoa taluk.
On 3rd Dec’99

6. Village : Anandapuram - SSR Works.
Officers and Engineers Present.

1. Sri S.T. Krishnamurthy, District Manger, ICT (P) Ltd., Shimoga.
2. Sri T. Prakash, Assistant Engineer, ICT (P) Ltd., Shimoga.
3. Contractor side Engineer Sri Anand was present.

This scheme has been approved under package SMG-11 & entrusted to M/s Maloo
Constructions, Bangalore. The inside finishing works of the Water Treatment Plant were nearing

completion. The over burdened earth near pure water sump was removed. Further it was instructed
to provide 0.60 x 0.60 m steps alround the pure water sump upto G.L. and suitable slope to be

provided where ever necessary and to be protected with rough stone revetment alround the pure water

sump if necessary'

Pump houses are to be provided (2 Nos.) on either side of pure water sump on

North-South side, so that the length of the suction pipes are to be provided as minimum a^possible.
Further it was instructed to fill up the OHT’s with water at Achapura, Yadehalli,

Anandapuram & Malandur by making other arrangements by the contractor and to test for its water
tightness and to conduct hydraulic test of OHTs etc. The balance works are to be completed early.
Contd. . . 5.

-57. Impounding Reservoir Between Anandapuram & Nandi Hole :

Officers and Engineers Present.
1.
2.

3

Sri S T. Krishnamurthy, District Manger, ICT (P) Ltd., Shimoga.
Sri L S'. Manjunath, Sri S.K. Muralidhar & Sri T Prakash, Assistant Engineers
ICT (P) Ltd . Shimoga
Contractor representative Sri Harikumar Reddy presented.

This work is recently entrusted to Sri R. Maheswara Naidu on tender basis under package

SMG-1 1A and the site was handed over to the tender contractor on 27-10-99. The jungle clearing of
site was nearing completion. During the discussion with Engineers about the early completion of the

Project, the following instruction were issued.
I).

Block level plan to be got up at 5.0 M intervel and levels taken and plotted on the drawing

sheet, and contours to be marked and work should be completed with in a weeks time.

2).

Check up the available soil and its suitability for the bund

3).

Check up the additional quantity and quarry required for casing of the bund and its suitability.

4).

If both the soils are suitable check up the quantity required for construction of bund.

5).

If required quantity not available find out addition quarry for the balance quantity required

and its suitability is also to be got tested.
< •

6).

Check up the soil available for hearting i.e puddle from the proposed quarry and its suitability.
If sufficient quantity is not available from the proposed quarry, new quarry to be located and

soil to be got tested for its suitability.
7).

Work up the section of the bund for storing water for 210 days with the available area kept in
I
mind

Contd.

6.

- 6 -

8).

Comparative cost to be worked out with alternative sections taking into consideration of
economics and proposals to be submitted to Executive Engineer. DPMU(WBP), Shimoga and

a copy submitted ttf the Project Manager. ICT (P) Ltd.. Bangalore with in a week time.

The contractor has to give his weekly program for planing, indicating the machineries
required. Men required and Materials, considering the time available, so as to complete the

scheme by 15-3-2000. Another I ’/2 months left out for final finishing, since already 1 ’/z
month has been elapsed
10).

Bar chan program to be furnished by the contractor

H).

A notice to be issued to the tender contractor for slow progress.

12).

Further instructed to check up the capacity of the pump and pipe line required to pump the

water during the monsoon period of 4 months for 210 days requirement.

-:The inspection of works in Phase-11 works under Package SMG-IO in Shimgoa taluk.:On 3rd Dec’99

8. Village: Keladi (SSI).
Officers and Engineers Present.
1. Sri S T. Krishnamurthy, District Manger, ICT (P) Ltd., Shimoga
2 Sri T Prakash, Assistant Engineer. ICT (P) Ltd., Shimoga.
4. Contractor side Engineer Sri Kumbar was present.

This scheme has been approved under package SMG-10 & entrusted to M/s Suprada
Construction Company, Dharwad. The structures like Water Treatment Plant, Pre-settling tank and

Raw Water Storage tank and OHT at Keladi village were completed. The finishing workk was under

progress. Tlie contractor was instructed to finish smoothly and neatly all the structures and instructed
to fill up the structures with water for hydraulic testing and its soundness.
Contd.

. . 7.

- 7It was also instructed to provide RCC approach slab for L5M width from tank bund to the

jackwell. For the OHT at Bandagadde. RCC columns have casted up to bottom slab level

It was

instructed to complete the balance works i e. laying of RCC for bottom slab, side wall and top dome

very early and scheme should be completed with in 31-01-2000.

_.The inspection of works in Phase-ll works under Package SMG-9 in Shimgoa taluk.:’
On 3rd Dec’99

9. Village : Chandragutti (SSI).
Officers and Engineers Present.
1. Sri S T. Krishnamurthy, District Manger, ICT (P) Ltd., Shimoga.
2. Sri E.B Chandrashekar and Sri T Prakash, Assistant Engineers, ICT (P) Ltd.. Shimoga
3. Contractor Sri V. Narasimhan presented.

This scheme has been approved under package SMG-9 & entrusted to Sri V. Narasimhan, Class I
Contractor.

The Pre-settling tank. Raw Water storage Tank and Pure Water Sump have been

completed long back.

Water Treatment Plant was in progress. Bottom slab concrete for the Water

Treatment Plant have been laid, side wall concrete is to be laid.
The balance work of the jackwell is not resumed for which the contractor expressed that as

soon as the water level receedes in the river he is going to speed up the work.

The OHT at

Chandragutti has been constructed. Other works such as Cl-vertical pipes erection, construction of
valve chambers, fixing of valves and fixing of Disinfection unit, lightening arrestor, etc are yet to be

completed.
The contractor has been instructed to complete balance works and commissionjhe scheme
before 30-4-2000 and to submit implement action schedule program keeping in consideration of the
completion date

Contd. . . . 8.

-8fumish the revised
The contractor Sri. V.Narasimhan was also instructed to
implementation schedule (village wise) for packages SMG-4, SMG-16 & SMG-19 also.
----X—



ANNEXURE - II

Report submitted to the DirectorPPMU
A management meeting with the Contractors was conducted at Belgaum on 8-12-99

by the Additional Director (Technical) PPMU Bangalore and Engineer-in-Chief PHED
Bangalore. This was attended by the undersigned and the Superintendent Engineer PHE

Belgaum, and District Manager ICT Belgaum. The concerned contractors attended the
meeting.

The Contractors were called upon by the Additional Director (Technical) to streamline
the implementation work in Belgaum which is very much lagging behind and the exist
policy schedule could not be adhere to. These contractors brought to the notices that, there

has been a number of bottlenecks in the implementation of schemes as indicated below.

1. Approval for Revised designs of rising main and Pumping machinery are not yet
communicate for many schemes by the client department.
2. Approval is yet to be accorded for schemes where the contractual amount is likely to
enhance due to modifications etc.

3. Handing over of sites for OHT/Sump/Approach Bund/Approach Road.
4. Establishment of sources

5. Land Acquisition.

Unless the pending approvals are immediately accorded and communicated, sources are

established, sites handed over, the contractors have expressed their inability to go ahead

with these schemes and complete as per exit policy programme
I would therefore request that immediate action has to be taken by the concerned for

sorting out above issues so that the contractors may be prevailed upon to expedite works
without excuses and hindrances for implementation of exit policy programme.

A copy of above particulars is submitted herewith for issuing necessary' directions in this
regard.

I am happy to inform you thqt the exercise of jointly conducting of meeting by

-15 -

Sri. H.Rajasimha Additional Director (Technical) and Engineer-in-Chief PHED has helped

very much to assess the status position and has also impressed the contractors very much. I

would therefore request that such joint interaction meeting must be continued in Belgaum

and taken up in other districts also as I am sure it is bound to have a very positive impact

on the speeding up of commissioning of schemes.

-/6 -

ANNEXURE - III

I

Inspection notes issued by Sri. S.Ramadas Project
Manager ICT Bangalore during Inspection of works on
10-12-1999 and 11-12-1999 in Gulbarga District.
10-12-99: The DM ICT Gulbarga and the Executive Engineer DPMU (WBP) accompanied
the Project Manager ICT Bangalore during inspection of works.

The Project Manger met the Executive Engineer DPMU and DPM in their office
and discussed regarding progress of Phase-II works. It was informed to complete all the on
going works by end of March’1999 positively as per exit plan. The contractors having slow

progress are to be expedited to speed up the works so as to complete them before March’99.
Executive Engineer is informed to conduct the management meeting with the contractors

immediately and get in writing on bond papers from them, the dates of commissioning of

each village in their packages and try to commission the schemes accordingly. This should
be watched regularly in every management meetings. If contractors fail, stringent action
should be taken to levy the L.D clause Executive Engineer told that now all the OHT sites

are cleared and also sources have been established except Kondagalli, Tadkal, Halgadla &

Hongunta. The Executive Engineer is informed to establish balance sources immediately.

1. Name of Work : KIRWS Schemes to Village Hongunta in Chittapur Taluk under

Package GLB-19 of Phase-ll Works.
The OHT excavation for foundation is done up to 3 mtr depth. The excavated soil is

Tilled up clay. The bottom is soft one. The excavation for another 2 mtr more (total 5 mtr) or
until hard strata met with is to be done. If hard strata is not met with even after excavation
to a depth of 5 mtr, then pile foundation to be provided to the raft.

The S.B.C received in 8 mt/sqmt as against 15 mt/sqmr in ESR. The width of foundation to

be increased as per actual SBC met with and full raft to be provided. The staging of OHT
may be changed to 12 mtr from 10.5 mtr as the ground level of the OHT is 1 mtr lower then

the ESR as told by the DM ICT Gulbarga.

There is a provision of infiltration well in the river bed and a R.C.C pump house. It was

examined in detail whether it is possible to make use of the existing Jack well and pump

house. The proposed Jack well depth is 10 mtr from the bed of the river. The bed of the
Jack well be about 4 mtr above the bed of the infiltration well. Hence it is proposed to pump

-17-

water directly from infiltration well. Instead of 2 Submersible pumps as per usual practice

(one stand by) 3 Submersible pumps (with 2 stand by) may be provided as there will be 8 to
10 mtr depth of water over infiltration well during rainy season for 3 months period. The

R.M from infiltration well to OHT may be provided G.I instead of PVC as it will be under
flood and ground is undulating and paved road is there instead of hume pipe pump house
small room may be constructed as per the suggestion of the contractor as hume pipe cannot
be transported to work site.

2. Name of Work: KIRWS Scheme to Village Bhagodi under Package GLB-23
under Phase-ll Works.

The proposed site for OHT is situated at about 2 km away from the village. The main
source is a shallow well in the river bed. The village is situated just on the bank of riverbed

near the shallow well. The shallow well is provided with centrifugal pump.
This pump will be stopped during rainy season, as the suction head is more than 8 mtr.
During 99 rainy season, the shall bore well is wash out and at present water is being
pumped directly to the mini water supply in the village. The existing R.M beyond village up

to existing OHT for a length of 1 km is damaged and stolen by the villagers. There are only
6 tanda houses are there near the proposed OHT site. The water for these tanda houses may

be provided by the existing hand pumps. Hence it is instructed to locate the OHT near the
village only by increasing the staging of OHT if required as per actual ground level. The

bore well sources may also be established near by village in consultation with geologist, so
that RM & DM each for a length of 2 km may be avoided. In this regard villagers are
contacted and have agreed to get the lands at higher levels near the village and resolution
will be sent with in a week after conducting village meeting. Executive Engineer is informed

to get the OHT site and establish the bore well sources immediately.

ON 11-12-99

1. Name of Work : KIRWS Scheme to Village Chimmaidalai under Package

GLB-11
OHT is completed. C.I pipes are being fixed. The excavation of valve chambers is being

done. The plaster is being done inside. The plaster should also be done outside to have neat
appearance before painting. The DM ICT Gulbarga told that the scheme will be
commissioned during 1st Week of January’2000.

2. Name of Work : KIRWS Scheme to Village Degalmadi under package GLB-2 of

Phase-ll works.
The side wall of OHT 3rd lift is under progress. The contractors representative told that
OHT will be completed by end of December’99. The R.M & D.M completed except rocky
out crop. In rocky out crop it is proposed to lay G.I pipes instead of PVC. The financial

implication are being worked out and will be submitted to Executive Engineer within a

week as told by the DM ICT Gulbarga. Immediate arrangements to lay GJ pipes in rocky
out crop to be made. The DM ICT Gulbarga told that the work will be completed by end of

2/2000.
3. Name of Work: KIRWS Scheme to Village Polakpalli under Package GLB-21.

Stating of OHT is under progress. The DM ICT Gulbarga told that the R.M & D.M is

completed except in rocky out crop. The proposals along with financial implications for
laying G.I pipes is submitted to S.E. PRE through Executive Engineer DPMU Gulbarga.

The excess is 24.5% over the bid amount. The contractor representative told that all the
works in villages Sawaleshwar and Chinchansoor completed and will be commissioned
during December’99 & January’2000 after receipt of power supply. Contractor is asking

permission to G.I pipes, so that he will complete balance R.M & D.M by the time OHT is

completed and Polakpalli Village can be commissioned by end of April’lOOO. The DM is
directed to get the approval from the competent authority.

4. Name of Work: KIRWS Scheme to Village Kallur road under Package GLB-02
Phase-ll Works.

The OHT is completed and painted also. The construction of valve chamber is under
progress. It is instructed to connect the over flow pipe to the distribution main to avoid

unnecessary wastage of water R.M, D.M and stand posts etc. are completed. The
contractor’s representative told that scheme will be commissioned by end of 12/99 if power

is made available. DM informed to commission the scheme by end of 12/99 positively.

-19-

ANNEXURE- IV

intercontinental consultants and technocrats pvt. ltd.

S.RAMADAS

Integrated Rural Water Supply & Envtronmenlal Sanitahon Rroject. Karnataka
Project Office: No.99, Groundfloor, Nishant Enclave,13 H' Main, -T1' Cross,
Doopanahalli, Vasanthappa Garden. Indiranagar, Hangalore - 56°
B.E.. F.I.E., Mem. 1.
Residence PH: No. 3301032

V1/2W“
VERY URGENT

To,
The District Manager
ICT, Belgaum/Bidar/Raichur/Bellary/Shimoga/Gulbarga

Sir.
Sub

K1RWS & ESP (WBP) Phase-11. -Delay in commissioning of water supply
schemes.
It is observed that, from the last two months the physical and financial progress is very

meager As per the exit policy, for achieving physical targets, financial progress will have to be

in the order of about Rs 10 Crores per month, for all six districts put together whereas the
progress so

far achieved for the last two months is about Rs.3.5 Crores per month in all districts

put together which is 1/3 of the anticipated progress. Position is the same in almost all the six

districts. This kind of progress definitely very poor achievement. I feel, at this rate it is not

possible to keep up the targeted progress and complete the project as per the Exit policy and the
project will not be completed before March 2000 as envisaged in the programme and in some

critical cases of SSR/SSI Schemes before June 2000.

If the project is continued to be progressed like tortoise low speed, the fixed time limit of
completion cannot be maintained. You are all very well aware farther extension of time beyond
March 2000 for major schemes of the Project and in some extraordinary cases beyond June 2000
cannot be extended at all and the World Bank will not agree to extend the further extended time

again. Further, the follow-on project ot Rs 1500 Crores depends

on the performance of these

..2/-

-A0-

-2-

ongoing works and its completion as per scheduled time limit If the Project is unnecessarily
delayed by the contractors, then the World Bank will definitely have rethinking on sanctioning of

the proposed follow-on Project to the state of Karnataka and the state may loose this good help
by the World Bank

The full World Bank Team will be visiting the Karnataka State in the month of February
2000 to study the situation and status of progress of the ongoing project and thereby to assess the

capability of completing the ongoing project well within the scheduled programme. Further, if

the progress is unnecessarily hampered by the contractors, the contractors will be offering
adverse, scope to the visiting team to decide on the sanctioning the follow-on Project to

Karnataka. That means, if the progress of works and performance of the Contractors are really
good then the follow-on Project will be a good boon to the state or vice-versa.

This fact is being repeatedly brought to your knowledge by the undersigned from the last
6 months whenever I visit the Project districts and apprise the Contractors. Such being the case I

request you to motivate them to achieve good progress in a befitting manner with high standards

of quality of works.
Under the above circumstances, I request all the District Managers, AEs of ICT, District

Project Managers DPMU, Executive Engineer DPMU, AEEs & AEs of DPMU, Superintending
Engineers of PHE Circles to bestow their special attention in motivating the contractors to step
up the works so as to complete the Project well in time with high standard of quality of work so
that the follow-on Project could easily be sanctioned by the World Bank. In order to achieve this

it is suggested to pull up the contractors now and then and to have close watch on daily basis
and monitor the progress for completing the Project well in time.
Further, it is also requested that any bottlenecks encountered has to be solved

immediately by the concerned persons, either he may be a Consultant or the Client

If
..3/-

-XJ-

bottlenecks are still not solved it definitely afiects the Project and cannot be prolonged for the
slackness of the persons responsible
If there are any contractors who failed to cope up with the work in spite of repeated

appeal and request it is suggested to issue final warning to them giving a time of 7 days for
improvement, if there is no improvement in their performance it is very much obligated to take

necessary action against them to terminate their contract forthwith and such of these contractors
names has to be sent to the EIC with adverse remarks to prevent them from having further

opportunity in getting fresh works. I request all of you to strive hard round the clock in the

coming crucial months and motivate the contractors now and then to complete the project both in
quality wise and quantity wise and see that all schemes are completed as per scheduled
programme. The matter may be treated as most important and urgent and there should not be any

slackness in any comer and at any point of time.
All the Contractors may please be advised suitably and motivate them to step up the

progress and complete all schemes well in time as per exit policy and as per terms of agreement
Yours faithfully
-sd/(S.Ramadas)
Project Manager
ICT, Bangalore.

Copy to: The Director PPMU Bangalore for kind information and needful action
Copy to: The Engineer-in-Chief PHED Bangalore for kind information and needful action
Copy for kind information and needful action to:
1. The Superintending Engineer PHE Circle Bangalore/Belgaum/Gulbarga.
2. The District Project Manager DPMU (WBP)
Belgaum/Bidar/Bellary/Raichur/Gulbarga/Shimoga.
3. The Executive Engineer DPMU (WBP)
Belgaum/Bidar/Bellary/Raichur/Gulbarga/Shimoga.
Copy for kind information to:
1. Col. (Retd) M.C.Nangia Project Co-ordinator ICT Bangalore
2. Col.(Retd) M R Salmi Resident General Manager ICT Bangalore
Copy for information to:
1. Technical Assistant-l/ll | Assistant Engineer 1C I Project Office Bangalore
2. Assistant Engineers , ICT (P) Ltd Belgaum/Bidar/Bellary/Raichur/Gulbarga/Shimoga.

-'22 -

ANNEXURE- V

LEAD IN BLOOD;
CHILDREN AT RISK
lead in the air, soil, water and food and the levels of
blood lead, it is necessary to set standards for control­
ACCORDING to several studies conducted in India,
ling lead in the environment.
over 50 per cent of the children living in many of its
On the priority list is the monitoring and ensuring that
major cities already have elevated blood lead levels,
lead in drinking water and milk supply is within safe lim­
raising serious concerns about their health and future
its. The use of lead solder in pipes for public water sup­
potential to be productive members of society. Lead, a
ply should be discontinued. Health care providers
highly toxic substance can significantly alter the health
should be trained to diagnose lead poisoned cases, pro­
of people exposed, even at low levels. It can cause a
vide treatment where needed and
decrease in IQ and learning ability in
offer preventive steps to patients
young children.
On the priority list is
and families. Periodic and selective
A document on the prevention
screening of blood lead of individu­
the
monitoring
and
and treatment of lead poisoning in
als living or working in high-risk
developing countries was released
ensuring that lead in
areas and availability of safe and
in Bangalore last month. This was
drinking water and
effective orally administered chelat­
prepared by the executive council of
ing agents at affordable prices
milk
supply
is
within
the International Conference on
should be an on-going process.
Lead Poisoning held in the city from
safe limits. The use of
The white paper suggests that for
February 8-TO this year. Scientists,
implementation of the above a num­
lead solder in water
public policy makers and industry
ber of government ministries need
leaders from over 20 countnes took
pipes should
to be involved. Energy and trans­
part in this conference. Submitted
portation ministries for unleaded fuel
be discontinued.
as a “call for action" by govern­
in automobiles, environment and
ments, industry, health and environ­
labour ministries for environment,
mental institutions, the recommendations are offered as
workplace and product safety, health ministry for pre­
guidelines for policy making and implementation.
vention and treatment measures, law and justice min­
In order to establish and implement a national plan,
political will and participation of venous agencies is istry for enforcement and so on.
In its concluding remarks the report points out that in
needed. The government must begin to force changes
in long standing practices in industry and public services many industrialised countries, a decrease of over 70 per
such as eliminating leaded petrol, testing for lead in cent in the average blood lead level of the population
water supply, food and other consumer products and was achieved in less than 20 years.
For more information contact The George Foundation
regulating lead in industrial emissions.
Given the direct link between the many sources of on 5440164.

Sangeeta Cavale

- 23 -

INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
KARNATAKA INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT. PHASE D PACKAGE D

NEW DELHI.

Mr. K.K.KAPILA
Chairman & Managing Director
A-l 1. Green Park. New Delhi
Ph.No.011-6964757. 6863000

Col.(Rtd) M.C.Nangia
Project Co-ordinator
ICT
New Delhi.

Col.(Rtd) M.K.Sahni
Resident General Manager
ICT, Bangalore.
Ph.No. Office 080-5275325. Resi 5288654

I

£

Mr. ELKRangaswamy
Deputy General Manager
ICT, Bangalore.
Ph.No. Office: 080-5275319 Resi: 3356617

Mr.S.Ramadas
Project Manager
ICT. Bangalore
Ph.No. Office:080-5275319
Resi. 3301032,3382387

Mr.J.D.Boli
District Manager
Gulbarga
Ph.No.06472-35780

Mr. P.V. Naik
District Manager
Bidar
Ph.No. 08482-29377

Mr.V.G.Khened
District Manager
Raichur
Ph. No. 08532-26527

Mr.M.G.Badappanavar
District Manager
Bellary
Ph. No. 08392-55160

CoL(Retd) Anath B.Kakhandaki
District Manager-I (North)
Belgaum
Ph.No. 0831-472710

Mr. T. Basav anthappa
District Manager-II
(South)
Belgaum
Ph. No. 0831 -472710

Mr. S.T. Krishnamurthy
District Manager
Shimoga
Ph. No. 08182-75984

INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
(WORLD BANK ASSISTANCE)
SUMMARY OF FINANCIAL PROGRESS FOR THE MONTH OF DECEMBER 1999
(Rs. in lakhs)
BATCH I & II

!
I

BATCH - III

Sr.
No.

District

Pkg

Vlg

Contract
value

Achievement
during month

Cum.
Achievement

%

Pkg

Vlgs

Contract
value

Achievement
during month

Cum.
Achievement

%

Total
Packages
(3+9)

Total
Villages
(4+10)

1

2

3

4

5

Total
During the
month
(6+12)

6

Total
Contract
value
(5+11)

7

8

9

10

11

12

13

14

15

16

17

18

19

20

1

Belgaum

28

67

3383

37

2217

65

10

10

265

6

92

35

38

77

3648

43

2309

63

2 Bellary

11

49

1096

81

755

69

5

10

224

7

62

28

16

59

1320

88

817

62

3 Bidar

20

60

1706

90

1582

93

9

17

386

63

16

29

77

2092

90

1645

79

4 Gulbarga

19

59

1304

21

1046

80

4

13

218

84

40

23

72

1522

21

1130

74

5 Raichur

18

80

2125

93

1797

85

1

2

35

9

26

19

82

2160

99

1806

85

6 Shimoga 12+1

44

1034

787

76

7

13

220

97

44

20(19+1)

57

1254

884

70

8184

77

36

65

1348

407

30

144+1

424

11996

8591

72

Total

108+1 359 10648
• r

Fp4rm Sheet?

322

6

19

341

Cumulative
%age against
Achievement
Contract value
(7+13)

INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
(WORLD BANK ASSISTANCE)

ABSTRACT
Summary of Milestone wise financial achievement for the month of DECEMBER 1999

i

O'

Sr.
No.

Total Villages
Batch No. of
No. of
No. of
work in
Contract
Programme Packages villages
progress
Value
villages

1

Batch I & II

108

359

10648

2

Batch III

36

65

Grand Total

144

424

III Milestone
Cumulative

II Milestone
Cumulative

I Milestone
Cumulative

T

A

%

T

A

%

358

3111

3339

107 3377 3163 93

1348

53

652

327

50

696

11996

411

3763

3666

97

4073 3243 99

80

T

A

%

3625 1682 46

11
3625 1682 46

___ (Rs. in laKnS)___
%age of |

Cumulative
Achievement

Achievement
against

During month

Upt to date

Contract Value

322

8184

77

19

407

30

341

8591

72

INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
(WORLD BANK ASSISTANCE)

ABSTRACT SUMMARY OF FINANCIAL PROGRESS FOR THE MONTH OF DECEMBER 1999 PART -1 (BATCH I & II Villages)
Financial Progress (Rs in Lakhs'
Contract Total no. of
III Milestone Achievement
II Milestone Achievement
villages
I Milestone Achievement
Value
During
To end of During
During
To end of
No. of
(Rs in where work is
To end of
Total
Total Target Prev.month
Total Target Prev. month
Target
in
progress
Prev.
month
month
month
Villages Lakhs)
month

Cumulative Achievement
during
%
Total
month

SI.
No.

District

No. of
packages

1

Belgaum

28

67

3383

67

661

838

838

1287

1110

33

1143

1435

232

4

236

37

2217

65

2

Bellary

11

49

1096

48

484

274

274

445

226

20

246

167

174

61

235

81

755

69

3

Bidar

20

60

1706

60

722

734

734

500

375

375

484

383

90

473

90

1582

93

4

Gulbarga

19

59

1304

59

274

470

470

401

247

247

629

308

21

329

21

1046

80

5

Raichur

18

80

2125

80

637

663

663

340

840

856

613

201

77

278

93

1797

85

6

Shimoga

12 + 1
108+1
(11 A)

44

1034

44

333

360

360

404

296

296

297

131

787

76

359

10648

358

3111

3339

3339

3377

3094

3163 3625

1429

8184

77

I
i

0

16

69

131
253

1682

322

INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
(WORLD BANK ASSISTANCE)

SUMMARY OF FINANCIAL PROGRESS FOR THE MONTH OF December’ 1999 PART II (BATCH III Villages)
Contract
Value

Total no. of
villages

Financial Progress (Rs in Lakhs)
II Milestone Achievement
I Milestone Achievement

During
Total
month

cumulative
achievement

during
month

total

SI.No.

District

No. of
packages

No. Of
Villages

(Rs in
Lakhs)

where work is in
progress

1

Belgaum

10

10

265

10

106

43

43

159

2

Bellary

5

10

224

5

123

55

55

101

3

Bidar

9

17

386

17

193

63

63

193

63

4

Gulbarga

4

13

218

8

109

84

84

109

84

5

Raichur

1

2

35

2

11

6

Shimoga

7

13 *

220

11

110

82

36

65

1348

53

652

327

I
N
oo
1

To end of During
Target Prev.month
Total
month

0

To end of

Target Prev.month
43

24

3

82

110

15

327

696

61

6

49

6

92

7

7

7

62

6

9

6

97

15
19

80

9

19

407

Remarks

INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LT:
LTD.
INTEGRATED RUR.AL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
Phase- II Package-II
(WORLD BANK ASSISTANCE)

Frm 02

SUMMARY OF PHYSICAL PROGRESS FOR THE MONTH OF DECEMBER" 1999

ABSTRACT (BATCH I & 11+ BATCH III)

_____________________
Total no

SI.No

1

District

No of
No of
Packages villages

of villages
where work
is in

2

3

4

progress
5

Belga um

28

67

10

Physical Progress______
Sump

_

OHT
Milestone in
Target
Nos

To end of
Prev month

During
month

Total

Target

To end of
Prev. month

During
month

Total

GLSR

Target

R.M. (kms)

To end of
Prev month

During
month

Total

17

18

Target

To end of
Prev

19

month
20

During
month

Total

21

22

8 ’

137

6

7

8

9

10

11

12

13

14

15

16

67

I & II

57

8c/50up

4c/1up

8c/48up

14

4c/6up

3up

4c/9up

11

6up

4c/5up 4c/5up

206

129

10

10

III

8

Sup

8up

Sup

2

1up

1up

1up

2

1 c/1 up

1c/1up 1 c/1 up

33

6

38

77

77

65

8c/58up

4c/9up

8c/56up

16

4c/7up

4up

4c/10up

13

1c/7up

5c/6up 5c/6up

239

135

8

143

11

49

48

I & II

47

32c

3

35c

8

5

5

6

7

7

76

81

3

84

5

10

5

III

5

1

1

23

7

4

11

16

59

53

20

60

60

25

9

17

17

i

29

77

77

19

59

59

4

13

23

1

2

3

Bellary

Bidar

I

4

5

6

Gulbarga

Raichur

Shimoga

Grand Total

3

3

52

32c

3

35c

11

5

I & II

53

47

2c/4up

49c/4up

4

3c/1up

II

15

1

68

47

2c/4up

49c/4up

5

3c/1up

I & II

54

38c/11up

2c

40c/14up

4

2c

8

II

13

3c/9up

9up

3c/7up

72

67

III

67

41c/25up

2c

43c/21up

4

2c

18

80

80

I & II

88

44c/44up

18c

62c/26up

21

8c/3up

1

2

2

III

2

2ld

1 c/1 up

1 c/1 up

19

82

82

12+1

44

44

I & II

42+1

35c/7up

7

13

11

III

12

3c/6up

19+1
144+1

57
424

55
358+53
411

54
396

Nos Compl

90

38c/13up
under prog.
Balance

8up

w
122
38

5

9

6

1

7

99

88

7

95

1c

4c

8

4c/1up

1c

4c/1 up

175

158

1

159

1

1up

2

38

4

1

5

2c

4c/1up

10

4c/1 up

1c

4c/1up

213

162

2

164

2c

5

3c

2up

3c/2up

142

112

2

114

25

14

0.5

14.5

2c

5

3c

2up

2up

167

128

0.5

114.5

8c/3up

4

3c/1 up

1up

3c/1 up

231

171

73

244

2

1 up

1up

3

6

3c/1up

3c/2up

234

171

73

244

35c/8up

1

1c

1c

80

97

1

98

3c/6up

2

1 up

1up

2up

18

12

3
46

1 c/1 up

1up

1 c/2up

Nos. Compl

“23"

98
1050

compl.

13
10

44c/44up 19c/1 up 63c/27up

Sup

6

21

8c/3up

Sup

3up

38c/14up

57

Nos. Compl

8c/3up

under prog.

14

under prog

Balance

20

Balance

1up

12

108
848
Balance
212
10kms excess in Raichur

108

Contd...

INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT Phase-ll
(WORLD BANK ASSISTANCE)

Districts
Belgaum

Be Mary

Bidar
/

Gulbarga

Raichur

Shimoga

Grand Total

Frm-02

Package - II

SUMMARY OF PHYSICAL PROGRESS FOR THE MONTH OF DECEMBER” 1999
____________________________ ABSTRACT (BATCH I & II BATCH III)
___________________ Physical Progress
D.M.
S.P. (nos.)
C.P. (nos.)
To end of
During
To end of
During
To end of
During
Awaiting
Villages
Target
Total Target
Total
Target
total
Dropped
Prey, month month
Prev. month month
energisation
Commissioned
Prey, month month
23

24

25

26

27

28

350

264

7

271

158

39

46

35

1

36

49

3

396

299

8

307

207

167

166

166

80

40

11

8

19

19

207

177

8

185

317

331

1

83

6

400

337

231

191

42

4

273

195

3

294

257

7

30

31

32

39

54

10

10

9

2

5

2

42

2

44

56

10

10

9

59

3

62

14

10

10

16

99

59

3

62

14

10

10

16

332

142

124

124

16

10

10

19

6

53

1

338

195

124

3c

194

138

95

20

2

198

158

97

89

346

168

39

2

5

7

5

301

259

94

353

173

39

39

217

225

225

67

58

58

79

43

43

21

11

11

296

268
Kms.
compl
Balance

268

88

69
Nos.
Compl
Balance

69

1873

Phy_co~1 Sheetl

1649

276

920

29

33

34

35

36

5

5

124

21

10

10

19

100

10

6

6

11

102

10

6

6

11

39

30

16

16

30

32

16

16

30

16

10

10

22

16

10

10

22

149

Compl
Balance

2
5

2

520
400

66
83

107

37

Remarks
38

Frm-02

INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT Phase- II Package !I
(WORLD BANK ASSISTANCE)
SUMMARY OF PHYSICAL PROGRESS FOR THE MONTH OF DECEMBER” 1999
(BATCH I & II)
Total no

SI.No

Total

Target

To end of
Prev month

During
month

Total

Target

To end of
Prev month

During
month

10

11

12

13

14

15

16

17

2

3

4

5

6

7

1

Belgaum

28

67

67

I
II
III

9
24
24

4c/51 up

1up

4c/52

4c/1 up

4c

4c

57

8c/52up

4c/1up

8c/52up

3

4

Bellary

Bidar

Gulbarga

11

20

19

49

60

59

48

60

59

I
II
III
I
II
III

9
18
20
47
14
20
19
53
16
19
19

80

80

Shimoga

12

44

44

88

44c/44up

I

II
III
Grand Total

49

359 |

358

32c

II

III

6

6

35
28

54

18

7
19

25

III

Raichur

7

I

I

9

19

8
12
27
47c
3c
17c/16up
18c
38c/16up
25c
19c/16up
28up

II

5

8

3
3c

GLSR

Sump

1

2

I
GJ
O
I

Distnct

Physical Progress

of villages
OHT
where work
No of
No of
To end of
During
Milestone in
Target
is in
Packages villages
Nos
Prev month
month
progress

9
35c

6
8
14

2
5_
8

8
12

1 c/2up

1 c/2up

3c/4up

3up

3c/7up

4c/6up

3up

4c/9up

1
4
5c
1c
1c

2/4up

29c/4up

_2

1 c/1 up

1c

2c/4up

49c/4up

4

3c/1up

1c

3
1
4
6
7
8
21

2c

1
4
5c
1
1
2
4c

2c

20c

2c

40c/14up

25c

16c
2c
18c

35c
2c/26up
62c/26up

8c/2up
9+1
2up
8c/1up
17c/4up
4up
17c/4up
18
10c/2up
2up
10c/2up
15
3Sc/8up
Sup
42+1 35c/7up
341+1 204c/119up 13up/29c 229c/104up

6

6

£
2
2

Sup
1up
6up
1
4
2
7c

4c
1up
4up
4up
4c/5up|4c/5up
1
4
2
7c

4

1up

4/1 up

18

1c
1c

1
4
5c

2_

3c
17c/14up

5
6
11

Total

2c

2c

6c
2c/3up
8c/3up

2c/3up
3up

2c
6c
2c/3up
8c/3up

2
5

2
2

T
1
1

51

22c/10up

1c/6up

23c/12up

35

2c
1c
3c
1c
2c
1up
3c/1up

2up
2up

1up
1up

2c
1c/2up
3c/2up
1c
2c
1up
3 c/1 up

1c
1c
1c
1c
18c/8up 5c/8up 23c/8up

Target

R.M. (kms)
To end of
During
Prev
month
month

19

20

105
46
55
206
18
44
14
76
70
71
34
175
26
54
62
142
95
40
96
231
16
34
30
80

80
33
16
129
20
18
43
81
69
60
29
158
32
38
42
112
95
40
36
171
53
27
17
97
748

910

21

£
4_
8

2
3

2

7

2
2

73
73

1
1
88

Total
22

80
37
20
137
20
18
46
84
69
60
30
159
32
38
44
114
95
40
109
244
53
27
18
98
836

Contd...

INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT Phase-ll Package - II
(WORLD BANK ASSISTANCE)
SUMMARY OF PHYSICAL PROGRESS FOR THE MONTH OF DECEMBER" 1999

Frm-02

BATCH I & II

Districts

[Belgaum

[Bellary

[Bidar
l
i

[Gulbarga

[Raichur

[Shimoga

[Grand Total

Phv

D.M.
To end of
During
Target
Total Target
Prey, month month

23
"se”
60
104
350
41
88
38
167

247
17
264
56
72
38
166

133
124
60
317
65
79
87
231
132
32
130
294
44
88
85
217
1576

130
109
92
331
80
43
68
191
132
32
93
257
98
87
40
225
1434

24

25~

26

27

Physical Progress
S.P, (nos.)
To end of
During
Prev, month month
28

7'^9

C.P. (nos.)
Total
30

1

7
3
3

89
89

100

247
24
271
56
72
38
166

71
55
158

130
109
92
332
80
43
71
194
132
32
182
346
98
87
40
225
1534

42
46
54
142
31
42
65
138
60
48
60
168
13
27
27
67
753

48
32
80

31

32

During
total
month
33”
34

To

~32

7
7

Target

To end of
Prev. month

39

39

39

39

59

3
59
42
46
36
124
' 14
30
51
95

y

5

T

59
3
62

42
46
36
124
14
30
56
100

39

39

39
12
32
14
58
414

39
12
32
14
58
422

8

Awaiting
energisation

Villages
Commissioned

Dropped

Remarks

35

36

37

38

26
18
54

10

10

10

10

14

10

10

14

10

10

8
8
16

8
2
10

8
2
10

19

6
4
10
12
8
10
30

4
2
6

4
2

11

7T

16

16

16

16

10

10

10
62

10

8
8
16
140

nn

9

16

30

22

107

INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT Phase- II Packagc-II
(WORLD BANK ASSISTANCE)
BATCH - III (VILLAGES)
SUMMARY OF PHYSICAL PROGRESS FOR THE MONTH OF DECEMBER 1999
_____________ Physical Progress

Total no.
of villages
where work
is in

SI.No

District

No. of
Packages

No. of
villages

1

2

3

4

progress
5

1

Belgaum

10

10

10

OHT
Milestone
in Nos

Target

To end of
Prev. month

During
month

Total

Target

To end of
Prev. month

During
month

Total

Target

6

7

8

9

10

11

12

13

14

15

3

Bellary

Bidar

6

9

13

17

8

3

4

5

6

Raichur

Shimoga

GrandTotal

4

1

7

37

13

11

2

15

70

13

Sup

Sup

8up

8

Sup

8up

8up

During
To end of
Prev. month month

16

2
2

1up

1up

1up

1up

2up
2up

2
2

1 c/1 up
1 c/1 up

17

Total

Target

To end of
Prev. month

During
month

TotAI

18

19

20

21

22

14

3

3

19

£

3_
6

II

_4
5

1 c/1 up 1 c/1 up
1 c/1 up 1 c/1 up

33

16

2

1

7
4

4

11

1

5

38

4

1

5

8

14

1

2

7

3

3

1

1

23

19
5

1

15

5

1

1
1

19

2
2

3c

I

3

3c

II

10

9up

9up

9up

13

3c/9ui

9up

3c/9up

7

4

3_

15

6
7

£

2.

I

is
Gulbarga

8_

1

II

J

R.M. (kms)

GLSR

I
II

2

Sump I GLSR______________

15

17

0.5

0.5

25

0.5

14.5

14

1

I

1
1

2up

1c/1up 1 c/1 up

2

2

II

2up

1c/1up 1c/1up

1

3

2
I

7

2c/5up

2c/5up

II

5

1 c/1 up

1 c/1 up

12

3c/6up

3c/6up

55

6c/25up

1c/18up 7c/24up

2
2

10

1up

2up

3up

10

1up
1up

1c/1up

1up
1up

2up
2up

1c/3up 1c/4up

9
9
18
140

9

9

3

3

12
43

5.5

Contd..

12
48.5

INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT Phase-II Package - II
(WORLD BANK ASSISTANCE)

BATCH III (VILLAGES)
SUMMARY OF PHYSICAL PROGRESS FOR THE MONTH OF DECEMBER 1999

D.M. (kms)
Target

Districts
Belgaum

Bellary

To end of During
Prev. month month

Target

26

27

7

15

23

24

18

7

28

28

1

29

46

35

1

15

11

25
Bidar

Total

40

11

42

6

[culbarga

30

31

34

3

2

5

2

36

49

3

2

6

2

11

8

8

8

11

8

19

19

6

25

Grand Total

OK

5

28

83

6

6

53

13

4

4

6

5

14

2

2

2

1

42

4

4

20

2

2

2

2

5

5

3

2

5

7

5

2

5
Shimoga

To end of
Prev. month

Target

29

29

[Raichur

C.P. (nos.)

28

25

41
I

Physical Progress
S.P, nds.)
To end of
During
Total
Prev.
month
month

7

2

34

35

35

9

45

8

8

12

79

43

43

21

297

101

115

167

ChnntO

14

11

11

11
16

11
2

18

9

32

During
month
33

total
34

Ready for
Commission
commissioni
ed
ng
35

36

Dropped

Remarks

37

38

INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
(WORLD BANK ASSISTANCE) PHASE - II PACKAGE - II

Summary of Commissioning and handing over of schemes/villages DECEMBER 1999

I

Sr.N
o

District

1

2

vlgs
Vlgs
Target of
Total
Achievem
Handed
Balance vlg.
commissioned handed commission
No. of
ent during over during not achieved
to end of
over Prev. ing for the
vlgs
the mth.
the mth.
against target
Prev. month
mth.
mth

—3~

4

5

6

7

8

1

Belgaum

77

1

2

Bellary

59

12

2

3

Bidar

77

13

10

4

Gulbarga

72

11

3

12

5

Raichur

82

21

1

7

9

6

Shimoga

57

16

6

5

6

2

Total

424

74

22

41

33

4

7

8

10

4
6

9

6

2

Total achieved
Handed over Balance vlgs to
Vlgs.
commission (up to date) (up to date)
be
awaiting
Cumulative
cumulative commissioned) energisation

10 J

11

12

13

14

Target

Achievement

22

9

45

16

2

43

2

56

19

12

58

26

52

11

3

61

17

55

30

1

52

11

26

22

8

35

10

Com&hn-I Sheetl

18

256

107

26

317

66

15
’ Une village have been
commissioned ahead of the
tarnet

68

j

12

Remarks

* Six villages
commissioned
Target

have been
ahead
of


Two villages have been
dropped due to non receipt ol
required contribution.

INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
(WORLD BANK ASSISTANCE) PHASE - II PACKAGE - II

list OF VILLAGES COMMISSIOINED during the
MONTH OF DECEMBER 1999

ABSTRACT
SI No.

District

Total No. of Villges Commissioned during 12/99

1

________ 2

3

2
3
4
5
6

Belgaum
Bellary
Bidar
Gulbarga
Raichur
Shimoga

8
4
6
nil
9

Total

33

list OF VILLAGES COMMISSIOINED during the
MONTH OF DECEMBER 1999

Belgaum :

1
2
3
4
5
6
7
8

BGM - 1
BGM-6
BGM-7
BGM-7
BGM-8
BGM- 12
BGM - 12
BGM - 28

Peeranwadi
Katakabhavi
Bijaguppi
Godachi
K. Bekwad

Tolagi
Kakkeri
Budigoppa

Bellary :

1
2
3
4

BLR - 1
BLR - 1
BLR - 1
BLR - 10

P. D. Halli
Y.Kaggal
Karmachedu
Honnahalli

Bidar:
1
2
3
4
5
6

BDR-2
BDR-5
BDR-6
BDR-7
BDR- 11
BDR - 20

Santhapur
Madargi
Waddankera
Rajola
Kamathana
G. Chincholi

mpr-kk

-3G -

INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
(WORLD BANK ASSISTANCE) PHASE - II PACKAGE - II

LIST OF VILLAGES COMMISSIOINED DURING THE
MONTH OF DECEMBER 1999

Gulbarga:

Nil

Raichur:

1
2
3
4
5
6
7
8
9

RCR- 1
RCR-5
RCR-6
RCR-6
RCR-7
RCR-7
RCR-9
RCR - 18
RCR - 18

Govighat
Tugal Dona
Goudur
Gonwatla
Wadaganal
Nerebenchi
Jeerkalgudi
Kalalbandi
Kyadiguppa

Shimoga :
1
2
3
4
5
6

SMG-2
SMG -2
SMG-3
SMG-3
SMG-5
SMG-7

Harmaghatta
Holalur
Somalapura
Devarahalli
Kudligere
Billahalli

mpr-kk

-37-

1

INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT LTD.
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
(WORLD BAK ASSISTANCE) PHASE - II PACKAGE - II

LIST OF TOTAL VILLAGES COMMISSIONED TO END OF DECEMBER 1999

ABSTRACT
DISTRICT

SL NO.
1
2
' 3
4
5
6

TOTAL NO. OF SCHEMES COMMISSIONED

9
16
19
11
30

Belgaum
Bellary
Bidar
Gulbarga
Raichur
Shimoga

22
107

Total

LIST OF TOTAL VILLAGES COMMISSIONED TO
END OF DECEMBER 1999

BELGAUM:
1
2

3
4
5
6
7
8
9

BGM-1
BGM - 3
BGM-6
BGM-7
BGM-7
BGM-8
BGM - 12
BGM - 12
BGM - 28

Peeranwadi
Chikkalwad
Katakabhavi

BLR - 1
BLR - 1
BLR - 1

P.D. Halli
Y.Kaggal
Kamarachedu

BLR - 3
BLR-3
BLR-4
BLR-4
BLR-4
BLR-4
BLR-6
BLR-6
BLR-7
BLR-7
BLR-7
BLR - 10
BLR - 10

D. Kaggal
Kyadigihal
Hakkandi
S. L. Halli
N. Basapura
Tambarahalli
Eshapura
Chirasthalli
Kondanayakahnahalli
Gudiobalapura
Suggenahalli
Old Daroji
Honnahalli

Bijag uppi
Godachi
K.Bekwad
Tolagi
Kakkeri
Budigoppa

BELLARY:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

MPR-KK

-38-

INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
’ (WORLD BAK ASSISTANCE) PHASE - II PACKAGE - II

LIST OF TOTAL VILLAGES COMMISSIONED TO

END OF DECEMBER 1999
BIDAR :

I

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

BDR - 2
BDR-3
BDR-3
BDR-4
BDR-4
BDR - 5
BDR - 5
BDR-6
BDR-6
BDR - 7
BDR-9
BDR - 10
BDR- 11
BDR - 11
BDR - 12
BDR - 16
BDR - 18
BDR - 18
BDR- 20

Santhpur
Eklar
Aliambar
Dhannura
H.Tugaon
Madargi
Kodambal
Samthabad
Waddankera
Rajola
K.Jawalga
K.Chincholi
Nagoora
Kamthana
Manahalli
Kalagapur
Hippalgaon
Markal
G.Chincholi

GLB- 1
GLB-2
GLB-2
GLB - 3
GLB-4
GLB-6
GLB - 10
GLB -14
GLB - 14
GLB - 15
GLB - 16

Dasthapur
Ranjole
Dugnoor
Gundahalli Main
Keriambalga
Badadal
Nimbal
Killenkera
Balched
Melkunda
Arekera . K

RCR- 1
RCR- 1
RCR - 1
RCR-2
RCR-2
RCR-5
RCR - 5
RCR - 5
RCR-5
RCR - 6

Sadapur
Mustur
Gavigat
Nilogal
Hirebannigol
Vanagera
Malgatti
Hanumanal
Tugaldona
Nagaral

GULBARGA:
1
2
3
4
5
6
7
8
9
10
11
RAICHUR :
1
R
3
4
5
6
7
8
9
10

MPR-Nov

-37-

INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
(WORLD BAK ASSISTANCE) PHASE - II PACKAGE - II
LIST OF TOTAL VILLAGES COMMISSIONED TO
END OF DECEMBER.1999

RAICHUR :
11
RCR-6
12
RCR-6
13
RCR-6
14
RCR-7
15
RCR-7
16
RCR-7
17
RCR-8
18
RCR-9
19
RCR-11
20
RCR- 11
21
RCR-11
22
RCR-12
RCR-12
23
RCR-12
RCR-12
24
RCR-12
25
RCR-13
26
RCR -13
27
RCR -13
28
RCR-15
29
RCR -16
30
RCR-17

Basapura
Goudur
Go nwatla
Koradakera
Wadagnal
Nerebenchi
Gabbur
Jeerkalgudi
Ankasadodahi
Santhekallur
Yerjunti
Eleganoor
Eleganoor (Camp)
Hosakera Soul Camp
Hosakera Kottai Camp
Bevinal
Huliyapur
Kalalbandi
Kyadiguppa

Herur
Ramathnal
Sannahosur

SHIMOGA :

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

SMG-1
SMG-1
SMG-1
SMG-1
SMG-2
SMG-2
SMG-3
SMG-3
SMG-3
SMG-3
SMG-3
SMG-3
SMG-4
SMG-4
SMG-5
SMG-5
SMG-5
SMG-5
SMG-5
SMG-5
SMG-5
SMG-7

Beeragandanatialli
Mukthenahaili
Chiradoni
Bannikodu
Haramagatta
Holalur
Kagathur
Vaddanal
Kanctiiganal
Somalapura
De’.varahalli
Hodigere
Gama
Thyagarthi
Attigunda
Veerapura
Tattehalli
Marashettihalli
Thimalapura
D.B.Halli
Kudligera
Billahalli

MPR-Nov

-40 -

INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT LTD.
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
(WORLD BANK ASSISTANCE) PHASE- II PACKAGE - II
VILLLAGES COMMISSIONED AND HANDED OVER TO END OF DECEMBER 1999

ABSTRACT
SI
No

District

1

2

No. of Schemes Commissioned & Handed over
3

Nil
2
12
3
1

Belgaum
Bellary
Bidar
Gulbarga
Raichur
Shimoga

1
2
3
4
5
6

26

Total

VILLLAGES COMMISSIONED AND HANDED OVER TO END OF DECEMBER 1999

si

District

Package No.

Name ofVillages

Remarks

1

2

3

4

5

1

Belgaum

1

Belllary

BLR-4
BLR-7

Hakkandi_______
Ko ndanayakantral li

1
2
3
4
5
6
7
8
9
10
11
12

Bidar

BDR - 3
BDR-3
BDR-4
BDR - 6
BDR-7
BDR - 9
BDR -10
BDR -11
BDR -12
BDR - 16
BDR -18
BDR-18

Ekiar
Aiiambur
H.Tugaon
Samthabad
Rajola
K.Jawalga
K.Chincholi
Nagoora
Manahalli
Kalagapur
Hippalgaon
Markal

GLB - 1
GLB-2
GLB -10

Dasthapur
Ranjole
Nimbal

RCR-11

Ankasadoddi

SMG-1
SMG-1
SMG-3
SMG-3
SMG -4
SMG-5
SMG-5
SMG-5

Beeragondanahalli
Mukhenahalli
Kagathur_______
Somalapura_____
Gama__________
Attigunda_______
Veerapura______
Tattehalli

No

Gulbarga

2
2
3

Raich ur
1

Shimoga
1
2_

2
4

2
2
2
8

MI’K NOV

-41-

INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
(WORLD BANK ASSISTANCE) PHASE - II PACKAGE - II
STATUS REPORT ON COMMISSIONING OF SCHEMES AS ON END OF DECEMBER ' 99

1
-b
i

Energised Completed and Commissioned
No. of Water supply No. of Water supply No. of Water supply schemes
schemes taken up
schemes handed
commissioned and yet to be
over to VWSC
handed over to VWSC

Total

No. of Water supply schemes
completed but yet to be
energised and commissioned

No. of Water
supply
schemes under
progress

5

6

7

8

9

9

2

14

16

2

43

77

12

7

19

26

58

Gulbarga

72

3

8

11

17

61

5

Raichur

82

1

29

30

11

52

6

Shimoga

57

8

14

22

10

35

Total

424

26

81

107

66

317

SI
No

District

1

2

3

1

Belgaum

77

2

Bellary

59

3

Bidar

4



4

In Shimoga two villages are dropped for want of reguired contribution

68

INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
(WORLD BANK ASSISTANCE) PHASE - II PACKAGE - II

STATUS POSITION OF DISTRICT WISE COMMISSIONING OF SCHEMES
TO END OF DECEMBER ’ 99

SI
No

District

1

2

No. of Schemes
Ready for
Commissioning
3

No. of Schmes
commissioned and
under Trial run
4

No. of Schemes
commissioned and Handed
over for maintenance
5

9

No. of Villages completed
(3) + (4) + (5)
6

9

1

Belgaum

2

Bellary

2

14

2

18

3

Bidar

26

7

12

45

4

Gulbarga

17

8

3

28

5

Raichur

11

29

1

41

6

Shimoga

10

14

8

32

Total

66

81

26

173

Com&hn~3
-43-

INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
(WORLD BANK ASSISTANCE) PHASE - II PACKAGE - II

LIST OF VILLAGES WHERE CIVIL WORKS COMPLETED BUT AWAITING ENERGISATION
TO END OF DECEMBER 1999

ABSTRACT
SI No.

District

Name of the Villages

2

T

3
Nil
________ 2________
________26________
________17________
________11________
10

Belgaum
Bellary
Bidar
Gulbarga
Raichur
Shimoga

2

2
£
£
6

Total

66

LIST OF VILLAGES WHERE CIVIL WORKS COMPLETED BUT AWAITING ENERGISATION
TO END OF DECEMBER 1999

DISTRICT WISE SUMMARY
SI No.

District

Package No.

Name of the Villages

1

2

3

7

4

Belgaum

Nil

Bellary

1
2

BLR-6
BLR-6
BLR-6

Anekal
Anekal (Tanda)
Eshapura

BDR- 1
BDR- 1
BDR - 1
BDR - 1
BDR-2
BDR-2
BDR-2
BDR-2
BDR-2
BDR-4
BDR-4
BDR-4
BDR-5
BDR - 5
BDR-5
BDR-6

Betgera
Kitta
Ladwanthi
Hirnagaon
Santhapur
Khathgaon
Dongaon
Hedgapur
Dapka
Bhatambara 1
Chalkapur
Wanjor Khed
Madorgi
Bernal Khed
Waddan Kera
Nagan Kera

Bidar

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

mpr-kk

LIST OF VILLAGES WHERE CIVIL WORKS COMPLETED BUT AWAITING ENERGISATION

TO END OF DECEMBER 1999

DISTRICT WISE SUMMARY
SI No.

District

Package No.

1

Name of the Villages

2
Bidar

3

4

BDR-7
BDR-8
BDR-8
BDR-8
BDR - 8
BDR- 11
BDR - 13
BDR - 16
BDR - 16
BDR - 19

Muc?:L.ii
Murki
Kherda (B)
Hokarna
Nidoda
Kamthana
Kohinoor
Wadagaon
Kamalanagar
Nittur (B)

Tz
18
19
20
21
22
23
24
25
26

Gulbarqa
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
1
2
3
4
5
6
7
8
9
10
11

Raichur

GLB- 1
GLB- 1
GLB - 1
GLB-2
GLB-3
GLB-5
GLB-5
GLB-8
GLB-9
GLB -10
GLB-11
GLB-11
GLB - 14
GLB - 16
GLB -18
GLB - 21
GLB-21
RCR-5
_RCR-6
RCR-7
RCR-8
RCR-8
RCR-9
RCR-11
RCR- 13
RCR - 14
RCR - 16
RCR - 18

mpr-kk

-45'-

Kumsi
Arunkal
S.Saradogi
Kallur Raod
Kakkasagera
Bapparga
Rajankollur
Nalwar
Yelwar
Madaki
Chimmaidalai
Nagaidalai
Kotgera
Devapur
padasawali
Sawaie^jwar
Chinchansou.

Hulgera
Gonwala
Koradakera
Bagalwada
Turkundona
Singonal
Mednapur
Navalahalli
Ojanahalli
Katlatkur
Kota

INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
(WORLD BANK ASSISTANCE) PHASE - II PACKAGE - II

LIST OF VILLAGES WHERE CIVIL WORKS COMPLETED BUT AWAITING ENERGISATION
TO END OF DECEMBER 1999

DISTRICT WISE SUMMARY
SI No.

District

2
7

2
Shimoga

2
3
4_

2
6_
7
8
9
10

mpr-kk

Package No.

Name of the Villages

3

4
Chiradoni
Hosakera
Kamasagar
Devarahalli
Vaddanal
Pandomatti
Maravanji
Maravanji Camp
Arabilachi
Nidige
Antharagange

SMG- 1
SMG- 1
SMG - 1
SMG-3
SMG-3
SMG - 7
SMG-7
SMG-7
SMG-8
SMG - 16
SMG -16

INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
(WORLD BANK ASSISTANCE) PHASE - II PACKAGE - II

IMPLEMENTATION ASPER EXIT POLICY

SL
No

District

Villages Completed &
Commissioned at the
end of Previous Month

Villages Handed over to VWSC

Villages Completed Commissioned
Cumulative

During the Month

Target

Achivement

Target

No. of
Previous
Achivement
Month
8
7

1

2

3

4

5

6

1

Belgaum

1

7

8

22

9

2 Bellary

12

10

4

45

16

2

3 Bidar

13

6

56

19

10

I

4 Gulbarga

11

12

52

11

3

i

5 Raichur

21

7

9

55

30

1

6 Shimoga

16

5

6

26

22

6

Total

74

41

33

256

107

22

£

Cumulative

During the Month

Target

Achivement

Target

Achivement

9

10

11

12

25

2

2

12

2
40

14

3

1
8

2

16

-4

65

26

INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
• (WORLD BANK ASSISTANCE) PHASE - II PACKAGE - II

Villages covered under different Bottlenecks
For the month of DECEMBER 1999

No. of villages
No. of Open
No. of Bore wells
OHT site under
flushing to be
well/Shaliow
Bore
to be drilled
dispute
done
wells to be drilled

Sr.
No.

District

1

i
Belgaum Bulganawadi

Hudli (1)

Katakabhavi

Doddi (2)

Parthanahalli

2

Bellary

3

Bidar

4

Gulbarga

Sump sites to
be handed
over

Arabhavi (college) Pachapur
Turunur

Sindhikurbet

SBC
Results

GLSR site
to be
handed
over
Nainglaz

Rustumpur

Nagenwadi

Kodal

Baparga (1)

Tadakal

Jeeratagi

Bheemanahalli (1) Halgadala

Bheemanahalli

Ankalga

Hungunta (SBW)
5

Raichur

K.Hosahalli. 3 nos.

Kolur

Bhagyanagar

Singnal. 2 nos.
Kandakur. 3 nos.

6

Shimoga -

Total Nos.

B.Beeranahalli (1)

4

14

4

Btl_vlg Sheet 1

— 4$-

5

3

2

1

Details of villages where work is not started

Dt:
1

Belgaum
BGM-26

Sampagaon

Surface source not settled

2

BGM-26

Sanikop

-do-

3

BGM-26

Hole Hosur

-do-

4

BGM-26

M K. Hubli

-do-

Dt:

Bellary

1

BLR-5

Bagewade

SBW yet to be established

OHT-2: GL Bracing Beam
SP = Not procured
RM,DM= Not procured

Oct_Age

2

BLR-14

Sidiginamola

SBW yet to be established
SP,RM, DM: Not started
OHT: 2nd bracing beam

3

BLR-17

Hargondanahalli

SBW yet to be established
OHT: Not started
SP : Not procured
RM : Not started
DS : Not started

Dt:

Gulbarga

1

GLB-9

Halgadla

source not established

2

GLB-13

Ravoor

-do-

3

GLB-19

Honegunta

-do-

4

GLB-22

Chintapalli

-do-

5

GLB-13

Salahalli

-do-

NOTATIONS
OHT-1
OHT-2

Foundation

OHT-3

2nd Bracing Beam

OHT-4

3rd Bracing Beam
Bottom Ring Beam & Slab

OHT-5
OHT-6

G.L. Bracing Beam

Side Wall

B.B.

Dome
Bracing Beam

G.L.

Ground Level

OHT-7

(BRB & S)

(SW)

a. GLSR-1 - foundation
b. GLSR-2 - RCC Beam

c. GLSR-3 - Masonry
d. GLSR-4 - Roof

PSBW
F&YT

Proposed Shallow Borewell

WR

Water requirement

WPR

Water Potability Results

PR

Pumping rate

HP

Hand Pump

SP

Stand Post

CS
CT

Cistern

WP

Flushed and Yield tested

Cattle Trough
Washing Platform

SSI

Dust Bin
Surface Source Scheme (Individual)

SSR

Surface Source Scheme (Regional)

UP

Under Progress

C

Completed

JW
1W
WTP

Jack well
Intake well
Water Treatment Plant

N.A.
CCS

Not applicable
Construction Schedule

MS-1

I Milestone

MS-2
MS-3

II Milestone
III Milestone

DB

-50-

INTEGRATED RURAL WATER SUPPLY AND
ENVIRONMENTAL SANITATION PROJECT
KARNATAKA
(World Bank Assistance)

Phase II

Package II Villages

PROGRESS REPORT
of Belgaum District
For the Month of DECEMBER 1999

INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.. NEW DELHI
CONSULTANTS FOR CONSTRUCTION MANAGEMENT AND QUALI FY CONTROL

Format

3

M/s. intercontinental Consultants And Technocrats Pvt. Ltd.
Integra ted Rural Water Supply and Environmental Sanitation Project
(World Bank Assisted)
Physical & Financial Progress Package wise (Month December 99)
Name of District: Belgaum
Sr.
No

Pack
-age

No of
villages

Name of
Contractor

Period of
completion

PDC

Mile
stone

Contract

Value
Rs. in
Lakhs

Date of
start

PDC

Financial
Progress In
Lakhs
(cumulative)

Physical Progress

A

25

T
2

A

25.00
26-9-98
It

85.00

95.77

7

26-3-99
III

1
up

121.3

115.71

BGM

1

01

4

K
Ramakrishna
Hyderabad

18 months

121.30

26-3-98

4th Sept 99

I
4

ip

5

o

04

05

07

A
a'

3

3

4

M/s B T Patil
and Sons,
Belgaum

Shri
R Nagraj,
Ramadurg

M/s
Coramandal.
Hyderabad

18 months

94 60

27-4-98

27th Oct 99

18 months

53 70

12-1-98

12th July 99

18 months

29th Sept
99

53 30

20-3-98

2

A

2

4

2.

A

2

1

1
up

OHT
in
Nos.

DM
in Kms

RM
In Kms

CP
in
Nos.

SP
in
Nos.

T

T_
4

A

2

A

T’

5.5

13

21.7

2

3
up

2/1

3/1
up

8

5.5

22

22.7

3

3

3/1

2C/
1C

20.00

18.32

2

2

27-10-98
II

60.00

28.23

5

7

2.2

11

9.30

1

27-4-99
III

94.60

39.45

9

11

2.75

18

15.5

2

27-10-99
I

10.00

10.00

1

1

12-7-98
II

35.00

19.69

4

3

1.2

12-1-99
III

53.7

25.99

6

5

1.2

12-7-99
I

13.00

11.42

1

1

II

35.00

16.87

4

20-3-99
III

53.3

33.22

6

4

Under
extended
time

4

2

11

-/1
2
up

-12

2
up
Under
extended
time

1

5.4

2

2
up

8.5

3

3
up
Godachi
Biiagupp<

1

2

20-9-98

Up

Remarks

Under
extended
time

5

12

No
of
sche
me
prop
osed

A

1/-

1

29-9-99
I

20-9-99

Sump I
GLSR
in
Nos.

No of
sche
me
comm
ission
ed

4

0.6

5

0.6

2

3
up

6

5.7

8

5.8

3

3
up

Under
extended
time

Contd..

Physical & Financial Progress Package wise (Month December 99)

Sr.
No

Pack Age

No of
village

Name of
Contractor

Period of
completion

Contract
Value Rs.
in Lakhs

Mile
stone

Date of
start

PDC

Financial
Progress in
Lakhs
(cumulative)

Physical Progress

PDC

08

M/s. B.T.Patil
and Sons,
Belgaum

4

18 months

12-5-98

16.00

17.12

2

64.00

28.63

6

III

80.00

46.07

10

12-11-99
I

13.10

13.10

1

1

2

13-10-98
II

40.00

15.01

3

2

7

13-4-99
III

66.00

34.80

5

3

1.6

12

25.00

9.72

4

3

0.9

80.00

17.56

13

10

21.4

I

A

2

3
up

-/1

1
up

1

3

3
up

1/2
Up

1C/
1up

1

T

6.7

11

5.0

11.7

18

16

1

6

2

10

1

A

Under
extended
time

1
up

12-11-98

12th Nov99

II

Remarks

Sump /
GLSR
in
Nos.

T‘

A
2.8

A

A

No of
sche
-me
Prop
-osed

A
3
up

T
4

T
2

T

OHT
in
Nos.

DM
in Kms

A

£
80.00

RM
In Kms

CP
in
Nos.

SP
in
Nos.

T
BGM

8

No of
sche­
me
com
missi
oned

12-5-99

9

09

3

I

M/s.
Pochampad,
Hyderabad

18 months

66.00

13-4-98

13th Oct 99

N

10
Up

Under
extended
time

1
up

2
up
1

2
up

-/1

1
up

4.0
(0-5)

2

2
up

-/1

1
up

3

0.5

1

3
up

1

8

9.6

3

4
up

1/1

-/1
up

6.32
(2.8)

14

10.17

5

4
up

1/1

-/1

13-10-99
10

10

3

M/s. B.T.Patil
and Sons
Belgaum

18 months

136.30

27-5-98

Under
extended
time

27-11-98

18th Nov 99

II

1
I

27-5-99

III

136.3

49.37

30

(13)

2

up

27-11-99

12

12

4

Shn S A.
Magdum.
Belgaum

18 months

21st Aug 99

96.70

21-2-98

I

19.00

19.00

3

21-8-98
II

59.00

51.45

8

21-2-99
III
21-8-99

1
Up

4

U

8

12.2

10

14.80

2

96.70

74.80
(7.56)

14

(5)

6

3

21-

1
up

3/-

1
up

up

P

14

15.2

17

16.45
(0.7)

3

Under
extended
time

1/-

1

3

3

3C

2

1

Cor.td . .

Physical & Financial Progress Package wise (Month December 99)

Sr.
No

Pack
-age

No of
villag
-es

Name of
Contractor

Period of
completion
PDC

Contract
Value
Rs. In
Lakhs

Date of
start

Mile stone
PDC

Financial
Progress in
Lakhs
(cumulative)

Physical Progress

A

8.00

20.53

2

M/s. Rao
Cont.
Bangalore

18 months

58.00

28.00

20.53

58.00

25.26

30-5-2000
I

60.00

53.99

27-4-99
II

140.00

116.48

1

1

3

0.30

4

5.0

1

27-10-99
III

241.00

116.48

2

2

5

0.30

6

5.00

1

4.5

2.90

1

0.57

1.0

0.68

2

1.45

1.2

1.95

1.6
(06)

4

19.0

5

23.20

1

2
Up

15

24.0

2

2C/

30-11-98

24

Hosur

Shri G.
Krishna
Reddy

18 months

241

27-10-98

I
W

26

27

25

26

1

Neginhal
Sampgaon
M.K.
Hubh
HoleHosur

M/s Suprad a
Cont.

M/s Rao
Cont.
Bangalore

A
4.0

1

5

7.0

3

10

1

1

A

T

3

1

2

5

2

2

A

A

28

1

6 months

11.32

540

4-6-99

24-9-98

11.32

2.90

100.00

240.37

24-3-99
II

300.00

323.68

1

2

13

22.10

540.00

335.30

2

4

29

22.10

23

24.2

1.12

1.12

1.52

1.30

2.81

2.905

3.80

3.80
(0.30)

2

6 Months

15 73

25-3-99
*28-4-99

I
28-7-99
II
28-10-99

-/2
up

1
Up

Contract
in Mile
stone II

-/1

up

3

Con tract
in Mile
stone II
Contract
in Mile
stone III

1
Up
2C/
1
Up

6.30

9.94

1

15.73

15.72

2

2

s

Contract
in Mile
stone III

-/1

18 months

III

Remark

Contract
in Mile
stone II

1
Up

27-4-2000
I
4-9-99
II
4-12-99
I

1

2

24-9-99

M/s Deepa
Cont. Co
Goa

A

Sump I
GLSR
in
___Nos^
T
A
-/2
1/up

No of
sche
me
prop
o-sed

2/2

24-3-2000
30

T

30-5-99
II
30-11-99
III

25

T_
2

T

T

15

OHT
In
Nos.

DM
in Kms

RM
In Kms

CP
In
Nos.

SP
in
Nos.

T
BGM

15

No of
sche­
me
com
missi
oned

1
Up
-/1

1
Up
1C

1

Under
extende
d time

Conid...

Physical & Financial Progress Package wise (Month December 99)
Period of
completion

Sr.
No

Pack
-age

No of
villag­
es

Name of
Contractor

PDC

Contr­
act
Value
Rs. in
Lakhs

Mile
stone
Date of
start

Financial Progress
in Lakhs
(cumulative)

Physical Progress

PDC

T

A

I

8.00

5.24

20-11-99
II

19.77

BGM

31

29

30

1

Asundi

M/s
Suprada
Cont.

Shri H. P.
Madhukar
HuWi

6 months

18 months

19.77

197

20-08-99

25-10-98

I
32

31

1

1

33

32

1

M/s Rao
Constn.
Bangalore

6 months

Shn. G.
Krishna
Reddy
Dharwad

6 months

25.06

31-5-99

*13-8-99

30 12

13-11-99

20-02-2000
I
25-4-99
II
25-10-99
III
25-4-2000
I
13-11-99
II
13-2-2000
I
11-10-99
II
11-1-2000

CP
in
Nos.

SP
in
Nos.

x
29

No
Of
sch­
eme
Com
miss
ione
d

RM
in Kms

1

T
2.0

2

4.375

A

A

T

DM
in Kms

A

T
1.2

3.215

OHT
In
Nos.

__ A_
0.50

T

0.80

1

A

No
of
sch
erne
prop
ose
d

Remarks

Sump /
GLSR
in
_Nos.
T
A
Contract
in Mile
stone II

(0.30)

30.00

114.49

3

12.80

2

0.80

1

1

1

8

13.50

7

9.0

1

197.00

2

2

14

13.50

11

9.0

1

10.00

1

1

2

100.00

154.03

25.06

5.22

2

2

4.5

12.00

11.52

1

1

2

3

2

5

30.12

4.00

Up
1
Up
1
Up
1
Up

1

1
Up

2.50

1

I

Note : Values in brackets indicate this month progress.

District Manager (South),
ICT. Pvt. Ltd.,
Belgaum.

Contract
in Mile
Stone III

Contract
in Mile
stone II

Contract
in Mile
stone II

Format

3

M/s. intercontinental Consultants And Technocrats Pvt. Ltd.
Integrated Rural Water Supply and Environmental Sanitation Project
(World Bank Assisted)
Physical & Financial Progress Package wise (Month December 99)

Name of District: Belgaum
Period of
completion

Sr.
No

Pack
-age

No of
villages

Name of
Contractor

PDC

Contr­
act
Value
Rs. in
Lakhs

Mlle
stone

Date of
start

Financial Progress
in Lakhs
(cumulative)

Physical Progress

PDC

T

A

02

Bellad
Bagewadi

Shri
B R Patil,
Nippani

18 months

95.74

25.00

35.93

II

60.00

25-10-99
III

95.74

13-10-98

T

A

50.26

1

2

55.32

2

T

A

T_
2

A
1

T_
1

A

5

1.40

2

0.5

8

2.90

4

3

03

4

M/s.
Coramandal.
Hyderabad

18 months
21st June
99

53 20

21-3-98

25^4:
2000
I

12.00

2

2

M/s.
Coramandal,
Hyderabad

18 months
21st Sept
99

3.0

Sump I
GLSR
in
Nos._
A
T

Contract
in Mile
Stone III

1

36.00

16.61

5

III

53.20

38.43

21-9-99
I

11.50

21-9-98
II

30.00

1
up
Under
extended
period

1

3

1

21-9-98

3

0.30

9

4.90

2

3
up

8

5

0.732

16

12.38

3

3
up

11.50

1

1

2

13.15

4

2

7

3
up

21-3-99

06

A

Remarks

1
up

(1-5)

12.00

II

6

T

No
of
sche
me
prop
osed

25-4-99

(0.46)
v)

OHT
in
Nos.

DM
in Kms

RM
In Kms

CP
In
Nos.

SP
in
Nos.

BGM

2

No of
scheme
commis
sioned

46.85

21-3-98

Up

1

U

Under
extended
time

1

2
up

1Z-

2

2
up

1/-

P
21-3-99
III
21-9-99

46.85

35.42
(1114)

6

2

3

1.8

12

Chikalwad

10.6

1
up

Contd..

Physical & Financial Progress Package wise (Month December 99)
Period of
completion
Sr.
No

Pack­
age

No of
villag
-es

Name of
Contractor

PDC

Contract
Value
Rs. In
Lakhs

Mile
stone
Date of
start

PDC

Financial
Progress in
Lakhs
(cumulative)

Physical Progress

T

A

13.00

7.5

2

22-11-98
II

45.00

18.73

6

11

22-5-99
III

73.80

27.21

10

2

22-11-99
I

7.00

7.00

1

24-11-98
II

23.00

13.57

4

24-5-99
III

38.42

23.27

6

5

24-11-99
I

15.00

15.00

3

2

25-9-98
II

55.00

29.44

10

6

1.0

7

8.64

3

2
up

-71

25-3-99
III

80.35

40.59

13

8.9

4.59

21.7

12.3

4

2C7
2
up

-71

BGM

T_
11

13

11

13

2

3

I
Uf

M/s. B T.
Patil and
Sons.
Balgaum

Shri
R Nag raj.
Ramadurg

18 months

73.80

22-5-98

17th Nov 99

18 months

38.42

24-5-98

24th Nov 99

I

14

14

4

Shri
S A.Magdu
m. Belgaum

18 months
25th Sept
99

80.35

25-3-98

25-9-99

CP
in
Nos.

SP
in
Nos.
A

T

Up

I -

RM
in Kms

A

T.
2

A

DM
in Kms

T

OHT
in
Nos.

Sump 7
GLSR
in
Nos.
A
T

3

A
3.4

T
1

A
1
up

5

10

4.9

2

1
up

1/-

8

16

12.85

3

2
up

17-

1

2

3

6

3.30

1

1
up

10

9.12

2

2
up

3.1

4

No
of
sche
me
com
miss
I
one
d

No
of
sche
me
Prop
ose
d

Remarks

Contract in
Milestone
III

Under
extended
time

1

Under
extended
time

Conid..

Physical & Financial Progress Package wise (Month December 99)
Sr.
No

Pack
-age

No of
villag
-es

Name of
Contractor

Period of
completion
PDC

Contract
Value
Rs. In
Lakhs

Date of
start

Mile stone
PDC

Financial
Progress in
Lakhs
(cumulative)

Physical Progress

T

A

I

16.11

73.00

08-6-99
II

56.11

83.11

1

1

08-12-99
III

116.11

83.11

2

2

08-6-2000
I

11.26

12.36

18-6-99
II

26.26

12.36

18-12-99
III

51.26

18-6-2000
I

20.00

25.36

25-4-99
II

50.00

25.36

2

2

1

0.3

8

3.6

25-10-99
III

2
Up

1
up

93.36

32.26
(6.9)

2

2
Up

2

2

0.3

13

5.0

1
Up

20.00

12.35

2

5.5

25-4-99
II

1
up

50.00

20.65

1

2

1

1

7

5.5

25-10-99
III

1
up

99.34

20.65

2

2

2

2

11

5.5

25-4-2000
I

15.00

19.59

1

2

2.6

25-4-99
II

40.00

22.06

1

1

3

4

4.5

1

1
up

25-10-99
III

79.30

29.56

2

2

5

9

6.5

1

1
up

SP
in
Nos.

BGM

T

16

17

16

17

Kunnur

Mangav
-ati

M/s Suprada
Cont.
Dharwad

Shri Lathure
& Brothers
Lathur

18 months

18 months

116 11

51.26

08-12-98

18-12-98

No Of
sche­
me
comm
ission
ed

A

CP
in
Nos.

T

A

OHT
in
Nos.

RM
in Kms

DM
in Kms

T

A
0.70

T_
2

A
6.0

T

1

1.50

6

7.0

1

2

1.50

8

1

1

1

2

2

1

1.80

A
1
up

No
of
sche
me
prop
osed

Remarks

Sump /
GLSR
in
Nos._
T
A

Contract
In mile
Stone Hi

1
up

1

1

3.2

2

3.2

1
up

Contract
in Mile
Stone III

1
up

Contract
in Mile
stone III

1
1

3

I

U)
J

18

18

Ainapur

i

Shri
B.R.Patil,
Nippani

18 months

93.36

25-10-98

25-4-2000

19

20

19

19(A)

Jugul

Shirugu
-ppi

Shri
B.R.Patil,
Nippani

Shri
B R Patil,
Nippani

18 months

18 months

99.34

79.30

25-10-98

25-10-98

25-4-2000

3

2
(Pr)

1

Contract
in Mile
stone III

1
up

1
up

Contract
in Mile
stone III

Contd...

Physical & Financial Progress Package wise Month (December 99)
Period of
completion
Sr.
No

Pack
-age

No of
villa
-ges

Name of
Contractor

PDC

Contract
Value
Rs. in
Lakhs

Mile
stone

Date of
start

Financial
Progress in Lakhs
(cumulative)

Physical Progress

PDC

T

A

20.00

26.75

50.00

49.54

1

117.10

53.74

2

SP
in
Nos.

BGM
T

21

20

Akkol

Shri
B R.Patil,
Nippani

117.10

25-10-98

No of
sche
-me
commissoned

CP
In
Nos.

A

T

A

RM
in Kms

JT

A

T_

OHT
in
Nos.

A
2.7

T

1

1.2

4

5.0

1

1
up

2.8

7

6.7
(1.7)

1

1
up

0.6

2

12

1

18 months

DM
in Kms

1

2

25-10-99

III

21

Sounda
-tti

M/s Suprada
Cont.
Dharwad

18 months

126.80

23-9-98

vr
oO
I

23

22

Chinchali

Shri H. P
Madhukar

225

27-10-98

23

Borg
-aon

Shri
B. R.Patil.
Nippani

25-10-98

2

3

(1.6)

25.00

91.39

23-3-99
II

60.00

91.39

1

2

1

1.35

7

12

1

23-9-99
III

1
up

126.80

91.39

2

4

2

1.35

12

12

1

23-3-2000
I

1
up

55.00

69.94

1

2

2.20

4

7.6

1

27-4-99
II

1
up

130.00

152.41

1

4

7

8.43

13

8.0

2

3
up

152.41

2

6

11

9.63

21

8.8
(0.8)

4

3
Up

2

2.0

1

18 months

146.45

2

25-4-2000
I

27-10-99
III

24

2
(Pr)

27-4-2000
I

225.00

(12)

1

26.00

34.97

76.00

46.68

1

146.45

55.49

2

1

18 months

25-4-99
II

1

1
up

I 25-4-2000

2
Pr

2

2

Sump /
GLSR
in
Nos.
T
A

Contract
in Mile
stone III

Contract
in Mile
stone II

Contract
in Mile
stone III

2

0.70

6

3.0

1

1
Up

3

0.70

10

5.0
(2.0)

1

1
Up

25-10-99

III

Remarks

Contract
in Mile
stone III

25-4-99
II

22

A

No of
sche
me
propo
sed

Contd...

Physical & Financial Progress Package wise (Month December 99)
Period of
completion

Sr.
No

Pack
-age

No of
villag­
es

Name of
Contractor

PDC

Contr­
act
Value
Rs. in
Lakhs

stone

Date of
start

Financial
Progress In Lakhs
(cumulative)

Physical Progress

PDC

T

A

30.00

81.39

120.00

142.84
(10.56)

T
27

Pach­
apur
Sindhihatti

Shri H. P.
Madhukar
Hubli

202

16-12-98

4

35

33

34

1

1

V)

A

T

A

OHT
In
Nos.

DM
in Kms

RM
in Kms

Sump /
GLSR
in
_Nos.
T_
A
1
1
Up

T.
3

A
4.90

T_
1

A
5.75

T.
1

A

10.25
(2.15)

4

6.82

3

4
Up

2

3
Up

4

2
Up

3

2
Up

18 months

26-6-99

II

Rustumpur
Bagarnal
Karaguppi

34.

CP
in
Nos.

SP
in
Nos.

BGM

28

No
of
sch­
eme
Com
miss
ione
d

26-12-99

III

S. A
Magdum
Belgaum.

6 months

B R Patil
Nippani

6 months

43.20

2

8

2

4

13

7

6.82

17.00

3.62

2

2

3

2.20

43.20

17.55

3

4

7

5.40

22.00

4.25

2

2

4

3

1.20

26-3-99

26-6-2000
I
19-9-99
II
19-12-99
I
7-10-99

*7-7-99

II

57.48

14.49

5

4

9.54

8.6

6.40

I
19-10-99
II
19-1-2000
I
25-9-99

11.00

7.0

3

1

1

2

29.08

7.0

6

2

2.5

4.5

1

1

2

II
25-12-99
I
6-8-99

15.18

4.04

2

1.60

0.20

4.40

4.20

9.00

7.61

2

1.0

1.80

1.0

3.20

II
6-11-99

22.96

18.06
(6.15)

2

2.0

2.0

3.0

3.20

19-6-99

57 48

I

202.00

1

1

1
Up

Remarks

Contract
in Mile
Stone II

Contract
in Mile
stone II

1
Up
1
Up

1/1

No
of
sch
erne
prop
ose
d

Contract
in Mile
stone II

1/-

7-1-2000
36

37

38

35

36

37

1

1

1

Shri B. R.
Patil
Nippani

6 months

Shri B R.
Patil
Nippani

6 months

Shri R S
Patil,
Shiraguppi

29.08

26-3-99

*19-7-99
15.18

26-3-99
*25-6-99

6 months

22.96

6-5-99

6.00

2
Pr

4.50

1

1

1

1
Up
1
Up
1
Up
1
Up
1
Up

1/-

Contract
in Mile
stone II
Contract
in Mile
stone II

Contract
in Mile
stone II

1
Up

Note : Values in brackets indicate this month progress.

District Manager (North),
ICT. Pvt. Ltd.,
Belgaum.

Fc rmat

4

Intercontinental Consultants And Technocrarts Pvt. Ltd.
Name and Address of the District Manager (North): Col. (Retd.) A. B. Kakhandaki,
CCB - 365, Giri Nivas, Sadashiva Nagar,
Belgaum-01 Tel: (0831) 472710

For the month of December 99

District: Belgaum
Sr.
No

Package
Name
BGM

Total
No. of
villages

Value of
the work
in Rupees
in Lakhs

Name and
address of the
contractor

Name and
address of
the
contractor
personnel

Name and
address of
Assistant
Engineer

Date of
award

Date of
starting

Financial Progress (Cumulative) in Rs. In
Lakhs

Date of
completion

MS -I
2

1

2

1

I

2

3

3

4
95.74

1

4

53.20

(F*
O

3

4

5

6

11

13

2

2

3

46.85

73.80

38.42

Shri
Nippani

6

5________
B.R.Patil

M/s. Coromandel
Pvt.
Prestcrete
Ltd.
Hills
Banjara
Hyderabad

Sunil
Shri
Kumar
Gokak
Ph : 08332 25215

M/s. Coromandel
Pvt.
Prestcrete
Ltd.
Hills
Banjara
Hyderabad

Shri
R.S.Hukkeri
Gokak
Ph : 08332 25215,2798
4

M/s. B.T.Patil and
Patsons
Sons
House Belgaum
0831
Ph
421112

Shri

J. S. Sawant
Belgaum
Ph : 0831
463617

R.Nagraj Beelagi
Nagar Ramadurg
Ph : 08335 42801

D.G.Yedhalli
S.K.Hadima
ni
Ramadurg

7
Shri
V.S.Diwate,
Kabbur.
Ph: 0833
57073
B.
Shri
R.
Chougule. at
Chikkodi.
S.
Shri
V.
Shri.
Diwate,
B. S. Kamate
Shri Nitturkar
Belgaum
for
village Daddi

V.S.
Shri
for
Divate
Katakbhavi
Shri
B.S.Kamate for
Khadaklat
village
Shri
V.S.Diwate for
Belkud Village
Hanji
Shri
for
Athani
villages
Kannal,
Parthanalli and
Yelihadagali

I

MS-II

A
12

T
13I

14

MS - III
T ______ A_
15
16

8

9

10

T
11

13-10-98

13-10-98

18 months

25

35.93

60

50.26

95.74

55.32
(0.46)

16-8-97

21-3-98

21-1-99

12

12

36

16.61

53.2

38.43

26-2-98

21-3-98

21-9-99

11.5

11.5

30

18.55

46.85

35.42
(11.14)

25-4-98

22-5-98

22-11-99

13

7.5

45

16.43

73.80

27.21

28-3-98

24-5-98

24-11-99

7

7

23

13.57

38.42

23.27

I

2

Contd..

Sr.
No

Pack­
age
Name
BGM

Total No.
of
villages

Financial Progress (Cumulative) in Rs. in Lakhs
Value of
the work
in Rupees
in Lakhs

Name and address
of the contractor

Name and
address of
the
contractor
personnel

Name and
address of
Assistant
Engineer

Date of
award

Date of
starting

Date of
comple
tion

A
12

MS-II
T
A
13J
14

MS-I

1

6

2

14

3

4

4

5

80.35

Shri S.A.Magdum
“Shreeyansh” 9th
cross,
Bhagya
Nagar Belgaum
Ph : 0831 -481818

7

16

1

116.11

8

17

1

51.26

9

18

1

93.36

10

19

1

99.34

I
Ts

6

Suprada
Constructions,
Dharwad
M/s.Lathure &
brothers,
Lathur.

Shri. Patil
Belgaum

Shri.
Krishnaraj

Shri. Desai

I

11

19(A)

1

79.30

Shri
Nippani

B.R.Patil

Shri
B.R. Patil
Engineers
and
Contractors,
Rajashila
Apartments,
Ashoka
Nagar,
Nippani.
Shri
B.R.Patil
Engineers
and
Contractors,
Rajashila
Apartments,
Ashoka
Nagar,
Nippani.

Shri Karoshi.

Shri.
Karoshi.

Shri. Karoshi

7
Shri.
R.
B.
Chougala.
Shri Abbubakar
Mulla
Belgaum
for
Nesaragi
village
Shri
B.
S.
Revankar
Khanapur
for
village Ankalagi
Shri B.S.Kamate
at Khadaklat for
Kunnur________
Shri
Hanamantraya
Patil.
Mangavati.

Shri Prabhakar
Hanji, Athani Ph:
08189-51632
for village
Ainapur(SSI)
Shri.
Hanumantraya
Patill
Jugul

Shri
Hanamantraya
Patil.
Siraguppi.

MS - lll_
T
_A_
15
16

8

9

10

T
11

4-2-98

25-3-98

25-9-99

15

15

55

29.44

80.35

40.59

8-12-98

8-12-98

18
months

16.11

66.74

56.11

83.11

116.1

83.11

2-1-99

2-1-99

18
months

11.26

12.36

21.26

12.36

51.26

12.36

29-9-98

25-10-98

18
months

20

25.36

50

25.36

93.36

32.26
(6.9)

29-9-98

25-10-98

18
months

20

12.35

50

20.65

99.34

20.65

29-9-98

25-10-98

18
months

15

22.06

40

22.06

79.30

29.56

3

Contd..

Financial Progress (Cumulative) in Rs. in Lakhs

[
Sr.
No

Total No.
of
villages

Value of
the work in
Rupees in
Lakhs

1

2

3

4

12

20

1

117.10

21

1

126.80

14

22

1

225.00

15

23

1

146.45

16

27

5

202.11

17

33

1

43.20

18

34

1

57.48

13

I

Pack­
age
Name
BGM

cys

Name and
address of
the
contractor
personnel

Name and
address of the
contractor

_______ 5_______
Shri
B.R.Patil
and
Engineers
Contractors,
Rajashila
Apartments,Ashok
a Nagar.Nippani.
M/s.
Suprada
Construction
Dharwad
Shri
H.P.Madhukar,41,
Prashant, Vijaya
Nagar.Hubli_____
Shri
B.R.Patil
and
Engineers
<
Contractors,
Rajashila
Apartments,
Ashoka
Nagar.Nippani.
Shri
H.P.Madhukar

S.
• Shri.
Magdum
Ms. B. R. Patil

A.

Name and
address of
Assistant
Engineer

Date of
award

Date of
starting

Date of
completion

MS-I
T J[~X
11
12

MS - II
T ___ X
14
13I

MS-III
T
15

A
16

7

8

9

10

Shri
Manjunath, R.
Akkol

29-9-98

25-10-98

18 months

20

26.75

50

49.54

117.10

53.74
(4.10)

Shri. Raju
Shri. Desai
Shri.
Kamble
yet
Not
given

Shri S. R.
Patil
at
Mangavatti.

21-9-98

23-9-98

18 months

25

68.71

60

91.39

126.80

91.39

Shri SR Patil
At
mangavati.

23-10-98

25-10-98

18 months

55

69.94

130

138.07

225.00

152.41

Shri. Meti I.
N.

Shri
Manjunath, R.
Borgaon

29-9-98

25-10-98

18 months

26

34.97

76

46.68

146.45

55.49

Shri. Mohan
Kulkarni &
Shri Patil S.
M.

Shri
S.M.Sondur
Gokak Ph ;
08332
for
25104
village
Pachapur &
six villages
Veeresh
Satya Naik
Veeresh
Satya Naik

16-12-98

16-12-98
I

18 months

30

81.39

120

142.84

202

19-6-99

19-6-99

6 months

17

14.12

43.20

17.55

26-3-99

7-7-99

6 months

22

4.25

57 48

14.49

____ 6
Shri.
Hedage

Not
given
Not
given

yet

yet

(10.56)

4

Contd..
Financial Progress (Cumulative) in Rs. in Lakhs
Sr.
No

Pack­
age
Name
BGM

Total No.
of
villages

1
19

2
35

2

20
21

Value of
the work in
Rupees in
Lakhs

Name and
address of the
contractor

1

4
29.08

_______ 5
Ms. B. R. Patil

36

1

15.18

Ms. B. R. Patil

37

1

22.96

Shri. R. S. Patil.

Name and
address of
the
contractor
personnel

Name and
address of
Assistant
Engineer

6

7
Veeresh
Satya Naik
Shri
Manjunath, R.
Shri.
Prabhakar C.
Hanji

Not
given
Not
given
Not
given

yet

yet
yet

Date of
award

Date of
starting

Date of
completion

MS -II__
A
T
14
13
7.00
29.08

8
26-3-99

9
19-7-99

10
6 months

MS-I
T _____ A
12
11
7.00
11

26-3-99

25-6-99

6 months

6

4.04

15.18

4.04

6-5-99

6-5-99

6 months

9

7.61

22.96

18.06
(6.15)

_MS - III
A
_T_
16
15

Note ;- The values in brackets shows the present months progress.

Distric^Manager(North),
I

o
GJ
I

ICT. Pvt. Ltd.,
Belgaum.

J

F o rma t

Intercontinental Consultants And Technocrarts Pvt. Ltd.
Name and Address of the District Manager (South) : Shri. T. Basavantappa.
CCB - 365, Giri Nivas, Sadashiva Nagar,
Belgaum-01 Tel: (0831) 472710
District: Belgaum
For the month of December 99
Sr.
No

Package
Name
BGM

Total
No. of
villages

Value of
the work
in Rupees
in Lakhs

1

2

3

4

1

1

4

121.30

Name and
address of the
contractor

Name and
address of
the
contractor
personnel

5
M/s.
K.Ramakrishna
Road - 3, Banjara
Hills Hyderabad

6
K.Bhavani
Belgaum-16
Ph : 0831453520

7
Raghavendra
Majakar
Belgaum
Ph : 0831
455080

M/s. B.T.Patil and
Sons
326/5,
Patsons House
Belgaum
Ph
0831
421112_________
R.Nagraj Beelagi
Nagar Ramadurg
Ph : 08335 42801

Shri
Pradeep
Sawant
Ph ; 0831
463617

I
i

2

3

4

4

5

7

3

3

4

94.60

D.G.Yedhalli
Sudhir Datye
Ramadurg
Ph : 42449

53.7

53.30

Name and
address of
Assistant
Engineer

M/s. Coromandel
Prestcrete
Pvt.
Ltd.
Banjara
Hills
Hyderabad

Shri
Lakshminara
yan
Gokak
Ph : 08332 25215

Date of
award

Date of
starting

Financial Progress (Cumulative) in Rs. in
Lakhs

Date of
completion

MS -I
T ___ A_
11
12

T
13;

MS - II
A_
14

MS - III
T _____
15
16

8

9

10

11-2-98

26-6-98

26-9-99

25

25

85

95.77

121.3

115.71

Shri
U.N.Nitturkar
Belgaum

13-4-98

27-4-98

27-10-99

20

18.32

60

39.45

94.60

39.45

Shri Ravindra
M.S Ramadurg
for
village
Hulkund

I
19-12-97

12-1-98

12-7-99

10

10

35

19.69

53.7

25.99

26-2-98

20-3-98

20-9-99

13

11.42

35

16.87

53.30

33.22

Shri Ravindra
Ramadurg Ph :
08335 - 42713
for
villages
Godachi,
Bijaguppi and
Toranagatti
Shri
Gummagol
Ramadurg for
Nandihal

4

Contd..

Financial Progress (Cumulative) in Rs. in Lakhs
Sr
No

Package
Name
BGM

Total
No. of
villages

Value of
the work in
Rupees in
Lakhs

6
A.T.Chipre
Belgaum

Y.S.Rao
G.V.Sairam
Dharawad

66

M/s. Pochampad
Cement
Pipe
Const. Co Jubilee
Hills Hyderabad

Shri
J.S.Sawant
Belgaum
Ph : 0831

136.30

M/s. B.T.Patil and
Patsons
Sons
Belgaum
House
0831
Ph
421112
S.A.Magdum
“Shreeyansh” 9th
Bhagya
cross,
Belgaum
Nagar
Ph :
0831 -481818
M/s Rao
Constructions,
Bangalore

Shri Patil
Belgaum

2

3

4

5

8

4

80

7

9

10

3

3

Name and
address of
the
contractor
personnel

________ 5________
M/s. B.T.Patil and
Patsons
Sons
Belgaum
House
0831
Ph
421112

1

6

Name and
address of the
contractor

9

12

4

96.70

10

15

2

58.00

Date of
award

Name and
address of
Assistant
Engineer

Date of
completion

________ 7________
Shri B.S.Revankar
C/O
Petgar
Compound
Parishwad,
Khanapur. Ph
0831 - 420902
S.R.Gummagol
Ramadurg
for
Village Hooli and
Hanchinal

_MS - III
A
T
16
15

8

9

10

T
11

12

MS - ll_
A_
T
14
13

25-4-98

12-5-98

12-11-99

16

17.12

64

28.63

80

46.09

4-2-98

13-4-98

13-10-99

13.1

13.1

40

15.01

66

34.80

25-4-98

27-5-98

27-11-99

25

9.72

80

17.56

136.3

49.37

4-2-98

21-2-98

21-8-99

19

19

59

51.45

96.70

82.36
(7.56)

30-11-98

20-1-99

18
months

8

20.53

28

25.26

58

MS-I
A

Shri.M.V.Mutanal
At
Gokak.

Ph.08288-74363

463617
Prakask C.P.
No. 12, Railway
Qtrs Khanapur

Ph : 0831
455080
Suresh Naik
and Uday
Shetty

Date of
starting

-

Shri S. M. Patil,
Belwadi,
for
village Dodawad
Shri Abbubabakar
Mulla,
Belgaum
for village Hudli

Contd..

Financial Progress (Cumulative) in Rs. in Lakhs
Sr.
No

Packa
-ge
Name
BGM

Total
No. of
villages

Value of
the work in
Rupees in
Lakhs

1

2

3

4

12

24

1

241.00

14

25

1

11.32

Name and address
of the contractor

Name and
address of
the
contractor
personnel

Name and
address of
Assistant
Engineer

Date of
award

Date of
starting

Date of
completion

MS -I
T '___ A
11
12

MS - II_
T
A_
13
14

7
Shri S.M.Patil
Beawadi,
Bailhongal for
village Hosur

8

9

10

14-10-98

27-10-98

18 months

60

53.99

140

116.48

M/s
Suprada
Constructi
ons,
Dharwad.

Shri
S
Gummagol.
Ramadurg

R

3-5-99

4-6-99

6 months

4.5

2.9

11.32

2.9

Shri. Raju
Dharmann
var

Shri
L
Belgavi
Bailhongal

B,
24-9-98

24-9-98

18 months

100

240.37

300

335.30

M/s
Deepa
Constructi
ons
Co.H.No.
10
Shantara
m Nagar,
Bivholim,
Goa

Shri
Abbubakar
Mulla.
Belgaum.

25-3-99

^8-4-99

6 months

6.3

4.05

15.73

15.72

________ 5________
Shri
G.Krishna
Reddy,Hubli

6
Shri. Naik

Shri Suprada Cont.
Dharwad.

Rao

MS - III

J____ A
15

16

241.00

116.48

540.00

335.30

I
tn

I

15

26

5

540.00

16

28

1

15.73

M/s.
Construction
Bangalore

Deepa
M/s
Co.
Constructions
Bicholim, Goa

4

Contd..

Financial Progress (Cumulative) in Rs. in Lakhs
Sr.
No

Pack­
age
Name
BGM

Total No.
villages

Value of
the work in
Rupees in
Lakhs

1
17

2
29

2
1

4
19.77

18

30

1

197.00

19

31

1

25.06

20

32

Note

Name and
address of the
contractor

Name and
address of
the
contractor
personnel

________5________ ____ 6
M/s.
Suprada Shri.
Constructions.
Jadhav.
Dharwad.
Yargatti.

Shri
H.P.Madhukar

M/s.
Rao
Construction

Shri.
Pralhad
Rao
Shri
Ganachari
Not
yet
given

Shri. G. Krishna Not
given
Reddy
The values in brackets shows the present months progress.
1

30.12

yet

Name and
address of
Assistant
Engineer

Date of
award

Date of
starting

Date of
completion

MS - II
T _____ A^
14
13
19.77

7
Shri.
Abbubakar
Mulla.
Belgaum.
Shri
Anil
Babu Rao.
Soundatti

8
07-8-99

9
20-8-99

10
6 months

MS-I
T _____A
11
12
8.00
5.24

9-10-98

25-10-98

18 months

30

114.49

100

154.03

Shri. L B.
Belgavi
Bailhongal.
Shri.S. M.
Patil. Belwadi

31-5-99

13-11-99

6 months

10

5.22

25.06

5.22

25-3-99

11-7-99

6 months

12

11.52

30.12

11.52

MS - III
A
15
16

197

154.03

(
-4
i

District Manager (South),
ICT. Pvt. Ltd.,
Belgaum.

t'orwaf - 5

Integrated Rural Water Supply and Environmental Sanitation Project
(World Bank Aided)
I 'illagennse Physical Progress
(Month - December - 99)
District: Belgaum (North)

Sr.
No.

Package
No.

Village
Name

TF

TM

AM

CA

5
Existing
Existing
2

6

7

8

'IT

TM

AM

CA

10

11
SSF-2
PWS-2

12
SSF1
PWS-1

13
SSF-1

OHT-2
0.70 km
RWS-4

PWS-1
2.0 km
OHT-2
1.50 km
RWS-4

BGM

2
BGM-02

1
1

2

3

1

4

BGM-03

BGM-03

BGM-03

3

4

Bellad
Bagexvadi

Jack well
Intake well
\TP
CP
RWL

5 .25 km

Settling Tank

Navilihal

Chikkalwad

Benadi

0}
00
I

5

6

BGM-03

BGM-06

Bambalwad

Katakbhavi

9
Filtration Plant
Pure Water Sump
PW - GM

1
2.59 km

O1 IT

1

0.90

DM

7.84 km

RWS

1

1.0
OHT-1
2.0 km
RWS-4

RM

1.97 km
4.03 km

1.07 km
1.0 km

0.2 km
0.4 km

1.1 km
2.0 km

Yes

0.232 km
4.58 km
7
2.4 km
5.95 km

0.232 km
1.38 km
7
2.4 km
1.9 km

0.232 km
0.7 km
7

0.232
4.58 km
7

Yes

0.2

4.7 km

2

1

1.5
ST4

ST-2

ST-2

OHT

1

OHT-7

OHT-8

OHT-8

SP

2

2

OHT
SP
Washing platform
OHT
SP

Existing

3

DM

RM

2

2

2

DM

BGM-06

Daddi

Surface
source
settled

10

21

21

1

OI IT-7

OHT-3

OHT-3

Dust Bins
RM

5

5

1

1

DM

1

RM
DM

0.96 km

0.96 km
0.2 km

0.1 km
0.1 km

0.1 km

1.65 km

RM

0.83 km
4.62 km

0.8 km
0.2 km

0.8 km
0.2

0.8 km
4.6 km

2
2.9 km
7.44 km

1.0 km

(Pr)

Yes

0.5 km

2(Pr)
1.0 km
6.2 km

1.2 km
1.28 km

1.2 km
0.28 km

1.0 km

Yes

Sump - 1

\'es

OHT
SP

3

OI IT-7
3

3

OHT-1
3

OI IT

1

OHT-7

OHT-7

OHT-7

OHT
Sump
SP

1

21

DM

7

Whether Source
Established
Yes/No
14

1

1

4

OHT-8
Sump-5
4

OHT-7
Sump-1
4

OHT-7
Sump-1
4

X_
CP
RM
DM

Yes

Yes

1.5 km

Yes

(Pr)

8

9

BGM-11

BGM-11

Belkud

OUT

Kadaklat &
Puttanwadi

SP
Sump (z\ddl)
OUT
SP

Existing
3

3

DM

1

SUM-2

I

OI IT 7

11

11

CP
Sump
RM

10.50 km

DM

12.61 km

RM

OHT-5

2

1

Sump - 4
2.0 km
1.2 km

10.3 km

1

2

3

4

5

6

7

8

9

10

10

BGM-11

11

Manuchiwadi

OHT

1

OUT-3

OHT-2

OHT-2

RM

0.98 km

0.5 km

SP

1

1

DM

1.075 km

0.3 km

11

12

13

14

15

16

17

BGM-11

BGM-13

BGM-13

BGM-13

BGM-14

BGM-14

BGM-14

12

13

14

Yes
0.3 km

1.0 km

0.10 km

0.95 km

Tapakarwadi

OHT

1

OHT-6

(Ham-3)

SP

2

2

Kannal

OHT

1

OHT-8

OHT-8

OHT-8

RM

1.5km

1.5 km

SP

2

2

2

2

DM

2.2km

2.2 km

GLSR (Repair)

1

Existing

RM

2.985 km

1.5 km

0.2 km

1.8 km

SP

2

2

2

2

DM

2.065 km

0.465 km

0.4 km

2.0 km

OHT

1

OHT-6

Ol IT-7

OI IT-7

RM

1.2 km

1.0 km

SP

3

3

DM

6.0 km

1.0 km

5.0 km

OHT

1

Existing

RM

1.75 km

1.25 km

0.5 km

Yes

SP

4

4

DM

3.38 km

3.38 km

GLSR

1

GLSR-5

RM

3.31 km

2.9 km

2.9 km

Yes

SP

3

3

DM

3.19 km

1.09 km

1.09

Dhulaganwadi

OHT

1

OI IT-8

0.42 km

(1 Iam-1)

SP

Nagcnwadi &

OI IT

1

OHT-3

Yadenwadi

SP

2

2

OHT

1

OHT-8

SP

4

4

OHT

1

OHT-8

SP

2

2

Jack well

1

JW-4

Parthan alii

Yelihadalagi

. Borgal

Nainglaz

OHT-6

OHT-6

OHT-8 (Up) OHT-8 (Up)

2

RM

0.45 km

0.45 km

DM

0.905 km

0.15 km

RM

0.42 km

DM

3.2 km

RM

0.335 km

0.335 km

DM

2.54 km

0.14 km

Yes

Yes

Yes

Yes

Yes

1.2 km

t
18

BGM-14

1

OHT-1

OHT-1

Yes

(I Iam-2&3)
19

20

21

BGM-14

BGM-14

BGM-16

Nesargi

Ankalgi

Kunnur
(SSI)

Intake well

1

VTP

2

RWL

1

Settling Tank

1

Raw water storage

1

Approach Bund

260m

1

OHT-7

OHT-8

JW-4

1 Up

1.0 km
RWS-4

RWS-4

OHT-7

RM

2.34 km

1.34 km

1.00 km

DM

7.205 km

3.2 km

4.0 km

Yes

RM

2.59 km

0.5 km

2.09 km y

DM

3.37 km

1.0 km

2.64 km

Filtration Plant

1

SSF-4 (Up)

Surface

Pure Water Sump

1

PWS-4

PWS-4

PWS-4

source

OHT

1

Ol IT-7

OHT-6

OHT-6

settled

1.0 km

RM

1.0 km

0.5 km

0.3 km

0.5 km

ST-4 (Up)

DM

7.6 km

1.0 km

1.0 km

7.0 km

RWS-4 (Up)

CP

4

OHT-8

JW-4
1 Up

Ctd.

2

Yes

1
22

23

2
BGM-17

BGM-18

3
Mangavati
(SSI)

Ainapur
(SSI)

24

25

BGM-19

BGM-19A

J

Jugul
(SSI)

Shiraguppi

(SSI)

O
I

26

BGM-20

Akkol
(SSI)

4

lack well
Intake well
SP
RWL
Settling Tank
Raw water storage
Jack well
Intake well
VTp

5
1
1
2
2.1 km
1
1
1

6
1
2
0.2 km
ST-2
RWS- 1

1

Existing
Existing
2
1.0 km
Existing
Existing

RWL
Settling Tank
Raw water storage
Jack well
Intake well
VTP
RWL
Settling Tank
Raw water storage

1
1
2
2.0 km
1
1

Existing
Existing

1

Existing
Existing

Jack well
Intake well
VTP
RWL
Setding Tank
Raw water storage

1

1.0 km
ST-4
RWS-2

2

5.09 km
1

1
1

1
2
2.8 km
1
1

8
JW-1

1
2
2.0 km
1
1

Jack well
Intake well
VTP
RWL
Settling Tank
Raw water storage

7

JW-4

2.0 km
Existing
RWS-3
JW-4
1
2
1 km
ST-4
RWS-3

ST-1
RWS - 1

2

1.80 km
ST- 1
RWS - 1

2

Existing
Existing

2(Pr)
0.7 km

2(Pr)
0.7 km
ST-1

2(Pr)
0.5 km

2(Pr)
0.5 km

RWS - 3

RWS - 3

JW- 1

JW-1

2(Pr)

2(Pr)
1.2 km
ST-3
RWS-2

9
Filtration Plant
Pure Water Sump
OHT
RM

10

11

1

SSF-3

1

PWS-3
OHT-5

1

DM

0.1 km
3.22 km

CP

2

Filtration Plant
Pure Water Sump
OHT
RM

1
1

1

12
SSF- 1
PWS- 1
OHT - 1

13
SSF - 1
PWS - 1
OHT-1
3.22 km

SSF-2
PWS-2
OHT-5

PWS-1
OHT-3

SSF-1
PWS-1
OHT-3

2.0 km

1.4 km

5.00 km

CP

0.2 km
13.00 km
2

Filtration Plant
Pure Water Sump
OHT
RM
DM
CP

1
1
1
0.2 km
10.52 km
2

SSF-4
PWS-4
OHT-6

SSF-1
PWS-1
OHT-5

2.0 km

5.5 km

1

SSF-3

1

PWS-3
OHT-6

DM

Filtration Plant
Pure Water Sump
OHT
RM
DM
CP

Filtration Plant
Pure Water Sump
OHT
RM

1

0.1 km
8.73 km
2
1
1

DM

1
0.1 km
6.7 km

CP

2

14
Surface
source
settled

PWS-4

SSF-1
PWS-4
OHT-5

2.0 km

6.5 km

SSF-3
PWS-3
OHT-5

SSF-1
PWS-1
OHT-1

1.7 km

5.0 km
2

Surface
source
settled

Surface
source
settled

Surface
source
settled

Surface
source
settled

1

2

3

________ 4________

5

6

27

BGM-21

Soundatti

Jack well

1

JW-4

(SSI)

Intake well
VTI’

1

1

2

RWL

1.59 km

28

BGM-22

Chinchali

(SSI)

Settling Tank

1

45

45

Raw water storage

1

RWS-4

Jack well

1

JW-4

1

29

BGM-23

Borgaon

VTP

2
3.06 km

Settling Tank

1

Raw water storage

1
6

(SSI)

30

BGM-27

Pachapur

Jack well
Intake well

Rustumpur

JW-5

2

PWS-5

PWS-5

source

OHT-8

OHT-8

settled

11

1

SSF-5

Up

Pure Water Sump

1

OHT

1

1.1

RM

0.43 km

0.21 km

ST-4

DM

12

12

45

CP

4

4

0.25 km

0.25 km

Filtration Plant

1

SSF-2

SSF-2

Surface

Pure Water Sump

1

PWS-2

PWS-2

PWS-2

source

OHT-1 (MV7)

1

OHT-6

OHT-7

OHT-7

settled

2.724 km

OHT-II (MBR)

1

OHT-2

ST-5

OHT-III (UK)

OHT-7

OHT-7

OHT-IV (CK)

1
1

OHT-7

RWS-3

OHT-4

OHT-6

OHT-6

5.87 km

1.0 km

1.2 km

6.9 km

0.8 km

8.8 km

JW-4

RWS-3

JW-4

JW-4

1

1

14

Surface

70

RM/GM

2

2

2

OHT-1

DM

17 km

2.3 km

Filtration Plant

1

SSF-3

SSF-1

Surface

Pure Water Sump

1

PWS-2

PWS-1

source

OHT

1

O1 IT-3

OHT-2

settled

OHT-2

RWL

2.8 km

1.0 km

1.0 km

RM

0.1 km

Settling Tank

1

ST-2

ST-1

DM

10.23 km

2.0 km

3.0 km

Raw water storage

1

RWS-2

RWS-1

CP

2

2

2

Jack well

1
1

Existing

Filtration Plant

1

SSF-3

SSF-2

Surface

Existing

Pure Water Sump

PWS-5

PWS-5

source

2

OHT

1
1

OHT-2

OHT-1

OHT- 1

settled

RWL

1.5km

GM

9.85km

2.85 km

2.13 km

9.13 km

Settling Tank

1

RM

1.79km

0.70 km

0.2 km

VTP

BGM-27

1

RWS-3

13

SSF-4

9
Filtration Plant

RWS-4
JW-4

0.336 km

VTP

Intake well

31

45

72

8

JW-3

1

RWL

CP

Up

0.6 km

Washing platform

Intake well

7

Existing

Raw water storage

1

RWS-5

RWS-5

DM

2.828km

GLSR (MBR)

1

GLSR-3

GLSR-3

GLSR-3

CP

6

out

1

OHT- 1

OHT - 1

OHT - 1 (SBC)

DM

0.51km

1.30 km

2.825km

2.825km

0.11 km

0.11 kn\

Surface
source
settled

32

BGM-27

Bagamal

OHT

1

OHT-5

33

BGM-27

Karguppi

GLSR

1

GI^R-4

34

BGM-27

Shindhihatti

OHT

1

OHT-8

OHT -4

OHT-4

DM

0.67km

0.5km

0.17 km

Surface
settled

GLSR-1

OHT-7

Sump

1

DM

1.69km

RM

0.60

DM

1.5km

SUMP-3

0.60

SUM - 2

0.60

SUM - 2
1.64km
0.60

Surface

1.45 km

Surface

source

settled
source
settled

1
35

36

37

38

39

2
BGM-33

BGM-34

BGM:35

BGM-36

BGM-37

3
U. Khanapur

Thana
Hattargi
Kanagale

Sidnal

Kottalgi

4

OHT
SP
OHT
SP

OHT
SP
Sump
OHT
SP
OHT
SP
DIU

5
1
4

6
OHT-8
4

1
8

OHT-8
8

1
8
1
1
2

OHT-8
8
Sum-2
OHT-8
2

1
3
2

OHT-8

7
OHT-7

OHT-5

8
OHT-7

OHT-5 (Up)

OHT-5

OHT-5

Sum-1
OHT-4

Sum-1
OHT-4

OHT-8

OHT-8
3(Pr)
Ctd.

9
RM
DM

10
5.0 km
7.0 km

11
2.0 km
2.0 km

12

13

14

0.9 km

5.4 km

Yes

RM
DM

9.54 km
8.6 km

9.54 km
8.6 km

0.6 km

6.4 km

Yes

RM
DM

2.5 km
4.5 km

2.5 km
2.0 km

0.5 km
0.8 km

0.5 km
4.5 km

Yes

RAf
DM

1.6 km
4.4 km

1.4 km
2.0 km

1.4 km
4.0 km

Yes

RM
DM

2.0 km
3.0 km

2.0 km
3.0 km

Yes

•istrict Manager (North),
ICT. Pvt. Ltd.,
Belgaum.

I
■J

Format - 5
Integrated Rural Water Supply and Environmental Sanitation Project

(World bank Aided)
Villagewise Physical Progress

(Month - December - 99)

District: Belgaum (South)

Sr.

Package

Village

No.

No.

Name

Whether Source
IT

TM

AM

C/\

5

6

7

8

OHT-8

OHT-8

I'M

AM

CA

9

10

11

12

13

14

Sump 1

1

80%

Yes

Sump 2

1

Yes/No

BGM

1

2

3

4

1

BGM-01

Sulebhavi

OHT

1

OHT-8

SP

3

3

CP

4

2

2

3

I

4

BGM-01

BGM-01

BGM-01

Pecranwadi

Marihal

Halga

U
I

5

6

7

8

9

BGM-04

BGM-04

BGM-04

BGM-05

BGM-05

Established

TT

Mache

Muchandi

1 longa

Turnur

Batakurki

RM

3.395 km

3.9 km

Ctd.
Ctd.

DM

8.00 km

7.6 km

Ctd.

1.35 km
8.00 km

0.05 km

OHT

1

Ctd.

RM

SP

2

2

2

2

DM

OHT

1

OHT-6

OHT-6

OI IT-8

Sump

SP

4

4

RM

CP

2

2

DM

1
1.36 km
5.50 km

GLSR

1

RM

3.76 km

DM

4.0 km

Ctd.

SP

3

OHT-1

1

OHT-8

OI IT-2

1

OHT-7

SP

6

6

GLSR

1

GLSR-5

RM

5.3 km
13.00 km

1.77 km

GI^R-5

GKSR-5

RM

4.35 km

1.0 km

DM

2.49 km

RM
DM

2.56 km
3.92 km

RM

1.8 km

DM

2.5 km

RM

DM

0.81 km
4.17 km

Sump

1

3

(Pr)

(Pr)

GLSR

1

GLSR-5

GKSR-5

GLSR-5

OHT

1

SP

2

OHT

1

SP

3

3

OI IT-6

2

OHT-8
3

Yes

Yes
3.6 km

DM

3

3

1.0 km

OHT-7

3

’les

5.1 km

OI IT-7

4

SP

Ctd.
0.5 km

OHT-7

SP

1.3 km
7.5 km

2.0 km

(1.00)

9.5 km

Yes

2.5 km

2.0 kni

Yes

2.56 km
0.92 km

3.00 km

Yes

1.5 km

0.3 km
2.5 km

0.67 km

Yes

0.81 km

Yes

3.0 km

But source under
review

1

2

3

4

5

6

7

8

9

10

11

10

BGxM-05

Hulkund

OUT

1

OHT-7

OHT-7

OHT-7

RM

2.715 km

2.715 km

SP

4

4

DM

4.57 km

2.07 km

Sump

1

50%

11

BGM-07

Godachi

OH'I’

1

SP

3

OHT-7

OHT-8

12

13

14

2.5 km

Yes

SUM-1

SUM-1

OHT-8

RM

3.05 km

1.45 km

1.0 km

3.00 km

3

DM

3.125 km

0.45 km

0.3 km

3.00 km

Yes

(Pt)

12

13

BGM-07

BGM-07

Bijaguppi

Nan dih al

SP

1

OHT

1

SP

1

1

OHT-8

OHT-8

RM

1.47 km

1.4 km

1.20 km

DM

0.8 km

0.2 km

0.8 km

OHT-8

RM

1.91 km

1.91 km

1.0 km

1

DM

0.8 km

0.4 km

0.5 km

Yes

Yes

(Pt)

14

15

16
17

BGM-07

BGM-08

BGM-08
BGM-08

Toranagatti

Gan digwad

Parishwad
Londa

I
I

18

19

20

21

22

23

BGM-08

BGM-09

BGM-09

BGM-09

BGM-10

BGM-10

K. Bekwad

Sopadla

Hooli

Hanchinal

OHT

1

SP

1

OHT-8

OHT-8

RM

0.73 km

0.73 km

0.4 km

0.5 km

DM

2.915 km

1.00 km

0.5 km

1.5 km

OHT

1

OHT-8

OHT-5

OHT-5

RM

3.45 km

0.45 km

3.5 km

SP

4

4

4

4

DM

6.0 km

1.0 km

6.0 km

CP

2

2

Sump

1

1

Ctd.

OHT

1

OHT-7

OHT-7

OHT-7

RM

3.6 km

1.1 km

2.5 km

SP

4

4

2(Pr)

2(Pr)

DM

4.56 km

1.5 km

3.1 km

GLSR

1

GLSR-5

GLSR-1

GLSR-1

RM

2.2 km

2.2 km

SP

3

3

3

3

DM

5.74 km

5.13 km

(Pt)

(Pr)

OHT

1

OHT-8

OHT-7

OHT-8

RM

3.5 km

3.5 km

SP

2

2

2

2

DM

1.5 km

1.8 km

OHT

1

OHT-8

OHT-8

OHT-8

SP

2

2

GLSR

1

GLSR-3

SP

3

3

OHT

1

OHT-8

SP

2

2

IW

2

GLSR-1

GLSR-1

OHT-8

Yes

Yes

Yes

Yes

RM

1.75 km

1.75 km

DM

3.79 km

3.79 km

2.38 km

2.38 km

3.74

3.74

RM

0.84 km

0.84 km

0.84 km

DM

4.22 km

1.5 km

2.3 km

Yes

3.0 km

Yes

RM '
DM

OHT-7

Yes

0.7 km

Yes

1.5 km

0.5 km

Yes

2

/Xrabhavi

GLSR

1

GLSR-4

GLSR-1

GLSR-1

RM

5.2 km

5.2 km

(MV)

SP

6

6

4

4

DM

4.015km

1.5km

2.0 km

1.451km

OHT

1

OHT-7

OHT-1

OHT-1

Arbhavi Math

OHT

1

OHT-7

OHT-8

OHT-8

RM

0.19km

0.186 km

(Ham-1)

SP

1

1

1

1

DM

0.485

0.45 km

(Pt)

(Pr)

Yes

1

2

3

4

5_

6

7

8

9

10

11

13

14

24

BGM-10

Sangankeri

OHT

1

OHT-4

OHT-3

OHT-3

RM

1.455km

1.455km

1.3 km

Yes

(Ham-2)

SP

3

3

3

3

DM

1.975km

1.5km

1.35 km

Jainarkodi

CS

.2

2

RM

1.20 km

1.2 km

1

1

Sump

Cancelled

RM

4.975km

2.0km

DM

4.075km

4.075km

3.57km

3.57km

RM

7.385km

3.0km

2.358km

2.358km

3.565km

25

BGM-10

(Ham-3)
26

BGM-10

Nagnoor

SP

1

1

OHT

1

OHT-8

SP

8

8

(Pt)

(Pr)

OHT-1

OHT-1

CP
27

BGM-10

Sindikurbet

OHT

SP

28

29

30

BGM-12

BGM-12

BGM-12

Nandgad

I lebbal

Kakkeri

)

31

32

33
34

BGM-12

BGM-15

BGM-15
BGM-24

Tolagi

Hudli

Dodwad

Ilosur
(SSI)

OHT

BGM-25

Gorbal

11

11

OHT-8

1

OHT-7
1

OHT-8

(31 IT-7
1

OHT-8

8

SP

8

CP

4

4

Washing platform

57

57

2

29

20

Cattle trough

7

7

OI IT

1

OHT-8

OHT-8

OHT-8

DM

Sump

1

Sump-1

1

Sump-2

1

RM

13.5 km

DM

7.7 km

3

2

Ctd.

1.5 km

0.5 km

13.0 km

0.25 km

0.25 km
2

7.6 km

RM

0.5 km

0.5 km

DM

1.24 km

0.24 km

2

2

3

3

Stand Post

3

3

Dust Bin

5

5

Washing platform

16

16

OHT

1

OHT-8

RM

1.56 km

3

DM

6.8 km

DIU

2

0.68 km
2

RM

1.26 km

0.01 km

SP

3

Washing platform

28

Cattle trough

4

4_

SP

2

2

Washing platform

14

14

DM

1.39 km

Dust Bin

5

5

5

Cattle trough

2

2

GLSR

1

GLSR-5

Ctd.

RM

1.35 km

1.35 km

SP

4

4

CP

2

GLSR

1

28

GLSR-3

4

4

Jack well

1

JW-4

1

VTP

2

RWL

5.0 km
1

2

JW-3

1

1.0 km
ST-3

Raw water storage

1

Existing

GLSR

1

Gl^R-4

SP

1

1

ST-3

GLSR-2

Yes

2

Yes
1.0 km

0.7 km

1.56 km

Yes

0.7 km
2

6.7 km
2

Commissioned

GLSR-2

JW-3
1 Up

Yes

1.39 km

Commissioned
Yes

3.00 km\

1

RM

1.65 km

1.65 km

DM

6.85 km

2.85 km

4.0 km

Yes

Filtration Plant

1

SSF-3

SSF-3

Surface

Pure Water Sump

1

PWS-2

PWS-1

source

OHT-7

OHT-6

settled

1.7 km

5.0 km

1.0 km

1.2 km

0.95 km

1.6 km

OHT

1

0.3 km

RM

0.2 km

ST-3

DM

6.0 km

CP

2

RM

1.425 km

GKSR-2

1.25 km
2

3.15 km

DM

GLSR-2

Yes

4

Sump_____

SP
Intake well

4

No

2.358km

Sump-5

SP

OHT-8

1.1 km

Sump-5

Sump-5

Cattle trough

OHT-8

1.1 km

Yes

3.565km

DIU

20

Dust Bin

Settling 'lank

35

OHT-7

1

12

DM

1.95 km

SSF-3

0.6 km

Yes

1

2

3

4

5

6

7

8

9

10

11

12

13

14

36

BGM-26

Neginhal

Jack well

1

JW-4

JW-4

JW-4

Filtration Plant

1

SSF-2

SSF-2

SSF-2

Surface source

Intake well

1
2

1

1 Up

1 Up

Pure Water Sump

1

PWS-2

VTP

OHT

1

OHT-8

OHT-8

OHT-8

RWL

5.0 km

2.0 km

GM

2.4 km

37

BGM-26

Sampagaon

yet to be

settled

2.1 km

Settling Tank

1

ST-3

ST-4

DM

5.3 km

Raw water storage

1

RW-5

RW-5

CP

4

OHT

1

OHT-8

OHT-8

RM

12.32 km

12.0 km

Surface

DM

5.5 km

5.5 km

source yet

5.9 km

2

to be settled

38

BGM-26

Sanikop

OHT

1

Existing

RM

DM

Surface
1.82 km

1.8 km

source yet
to be settled

39

BGM-26

Hole Hosur

OHT

1

Existing

RM

Surface

DM

3.845 km

4.0 km

source yet

to be settled

40

BGM-26

M.K.Hubli

OHT-I

1

OHT-8

OHT-8

OHT-8

RM

8.56 km

8.0 km

Surface

OHT-II

1

OHT-8

OHT-1

OHT-1

DM

7.0 km

7.0 km

source yet

GLSR

1

GLSR-5

Ctd.

RM

2.81 km

< ’1.0 km

0.61 km

2.905 km

0.37

3.77 km

to be settled
41

BGM-28

Budigoppa

1

o-

42

BGM-29

Kadabi

SP

2

2(Pr)

2(Pr)

DM

3.77 km

0.3 km

WP

14

14

14

DIG

2

2

OHT

1

OHT-2

RM

4.38 km

1.0 km

SP

2

DM

3.22 km

1.0 km

Yes

2

0.3

0.8 km

Source not

yet finalised

43

BGM-30

Asundi

Jack well

(SSI)

Intake well

1
1

VTP

2

RWL

13.05 km

Settling Tank

1

JW-5
1

ST-4

JW-6
1 Up

ST-4

JW-6

Filtration Plant

SSF-5

SSF-5

Pure Water Sump

1
1

SSF-5

1 Up

PWS-2

PWS-2

PWS-2

OHT

1

OHT-3

OHT-4

OHT-4

source

13.05 km

RM

0.45 km

0.45 km

settled

ST-4

DM

10.6 km

9.0 km

CP

2

Washing platform

44

BGM-31

Ambadgatti

1
5

OHT-8

OHT

1

OHT-8

SP

3

3

OHT

SP

45

BGM-32

Tigadi

OHT-5

OHT-5

OHT-5

OHT-5

RM

2.0 km

DM

4.5 km

4.5 km

RM

3.0 km

3:o km

DM

5.0 km

1.0 km

L
V.

District Manager (South),
ICT. Pvt. Ltd., Belgaum.

Surface

1.0 km

Yes

4.5 km

Yes

M/S. B. R. PATIL, NIPPANI.

INTERCONTINENTAL CONSULTANTS & TECHNOCRATS Pvt. Ltd.
KIRWS & ESP PHASE - II
(WORLD BANK ASSISTANCE)
MONTH : DECEMBER 99
DISTRICT BELGAUM.

LIST OF DEFICIT CONTRACTORS
Name of the
Contractor

3

Name of
Schemes
Villages
4

1

B. Bagewadi

Shri. B. R.
Patil.
Nippani.

95.74

Shri. B. R.
Patil.
Nippani.

93.36

Shri. B. R.
Patil.
Nippani.

99.34

No. of

No.

Package
No.

1

2

1

BGM-02

SI.

I
-J

BGM-18

Villages

1

Ainapur

1

3

BGM-19

1

Jugul

5

Contract
value Rs.
in lakhs
6

Date of
start
7

End of
Milestone
I/II/III
8

25-11-98 I. 25-4-99
II. 25-10-99
III. 25-4-2000

Financial Achivement
Cumulative I/II/III
Short fall *z«
A_
T
11
10
9

Target

Achieved

13

14

15

1. RM is delayed due to non employment
2
2
of labours by contractor.
2.9
5
2. PWS & SSF, poor progress
Head works Existing
ST-2 by contractor
ST-4
ST
RWS-4 RWS - 4 3. OHT delayed because of poor SBC.
RWS
SSF - 1 4. DM delayed as Distribution System
SSF - 2
SSF
PWS - 2 PWS - 1 completely revised.
PWS
OHT OH T - 6 OHT-2
3
7.84
DM

65%

1. RM / DM was slow due to villagers
obstruction initially and also non employment of labours by contractor.
Head works Existing
2. WTP components poor progress due to
Existing
ST
non-employment of appropriate labour &
Existing
RWS
SSF -1 also due to rocky strata. •
SSF - 3
SSF
PWS - 3 PWS - 1 3. Contractor has been issued further
PWS
OHT OHT - 5 OUT - 3 notice for expediting the work.
5
13
DM

12.35

68%

35.93

60.00

50.26

98.74

55.32

20.00

II. 25-10-99

50.00

III. 25-4-2000

93.36

25-10-98 I. 25-4-99
II. 25-10-99
III. 25-4-2000

20.00
50.00
99.34

20.65
32.26%

I. 25-4-99

Item
12

Remarks

44%

25.00

25.36
25.36
32.26

25-10-98

Physical status of works

PM
RM

PM
RM

1

2

2

1. RM delayed due to dispute for sharing
2
2
jack well.
0.7
2
2. Head work need modification & revised,
Head works Existing
ST - 1 design of steining wall in progress.
ST-4
ST
3. WIT components delayed due to non
RWS - 2
RWS
employment of labour as well poor SBC .
SSF
1
SSF - 4
SSF
PWS - 4 PWS - 1 Revised design based on under reamed piles
PWS
OUT - 6 OI IT - 5 for SSF. For other structure design awaited.
OHT
Contractor has been issued further notice
5.5
7.00
DM
for expediting the work.
PM
RM

_1_
4

I
CO
1

2
BGM-19^

2
1

4
Shiraguppi

5
Shri. B. R.
Patil.
Nippani.

6

7

79.30

25-10-98

8
I. 25-4-99
II. 25-10-99
III. 25-4-2000

40.00
79.30

22.06

I. 25-4-99
II. 25-10-99
III. 25-4-2000

20.00
50.00
117.10

26.75
49.54
53.74

54%

26.00
76.00
146.45

34.97
46.68
55.49

62%

5

BGM-20

1

Akkol

Shri. B. R.
Patil.
Nippani.

117.10

25-10-98

6

BGM-23

1

Borgaon

Shri. B. R.
Patil.
Nippani.

146.00

25-10-98 I. 25-4-99
II. 25-10-99

III. 25-4-2000

9

15.00

10
19.59

11

63%

29.56

12
PM
RM

13
1
3

PM
RM

3

14

___________________ 15________________

2

1. RM delayed due to dispute of sharing
jack well.
Head works
2. Head work need modification &
ST
Existing
problem of approach.
RWS
RWS-4 RWS-3 3. WTP components non-employment of
SSF
SSF-3 SSF-1 appropriate labour by contractor & also due
PWS
PWS-3 PWS-1 to hard rock excavation.
OHT OHT-7 OHT- 5 4. OHT slow progress due to non­
DM
9.00
6.5
employment of skilled labours.
Contractor has been issued further notice
for expediting._______
PM
1
2
1. RM delay due to non-employment of
RM
3.00
2.8
labours.
Head works
1
20%
2. Approach and Jack well slow due to
ST
ST-4
ST-3 non-employment of labour and poor
RWS
RWS-3 RWS-2 organisation of contractor.
SSF
SSF-3 SSF -1 3. WTP component slow due to delay in
PWS
PWS-3 PWS-1 acquistion of land also slow progress.
OHT OHT-7 OHT -1 4. OHT capacity changed.
7.00*
DM
6.7
0.5

2 Up 1. Delay in progress of OHT & WTP was
0.7
due to land dispute.
I lead works
1
60% 2. Jack well site was disputed, hence delay
ST
ST - 3
ST - 1 in progress also delay caused due to back
RWS
RWS - 3 RWS - 11 water of barage.
SSF
SSF-3 SSF - 1 3. Revision in design of Raw water storage
PWS
PWS-3 PWS-1 required as existing GLSR has gone in
OHT OHT-3 OHT - 2 private land and its acquisition is pending.
DM
10.00
5.00
1

7

2
BGM-34

_3
1

4
T. Hattargi

5
Shri. B. R. Patil
Nippani

6
57.48

7
*26-3-99
7-7-99

8
I. 7-10.-99
II. 7-1-2000

9
22.00
57.48

10
4.25
10.49

11
80%
82%

(Ammended)

8

BGM-35

1

Kanagale

Shri. B. R. Patil
Nippani

29.08

*26-3-99 I. 19-10-99
19-7-99 II. 19-1-2000

11.00
29.08

7.0
7.0

36%
76%

(Ammended)

13
2
9.54
2*

14

_________________15_____________

12
PM
RM
SUMP
GLSR
OHT
DM

OHT - 8 OHT - 5 sources.
3. Sump cancelled due to revision of sources.
6.4
8.6

PM
RM
SUMP

3
2.50
SUM - 2

0.5
SUM -1

OHT
DM

OHT-8
4.5

OHT-5
4.5

sources.

PM
RM
OHT
DM

1
1.6
OHT-6
4.40

1.4
OHT-4
4.0

location of OHT site and delay caused by VWSC

1. Delay in intial handing over of site is due to

objection raised by school authorities & also
objection raised by VWSC
2 RM / PM delayed due to delay tn finalisation of

1. Delay in handing over of site is due to delay

purchase of private land and delays caused by
VWSC members.

2 RM / PM delayed due to delay in finalisation of

9

BGM-36

1

Sidnal

Shri. B. R. Patil.
Nippani

15.18

*26-3-99 I. 25-9-99
25-6-99 II. 25-12-99

6.00
15.18

4.04
4.04

73%
73%

1. Delay in handing over of site is due to changes in

2 Due to change in location of OHT, staging height

is increased from 9M to 12 M to maintain planned

hydraulic gradient.

I

1

M/S. B. T. PATIL & SONS, BELGAUM.
SI.
No.

Package
No.

No. of
Villages

1
10

2

_3

BGM-04

3

11

BGM-08

4

Name of
Schemes
Villages
4

Name of the
Contractor

Mache
Muchandi
Honaga

M/s. B. T.
Patil & Sons,
Belgaum.

Parishwad
Gandigwad
K. Bekwad
Londa

5

M/s B. T.
Patil & Sons,
Belgaum.

Contract
value Rs.
in lakhs
6

Date of
start

94.60

27-4-98

80.00

7

12-5-98

End of
Milestone
I/II/III
8
I. 27-10-98
II. 27-4-99
III. 27-10-99

I. 12-11-98
II. 12-5-99
III. 12-11-99

Financial Achivement
Cumulative I/II/III
A
Short fall %
9
10
11
20.00
18.32
58%
60.00
28.23
94.60
39.45
58%

Z

16.00
64.00
80.00

17.2
28.63
46.7

42%
42%

Physical status of works

Item
12

Target
13

Achieved

PM
RM
Sump
GLSR

5
11

5
2.5

OHT

2

DM

18

PM
RM
Sump
GLSR
OHT

10
10
1
1
1

DM

18

14

L
2



____________ 15____________________

1. Delay in progress of RM is mainly due to
delay in establishment of reliable water sources.
2. Delay in GLSR due to slow progress by

1C
contractor.
1 C
3. LD proposed.
1C
4. Sump site yet to be finalised at village Mache.
1 - 80%
15.5

10 Up
11.7
1
20%
1C
1 - 60%
16

I

As per review meeting held on 8-12-99, revised

Probable date of completion as under.
K - Bekwad - 31-12-99 - But progress not
satisfactory.

Gandigwad - 31-1-2000 But progress not
satisfactory

Parishwad - 15-1- 2000

Londa - 28 - 2 - 2000.
2. LD imposed.

o
1

Remarks

12

BGM-10

3

Arbhavi
(+3 Hamlets)
Sindikurbet
Nagnur

M/s B. T.
Patil & Sons,
Belgaum.

136

12-5-98

I. 27-11-98
II. 12-5-99
III. 27-11-99

25.00
80.00
136.30

9.72
17.56
49.37

63%
64%

I

PM
RM
Sump
GLSR
OHT
DM

22
16
1
1
5
14'

13
3.52

As per review meeting held on 8-12-99, the

revised probable date of completion as under.

Arbhavi Math & hamlets - 31-12-99

1 - 10% Arbhavi Main village - 28-2-2000
4 Up Sindhikurbet village - 15-3-2000
10.17 Nagnur village - 25-3-2000
work in progress but still slow. Contractor has
been asked to expedite the same.

13

BGM-11

2

x Khadaklat
(+ 2 Hamlets)
Belkud

M/s B. T.
Patil & Sons,
Belgaum.

73.80

22-5-98

I. 22-11-98
II. 22-5-99
III. 22-11-99

13.00
45.00
73.80

7.50
8.78
27.21

63%
63%

PM
RM
Sump
GLSR
OHT
DM

17
8
1

As per review meeting held on 8-12-99 the
revised probable date of completion as under.

1 Up

(a) Village Belkud - 31 - 1 - 2000

(b) Khadaklat - 28 - 3 - 2000.

3
16

3 Up
12.85

LD imposed.

Contractor has been issued notice to expedite.

M/S. COROMANDAL PRESTCRETE PVT. LTD. HYDERABAD.
SI.
No.

1
14

Package
No.
2
BGM-03

No. of
Villages
3
4

Name of
Schemes
Villages
4

Name of the
(Contractor

Chikkalwad
Navalihal
Bambalwad
Benadi

M/s.
Coromandal
Prescrete
Pvt. Ltd.,
Hyderabad.

5

Contract
value Rs.
in lakhs
6
53.20

Date of
start
7

21-3-98

End of
Milestone
I/II/III
8
I. 21-9-98
II. 21-3-99
III. 21-9-99

Financial Achivemcnt
Cumulative I/II/III
Short fall %
T
A
11
9
10
57%
12.00
12.00
36.00
53.20

16.61
38.43

28%

Remarks

Physical status of works

Item
12

Target
13

Achieved
14

PM
RM
Sump
GLSR
OHT
DM

8
5

5
0.732

15
1. Delay in OUT is due to slow progress by
contractor. Now new GPA has commenced the
work with all sincerity. LD is recovered in RAB.

During review meeting held on 18-9-99 at the

3
16

3 Up
12.38

office of Engineer-in-Chief, PHE Bangalore,
reviewed probable date of completion given.

Chtkkalwad commissioned / Navalthal - Jan 2t M M1.
Benadi - Dec -99, Bambalwad - 15-3-2(XX)

Chikkalwad commissioned on 30-10-99.

15

BGM-06 ’

2

Daddi
Katakbhavi

M/s.
Coromandal
Prescrete
Pvt. Ltd.,
Hyderabad.

46.85

21-3-98

I. 21-9-98
II. 21-3-99
III. 21-9-99

11.50
30.00
46.85

11.50
13.15
24.28

48%
48%

PM
RM
Sump
GLSR
OHT
DM

6
3
1

5
1.8
10%

1. As per renew meeting held on 8-12-99 at
office of Supenntendmg Engineer, PHE Belgaum.

with EIC revised probable date of completion
31 - 01 - 2000 & work is progressed accordingly

2
12

2 Nos. 95% 2. LD imposed.

10.6

I

oO
16

BGM-07

4

Godachi
Torangatti
Bijaguppi
Nandihal

M/s.
Coromandal
Prescrete
Pvt. Ltd.,
Hyderabad.

53.30

20-3-98

I. 20-9-98
II. 21-3-99
III. 20-9-99

13.00
35.00
53.30

11.42
16.87
33.22

37%
38%

PM
RM
Sump
GLSR

oirr
DM

6
6

3
5.7

1. As per review meeting held on 8 - 12-99
revised probable date of completion as under.

Village - Bijaguppi - 31-12-99

Village - Godachi -

3

8

1 c
1-70%
1 - 95%
5.8

31-12-99

Village - Nandilikl - 15-01-2000
Village - Torangatti - 31-01-2000.

work being progress accordingly.
2. LD imposed.

SHRI. R. NAGARAJ, RAMADURG.

SI.
No.

I

No. of

Villages

1

2

3

17

BGM-05

3

18

&
P

Package
No.

BGM-13

3

Name of
Schemes
Villages
4

Name of the
Contractor

Tumur
Batakurki
I lulkund

Shri. R.
Nagraj.
Ramadurg.

Kannal
Yelihadgali
ParthanhaUi

5

R. Nagraj

Contract
value Rs.
in lakhs
6

Date of
start

53.70

21-1-98

38.42

7

24-5-98

End of
Milestone
I/II/III
8

I. 12-7-98
II. 12-1-99
III. 12-7-99

I. 24-11-98
II. 24-5-99
III. 24-11-99

Financial Achivement
Cumulative I/II/III
A
Short fall %
9
10
11

z

10.00
35.00
53.70

7.00
23.00
38.42

10.00
14.52
25.99

7.00
13.57
23.27

63%
52%

64%
39%

Physical status of works

Remarks

Item
12

Target
13

Achieved
14

15

PM
RM
Sump
GLSR
OHT

6
5

1.2

DM

11

PM
RM
Sump
GLSR
OHT

6
5

DM

10

1. Delay in progress of PM and RM due to

delay in finalisation of reliable water sources.
2 Batakurki source recendy finalised.
3.1-OHT work - court stay order recendy withdrawn.

3

1 C
4. LD imposed.
1 - Court Scope of work for transmission main increased
case at village Hulkund. New sump being provided.
1 - 70% Excavation completed.
8.5

5
3.1

1. Procurement, delay due to finalisation

of bore wells sources
2 However LD imposed.
As per review meeting held on 8-12-99, work

2

1 -95% is to be completed by 26 - 1 - 2(XX).
1 -60%

9.12

Shri. S. A. Magdum.
SI.
No.

Package

No. of

No.

Villages

1
19

2

2

BGM-14

4

Name of
Schemes

Name of the
Contractor

Contract

Date of

End of

value Rs.
in lakhs

start

Milestone

Financial Achivement
Cumulative I/II/III
A
Short fall %
T

Item

Target

Achieved

4

5

6

7

8

9

10

11

12

13

14

Ankalgi

Shri. S. A.

80.35

25-3-98

I. 25-9-98

15.00

15.00

49%

PM

13

Borgal

Magdum.

II. 25-3-99

55.00

29.44

RM

8.9

III. 25-9-99

80.35

40.59

49%

Sump

Villages

Nainglaz (MV)

I/II/III

GLSR
OHT

Dhulganwadi
(Ham - 1)

Remarks

Physical status of works

15

1. Slow progress of GLSR is due to delay in

4.59

acquisition of land. Delay by contractor.

2. Delay due to land problem tn acquistion of

1
4

land for OHT.

1 C

Work is likely to be completed by 15-3-2000.

1 - 85%
1 - 95%

Nagenwadi

1 -10%

(Ham-2)

Yadenwadi

DM

21.7

12.3

Head works

1
2

1.8

(Ham-3)
Nesargi

20

BGM-17

~ 1

Mangavati

M/s. Lathure
Bros, Lathur.

51.26

18-12-98 I. 18-6-99
II. 18-12-99

11.26
26.26

12.26

12.26

53%

RM

1. Jack well delayed due to collapse of the side

walls of the dug up trench. During monsoon season
area was under flood water. Contractor has been

advised to adopt sinking method to overcome this

III. 18-6-2000

I
oo

51.26

2
ST - 4

RWS
SSF
PWS

RWS - 3 RWS-1 (L’p) revised design based on SBC (BC - Soil) Contractor
SSF - 3 SSF- - 1 (Up) has been advised to adopt proper foundation (under
PWS - 3 PWS-1 (b'p) reamed piles) But he is still consultating the specialist
OHT-1 on the subject since it is a turnkey work of the
OHT-5
Contractor.
3.2
3.25

OHT

DM

U)

problem and the appropnate design also given.

PM
ST

ST - 1 (Up) 2. WTP delayed due to SBC and non submission of

3. OHT work is also progressing slowly. Contractor

1

has been issued notice to expedite the progress
considering the exit policy requirement

DISTRICT
I. C. T. Pvt Ltd.

Notations
A. Head Works

D. VTP — Vertical Turbine Pump



APC - Approach channel.



VTP — 1 — Procurement of pumps



APC - 1 - Approach channel earth work



VTP — 2 — Installation of pumps



APC - 2 - Approach channel RCC work.



ViP — 3 — Installation of electrical control system.



APC - 3 - Approach channel slope pitching.



VTP — 4 — Service connection



APC - 4 - Approach protective work

B. INT - Intake well
INT - 1 - Foundation

VTP — 5 — Commissioning / trial run.

E. ABrC - Approach Bridge - (RCC)



ABrC — 1 — Foundation



INT - 2 - Super structure

ABrC - 2 — Columns



INT — 3 - Finishes

ABrC -3-Deck

INT - 4 - Laying intake pipe

ABrC - 4 — Finishing.

!

INT - 5 - Intake protective works.
l

C.TW-TackweU

F. ABrS - Approach Bridge (Steel)



ABrS — 1 — Foundation



JW - 1 - Excavation



JW - 2 — Foundation

ABrS — 2 — Columns



JW - 3 - Steining wall / Inlet ports

ABrS — 3 — Launching of Girders



JW - 4 - Decking / Ladders

ABrS - 4 - Finishing.



JW - 5 — Pump house / hoist mechanism



JW - 6 - Finishes/provision of various valves.

K. PWS - Pure Water Sump
G. Abn - Approach Bund



EW - Earth work.



EWP - Pitching of Side slopes



PWS - 1 - Foundation



PWS - 2 - Side walls

PWS - 3- Dome

H. WTP - Water Treatment Plant



ST - Settling tank



ST - 1 - Foundation



ST-2-Side walls



ST - 3 - Finishing including provision of valves.



ST - 4 - Hydraulic testing.

I. RWS - Raw Water Storage Tank
RWS - 1- Foundation



RWS - 2 - Super structure

RWS - 3 — Finishes including provision of valves

1
co

RWS - 4- Hydraulic testing.

J. SSF - Slow Sand Filter



SSF - 1 - Foundation



SSF - 2 - Super Structure



SSF - 3 - Finishes & provision of valves



SSF - 4 - Hydraulic Testing



SSF - 5 - Filter Media - Loading.



SSF - 6 - Trial run / Commissioning.

PWS - 4 - Finishes/Provision of valves.
PWS - 5 - Hydraulic Testing.

1. OHT - Over Head Tank

4. PMC - Pumping Machinery (Centrifugal)

OHT - 1 — Foundation



PMC — 1 — Construction of pump house



OHT - 2 - G. L. Bracing Beam



PMC — 2 — Procurement of pumps



OHT - 3 - 2nd Bracing Beam



PMC — 3 — Installation of pumps



OHT - 4 - 3rd Bracing Beam



PMC — 4 — Installation of Electrical Control System / Testing.



OHT - 5 - Bottom Ring Beam & Slab (BRB & S)



PMC — 5 - Trail run / commissioning.



OHT - 6 - Side wall (SW)

OHT - 7 - Dome
OHT - 8 - Staircase & finishing

2. GLSR / SUM - Ground Level Service Resetvoir / Sump.

1
(F'

)



GLSR / SUM - 1 - Foundation



GLSR / SUM - 2 - RCC Beam



GLSR / SUM - 3 - Masonry



GLSR/SUM-4-Roof



GLSR / SUM - 5 - Finishing

5. DIU - Disinfection Unit
DIU — 1 — Construction room for installation of Disinfection

unit.
DIU — 2 — Procurement of DIU

DIU — 3 — Installation including electrical system.
DIU — 4 — Trail run and commissioning.
6. CT - (battle Trough

3. PMS - Pumping Machinery Submersible


PMS -1 - Erection of RCC Hume pump house.



PMS - 2 - Procurement of pumps

PMS - 3 - Installation of pumps



CT — 1 — Procurement of Catde trough



CT — 2- Installation & Finishing

7. STP — Public Stand Post.

PMS - 4 - Installation of Electrical panel / Automatic control
system (Robot) and Testing.
PMS - 5 - Trial run / Commissioning.

8. WP - Washing Platform

INTERCONTINENTAL CONSULTANTS & TECHNOCRATS Pvt. Ltd.
KIRWS & ESP PHASE - II
(WORLD BANK ASSISTANCE)
MONTH: DECEMBER 99
DISTRICT: BELGAUM.

2» List of agencies unlikely to Achieve Milestone I Targets

1

2

3

Name of
Schemes
Villages
4

1

BGM-25

1

Gorbal

SI.
No.

2

Package No. of
Villages
No.

BGM-31

1

Ambadgatti

Name of the
Contractor

M/s. Suprada
Constructions
Dharwad.

5

M/s. Rao
Constructions,

7

End of
Milestone
I/II/III
8

Financial Achivement
Cumulative I/II/III
Short fall %
A
Z
ii
10
9

*3-5-99
4-6-99

I. 4-9-99
II. 4-12-99

4.50
11.32

Contract
value Rs.
in lakhs
6

Date of
start

11.32

2.9
2.9

36%
75%

(Ammended)

25.06

*31-5-99
13-8-99

I. 13-11-99 10.00
II. 13-2-20 25.08

5.22
5.22

48%
80%

(Ammended)

1
co
-J
1

3

BGM-32

1

Tigadi

Shri. G.
Krishna reddy

30.12

*25-3-99
11-7-99
(Ammended)

I. 11-10-99 12.00
II. ll-l-20( 30.12

11.52
11.52

4%

Physical status of works

Remarks

Target
13

15

Item
12

PM
1
0.5
RM
SUMP
GLSR 1 - 50%
OHT
0.68
DM

PM
RM
SUMP
GLSR
OHT
DM

1
2.00
1%

PM
RM
SUMP
GLSR
OHT
DM

1
1.00

1
4.5

Achieved

14

GLSR slow progress due to hard rock strata

1.2

met in levelling the ground in hilly terrain for

foundation.

10%

0.8
1. Due to change of site of OHT and finally site was

decided on 13-8-99 by XWSC and were progressed.

20%
4.0
1. As the land was not available for construction of
OHT, the new land was donated by school

authority subsequently hence, site could be handed
over on 11-7-99.

1 - 50%
3.00

10%
2.5

2. RM delayed due to change tn source.

3. Delay in construcuonof OHT due to poor

progress by contractor.

4. Notice issued to contractor.

INTERCONTINENTAL CONSULTANTS & TECHNOCRATS Pvt. Ltd.
KIRWS & ESP PHASE - II
(WORLD BANK ASSISTANCE)
MONTH: DECEMBER 99
DISTRICT: BELGAUM.

2. List of agencies unlikely to Achieve Milestone I Targets

4

2
BGM-34

2
1

5
4
T. Hattargi Shri. B. R. Patil
Nippani

6
57.48

7
*26-3-99
7-7-99

8
9
I. 7-10-99 22.00
IL 7-1-200C 57.48

10
4.25
10.49

11
80%
82%

(Ammended)

5

BGM-35

1

Kanagale

Shri. B. R. Patil
Nippani

29.08

*26-3-99
19-7-99

I. 19-10-99 11.00
II. 19-1-20C 29.08

7.0
7.0

36%
76%

(Ammended)

I
90

cc

'6

BGM-36

1

Sidnal

Shri. B. R. Patil.
Nippani

15.18

*26-3-99
25-6-99

I. 25-9-99 6.00
II. 25-12-S 15.18

4.04
4.04

73%
73%

(Ammended)

12
PM
RM
SUMP
GLSR
OHT
DM

13
2
9.54
2

PM
RM
SUMP
GLSR
OHT
DM

3
1.00
2

PM
RM
SUMP
GLSR
OHT
DM

14

_________________ 15_______________
1. Delay in indal handing over of site is due to

objection raised by school authonhes & also
objection raised by VWSC.

2. RM / PM delayed due to delay in finalisation of

1
8.6

25%
6.4

sources.

1. Delay in handing over of site is due to delay

purchase of private land and delays caused by

VWSC members.
2 RM / PM delayed due to delay in finalisation of

50%
4.5

20%
4.5

1
1.00

50%
4.40

sources.

1. Delay in handing over of site is due to changes in

location of OHT site and delay caused by VWSC.

20%
4.2

4

District Manager (NorthJ,

District Manager (South),

ICT. Pvt. Ltd.,

ICT. Pvt. Ltd.,

Belga um.

Belga um.

* - Original date of start based on work order date.

* - Ammended date of start based on date of handing over of site.

INTERCONTINENTAL CONSULTANTS & TECHNOCRATS PVT. LTD.
KARNATAKA INTEGRATED RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION PROJECT
(WORLD BANK PROJECTJ-PHASE -II
MONTH : DECEMBER 99
DISTRICT : BELGAUM

3. Statement of Bottlenecks
SI
No

1

s

No. of
villages
- flushing to be
done

No. of
villages
New bore
wells to
be drilled

No. of open
Wells
Shallow/ bore
wells to be
drilled

OHT sites
under
dispute

2
03 Nos.

3
03 Nos.
1. Hudli (1)
2. Daddi (2)

4
1 No.
Parthanalli -1
To be
establish fully.

5
2 Nos.
1. Arbhavi
College
2. Nagenwadi

1
1.

3.

Dhulganwadi
Sindhikurbct
Katakbhavi

District Manager (North),
ICT. Pvt. Ltd.,
Belgaum.

SBC
results
awaited

6
02 Nos.
Pachapur
Rustumpur

Sump sites to
be handed
over

7
Nil

GLSR
sites to
be
handed
over

Awaiting
Energisation
for
commissioning

T

A

8
Nil
(But
dispute in
Nainglaz)

9_____ 10
02 Nos.
Nil
1. Katakbhavi
2. Bekwad

11
Nil

Pressure testing
(RM+DM)

District Manager (South),
ICT. Pvt. Ltd.,
Belgaum.

INTERCONTINENTAL CONSULTANTS & TECHNOCRATS Pvt. Ltd.
KIRWS & ESP PHASE - II
(WORLD BANK ASSISTANCE)
MONTH: DECEMBER 99
DISTRICT: BEIdGAUM.
SSI / SSR SCHEMES
4. List ofagencies unlikely to Achieve Milestone II Targets

Name of the
Contractor

Date of
start

End of
Milestone
I/II/III
8

Financial Achivement
Cumulative I/II/III
T
A_
Short fall */•
9
10
H

1

2

3

1

BGM-02

1

B. Bagewadi

Shri. B. R.
Patil.
Nippani

95.74

25-11-98 I. 25-4-99
II. 25-10-99
III. 25-4-2000

25.00
60.00
98.74

35.93
50.26
55.32

44%

2

BGM-17

1

Mangavati

M/s. Rao
Constructions,
Bangalore.

51.26

18-12-98 I. 18-6-99
II. 18-12-99
III. 18-6-2000

11.26
26.26
51.26

12.26
12.26

53%

Package
No.

No. of
Villages

5

I

•J)

Contract
value Rs.
in lakhs
6

Name of
Schemes
Villages
4

SI.
No.

I

7

Physical status of works

Remarks

Target
13

15

Item
12

BGM-18

1

Ainapur

Shri. B. R.
Patil.
Nippani.

93.36

25-10-98 I. 25-4-99
II. 25-10-99
III. 25-4-2000

20.00
50.00
93.36

2
2
1. RM is delayed due to non employment
5
2.9 of labours by contractor.
Head works Existing
2. PWS & SSF, poor progress
ST
ST-4
ST-2 by contractor
RWS
RWS-4 RWS - 4 3. OHT delayed because of poor SBC.
SSF
SSF-2 SSF-1 4. DM delayed as Distribution System
PWS-2 PWS-1 completely revised.
PWS
OHT
OHT-6 OHT-2
DM
7.84
3

PM
RM
Head works

25.36
25.36
32.26

65%

14

PM
RM

ST
RWS
SSF
PWS
OHT
DM

3

Achieved

PM
RM

1
1
1

1.8

3.25

3.2

1
2
Head works Existing
ST
Existing
Existing
RWS
Existing
SSF
1%
PWS
1%
OHT
DM
13

2

5%
5%
5

1. Jack well delayed due to back water and
non employment of labour.
2. WTP delayed due to SBC and non
submission of revised design based on
SBC (BC - Soil)
3. OHT work is also progressing slowly.
Contractor has been issued notice.

1. RM / DM slow due to villagers
obstruction and also non - employment
of labours by contractor.
2. WI'P components poor progress due to
non-employment of labours.
3. Contractor has been issued further
notice.

4

5

I

6

2
BGM-19

BGM-19A

BC IM-20

2

4

1

Jugul

Shiraguppi

1

1

z\kkol

^0
I

5
Shri. B. R.
Patil.
Nippani.

Shri. B. R.
Patil.
Nippani.

Shri. B. R.
Patil.
Nippani.

6
99.34

79.30

117.10

8
7
25-10-98 I. 25-4-99
II. 25-10-99
III. 25-4-2000

25-10-98 I. 25-4-99
II. 25-10-99
III. 25-4-2000

25-10-98 I. 25-4-99
II. 25-10-99
III. 25-4-2000

9
20.00
50.00
99.34

15.00
40.00
79.30

20.00
50.00
117.10

10
12.35
20.65
32.26%

19.59
22.06
29.56

26.75
49.54
53.74

11
68%

63%

13
2
2
Head works Existing
25%
ST
25%
RWS
20%
SSF
20%
PWS
50%
OHT
7.00
DM

12
PM
RM

PM
RM

BGM-23

1

Borgaon

Shri. B. R.
Patil.
Nippani.

146.00

25-10-98 I. 25-4-99
II. 25-10-99
III. 25-4-2000

26.00
76.00
146.45

34.97
46.68
55.49

5%
5%
5%
5%
15%
5.5

54%

1. RM delayed due to dispute of sharing

10%
5%

jack well.
2. Head work need modification &
problem of approach.
3. WTP components non-employment of
labour by contractor.
4. OHT slow progress due to non­
employment of skilled labours.
Contractor has been issued further notice

ST
RWS
SSF
PWS
OUT
DM

Existing
50%
25%
25%
50%
9.00

PM
RM

1
3.00
1
80%

2.8
20%
70%

50%
25%
50%
7.00

25%
10%
10%
6.7

1
3
1
25%
40%
25%
25%
50%
10.00

2 Up
0.7
60%
10%
20%
5%
5%
15%
5.00

Head works

62%

PM
RM
Head works

ST
RWS
SSF
PWS
OHT
DM

___________________ 15_______________
1. RM delayed due to dispute for sharing
jack well.
2. Head work need modification & there
is problem of approach to site.
3. WTP components delayed due to non
employment of labour as well poor SBC .
Revised design based on poor SBC (BCSoil) still awaited.
DM - delay due to B. C. Soil and also
villagers objection over using excavators.
Contractor has been issued further notice.

2

Head works

ST
RWS
SSF
PWS
OHT
DM

7

1
3

14
2

50%
6.5

2

1. RM delay due to non-employment of
labours.
2. Approach and Jack well slow due to
non-employment of labour and poor
organisation of contractor.
3. WIT component slow due to delay in
acquistion of land also slow progress.
4. OHT progress delayed due to land
acquisition problem.

1. Delay in progress of OH 1 & WI P was
due to land dispute.
2. Jack well site was disputed, hence delay
in progress also delay caused due to back
water of barage.

INTERCONTINENTAL CONSULTANTS & TECHNOCRATS Pvt. Ltd.
KIRWS & ESP PHASE - II
(WORLD BANK ASSISTANCE)
MONTH : DECEMBER - 99
DISTRICT: BELGAUM.

4. List of works, the agency not Achieved the Milestone Targets
SI.
No.

Package
No.

No. of
Villages

1

2

3

1

BGM-01

4

Name of
Schemes
Villages
4

Name of the
Contractor

Sulebhavi
Peeranwadi
Marihal
Malaga

K.
Ramakrishna
Hyderabad.

5

Contract
value Rs.
in lakhs
6

Date of
start

121.30

26-3-98

End of
Milestone
I/II/III
8
I. 26-9-98
II. 26-3-99
III. 26-9-99

Financial Achivement
Cumulative I/II/III
T
A
Short fall 0 o
9
10

TT

25.00 25.00
85.00 95.77
121.30 115.71

12%
5%

Physical status of works

Remarks

Item
12

Target
13

Achieved
14

PM
RM
Sump
GLSR
OHT
DM

16
8.0
3
1
2
22.00

5.5
contractor in respect Peeranwadi & Sulebhavi
2C + 1 Up village.
1C
2. Delay in rising main & pumping machinery
1 C + 1 Up for village Marihal is due to delayed approval
22.70
by client.

15
1. Delay in procurement of pumps is due to

3. Delay in rising main & pumping machinery

for village Halaga due to establishment of new

I

bore wells in place of Open well & delayed

U)

approval by client.

i

4. Delay of OHT at Marihal is due to demand

by VWSC for change in site.

2

BC.M-03

4

Chikkalwad
Navalihal
Bambalwad
Benadi

M/s.
Coromandal
Prescrete
Pvt. Ltd.,
Hyderabad.

53.20

21-3-98

I. 21-9-98
II. 21-3-99
III. 21-9-99

12.00
36.00
53.20

12.00
16.61
38.43

57%

28%

PM
RM
Sump
GLSR
OHT
DM

8
5

1 Up
0.732

1. Delay in OHT is due to slow progress by
contractor. Now new GPA has commenced the

work with all sincerity. LD is recovered in RAB.
During review meeting held on 18-9-99 at the

3
16

3 Up
12.38

office of Engineer-in-Chief, PHE Bangalore,
reviewed probable date of completion given.
Chtkkahvad commissioned / Navalihal - Jan 2(MX».

Benadi - Dec -99, Bambalwad - 15-3-200(1
Chikkalwad commissioned on 30-10-99.

1
3

4

I
-D
Cm
I

5

2
BGM-04

BGM-05

BGM-06

3_

3

3

2

4
Mache
Muchandi
Honaga

Tumur
Batakurki
Hulkund

Daddi
Katakbhavi

5

M/s. B. T.
Patil & Sons,
Belgaum.

Shri. R.
Nagraj.
Ramadurg.

M/s.
Coromandal
Prescretc
Pvt. Ltd.,
Hyderabad.

6

94.60

53.70

46.85

7
27-4-98

21-1-98

21-3-98

8
I. 27-10-98
II. 27-4-99
III. 27-10-99

I. 12-7-98
II. 12-1-99
III. 12-7-99

I. 21-9-98
II. 21-3-99
III. 21-9-99

9
20.00
60.00
94.60

10.00
35.00
53.70

11.50
30.00
46.85

10

11

12

13

14

18.32
28.23
39.45

58%

PM
RM
Sump
GLSR

5
11

5
2.5

2

oirr

2

DM

18

1 C
1 C
1 C
1 - 80%
15.5

PM
RM
Sump
GLSR
OHT

6
5

1.2

10.00
14.52
25.99

11.50
13.15
24.28

58%

63%
52%

48%
48%

15
1. Delay in progress of RM is mainly due to
delay in establishment of reliable water sources.
2. Delay in GLSR due to slow progress by

contractor.
3. LD proposed.
4. Sump site yet to be finalised at village Mache.

1. Delay in progress of PM and RM due to

delay in finalisation of reliable water sources.
2. Batakurki source recently finalised.
3.1 -OHT work court stay order recently withdrawn.

DM

11

1 C
1 - Court
case
1 - 70%
8.5

PM
RM
Sump
GLSR
OHT
DM

6
3
1

1.8
10%

3

4. LD imposed.

Scope of work for transmission main increased

at village Hulkund. New sump being provided.
Excavation completed.

1. As per review meeting held on 23-12-99 at
office of Superintending Engineer, PHE Belgaum.
with EIC revised probable date of completion

31 - 01 - 2000 & work is progressed accordingly.

2
12

2 Nos. 60% 2. LD imposed.
10.6

6

7

2
BGM-07

BGM-08

3_
4

4

4

5

6

7

8

9

10

11

12

13

14

Godachi
Torangatti
Bijaguppi
Nandihal

M/s.

53.30

20-3-98

I. 20-9-98
II. 21-3-99
III. 20-9-99

13.00
35.00
53.30

11.42
16.87
33.22

37%

PM
RM
Sump
GLSR
OHT

6
6

3
5.7

Parishwad
Gandigwad
K. Bekwad
Londa

Coromandal

Prescrete
Pvt. Ltd.,
Hyderabad.

M/s B. T.
Patil & Sons,
Belgaum.

80.00

12-5-98

I. 12-11-98
II. 12-5-99
III. 12-11-99

16.00
64.00
80.00

17.2
28.63
46.7

38%

42%
42%

15

1. As per review meeting held on 23 - 12-99
revised probable date of completion as under.
Village - Bijaguppi - 31-12-99

Village - Godachi - 31-12-99

3

DM

8

PM
RM
Sump
GLSR
OHT

10
10
1
1
1

DM

18

<

1 C
1-70%
1 - 95%
5.8

Village - Nandihal - 15-01-2000

10 Up
11.7
1
20%
1C
1 - 60%
16

As per review meeting held on 23-12-99, revised

Village - Torangatti - 31-01-2000.
work being progress accordingly.

2. LD imposed.

Probable date of completion as under.

K - Bekwad - 31-12-99 - But progress not
satisfactory.

Gandigwad - 31-1-2000 But progress not

satisfactory

Parishwad - 15-1- 2000
Londa - 28 - 2 - 2000.

2. LD imposed.

I
1

8

BGM-09

3

Sopadla
Hooli
Hanchina)

M/s.
Pochampad

66.00

13-4-98

I. 13-10-98
II. 13-4-99
III. 13-10-99

13.00
40.00
66.00

13.10
15.01
34.80

47%
47%

PM
RM
Sump
GLSR
OHT

1
2

DM

12

5
3

1. Contractor did not attend review meeting on

1.6

18-9-99 . Notice served on contractor for poor

20%
1C
1 - 70%
4.0

on 25-10-99, assuring to complete by 31-12-99.

progress. Now contractor has reported for work

1

2

2

9

BGM-10

3

4
Arbhavi
(+3 Hamlets)
Sindikurbet
Nagnur

5

6

7

M/s B. T.
Patil & Sons,
Belgaum.

136

12-5-98

8

9

I. 27-11-98 25.00
80.00
II. 12-5-99
III. 27-11-99 136.30

10
9.72
17.56
49.37

11
63%
64%

12
PM
RM
Sump
GLSR
OHT
DM

13
22
16
1
1
5
14

14

13
3.52

15

As per review meeting held on 23-12-99, the

revised probable date of completion as under.
Arbhavi Math & hamlets - 31-12-99

1 - 10%
4 Up
10.17

Arbhavi Main village - 28-2-2000
Sindhikurbet village - 15-3-2000

Nagnur village - 25-3-2000
work in progress but still slow. Contractor has
been asked to expedite the same.

10

11

BGM-11

BGM-13

2

3

I

Khadaklat
(+ 2 Hamlets)
Belkud

Kannal
Yelihadgali
Parthanhalli

M/s B. T.
Patil & Sons,
Belgaum.

R. Nagraj

73.80

38.42

22-5-98

24-5-98

I. 22-11-98
II. 22-5-99
III. 22-11-99

I. 24-11-98
II. 24-5-99
III. 24-11-99

13.00
45.00
73.80

7.00
23.00
38.42

7.50
8.78
27.21

7.00
13.57
23.27

63%
63%

64%
39%

-J)
‘-O
1

12

BGM-12

4

Nandgad
Hebbal
Tolgi
Kakkcri

Shri. S. A.
Magdum.

96.70

21-2-98

I. 21-8-98
II. 21-2-99
III. 21-8-99

19.00
59.00
96.70

19.00
51.45
74.8

23%
23%

PM
RM
Sump
GLSR
OUT
DM

17
8
1

1 Up

3
16

2 Up
12.85

Contractor has been issued notice to expedite.

PM
RM
Sump
GLSR
OHT

6
5

3.1

of bore wells sources

DM

10

1 -80%
1 -60%
9.12

PM
RM
Sump
GLSR
OHT
DM

18
14
2

15.2
2C

2
17

3C
16.45

As per renew meeting held on 23-12-99 the
revised probable date of completion as under.
(a) Village Belkud - 31 - 1 - 2(XX)

(b) Khadaklat - 28 - 3 - 2000.
LD imposed.

1. Procurement, delay due to finalisation
2. However 1.1) imposed.

As per review meeting held on 23-12-99, work

2

is to be completed by 26 - 1 - 2000.

1. Under procurement, delay due to drilling of

new bore wells.

2. Delay in acquisition of land for sump.
3. Delay in receipt of clearance for road cutting

from PWD.
4. Contractor has applied for extension of time.

Forwarded duly recommend upto 30-11-99 as
requested by contractor. But work likely to be

completed by 31-1- 2000.

1

13

2
BGM-14

2
4

4
Ankalgi
Borgal
Nainglaz (MV)
Dhulganwadi
(Ham - 1)
Nagenwadi
(Ham-2)
Yadenwadi
(Ham - 3)
Nesargi

5
Shri. S. A.
Magdum.

District Manager (North),
ICT. Pvt. Ltd.,
Belgaum.

I
6^
I

Note :

PM
RM
GLSR
OHT
DM
GPA

- Pumping Machinery
- Rising Main
- Ground Ixvel Service Reservoir
- Over Head Tank
- Distribution Main
- General Power of Attorney

6
80.35

7

25-3-98

8
I. 25-9-98
II. 25-3-99
III. 25-9-99

9

15.00
55.00
80.35

10
15.00
29.44
40.59

11

12

13

49%

PM
RM
Sump
GLSR
OHT

13
8.9

49%

DM

14

15__________________

1. Slow progress of GLSR is due to delay in

4.59

acquisition of land. Delay by contractor.
2. Delay due to land problem in acquisdon of

4
4

21.7

land for OHT.

2C
1 - 25%
1 -10%
12.3

3. Contractor has asked for extension of time

and forwarded, duly recommended upto
30-11-99 as requested by him. But the work is

likely to be completed by 15-3-2000.

District Manager (South),
ICT. Pvt. Lid,
Belgaum.

(5) List of Agencies on whom penal Action has been recommended.
SI.
No.

Package
No.

No. of
villages

Name of
Contractor

Contract
value

Date of
start

End of
Milestone

Name of Scheme/
Villages

I/II/III

1.

BGM-2

M/S B. R.
Patil
Nippani

13-10-98

II
25-10-99

53.20

21-3-98

III
21-9-99

M/s B. T.
Patil & Sons
Belgaum

94.60

27-4-98

II
27-4-99

Shri. R.
Nagraj
Ramadurg

53.70

2

M/s
Coramandal
Prestcrete,
Hyderabad

46.85

4

M/s
Coramandal
Prestcrete,
Hyderabad

4

M/s. B. T.
Patil &
Sons.,
Belgaum.

I

95.74

M/s.
2

BGM-3

4

3.

BGM-4

3

i

4.

5.

6.

7.

BGM-5

BGM-6

BGM-7

BGM-08

3

Cormandal
Prestcrete
Pvt. Ltd.,
Hyderabad

53.30

80.00

12-1-98

III
12-7-99

21-3-98

III
21-9-99

20-3-98

III
29-9-99

12-5-98

12-11-99

Financial cumulative for
Milestone I/1I/I1I____
T
A
Shortfall
%

1.

Bellad
Bagewadi

95.74

55.32

42%

1.
2.

Bambalwad
Benadi
Chikalwad
Navilihal

53.20

38.43

27%

Mache
Muchandi
Honaga

94.60

39.45

58%

53.70

25.99

52%

3.

Tumur
Batakurki
Hulkund

2.
3.

Daddi
Katakbhavi

46.85

35.85

23%

1.
2.

Godachi
Torangatti
Nandihal
Bijaguppi

53.30

33.22

38%

Parishwad
Gandigwad
K. Bekwad
Londa

80.00

46.07

42%

3.
4.

5.
6.

7.

1.
2.

3.
4.
1.
2.

3.
4.

Status of
works

RM :2 km
against 8.
DM just
started. OHT
raft slab laid.
1 OHT upto
bottom slab.
1 OHT upto
raft.
1 OHT yet to
start
l.OHT
completed
another slow
progress
GLSR slow
progress
OHT of
Tumur under
dispute.Found
ation Raft laid
at Hulkund.
DM started
but slow
progress
OHT slow
progress, DM
& RM started
but slow
progress
OHT finishing
slow. RM - 4.2
km against 6
km. DM-5.8
km against 8
____ Km.____
GLSR at
Londa very
slow. DM - 5
km against 11
kms.

Details of
penal action

Remarks

Liquidated
damage
proposed

Liquidated
damage
Imposed.

Liquidated
damage
proposed

Liquidated
damage
proposed

Under
extended
period

Liquidated
damage
imposed

Under
extended
period

Liquidated
damage
imposed.

Under
extended
period

Liquidated
damage
imposed

(5) List of Agencies on whom penal Action has been recommended.
Package
No.

SI.
No.

BGM-9

8

BGM- 10

9

10

11

BGM - 11

BGM - 18

No. of
villages

Name of
Contractor

3

M/s
Pochampad
Cement Pipe
Construction
Co.
Hyderabad

3

M/s B. T.
Patil & Sons
Belgaum

2

M/s B. T.
Patil & Sons
Belgaum

1

Shri. B. R.
Patil.
Nippani

1

Shri. B. R.
Patil.
Nippani

Oo

12

BGM - 19

Contract
value

66.00

66.00

136.00

93.36

99.34

Date of
start

End of
Milestone

Name of Scheme/
Villages

Financial cumulative for
Milestone I/II/III

1.
3.
4.

Sopadala
Hooli
Hanchinal

66.00

Arbhavi
Shindikurbet
Nagnur

Khadaklat
Belkud

13

14

BGM19A

BGM-23

1

1

Shri. B. R.
Patil.
Nippani

79.3

146.45

Details of
penal action

DM&RM
started but
slow progress

Liquidated
damage
imposed

OHT slow
progress. RM,
DM slow
progress
OHT slow
Progress. RM
not started.
DM slow
progress
OHT raft
foundation
laid. RM, DM
not started
OHT raft
foundation
laid.
RM not
started. DM 5.5 as against
7.0 km.
OHT upto
bottom slab
DM 3.4 km
against 4.0
RM not
started.
OHT under
excavation.
RM not
started. DM
3.0 km against
6.0 km

Liquidated
damage
imposed

Remarks

mi/ni

13-10-98

III
13-10-99

27-5-98

27-11-99

1
2.
5.

22-5-98

II
22-11-99

1.
2.

25-10-98

25-10-98

II

II

25-10-98

II
25-10-98

Ainapur

Jugul

136.3

73.8

93.36

99.34

34.80

49.37

27.21

32.26

32.26

47%

64%

63%

65%

68%

I

Shri. B. R.
Patil.
Nippani

Status of
works

25-10-98

25-10-98

II
25-10-98

II
25-10-98

Shhiraguppi

Borgaon

79.30

146.45

29.56

55.49

63%

62%

Liquidated
damage
imposed

LD. To be
imposed

II Mile
stone not
achieved

Liquidated
damage
proposed

II Mile
stone not
achieved

Liquidated
damage
imposed.

Liquidated
damage
proposed

II Mile
stone not
achieved

II Mile
stone not
achieved

(5) List of Agencies on whom penal Action has been recommended.
SI.
No.

15

Package
No.

BGM-24

No. of
villages

Name of
Contractor

1

Shri. G.
Krishna
Reddy,
Hubli
M/s.
Suprada
Construction

Contract
value

241.00

Date of
start

27-10-98

27- 4 -2000

Financial cumulative for Milestone
I/II/III

Hosur

241.00

116.48

52%

Gorbal

11.32

2.90

75%

11.32

4-6-99

19.77

20-8-99

II
2-2-2000

Kadabi

19.77

5.24

74%

M/s. Rao
Construction

25.06

13-8-99

II

Ambadgatti

25.06

5.22

79%

32

Shri. G.
Krishna
Reddy

30.12

13-11-99

II
1 1-1-2000

Tigadi

30.12

1 1.52

60%

BGM -33

1

Shri. S. A.
Magdun

43.20

19-6-99

II
19-12-99

43.20

17.55

59%

1

Shri. B. R.
Patil

57.48

7-7-99

II
7-1-2000

T. Hattargi

57.48

14.49

74%

1

Shri. B. R.
Patil

29.08

19-7-99

II
7-1-2000

Kanagale

29.08

7.00

76%

I

Shri. B. R.
Patil

15.18

25-6-99

II
25-12-99

Sidnal

15.18

4.04

73%

BGM - 25

1

17.

BGM-29

1

18

BGM-31

1

M/s.

I

II

Name of
Scheme/
Villages

II
4-12-99

16.

19.

End of
Milestone
I/II/III

BGM

Suprada
Construction

U)

13-2-2000

-I)
I

20.

21.

22.

23.

BGM-34

BGM-35

BGM

36

U.

Khanapur

Status of
works

WTP65%.
OHT slow
progress.
RWL very
slow.
GLSR slow
progress. DM/
RM not
achieved.
1 OHT slow
progress. DM/
RM not
achieved
1 OHT slow
progress. DM/
RM not
achieved
1 OHT slow
progress. DM/
RM not
achieved
1 OHT slow
progress. DM/
RM not
achieved
1 OHT slow
progress. DM/
RM not
achieved
1 OHT slow
progress. RM
not achieved.
Sump yet to
start.
1 OHT slow
progress. RM
not achieved

-J
-

Details of
penal action

Remarks |

Liquidated
damage
proposed

II Mile
stone not
achieved

Liquidated
damage
proposed
Liquidated
damage
proposed

Liquidated
damage
proposed
Liquidated
damage
proposed

Liquidated
damage
proposed

Liquidated
damage
proposed

II Mile
stone not
achieved
II Mile
stone not
achieved
II Mile
stone not
achieved

II Mile
stone not
achieved
II Mile
stone not
achieved

II Mile
stone not
achieved

Liquidated
damage
proposed

II Mile
stone not
achieved

Liquidated
damage
proposed

II Mile
stone not
achieved

-J

INTEGRATED RURAL WATER SUPPLY AND
ENVIRONMENTAL SANITATION PROJECT
KARNATAKA
(World Bank Assistance)

Phase II

Package II Villages

PROGRESS REPORT
of Bellary District

For the Month of DECEMBER 1999

INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD , NEW DELHI
CONSULTANTS FOR CONSTRUCTION MANAGEMENT AND QUALITY CONTROL

7
FORMAT - 03
PROGRESS PACKAGE WISE FOR THE MONTH OF DECEMBER 99

FINANCIAL & PHYSICAL
Name of District : BELLARY
SI.
Packag
No. of
Name of
Period Contra
Date
No.
e no.
villages in contractor
of
ct
of
package/p
comvalue
start
rogress
pletio
n
in
months

I

2

3

_______ 4

5

6

7

M/s. Mega

Mile
Stone

Financial
progress
in lakhs
cumulative in
Rs. Lakhs
T

z\

I

__ 9
27.01

10
24 16

II

58.72 ' 42.07

£

Physical progress

No of
schemes
commiss
ioned

Cumulative
During the month

S.P
in nos

Z
4

C.P
in nos

R.M
in Kms

T
19

A
20

Nil

18
2.0

Nil

nil

7.0

9.0

7.0

3

3

N.A

Nil

3

8.0 4 7.65

9.0

9.0

4

4

N.A

3

1

Nil

1

A
16

N.A

8.0

N.A I

A_
14

OHT
in Nos

Sump/
GLSR in
nos.
T
A
21
22
N.A

T
15
Nil

A
T
12
13
■ Nil N.A

D.S
in Kms

T
17

A

constructions

1

BLR-1

4/4

Engineers

tand

18

69.95

7-2-98

Contractors

Hyderabad

1

2

BLR-2

4/3

Mr.K.Maheswar

18

112.39 24-8-98

a Naidur. Hyd.

O
O

.... i...........
Ill J 69.95

52 89

-

40.00

i 35 18

2

I

II
II

3

4

5

BLE-3

BLR-4

BLR-5

3/3

8/8

5/5

112.39 j

7

I

37 47

Constructions.

II

123.97

66.84

Nellore

III

137.53

117 67 nil

I

81.22 ! 42 80 I

II

130.88

73.22

Hyderabad

III

157.23

I 14.79

M/s.Coramandal

I

30.00

12 02

II

70.00

■ 26.34

Ill

94.07

f 32.92 ’

M/s.K.Ramakris
hna. Engineers
Contractors.

Ltd.. Hyd.

18

18

18

137.53 23-3-98

157.23 23-4-98

94.07

12-3-98

Nil

2



1.7

4.2

5.0

1

Nil

5

8.5 f

1.7

16.7

10.8

2

2

1/0

4

3

2/0

10

51.08

M/s.Pinakini

Presticrctre (P)

Progressl.doc

47 75

90.00

f -

2

Nil

10.5

4

Nil Nil
......
1 6 | 16 4 ' nil

No. of Rem;
scheme
s
propose
d

9.29

21.0

0.5

2.99

7.8

1

Nil

nil

6.5

14.29

16.5

2

2

0/3

23

24

Nil

Nil

25

2

1/0

I

Nil

1

0/3

Nil

2

2/3

2

nil

nil

16

11.7

21

19.0

nil

Nil

2/3

nil |N.A ; -

2.86

Nil

12.0

6.6

2

nil

N.A

Nil

2

8

N.A

-

10.21

4.8

29.2 19.85

5

N.A

Nil

5

nil

nil

nil

11

13.3

33

24.85
0.5

8

6

4

8

Nil

N.A

I

Nil

3

Nil

1

Nil N.A

Nil

1

Contra

3

Nil

N.A

-

4

0.3

10

2.5

3

Nil N.A

Nil

2

term in

6

- ’ N.A'

-

6

0.42

17

7.59

5

Nil N.A

nil

nil

nil

nil

nil

2

8

Package
no.

SI.
No

No. of
villages in
package/
progress

5/5

BLR-6

6

Name of
contractor

M/s. Pinakini
{constructions.

Period
of
comple­
tion
in
months

Contract
value

18

87.66

Date
of start

10-4-98

5/5

1
5/5

I
o

CC

r
9

!

4/4

BLR-9

To~T BLR-10

4/4

Mr. G.V. Pratap !
I Reddy, Engg. &
[Contractors, 11yd
I Mr. G.V. Pratap |

I_______ L
BLR-11 T
11 Jii ------Lx.
-------

I

12 J{

BLR-12 |

I

...

Progressl.doc

T

1/1

B.Ramesh.

12

[LIGT947 Bidair |
2/2

' M/s. Navarang |
I constructions, :

Raichur.

ir

18

f

51.66
30.84

nil

9.0

11.8

18

14.3

6

6 |

nil

[ nil

2

23^2-98

I

j 57.85

40.15

10

nil

nil

nil

0.78

0.60

1

nil :

nil

I nil

Nil

1

=::=4

II

I 9 7.65
U 15.27

64.96
102.6 | nil
8

10

jT

nil

5

3

nil

4

9

9.7

16.16 12.9
15.2
19

Nil

nil

:r:

6.52|10.60

3

1

I 85.51

i 5413

11 | nil
nil i 9

nil

nil

6.32

nil

8.48 8.0

113941 | 75.12

T

nil

9

6.8

16

15

II
/14 I‘103 73
i 150.44

ml. nil

nil

nil

15

11.5

26

19.8

30.00
II 10
I 7000- ’! 34.481

1

Nil I N.A |

2

Nil •

4 ’4.71 j

1

4

-.. iN.A 1

5.05
3.05

11 46.91 •

3

| 90.44
| 20.94

18

_5

1

111

21-3-98

^9-12-98 i
•i............. r

I
II

24-8-98
F........... |

I
II

—I
I HI

..........!..

1
4

nil

III

50.37

nil
Nil

nil

111
18

~ ~T

Sump/
OUT
GLSR in nos
in Nos.
T | A
A
T
nil | N.A
1
........
4

8

I90.44

DS
in Kins
j A
8.3
3.20
15
6.7

nil

II

18

R.M
in Kins
A
t
4.95 0.85
6.0 3.65

75.22

1

I Reddy, Engg. & i

{Contractors, Hydj

-

150.41

18

Hyderabad.

-

GT W
H.-’ C

M/s.K.Ramakris
hna, Engineers, j

CP
in nos.
T | A'
nil
nil
n’a

87.66

and contractors, |

i

c:

115.27

18

Hyderabad.
BLR-8

8

|M/s.K.Ramakris
hna. Engineers
I
and contractors,

SP
in nos.
T | A
j 44.32 | 18 $8
— [ nil
j 77.83 34 96 8! 5

111

J______
BLR.-7

I
11

Vellore.

7

A

T

Format 03 contd..
No of
No. of Reniarl
schemes
sche
mes
propose
com
d
imssi
oned

Physical progress

Financial
progress
in lakhs
Mile
Stone cumulative in
Rs. Lakhs

13-4-991
27-9-98

I
I[
I
11

II!

7
19 55

47 25

3

50.37 j 47.09

7

..... I
J 30.96

11.50

| 51.66
i 16.09. io.5O
, 27.46 1 15 16

30.84 [ 17 86 j

3
6

1

1
1

3
6

--

Nil
-

N.A
' N.A

11
1.8

4

5.82

3.6

12

13.4
14.0

N.A

1
3

N.A

5

i 3.9 | :20

0

4

™2”

11

5
12.5

N.A
N.A

•N.A

: 0.3 j

T

Nil

2

1.25

I
3

I" 5

4
4 | 4 | 2/0 j nil
nil

4

1
2

nil

2/11 o/i

| nil
-

nil

nil

1/1

nil

Nil
nil

1
2

r4

nil

i/i

nil

4

i nil i
i
j 1

- j
„■ r

nil

nil

£

0/1

nil
1

1
2

1

1

0/1

j

I
t

1
2

Nil

I

1

| - 1. I/O.. r-

Nil

1 f

1
2

Nil

N.A

-

1

N.A

-

Nil
Nil

1
I



1.6

j

1

nil
1

I

I N-A i "

Nil I

9

13.

14.
15.

BLR-13

BLR-14
BLR-15

1/1

2/2
2/2

M/s. Rao
Constructions,
Bangalore.
M/s. K.S.C.C.
Bellary
Mr. B.R. Meli
Lingasanoor.

12

84.97

14-6-99

12

12

17-4-99

46.01

28-4-99

48.96

25.33

1I_ 84.97
I ' 11.80
29.48
'
27.60
i
46.01

33 65

I

n_

n

1_____

16.

BLR-17 I

4/4

N.A. - Not Applicable

J
o

Progressl.doc

Rajendra Andral
Gulbarga.

12

41.04

17-4-99

I
II

29.64
41.04

C.C.S. - Corrected Construction Schedule

5.57
12.05
12 37

5.4

| Nil

5.4
1

1
1
3
3
6

Nil

N.A
N.A.
0
2

2.3
3.6
2
4.4

1
3

Nil N.A
NX

2.0
4.2

C.S. - Construction schedule

2
4.5
4
10.2

Nil
1.0

4.0

1
3.0
15
1
2.0
1
4.2 2.0
2
12.6 '76
| 1.2 j

0/1
1/0
1/1
Nil
1

- | Nil
0/1 Nil!
Nil[

---

Nil
Nil

-

C.S noi

subinilte

10

FINANCIAL PROGRESS PACKAGE WISE FOR THE MONTH OF DECEMBER 1999
District : BELLARY

Si.
No

2

2
BLR-1

l

I

Package
No.

Total
no. of
villages
3
4

FORMAT-04

Value of work
in Rs.

4
69,95,128-00

2

BLR-2

4

1,12,39,402

3

BLR-3

3

1,37,53,664-00

4

BLR-4

8

1,57,230-00

o
Cm
I

5

BLR-5

Progressl.doc

5

94,07,745-00

Name & Address
of contractor

Name & Address of
contractor personal

Name and
address of
assistant
Engineer
”__________ 7

Financial progress (Cumulative) in Rs. Lakhs
Date of
award

Date of
starting

8

9

Date of
comple

tion
10

T
11

_________ 6________
S M Mruthyunjaya
Sri P V.Ranga Reddy
• H.No. 24,
G.P.A. Holder,
13-06-97 07-02-98 06-08-99 27.01
M/s. Mega Constructions Sanjay Gandhi
Tilak Nagar, Cantonment Nagar,
_______ Bellary______ Bellary - 583 104.
Sri.
Sri P.Bhagat Dutt
Mr. K.Maheswara 1
B M.Rajasekharaih,
G P A. Holder,
Naidur, Engineers
06-04-98 24-08-9823-2-2000 40.00
Sandur
Visweswara Nagar,
and Contractors,
_______ Bellary.______
Hyderabad._____
Sri. V Balaswamy,
Sri. Dhanunjaya Rao,
M/s Pinakini Cons.
C/o.
Manjunath
G.P.A. Holder
16/1726, Ram murthy
23-09-97 23-03-98 22-09-99 51 08
Gowda, Kurugodu
Near old post office.
Nagar, Nellore
______ Kurugodu_____ Bellary dist._______
Sri. H M Renukaiah
Sri. S Pravas Dutt,
M/s. K.Ramakrishna
C/o. Sridhara Shetty
G P A Holder,
Hyderabad.
25-1 1-97 23-04-98 22-10-99 81.22
Kudligi Circle,
Visweshwara Nagar,
Ramnagar,
Kappagal Road,
H.B.Halli, taluk.
_______ Bellary.______
S Shivakeri,
Sri. Suresh Kumar
M/s. Coramandal
C/o Chandrasekhar
Vijaya Mary Hospital
Prcsticre (P) Ltd.,
Co-operative
Siruguppa
Aurora Colony,
28-10-98 12-03-98 I 1 -09-99 30 00
developemtn
Hyderabad.
officer, Opp. Sri
Ram
Medical
Store, Siruguppa.

5
M/s. Mega
Constmctions,
Hyderabad.

MS 1
A
12

24 16

MS
Ta__ I

T___
13

58 72

Remarks

14

111
T_____
15

A
16

42 07

69 95

52.89

MS 11

C C S. is not
given. Target
is considered
as per N.C.B.

35.18

90.00

47 75

112.39

37 47

123 97

66 84

137.53

HL67
27 51

130.88

73.22

157.23

114 79
7 88

42 80

Contract
terminated

12 02

70 00

26.34

94.07

32 92

is

11

________ ___ ______ Format 04 contd..
SI.
No

Package
No.

6

BLR-6

BLR-7

7

BLR-8

8

BLR-9

9

10

I

Total
no. of
villages
5

11.

BLR-10

BLR-1 I

Value of work
in Rs.

87.65,700-00

1,15,27,417-00

5

1,50,40.995

5

4

4

I

90.44 lakhs

50,36,904

51.66

I

12.

BLR-12

2

30,84,188

13.

BLR-13

I

84.97

14.

BLR-14

2

2948

15.

BLR-15

2

4601

16.

BLR-17

4

41 04

C.C.S.

Progressl.doc

Name and
Date of
address of
Name & Address
award
assistant
of contractor
Engineer
H.B.V. Appaji
Sri. Dhanunjaya Rao,
M/s. Pinakini Const.
C/o. BasavannSnaur
G.P.A. Holder
16/1726, Ram murthy
27-11-97
Depot manager,
Near old post office.
nagar, Nellary.
Kudligi_____________
_______ Kurugodu
V.Narendra Kumar
Sri. C.H.Subba Rao,
M/s. K.Ramakrishna
C/o. Manithi,
G.P.A. Holder,
Engineers & Contractor
21-01-98
G. P.Travels,
I lospet.
I lyderabad.
Hospet,____________
C.Mallikarjuna
and
Sri. S Pravas Dutt,
-doL.Hanumanathappa
G.P.A. Holder,
21-01-98
H. No. 46,
Visweswara Nagar,
Kappagal Road, Bellary. S.G. Nagar,
Bellary.____________
' Sri.
Sri. Sekhar Babu
Mr. G.V.Pratap
B.M.Rajasekharaiaha,
G.P.A. Holder,
Reddy, Engineers
28-07-98
11arapanahalli
Harapanahalli
and Contractors,
Hyderabad._____
Sri H.S.Shaik
Sri Sidda Reddy
Mr. G.V.Pratap
Mahaboob Basha
G P A. Holder,
Reddy, Engineers
23-01-98
Bellary
and Contractors,
Hyderabad._____
Sri. H.V.V. Appaji
B Ramesh,
L.l.G. 94, KHB Colony
13-4-99
Bidar - 585 401.

Name & Address of
contractor personal

M/s. Navarang
Constructions,
Raichur.
M/s. Rao
Constructions,
Bangalore.
M/s. K.S.C C
Bellary
Mr B.R Meti,
Lingasonoor

Sri S.Subramanyam.
GPA.Holder,
_____ Bellary._____

Sri. H.B.V Appaji,
Harapnahalli

Sri. AJagan Mohan
31-03-99
Reddy,
Siruguppa.__________
Sri.P.G.Shanta Kumar 14-06-99
Bellary
Sri.
Kumar

Mr Rajendra Andral
Engineers &
Contractors,
Gulbarga._____ ______________

Date of
comple
tion

MSI
A

T

IT

MS II

Remarks

MS 111

I T

| A

10-04-98 09-10-99

44.32

18.58

77.83

34.96

87.66

75.22
9.21

23-02-98 22-08-99

57.85

40.15

97.65

69.54

115.27

102.68
9.84

21-03-98 20-09-99

85.51

54.13

139.41

75.12

150.41

103.73
1.25

09-12-98 08-6-2000

30.00

11.10

70.00

34.48
12.63

90.44

24-08-98 23-2-2000

20.94

19.55

47.25

36.0

50.36

30.96

11.50

51.66

27-9-98 08-3-2000

16.09

9.27

27.46

15.16

17-4-99 16-4-2000

48.96

25.33

84.97

32.65
7.99

8-8-2000

11.80

9-8-99

47.09
3.94

Contractor has to
Submit
construction
schedule

16-6-2000

17-6-99

30.84

17.86
1.61

29.48
-do-

V.Narendra

Sri.
H.S.Shaik
Mahaboob basha
Sri. H.V.V. Appaji
Sri. H.M.Renukaiah

Corrected construction schedule

02-06-98

Financial progress (Cumulative) in Rs. Lakhs
Date of
starting

28-04-99

28-4-99 27-4-2000

27.6

5.57

46.01

17-4-99

30-5-99 29-5-2000

29.64

12.37

41.04

C.S.

Construction schedule

12.05
6.48

12
FORMAT - 05
VILLAGEWISE PHYSICAL PROGRESS

For the month of DECEMBER 1999

District : Bellary

SI. No.

Package No.

Village name

1

BLR-1

K.Bevinahalli
(MS 2)

2

3

4

5

6

BLR-1

BLR-1

BLR-1

BLR-2

BLR-2

c>
7

8

9

10

Progressl.doc

BLR-2

BLR-2

BLR-3

BLR-3

Start date
Completion date
07-02-98
06-08-99

P.D.Halli
(MS 2)

Y.Kaggal
(MS 3)

Kamarchedu
(MS 3)
Susheelnagar
(MS 2)

24-08-98
23-2-2000

Krishnanagar
(MS 1)

Bommaghatta
(MS 2)
A.S.Gudi
(MS 2)

Kyadigihal
(MS 1)
D.Kaggal
(MS 2)

23-03-98
22-09-99

Status

OHT 7 - Completed

RM- 5.1 Km(C)

CP - Procured
OHT 7 - Completed

DS - 2.2 Km(C)
RM - 0.9 Km(C)

CP - Procured
OHT 7 - completed

DS - 2.5 Km(C)
RM - 1.15 Km(C)

CP - Procured
OHT 7 - Completed

DS - 1.2 Km(C)
RM - 1.9Kms(C)

CP - Procured
OHT 7 - Completed

DS - 2.5 Kms(C)
RM - Not started (0.6)

SP - Not procured
OHT 1 - Foundation

DS - 3.5 Kms (5.4)
RM -Not started (3.9)

SP - Not procured
OHT 7 - Completed

DS -Not started (5.0)
RM -3.2 Kms (C )

SP - Procured
OHT 7 - completed

DS - 5.6 Kms (C )
RM-1.0 (2.9)

SP - Procured
OHT 7 - Completed

DS - 3.5 Kms (4.8)
RM - 1.7 Km (C)

SP - Procured
OHT 7 - Completed

DS - 2.0 Km(C)
RM - 2.5 Kms (C )

SP - Procured

DS - 2.5 Km (C)

Whether source established
Yes/No.
YES
1 No.

YES
1 No.

YES
1 No.
YES
1 No.

YES
1 No.
YES
1 No.

YES
3Nos.
YES
5No.

YES
1 No.

YES
4 Nos.

13

SI. No.

Package No.

Village name

11

BLR-3

Kurugodu
(MS 2)

12

13

14

15

16
I
o

17

BLR-4

BLR-4

BLR-4

BLR-4

BLR-4

BLR-4

(T'

S.L.Halli
(MS 1)

23-04-98
22-10-99

Kanninahalli
(MS 2)
B.G.Halli
(MS3 )
I'ambrahalli
(MS 2)
Hakkandi
(MS 2)

N.Basapura
( MS 2 )

I

18

19

20

21

22

BLR-4

BLR-4

BLR-5

BLR-5

BLR-5

Kuruvathi
(MS 3)
Ambli
(MS 2)
Ibraliimpura
(MSI)

Nagalapura
( MS 3 )
Deshnur
(MS 3)

Status

Start date
Completion date

12-03-98
1 1 -09-99

GLSR - 3 Nos. completed.

KM-7.5 km (12.0)

SP - Procured
OHT 5 - Completed

DS- 14,5 Kms (16)
RM - 0.6 (C)

SP - Procured
OHT 7 - Completed

DS- 1.4 Kms (C)
RM - 4.9Kms (C)

SP - Procured
OHT 7 - Completed

DS- 2.9 Kms(C)
RM - Not started (2.6)

SP - Procured
OH 17 - Completed

DS - 5.5 Kms (NC)
RM -2.0 Kms(2.2)

SP - Procured
OHT 7 - Completed

DS- 8.5 Kms.(9.3)
RM - 2.2kms(C )

SP - Procured
OHT 7 - Completed

DS -2.5 Kms(C )
RM - 3.5 Kms (C)

SP - Procured_________
OHT 3 - 2nd Bracing beam

DS-3.3 Kms (C )
RM - 1.4 (2.9)

SP - Not procured
OHT 7 - Completed

DS-2.0 Kms (3.1)
RM - Not started (2.7)

SP - Not procured
Oll i' 6 -Side wall

DS-3.0/0.5 Kms (3.0)
RM - Not started (1.2)

SP - Not procured
OHT 2 - GL Bracing beam

DS-3.0 (C )
RM-0.12 (0.4)

SP - Not procured______
OHT 2 - GL Bracing Beam

DS-0.19 (2.2)
RM - Not started (3.0)

- Not procured

DS - 3.0 Kms (5.5)

SP

Progressl.doc

Whether source established
________Yes/No.________
YES
11 Nos.
YES
2 Nos.
(1 No. Existing)
YES
1 No.

YES
3 Nos.
YES
4 Nos.
YES
2 Nos.
(1 No. Existing)
YES
1 No.
YES
1 No.
YES
2 Nos.
YES
I No. SBW
YES
1 No. SBW
YES
1 No. SBW

SI. No.

Package No.

Village name

23

BLR-5

24

BLR-5

Kottalachinta
(MS 2)
Bagewadi
(MS 2)

25

26

27

28
I

28 (a)

BLR-6

BLR-6

BLR-6

BLR-6

BLR-6

Chirasthahalli
(MS 2)

10-04-98
09-10-99

Eshapura
(MSI)
Harakanahal
(MS 2)

Anekal
( MS 2 )
Anekal Tanda
(MS2

o
i

29

30

31

32

33

34

Progressl.doc

BLR-6

BLR-7

BLR-7

Madur
(MS 2)
Suggenahalli
(MS 2)

Malpanagudi
( MS2 )

BLR-7

Kondanayakanahalli
(MSI)

BLR-7

Gudiobalapura
( MS 2)

BLR-7

Hampi
(MS3 )

Status

Start date
Completion date

23-02-98
22-08-99

OHT 6 - Side wall
SP - Not procured
OHT 2 - GL Bracing beam

RM - 0.3 Kms (0.7)
DS-1.4 Kms. (2.3)
RM - Not started (0.4)

SP - Not procured
OHT 7 - Completed

DS - Not started (3.5)
RM -2.0/0.2Km (C)

SP - Proemed
OHT 7 - Completed

DS - 3.5 KM(C )
RM-0.85 km(C )

SP - Procured
OHT7 - Completed

DS - 1.5 Kin(C)
RM-2.85 Kins (3.45)

SP - Procured
OHT 7 - Completed

DS-1.2 Kms(1.5)
RM - 2.0 Kms (C)

SP - Not procured
OUT 7-Completed

DS - 1.0 Kms(2.3)
RM-2.6(C)

SP - Not procured
OHT 7 - Completed

DS - 2.0 Kms (C)
RM-2.0 (0.5)

SP - Not procured
OHT 7 - Completed

DS - 6.6 Kms (C)
RM-5.5 Kms (C)

SP - Procured
OI IT 7- Completed

DS - 4.2 Kms (C)
RM-1.7Kms (C)

SP - Procured
OHT 7 - Completed

DS - 3.5 Km(C )
RM - 0.7 km(C )

SP - Procured
OHT 7- Completed

DS - 3.2 Km(C )
RM-0.5Kms(C)

SP - Procured
GLSR 4- Completed
SP - Procured

DS - 3.2 Km (C )
RM-2.0 Kms (3.0)
DS-2.2 km (2.9)

Whether source established
Yes/No.
YES
1 No. SBW
YES
1 No. SBW
YES
1 No.
YES
1 No.
YES
3 Nos.

YES
1 No.

YES
1 No.
YES
1 No.
YES
1 No.

YES
5 Nos.
YES
2 Nos. ( 1 No. Existing)

YES
2 Nos.
YES
3 Nos.

15

SI. No.

Package No.

Village name

35

BLR-8

Y.Budihal
(MSI)

36

37

38

39

40

41

BLR-8

BLR-8

BLR-8

BLR-8

Start date
Completion date
21-03-98
20-09-99

Karichedu
( MS2 )

Sindhavala
(MS 2)
Yesh wanthanagar
( MS 2 )
Bandri
( MS2)

09-12-98
08-06-2000

09

42

43

44

45

46

RM - 2.0 Kms (2.85)

SP - Procured
OHT7-Completed

DS - 5.8 Km (C )
RM - 1.0 Kms (1.1)

CP - Procured
GLSR 4 - Completed

DS - 2.0 Kms (C )
RM - Not started (2.0)

CP - Procured
OHT 7- Completed

DS - 1.3 Kms (3.5)
RM 4.0/1.5 Kms (4.6)

SP - Procured
OHT 7 - Completed

DS-6.5 Km(C)
RM - 4.5 Kms (C )

SP - Procured________
OHT 4-3rd Bracing beam

DS - 5.0 Kms (5.8)
RM 3.0/1.8 Kms (4.8)

Nandi bevoor

BLR-9

Konganahosur

SP - Not procured
OHT 1 - Foundation

DS - 4.5/0.5 Kms (5.0)
RM 0.5 (1.0)

BLR-9

Nagarakatte

SP - Not procured
OHT 7 - Completed

DS - 2.4 Kms (C)
RM - 0.5 (0.6)

SP - Not procured
OHT 7 - Completed

DS - 2.0/0.7 Kms (2.4)
RM-2.25/0.25 Kms (2.5)

SP - Not procured___________
OU T 5 Bottom ring beam and
slab
SP - Not proc med___________
GLSR 4- Completed

DS-3.5/1.5 Kms (4.0)
RM - Not started (3.0)

SP - Procured_________
OHT 4 - 3rd bracing beam

DS - 3.5 Kms (C)
RM - 1.2 Kms (2.0)

SP - Procured
OHT 7 - Completed

DS-3.0/0.6 Kms (3.7)
RM - 1.0 Kms (C)

I
42 (a)

OHT 7 - Completed

BLR-9

I

<5

Status

BLR-9

BLR-9

BLR-10

BLR-10

BLR-10

Kurubanahalli
(Hamlet)
I lallikere

Old Daroji
(MSI)

Garga
(MS 2)
Honnahalli
(MS 2)

24-08-98
23-02-2000

SP

Progress 1 .doc

- Procured

DS-3.0/1.0 Kms (3.4)
RM - 1.0 Kms (C)

DS-2.5 Kms(C)

Whether source established
________ Yes/No._________
YES
5 Nos.
YES
2 Nos.
(1 No. Existing)
YES
1 No.

YES
2 Nos.
YES
4 Nos. (1 No. Existing)
YES
4 Nos.

YES
1 No.
YES
1 No.
YES
1 No.
YES
2 Nos.

YES
1 No.
YES
2 Nos.
YES
2 Nos.

16

c>

J)
i

Package No.

Village name

47

BLR-10

48.

BLR-11

Muddathnur
(MS 3)
Hire Hadagali

49.

BLR-12

Sattur

50.

BLR-12

Hosakote

51.

BLR-13

Ravihal

17-04-99

52.

BLR-14

Sidiginamola

14-06-99

53.

BLR-14

Kodal

54.

BLR-1 5

Metri

55.

BLR-15

Kakubalu

56.

BLR-17

Ladakanabavi

57.

BLR-17

Haragondanahalli

58.

BLR-17

Hagaranoor

59.

BLR-17

Angoor

NOTE : OHT 1 - Foundation
OHT 2 - GL Bracing Beam
OHT 3 - 2,,d Bracing Beam
OHT 4 - 3rd Bracing Beam
OHT 5 - Bottom Ring Beam and Slab
O1 IT 6 - Side wall
O1 IT 7 - Dome

Progressl.doc

Status

Start date
Completion date

SI. No.

27-09-98
26-03-2000

28-04-99

17-04-99

OHT 7- Completed
SP - Not procured__________
OHT 2- GL Bracing beam
SP
- Not procured
OHT 5- Bottom ring beam & slab
SP - Not procured__________
OHT 7 - Completed
SP - Not procured__________
Sump - Not started
Reservoir - Excavation

OHT6 - Sidewall
SP - Not started_______
GLSR - Completed
SP - Not started
GLSR - Not started
SP
- Not procured
OHT3 - 2nd bracing beam
SP - Not started

RM - 1.3 Kms (1.5)
DS - 3.5 Kms (4.0)________
RM-3.5 Kms (11.0)
DS - Not started (12.5)
RM - 1.25(1.5)
DS - 1.2 Kms (1.3)________
RM - Not started (0.9)
DS - 2.3 Kms (C )_________
G.M - 4.64 (4.7)
R.M.-0.8 (0.95)
Treatment Plant - Not started
RM - Not started (2.3)
DS - 2.0 Kms (2.2)
RM - Not started (1.3)
DS -2.0 Kms (2.4)
RM - Not started (2.3)
DS - Not started (6.6)
RM-2.0 (2.1)
DS -3.0 Kms (3.5)
DS -4.2 Kms (C)

Whether source established
________Yes/No.________
YES
________ 3 Nos.________
NO
6 nos.
YES
________ 2 Nos.________
2 Nos.
From Canal

YES
1 No. SBW
YES
1 No.
YES
3 nos.
YES
3 nos.
Nil

YES
RM - 1.0 Kms (2.0)
OHT1 - Foundation
1
No.
DS
1.2
Kms(3.2)
_______________
SP - Not procured
YES
RM - Not started (2.2)
GLSR 3 - Masonry
1 No.
DS -2.2 Kms (3.0)_______________
SP - Not Procured
YES
RM
Not
started
(0.1)
OHT 1 - Foundation
1
No.
DS
Not
started
(2.3)
____________
SP - Not Procured
MS
1
First
Mile
Stone
BB
Bracing
Beam
GLSR - 1 Foundation
MS 2 - Second Mile Stone
GL- Ground Level
GLSR - 2 RCC Bed
MS 3 - Third Mile Stone
PSBW - Proposed shallow Bore Well
GLSR - 3 Masonry
BRB & S - Bottom Ring Beam and Slab
GLSR - 4 Roof
Nearing
Completion
(
)
Figure
in
Bracket
shows total quantity
NC
C
- Completed

17

STATUS POSITION OF OHT, GLSR & SUMP UNDER WORLD BANK ASSISTANCE - PHASE-11.

52

Package No.

Name of Village

BLR-02
Ci

‘1

BLR-03
BLR-07
a

BLR-08
BLR-09
BLR-11
BLR-13
BLR-15

I

c>
i

n

Hampi
Bandri
Naudi Bevoor
Hire Hadagali
Ravihal

L,; Metri
"

SI. No.

Package No.

L
2.
. 3. .

BLR-03
BLR-07
BLR-08
BLR-10
BLR-15
BLR-17
BLR-14



«





7.

god

-^'Total " ■’"*

Name of Village
____ _____________
Kurugodu
Hampi

Wrr -

Hasoor
Total

Progressl.doc

No. of OHT’s under
_____ progress_____
16

No. of OHT’s
completed
35

No. of OHT’s

No. of Sumps

1
1
2
1
1
1
1
1
1
1
11

No. of GLSR

No. of Sumps Nearing
Completion

No. of Sumps
Completed

No. of OHT’s Not
started

No. of Sumps Under
Progress

: r-.:

i

No. of Sumps
Not Started

-

1
1

1
1

-

1
4

■ 5’"

No. of GLSR Nearing
Completion

No. of GLSR
Completed

3
1
1
1
1
1

SsW
i
-

9

No. of OHT Nearing
completion
1

7

<



2

No. of GLSR Under
Progress
-

No. of GLSR
Not Started

1

1

_______

1



1

18

WATER SUPPLY COMPONENTS

Water supply components

Package

SI.
No.

1

2

1
2

BLR - 1
BLR-2

FORMAT - 06
FOR THE MON 1 11 OF DECEMBER 1999
Remarks

HP
T ___ A
4
3

ST
T__ A
6
5

N.A
N.A.

15nos.
8 nos.

40

10
Nil

CS
T ___ A
8
7
N.A
N.A

WP

CT

DB
T
9

A
10

T
11

A
12

I 21 nos.

Nil
Nil

I 13 nos.
I7nos.

Nil
Nil

; 31 nos.

T
13

A
14

61 nos. [
108nos

Nil

3

BLR-3

N.A |

4

BLR-4

N.A !

34nos

30

5

BLR-5

N.A.

62nos

Nil

■“i

3 8 nos.

30

19nos.

15

124nos

50

N.A 1

37nos i

10

2 2 nos

10

| 11 Onos

70

N.A.

33nos i

Nil

? N.A
....

Contract is terminated

80

34nos

34

16nos. [

16

N.A !

' 39nos

Nil

19 nos |

Nil

125

50

N.A
N.A. |

j 21 nos !
I 16nos. •

Nil
5

11 nos |
10 nos |

Nil
Nil

68
57nos. ;

Nil
20

N.A

1912nos.
.... 1j Nil

6 nos. !

Nil

40nos.

Nil

N.A.
DB
WP
C.C.S.

Not applicable.
Dust Bins
Washing plat forms
Construction schedule

16

N.A

7

BLR-7

N.A |

32 nos

26

| N.A

8

BLR-8

N.A

30nos-

15

BLR-9
BLR-10

N.A
N.A.

! 37nos
| 25nos.

Nil
5

)

Progressl.doc

102

8

44

HP
ST
CT
CS

58nos |

25

1 Inos. |

N.A I

BLR-12

Nil

19

BLR-6

11

90nos.

19nos

6



Nil

16 nos

J

9
10

i Contractor has not furnished
the C.C.S. and target is
I considered as per N.C.B

I

f
I 91nos

16

15

N.A.

Hand Pump
Stand Post
Cattle troughs
Cisterns

1 .. J

.

I

All the works are
proposed under
III Milestone

L



25 nos Nil

C.S.

Construction schedule

28

INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.,
KIRWS & ESP
PHASE D
PACKAGE - II
(WORLD BANK ASSISTANCE)
MONTHS: DECEMBER 99
DISTRICT: BELLARY
1. Hydraulic testing of PVC pipes

SI.
No.

Date of
testing

1.

21-6-99
to
30-6-99

Name of
Village

BLR.-07

Kondanayakan
alialli

RM in Km
A

T

A

0.73

0.73

3.10

3.0

30 RM

Nil

33 RM

Nil

3.2

Nil

28 RM

Nil

| 30 RM !

Nil

0 to 0.37

BLR.-07

24-6-99
) BLR-07
to
29-6-99

Suggenahalli

3.5

I 29-6-99 !
to
| 30-6-99 I
BLR-07
4.
&
| 6-7-99
to
I 8-7-99 !

Malpanagudi

0.37

i

j...-..... I'

t

2.19

I 1-747 | 1.547

4.0

2.72

4.437! 4.137

33 RM

I 30 RM

Nil

35 RM

Nil

Nil

33 RM |

Nil

. 26-6-99 |
to

6.

7.

| 28-6-99 i BLR-07
&
I 10-7-99 |
I 12-7-99 |
BLR-04
to
I 13-7-99 I
15-7-99
BLR-04
!
10
1 18-7-99

Hampi

OK/not OK

OK

r

t
0.5

5.

Remarks

T

Gudi
Obalapura

3.

Components testes
OH I _____
inlet pipes
outlet pipes
A
T
T
A

DM in Km

Chainages
(for RM)
0 to 0.5
0.5 to 0.73

I

21-6-99

I

Package
no.

0.952 I 0.932

1.826

0 to 0.5
0.5 to 1.0
1.0 to 1.5
1.5 to 2.19

0 to 544
0 to 487
Oto 516

0 to 242
Oto 210
0 to 200

1.811

OK

OK

OK

OK

0 to 280

t
Hakkandi

1.0

0.75

2.5

2.0

32RM

Tambrahalli

2.0

1.8

5.0

4.112

28 RM

32 RM . 33 RM
Nil

30 RM

33RM

Nil

0 to 500
500 to 750

0 to 500
500 to 950
500 to 850

OK

OK

Contd..2

Progressl.doc

29

#2#

Date of
testing

SI.
No.

Package
no.

Name of
Village

RM in Km
T

19-7-99
to
29-7-99
21- 7-99
to
22- 7-99
21-7-99
to
22- 7-99

8.

9.

10.

I
S3

A

DM in Km

T

A

Components testes______
OHT _________
inlet pipes
outlet pipes
A
T
T
A

B.G.Halli

5.5

2.838

25RM

Nil

26 RM

Nil

OK

BLR-04

Kannihalli

2.7

1.890

28 RM

Nil

29 RM

Nil

OK

BLR-04

Ambli

1.5

0.2

24 RM

Nil

26 RM

Nil

OK

24-7-99

BLR-08

Y eshwanthanagar

6.0

2.4

6.5

33RM

Nil

35 RM

Nil

12.

24-7-99
to
27-9-99

BLR-08

Bandri

4.5

4.04

4.5

30RM

Nil

32 RM

Nil

13.

28-7-99
to
30-7-99

BLR-02

Bommaghatta

3.2

1.65

5.6

1.867

33 RM

Nil

35 RM

Nil

14. | 31-7-99

BLR-02

Susheelnagar

3.5

2.119

30RM |

Nil

32 RM

Nil

18-8-99
to
20-8-99

BLR-03

Kyadigihal

1.7

1.5

2.25

1.9

BLR-03

D.Kaggal

2.5

1.4

2.5

2.4

15.

- 22-8-99

16' I

to
26-8-99

Progressl.doc

OK/not OK

BLR-04

11.

t-

Remarks
Chainages
(for RM)

0 to 500
500 to 1100
1100 to 1800
1800 to 2400
Oto 180
0 to 600
600 to 1150
1150 to 1650
0 to 650
650 to 1250
1250 to 1850
1850 to 2390
Oto 450
450 to 1000
1000 to 1650

OK

OK

OK

OK
0 to 350
350 to 850
850 to 1350
1350 to 1500
0 to 487
0 to 440
440 to 942

OK

30

#3#

SI.
No.

Date of
testing

17.

20- 7-99
to
21- 7-99

BLR-06

18.

22- 7-99
to
23- 7-99

19.

20.

24- 7-99
to
25- 7-99
28- 7-99
to
29- 7-99

Package
no.

Name of
Village

RM in Km

DM in Km

T

A

T

A

1 larakanal

2.77

2.77

2.8

1.2

BLR-06

Chirasthahalli

2.0

1.8

3.5

1.6

BLR-06

Eshapura

0.9

0.9

1.5

1.5

BLR-06

Anekal Tanda

2.6

2.0

2.0

1.2

BLR-06

Anekal

2.0

1.2

2.3

BLR-06

Madur

2.5

1.2

6.6

1.0

BLR-04

N.Basapura

3.5

3.5

3.3

3.3

Components testes______
OL1T _________
inlet jipes
outlet pipes
T
A
T
A

26- 7-99 t
I

21.

to

27- 7-99 |
30-7-99 '

I

22.

to

01-8-99
1-10-99 I



23.

5-10-99 :

24.

25.

t
6- 10-99
( BLR-04 '
to
7- 10-99 !
f
8- 10-99 '
to
BLR-04
10-10-99,

Progressl.doc

S.L.Halli

0.6

0.6

1.4

1.4

Remarks

Chainages
(for RM)
0-5.00
500-1000
1000-1500
1500-2125
0-500
500-1000
1000-1500
1500-1800
6-500
500-900

OK/not OK

OK

OK

OK

0-500
500-1000
1000-1500
1500-2000
0-500
500-1000
1000-1200
0-500
] 500-1000
1000-1200
0-500
500-1000
1000-1500
1500-2000
2000-2500
2500-3000
3000-3500

OK

0-600

OK

0-500
500-1000

OK

OK

OK

OK

p.
Kanninahalli

4.9

3.0

T

31

RM in Km

Name of
Village

Package
no.

SI.
No.

Date of
testing

26.

10- 10-99
to
: BLR-10 |
11- 10-99:

DM in Km

T

A

T

A

Old Daroji

1.2

1.2

5.5

5.5

I lonnahalli

1.0

1.0

2.5

2.5

Muddathnur

2.5

1.5

4.0

2.5

Components testes______
OHT _________
outlet pipes
inlet pipes
A
T
A
T

12- 10-99

to
BLR-10
13- 10-99|

27.

14- 10-99

BLR-10 \

to

28.

15- 10-99

| 10-10-99|

4.64 •
(G.M)|

4.64

N.A I

0.90
Ravihal
(SSI Scheme) i (R.M)

0.80

N.A. :

Ravihal
to !: BLR-13

,I
(SSI
Scheme)
| 22-10-99)

29.

I

t-

17- 11-991

30.

lo

> BLR-13 ;

18- 11-991
31.

Tambrahalli

:

4.00 |

3.20

9.30

4.8

4.8

2.6 .

.. .

I
'
| 17-10-99:
32.
BLR-01
to

K.Bevinahalli

: 18-10-991

i

Progress 1 .doc

14 RM

14RM | 14RM ’

OK/not OK

OK

0-500
500-1000
0-500
500-1000
1000-1500
0-500
500-1160
1160-1460
1460-1960
1960-2510
2510-2990
2990-3590
3590-4010
4010-4640

OK

j
|
|
!
|
|
|
!

48-584
630-900

i

02-11-99
BLR-04
to
04-ll-99j

14RM

Remarks

Chainages
(for RM)
0-500
500-1000
1000-1200

2.6

0-500
500-1000 I
1000-1500 I
1500-2200 |
0-500
500-1000
1000-1500
1500-2000
2000-2500
2500-3000
3000-3500
3500-4000
4000-4500
4500-4800

OK

OK

OK

t
OK

OK

32

33.

19-10-99 BLR-01 |

P.D.Halli

0.9

0.9

2.3

2.3

34.

20- 10-99
to
BLR-01
21- 10-99

Kammarchedu

1.9

1.9

2.3

2.3

0-500
500-900
0-500
| 500-1000
I 1000-1500
|

1500-1900
0-500

35.

22-10-99i BLR-OI

Y.Kaggal

1.8

1.8

1.2

1.2

| 500-1000
! 1000-1500

1500-1800 ■
G.M. Gravity Main.

Progressl.doc

OK

OK

33

INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.,
KIRWS & ESP
PHASE D
PACKAGE - II
(WORLD BANK ASSISTANCE)
MONTHS: DECEMBER 99
DISTRICT: BELLARY
2. List of deficit Contractors in I Milestone.

SI.
No.

Package
No.

No. of villages

1

2

3

1.

BLR-9

2.

BLR-15

I

Progressl.doc

Name of the
Contractor

Contract
value Rs.
In lakhs

Date of
start

5

6

Target for I
MS Rs. In
Lkahs

End of I
MS Rs. In
laklis

Achievements
to end of MS
Cumulative

7

8

9

Shortfall in Progress in MS
Cumulative

Amount Rs. In
lakhs
10

4

________ 4________
Mr. G.V.Pratap Reddy,
Engineers &
Contractors, Hyderabad.

90.44

9-12-98

30.00

11.10

11.62

18.38

2

M/s. B.R. Meti
Lingsugur.

46.01

28-4-99

27.66

5.57

5.57

22.03

Shortfall in
Physical status of
works

Delay attributed
to Department/
Contractor

12

13

%
11
63.22

OHT - 1/ Nil
R.M - 2/ Nil

Contractor

79.8

RM-2/Nil
DS - 4/2

-do-

34

INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.,
K1RWS & ESP PHASE-II. PACKAGE-11
3. Statement of Bottlenecks
Month : DECEMBER 99
District : Bellary.

SI.
No.

Package
No.

No. of
villages
flushing to
be done

No. of villages
New
Borewells to
be drilled

No. of open
wells
Shallow/Borew
ells to be
drilled

OUT sites
under dispute

SBC results
awaited

Sump sites
to be handed
over

GLSR sites
to be handed
over

Awaiting
Energisation
for
commissioned

Pressure testing
(RM + DS)

T
1

I

I

BLR-1

2

BLR-2

3

BLR-3

4

BLR-4

5

BLR-5

6

BLR-6

DO

1

Progressl.doc

A

35

SI.
No.

Package
No.

No. of
villages
flushing to
be done

No. of
villages
New
Borewells to
be drilled

No. of open
wells
Shallow/Borew
ells to be drilled

OUT sites
under dispute

SBC results
awaited

Sump sites
to be handed
over

Cd.SR sites to
be handed
over

Awaiting
Energisation for
commissioned

Pressure testing
(RM + DS) "

T

I

7

BLR-7

8

BLR-8

9

BLR-9

10

BLR-10

11

BLR-12

12

BLR-14

O
i

Kodal
1

13

BLR-17

NOTE : List of villages Package wise to be appended.

Progress 1 .doc

A

AGENDA FOR THE MEETING CONDUCTED BY
ENGINEER-IN-CHIEF, RHE ZONE, BANGALORE, ON 06-01-2000
i)
Bottlenecks
latest
position,
including
alternate BW’s to be drilled, Open wells or
Shallow BWs to be provided, OHTs/GLSR sites
to be handed over etc.,______________________
ii) Awaiting Energisation

iii) Approval for design and modifications
awaited from the E.E.s______ _______________
iv) Extension of time proposals awaiting

I

g

v) Permission pending from other departments
for R.M., DM laying.

vi) Any other pending Proposals

Horizl

1) Kodal - Since the existing borewell is rejected by
villagers.

1) Anekal
2) Anekal Tanda
3) Providing Transformer to Eshapura
Nil

Proposals are being processed
1) Hampi Sump site - By Archeological Department
2) Malapanagudi (R.M.) - By railway Department.
3) A.S. Gudi (R.M & D.S) -doand P.W.D.

36
INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.,
KIRWS & ESP
PHASE-II
PACKAGE - II
(WORLD BANK ASSISTANCE)
MONTHS: DECEMBER 99
DISTRICT: BELLARY
4. List of works, the agency is unlikely to Achieve the Milestone target::s____________

SI
No.

Package
No.

No. of
villages

Name of the Contractor

1

2

3

4

z-,ontract
. .
C
value Rs In
lakhs

DateMile
of
start

5

6

- - -

End of
Milestone
l/ll/lll

Name of
Schme/Villages

7

8

23-02-99

Bommaghatta

23-08-99

A.S.Gudi,
Susheelnagar

Ill

23-02-2000

Krishnanagar

112.39

I

22-10-98

S.L.Halli,

81.22

42.80

47.30

II

22-04-99

Hakkandi, N.Basapura,
Tambrahalli, Kuruvathi,
Kannehalli.

130.88

73.22

55.90

II

22-10-99

Ambli, B.G.Halli.

157.23

114.79

I

11-09-98

Ibrahimpura

30.00

12.02

61.34

11

11-03-99

Kottalachinta,
Nagalapura,

70.00

26.34

64.0

III

11-09-99

Bagewadi, Deshnur.

94.07

32.92

I

20-09-98

Y.Budihal

85.51

54.13

36.69

II

20-03-99

Karichedu,
Yesh wanthanagar,
Bandri

139.41

75.12

43.52

III

20-09-99

Sindhavalam

15041

103.73

Stone

I

1.

2.

BLR-2

BLR-4

4

8

Mr. R.Maheswara Naidu,
Hyderabad.

M/s. K. Ramakrishna,
Engineers & Contractors,
Hyderabad.

112.39

24-08-98

II

157.23

23-04-98

I
V
i

3.

4.

5.

BLR-05

BLR-08

BLR-09

Progressl.doc

5

5

4

M/s. Coramandal
Presticrete (P) Ltd.,
Hyderabad

M/s. K. Ramakrishna,
Engineers & Contractors,
Hyderabad.

M/s. G.V. Pratap Reddy,
Engineers & Contractors,
Hyderabad

94.07

150.40

90.44

12-03-98

21-03-98

09-12-98

|

I

08-06-99

Nagarakatte,

II

08-12-99

111

08-06-2000

Hallikere,
Konganahosur,
Nandi Bevoor.

Financial cumulative for l/ll/lll

Status of works

X

A/T
______ 12
OUT - Nil/I
R.M. - 2/2
D.S. L 5.0/4
OHT - Nil
R.M - Nil
D.S. - Nil

A
10

Shorfall %

9

40.00

35.18

12 05

90.00

47.75

//

t

30.00

11 10

70 00

34.48

Remarks

13

In II M S.

OHT-Nil/1
R.M -Nil/3
D.S. -6.6/12
OHT-4/5
R.M. -3.3/7.35
D.S. - 12.5/17.2
In 111 M S

\ OHT-Nil/1
| R.M. -Nil/1
j D.S. -Nil/3
OHT-Nii/3
R.M. - Nil/3
D.S. - 1.1/7.00

Contract is
tenninated

| OHT-Nil/1
| R.M. -Nil/3
! D.S. -8.00/8.48
I OHT- 3/4
| R.M. -5.2/12.00
J D S. - 8/17.30

I

In III M.S

i OHT-Nil/1
| R.M. -Nil/2

I DS<117^4
90.44

In II M S.

INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.,
KIRWS & ESP
PHASE D PACKAGE - 11
(WORLD BANK ASSISTANCE)
MONTHS: DECEMBER 99
DISTRICT: BELLARY

_____ fL

List of Agencies on whom penal action has been recommended.

SI.
No

Package
No.

No. of
villages

Name of the
Contractor

Contract
value Rs.
In lakhs

Date of
start

1

2

3

4

5

6

Mile
Stone

End of
Milestone
I/II/III

Name of
Schme/Villages

7

8

Financial cumulative for
I/II/III

2

1.

BLR-2

4

Mr R.Maheswara
Naidu, I lyderabad

112.39

24-08-98

Mr. K.Ramakrishna

2.

BLR-04

8

Engineers &
Contractors

157.23

23-04-98

Hyderabad.

1

A
10

9

Shorfall %
11

3.

BLR-05

5

M/s. Coramandal
presticrete (P) Ltd.,
Hyderabad

94.07

12-03-98

Bommaghatta

40.00

35.18

II

23-08-99

A.S.Gudi,
Susheelnagar

90 00

47.75

III

23-02-2000

Krishnanagar

112.39

is to be completed

81.22

47.30

By the end of 2nd M.S.
29 Kms of Distribution i

55.90

j system is to be achived

12.05

42.80

I

22-10-98

II

22-04-99

III

22-10-99

I

11-09-98

I brah impura

30.00

12-02

61 34

II

11-03-99

Kottalachinta
Nagalapura

70.00

26.34

72.00

III

11 -09-99

Bagewadi. Deshnur

94.07

32.92

Y.Budihal

85.51

54.13

S.LHalli

.... t

' Hakkandi, N.Basapura ] 130.88 i 73.22
i Tambrahalli, Kuruvathi I
I Kannenahalli, Ambli, j 15723
114 79
I
B.G.Halli
|
|

t

4

5.

6.

BLR-08

BLR-09

BLR-12

5

4

2

Mr. G.V. Pratap
Reddy
Engineers &
Contractors
Hyderabad

M/s. Navarang
constructions

150.40

90.44

30.84

21-03-98

09-12-98

27-09-99

I

II

20-03-99

Karichedu,
Yeshwanthanagar,

139.41

75.12

III

20-09-99

Bandri , Sindhavakun

50 41

| 103.73

08-06-99

Nagarakatte,

30.00

!

II

08-12-99

Hallikere,
Konganahosur,

70 00

.........
I'
34.48

III

08-06-2000

Nandi Bevoor

90.44

1

26-03-99

Sattur

16.09

9.27

II

26-09-99

Hosakote

27 46

15.16

30.84

17.86

III

Progressl.doc

20-09-98

J

26-03-2000

|

iiio

Details of
penal action
taken

Remarks

13

14

j By the end of I s’i
L.D. clause
j milestone as per target |
levied
One Ol IT are to be from 23-02-99
completed and One sump

23-02-99

|

Mr. K.Ramakrishna
Engineers &
Contractors
Hyderabad.

A/T
12

I

L.D. caluse
levied
from 23-04-99’

I
By the end of II
milestone 3 OHTs are to j
be completed, DM I I :
Kins is achieved instead \
of 10 Kms.

L.D. clause
levied from
12-03-99

36 69

By the end of II M.S.

L.D. Clause i

43.53

I GLSR & 9 Km of
Rising main is to be

levied from |
22-03-99' |

P

I

Status of works

I achieved.

18 90

34.74

! By the end of 1 M.Sj
i One OHT is to be
"l................
)
■ achieved

L.D. Clause

I By the end of I M.S.
: One OHT is to be

L.D. clause j
Levied from :
28-63-99

i achieved.

I

levied from J
9-6-99

Contract is
terminated

INTEGRATED RURAL WATER SUPPLY AND
ENVIRONMENTAL SANITATION PROJECT
KARNATAKA
(World Bank Assistance)
Phase II

Package II Villages

PROGRESS REPORT
of Bidar District

For the Month of DECEMBER 1999

INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD., NEW DELHI
CONSULTANTS FOR CONSTRUCTION MANAGEMENT AND QUALITY CONTROL

FORMAT-3

FIINANCIAL&PHYS1CAL PROGRESS PACK A G E WIS E
NAME OF DISTRICT :BIDAR

SI. Pack No.of Name of
No ages Villag Contractor
No
es

m
packa
ges/
progr
ess

For the month of December-99

Peri Contract
od
value in
Of Rs.
com I .akhs
pleli
on
in
moni
h

Date of Mi lest Financial
start
one Progress

Physical progress (cumulative)

Cumulative
In
Rs. Lakhs

T

schdsche ks
me mes
com prop
mis^osed
ione
d

A

CP in
Nos.

SP in

Nos.

<u

I

->

1

I

2

3

6

2

6

4
Satish V
Guttedar

H.A Phulse

6_____

18

18

165.59

107.77

7
25.3.98

9.1.98

1

T
9
10
11
38.52 38.52 6

11
111

55.19 55.19
71.88 71.79

I

II
111
I
II
111
1

55.80 55.80
35.92 21.90
16.05 15.9(
27.08 27.08
44.67 44.6;
62.28 69.60
52.97 52.97
37.38 19.75
21.80 26.19
40.21 40.21

11
III

37.71 37.71
35.22 32.63

8

11
111

3

4

5

3

A
5

3

5

5

H.A Phulse

Meera & ceiko

Satish V
Guttedar

18

134.03

18 1 12.15

18

No. No. Re
of of mar

9.1.98

23.3.98

1 13.14 5.3.98

1

A

12
8

A
13

14

I

4
6

A

2
2
2

4
2

T

3

i
5
4
2
5~

1
11

4_
2

11

1

RM
in Kms

T__ A____
15
16
6.15
6.15

x_

8.57
7.76

7.79
9.18

6.80
6.55

A

3.73
8.06

A

T

19

20

21

JZ

1

7.79
16.24

12.91 12.91
6.33 6.68

SUMP/GLSR
in Nos.

T

18
10.91 10.92

9.41 9,41
I 1.68 1 1.68
2.81 2.81
6.60 6.60
1.72 0.90 6.27
5.82
2.24
2.24
5.38 5.38
10.20 10.20
3.09 3.09
1.25
3.94
3.23 3.77
4.75 4.75
16.27 1 6.29
4.0
4.0
7.38
2.26
1.25
1.25 5.49 7.38
4.38 4.38 10.81 10.81

3.73
7.31

OUT
in Nos.

DM
in Kms

1

23

0/1

£_

1/1

1

0/1

1

A
22

2

0/2
1/1

2
2
n

0/1

->

0/1

1
2

24

2

£

I

1

1

0/1

2

£

0/1

2

T

2

1

2

0/1

0/1

1/1

0/1

T

2

£
1

1

2
1

T

25

2

2

6

7

8

9

10

I
X?

4>

I I

12

13

14

15

2
4

7

8

9

10

3

4

2

1

11

12

13

14

15

4
The General
Manager
KSCC ltd

R.Maheshwar
Naidu

The General
Manager
KSCC Ltd.

B .Ramesh

Dhanraj S.
Talampalli

K.l I Phulsc

I

2

I

1

R.Mahesh war
Naidu

Basawaraj
R. sajjan

Basawaraj
R. sajjan

R. Mahesh war
Naidu

_5
1
8

I
8

1
8

1
8

1
8

1
8

1
8

1
8

1
8

1
8

6
87.24

68.40

104.7
83

48.10

66.24

87.40

43.52

49.65

47.85

132.8
9

2

9
33.91

10
33.91

22

i

29.08
24.25
53.29

20.89
8.65
41.27

2
2

2.3.98

11
111
I

6.4.98

11
111
1

8.80
6.31
68.20

20.00
64.19

9.1.98

11
111
I

12
24.58
35.74

26.36
35.74

9.3.98

11
111
I

5.00
7.36
22.08

11
111
I

__ 7
6.4.98

17.2.9
8

12.3.9
8

16.3.9
8 '

11.3.9
8

25.3.9
8

2

7

12
4

1

13

14

2

I

15
3.72

16
3.72

17
6.27

18
6.27

19
2

20
1

4.80
1.14
3.12

5.10
0.61
3.00

4.03
4.86
1 1.89

4.28
2.87
1 1.89

2_
2_

1

2

2

4.60

1
2

1

1.1 I

5.10

4.60
1.37
5.10

5

2.22

0.60
2.22

5

5

5.97
4.24
1.29

5.97
2.85
1.29

4.26
3.00
2.42

4,26
4,42
2.42

1_
1

3
1 up
1.0

3.50
4,42
22.08

->

2

5.40

6.61

4.37

4.17

1

1

22.08
22.08
24.68

22.08
31.84
24.68

4

4

3.52

4.00

10.76

13.00

1

5

2.25

2.25

3.49

3.49

1

11
III

31.36
31.36

31.36
36.78

4
4'

2

2.01
2.07

2.01
1.99

6.28
6.28

6.28
7.15

1

1

30.00

30.00

4

4

4.38

3.42

10.49

1 1.55

1

1

11
111
1

13.52
29.22

6.57
4.1 1
29.22

2

4

5.50

5.50

5.41

5.41

1

1

11
111
I

10.21
10.21
40.00

10.21
4.22
40.00

2.09

1.50

3.90

1

1 up

5.56

5.50

1 1.03

3.90
1.79
1 1.03

11
111
I

7.85
44.29

2.26
1.73
44.29

11
111

44,29
44.31

23.54
34.18

4

2_
2
2
2

21

22

23

24
2

1

2
2

1/0

2
1/0

1

2

2

_1_

£
i

1/0

1

2
1
0/1

0/1

1

1

1

!_
1

1

2

6

6

2

1

I

1

1

0.97

1/0

1/0

1

1

3

8.32

25.83

19.00

2

I 8.00 | -

2

2
i

25

1
16

17

18

19

20

2

76

17

18

2
3

BidarKLAC

3

3

19

20

4
G.S Kubcrappa

B.Ramesh

B.Ramesh

3

Salish V.
Guttedar

18

18

18

18

18

6
122.54

7
17.2.98

63.88

20.6.98

43.65

20.6.99
25.3.98

53.97

53.48

25.3.98

25.3.98

I
21

22

23

24

25

26

Kolarki Shanker

21

I lainunanth Rao
Klniba

22

Dhamaj
Talainpalli

23

I lainunanth Rao
Khuba

24

25

26

9

2

P.Basaiah &
Sons

I’ennanenl
Prestress Pvt.
Ltd.

12

12

12

12

12

12

43.83

25.76

50.06

20-5-99

40.89

70.61

26.31

25-6-99

25-5-99

£
11

9
27.95
47.29

10
27.95
47.29

11
3
6

111

47.29

34.54

2

1
11
111
1
11
111
1
11
111

21.29
21.29
21.29
28.56
7.54
7.54
30.15
1 1.91
1 1.91

15.82

2_
1

32.89
28.56
3.34
6.90
30.15
7.97
4.24

1

17.83

17.83

3

11
111
I

17.83
17.83
21.915

17.54
15.89

2

II

21.915

1

12
6
5

13

14
2

2

n

2

2

2

i

2
2

T

2

2

18
4.04
11.81

19
1
1

20
I
1

21

1.66

17
4.04
1 1.8
1
2.23

1.64

1

1

1/
0

2.69 1.80
0.80
1.22
1.67 3.19
0.33 0.33
0.33 0.55
5.49 5.49
1.78 1.98

5.35
5.88
4.83
6.10
1.84
1.84
3.60
0.41

5.35
5.55
0.80
6.10
1.84
0.70
3.60
0.41
7.99

2
2
2

2.84

2.84

1

2.50
6.52
6.92
9
6.92
9
2.50
75
2.50
75
3.00 5.53

2.50
6.20

15
4.29
5.05

16
4.29
5.05

1.56

1.68
1.37

1.39

0.54
8.26

12.88

0.54
4.1 1
1.13
75
1.13
75
0.78

11

12.88

0.78

I

25.03

1

25.03
20.445

II

20.445

I

35.305

II

35.305

I

13.155

II

13.155

35.55

4.92

7

1.25
1.25
2.33
05
2.33
05
3.82
25
3.82
25
2.28
5

128
5

5.53
3.7

2
1

23

24,
1
I

I



1
2

2

1

_1_
2

T

2
i

2
1/
0

1

2

£

1 up

1

1

1

I
1

3.00

22

0.4

0.7
1
0/
I

3.7
6.30
8
6.30
8
2.86

1

2.86

1

1
I

1

28

29

2

3

4

27

9

P. Basaiah &
Sons

28

29

Kolarki Shankcr

Satish.V.
Guttedar

5

6

7

57.25

12

12

46.31

24.76

8

9

1

28.625

2.14

II

28.625

2.14

1

23.155

II

23.155

3.67
75
3.67
75

1

12.38

10

II

12

13

14

15

16

1.32

12.38

1.32

15
total

1

29

19 Contractors

18

pac
kag
cs

20.91

I

721.77

733.60

II

500.86

III

142

16

10

20

21

0/
I
I
I

1
1

130.3

375.57

60.3
3

109.3

483.48

472.90

21.7

I

192.89

62.50

II

192.89

i

19

I

67.9

crores

N
(T'

1 1
9

18

4.47
I
4.47
I
5.65
5
5.65
5
3.56
85
3.56
85

15
II

17

7
51.79

4

2091.8
9

Total No. Of Packages/ villages
renders finalised Packages
renders called for packagesA illages
Note: SP- Submersible pump
Ol IT - Over Head tank
UP- Under progress

18.7
47
18.7
47

41.5
29
41.5
29

1644.57

29/77
29/77
0/0

CP - Centrifugal pump
Cd.SR - Ground level storage

RM - Rising Main
T- Target

DM - Distribution
A- Achievement

BiO
DISTRICT MANAGIiR
IC I (P) LI D
BIDAR.

22

23

24

2
5

FORMAT -4
District: Bidar

SI.
No

Packa
ge
No.

Total
No. of
village

Value of
work in
lakhs

Name & Address
of contractors
proposed

Name &
Name &
Address of Address of
Contractor^' Asist.
personal
Engineer

Date of
Award

Date of
starting

Name of Address of DM:-P.V. Naik
MICi -32
KI IB Colony
____________________ Bidar________
Date of
Financial Progress (cumulative) in Rs.
Completion
Lakhs

MS-1

2

A
16
71.79

10
24.9.99

11
38.52

9.1.98

8.7.99

55.80

55.80

35.92

21.90

16.05

15.9

8.1.98

9.1.98

8.7.99

27.08

27.08

44.67

44.67

62.28

69.60

20.1.98

23.3.98

22.9.99

52.97

52.97

37.38

19.54

21.79

26.19

20.1.98

5.3.98

4.9.99

40.21

40.21

37.71

37.71

35.22

32.63

I

3

2

2

6

107.77

3

3

3

134.03

4

4

5

112.15

Meera & Ceiko
Pumps Pvt Ltd Regd.
Office D.No 4-3-161.
215.315. Hill street
Ranigunj Secunderabad

Abdul
Khadeer
H.No 4-1135/1 Noor
Khan Talim
Bidar________
Mallikarjun
Bi radar C/o
Baburao Mugla
Near New water
tank Bhalki

5

5

5

1 13.14

Satish.V Guttedar
Excise & PWD
Classi Contractor
H.O: Trishnu
Building Gulbarga

Basawaraj
Malkappa C/o
Pola .S Near
Balaji Temple
I lumnabad

I

P

15
71.86

___ 9
25.3.98

1

6

MS-3

7
8
Jagadev S
20.1.98
Jeevangi C/o
Pola. S. Near
Balaji temple
I lumnabad____
Joseph. S/Subash 9.10.97
Padsale Bidar

4
165.59

_________ 5
Satish V Guttedar
Excise&PWD
Classi Contractor
H.O: Trishnu
Building Gulbarba
K.H Phulse
Classi Contractor
8-9-191. Gurunagar
Bidar -585401
H.A.Phulse PWD
Class I Contractor
8-9-191. Gurunagar
Bidar-585401

MS-2___
T
A
13
14
56.19 55.19

A
12
38.52

r

_1_
6

2

7

2
4

4
87.24

7

3

68.40

8

8

4

104.78

9

9

2

48.10

5
I'he General
Manager KSCC
Ltd No.3
Goduthai Nagar
Gulbarga______
R.Maheshwar
NaiduEngineer
& Contractor GI plot No.4
uday Ki ran
Apartment
Srinagar colony
Hyderabad500073_______
The General
Manager KSCC
Ltd Goduthai
Nagar Gulbarga

B.Raniesh
Classi
Contractors

I

LIG-94. KHB
Colony Bidar

I

10

10

I

66.24

1I

II

2

87.40

12

12

I

43.52

13

13

2

49.65

14

14

I

47.85

Dhanraj S.
Talampalli
Calssl
Contractor
Hallikhed (B)
Tq.l himnabad
K.ll Plmlse8-9191. Gurunagar
Bidar-585401
R.Maheshwar
NaiduContracto
rs G-l.plotNo.4
Srinagar colony
I lyderabad
Basawaraj R.
Sajjan Classi
Contractor Raj
Nanda Nivas
Vasanthanagar
Gulbarga
— DO —-

6

7
Jagadev S
Jewargi C/o
Pola.S. Near
Balaji temple
I himnabad
Syed Mujtaba
Hussain
Basavakalyan.

8

9

10

13

14

16.4.98

5.10.99

I 1
33.91

12

16.2.98

33.91

29.08

20.84

20.1.98

2.3.98

1.9.99

53.29

41.27

16.2.98

6.4.98

5.10.99

68.20

8-1-98

9-1-98

8-7-99

31-1-98

9-3-98

B.G sriniva
slab Gurunagar
Bidar________
Joseph Samuel
H.No.12-1-56
Nazareth
Colony Bidar

16.2.98

15
24.25

8.65

8.80

6.31

20.00

64.19

12.00

24.58

26.36

35.74

35.74

5.00

3.50

7.36

10.02

8-9-99

22.08

22.08

22.08

22.08

22.08

31.84

17.2.98

16.8.99

24.68

24.68

31.36

31.36

31.36

36.78

9-3-98

12-3-98

1 1.9.99

30.00

30.00

13.52

6.57

Basawaraj
Malkappa C/o
I’ola S Near
Balaji Temple
I himnabad

9-3-98

16.3.98

15.9.99

29.22

29.22

10.215

10.22

-—Do—-

9-3-98

1 1.3.98

10.9.99

40.00

40.00

7.85

2.26

Narendra
N.D. H.No 82-140
Shahgunj
Bidar_______
Narendra
N.D. H.No 82-140
Shahgunj
Bidar_______
Jagadev S
Jewargi C/o
Pola.S. Near
Balaji temple
Humnabad

16

4.1 1

10.21

4.22

1
15

2
15

2

16

16

3

17

17

3

4
132.89 R.Maheshwar
Naidu
Contractors G1 .plotNo.4
Srinagar colony
Hyderabad
122.54 G.S Kuberappa
CIass-I
Contractor
Dattatri Nilaya
Basaveshwar
colony shahapur
63.88 K.1..A.C Bidar

18

18

3

43.65

19

19

2

53.97

20

20

3

21

21

2

22

22

2

23

23

I

Satish.V
Guttedar Excise
& PWD Classi
Contractor 11.0:
Trishnu Build
ing Gulbarga
43.83 Shankar Kotarki
Engineers &
Contractors
Venkadi ri
Upstair 4-7-137.
Gandhi Gunj
Bidar - 585 401
25.76 I lanumanth Rao
Khuba Class-1
Contractor
Aurad________
50.06 Dhanraj
I Talampalli

1

2
p

B.Ramesh
C lass-1
Contractors
1.IG-94. KHB
Colony Bidar
B.Ramesh
Class-1
Contractors
1.IG-94. KHB
Colony

i

53.48

6

7
Joseph Samuel
H.No. 12-1-56
Nazareth
Colony Bidar

8
24.3.98

9
25.3.98

10
24.9.99

11
44.29

12
44.29

13
44.29

14
23.54

15
44.29

16
34.18

Shivpuie
Shrimanth
C/o Yuviaj
patil
Kainalnagar

16.2.98

17.2.98

16.8.99

27.95

27.95

47.29

47.29

47.29

34.54

Subash
M.Padasale
KI IB Colon)’
Bidar
Shiva Kumar
Patil H.No 91-443 Nandi
colony Bidar

10.6.98

20.6.98

19.12.99

21.29

15.82

21.29

21.29

32.89

24.3.98

25.3.98

24.9.99

28.56

28.56

7.54

3.34

7.55

21.48

24.3.98

25.3.98

24.9.99

30.15

30.15

11.91

7.97

11.91

20.39

24.3.98

25.3.98

24.9.99

17.83

17.83

17.83

17.54

17.83

15.89

Kuppana
Shangond

85-6
15-4-99

21-6-99

20-6-2000 21.91
5

21.91
5

Kuppana
Shangond

928
10-6-99

21-7-99

20-7-200

12.88

12.88

Shivaraj Palleii

399
6-5-99

20-5-99

5-5-2000

25.03

Narendra
N.D H.No. 82-140
Shahgunj
Bidar_______
Subash
M.Padasale
KHB Colony
Bidar

35.55

25.03

r

1
24

2
24

2
2

4
40.89

25

25

T

70.61

P. Basaiah &
Sons

Shivaraj Palleri

26

26

2

26.31

Permanent
Prestress Pvt.

Tariq Nayeem

27

27

2

57.25

28

28

2

46.31

29

29

5
I lanumanth Rao
Khuba

6

7
Tariq Nayeem

Ltd.________

1

24.76

P. Basaiah &
Sons
Kotarki Shankar
Ijigineers &
Contractors
Venkatidri
I-stales 9-7-131.
Gandhi Gunj
Bidar 585 401
Satish V
Guttedar

Syed Mujtaba
Ilussain
Syed Mujtaba
Ilussain

Shiviaj Palleri

8
934
10-6-99
994-998
17-6-99
76
15-4-99

9
27-7-99

10
11
26-7-2000 20.44

25-6-99

24-6-2000

999-1004
17-6-99
79-6
15-4-99

21-7-99

274
3-5-99

26-7-99

25-5-99 24-5-2000

23-7-99

5
35.30
5
13.15
5

20-7-2000 28.62
5
22-7-2000 23.15
5

25-7-2000

12.38

12

13
20.445

13.33

35.305

4.92

13.155

14

15

28.625
23.155

12.38

I

Remarks: In Column No. 12 .14 & 16 the figure above is cumulative and below is for present month

A- —• k-

DIS TRIC T MANAGER
1CT(P) LTD..
BIDAR.

16

FORMAT-5
VILLAGE WISE PHYSICAL PROGRESS
FOR THE MONTH OF December- 99

DISTRICT : BIDAR

[

Status

Village Name

SI No.

Package No.

1

2
BDR-1

______ 3
Betgera

________ 4
GLSR Completed

2

BDR-1

Kitta

OHT-7- Completed

3

BDR-1

Ghotala

4

BDR-1

Ladwanthi

OHT-7 Completed
Sump Completed
GLSR Completed

5

BDR-1

Algood

GLSR Completed

6

BDR-1

Hirangaon

OHT-7 Completed

7

BDR-2

Hedgapur

OHT-7 Completed

8

BDR-2

Santhpurl

GLSR Completed

9

BDR-2

Dapaka

OHT-7 Completed

10

BDR-2

Kathagaon

OHT-7 Completed

11

BDR-2

Khed

OHT-7 Completed

12

BDR-2

Donagaon

OHT-7 Completed

13

BDR-3

Aliamber

OHT-7 Completed

14

BDR-3

Hangarga

OHT-7 Completed

15

BDR-3

Eklar

GLSR Completed

16

BDR-4

H. Tugaon

OHT-7 Completed

17

BDR-4

Bhatambra

OHT-7 Completed

18

BDR-4

Dhannura

OHT-7 Completed

3 \

- 131-

RM-2.70Kms/2.97
DM-5.80Km/5.80
RM-2.65KM/2.65
DM-7.50Km/7.50
3.80___________
RM-3.80 Km/3.50
DM-7.50KM/6.90
RM-2.95KM/2.95
DM-3.25KM/3.25
RM-Nil
DM-3.50KM/3.80
RM-6.90KM/6.70
DM-7.50KM/7.10
RM-4.14Km/5.19
DM-5.0KM/5.24
RM-4.36Km/4.36
DM-6.2KM/6.440

RM-1.2Km/1.2
DM-3.8KM/3.8
RM-1.6Km/1.6
DM-2.7KM/2.71
RM-l.OKm/l.O
DM-2.60KM/2.64
RM-0.82KM/0.80
DM-4.00KM/4.00
RM-2.24Km/2.24
DM-5.385KM/5.385
RM-11.7Km/l 1.7
DM- 2.54KM/2.2
RM-1.25Km/1.25
DM-3.23KM/3.23
RM-1.0KM/0.993
DM-5.28KM/5.523
RM-4.10Km/4.10
DM-10.50KM/10.50
RM-1.20KM/1.30
DM-6.0KM/6.135

Whether Source Established
_______ Yes / No______
___________ 6_________
Yes (PBN-2)
Yes (PBW-4), (PBW-5) KEBYes Except Pump erection
ready for Commissioning
Yes (PBW-1) Yes (PBW-2)
(PBW-3) New Borewell
Yes (PBW-4) KEB-No

New Bore well drilled KEBNo.____________________
Yes (PBW-1) KEB-Yes
Yes (PBW-1)
No (PBW-3)__________
Yes (PBW-1), (PBW-7),
KC-7
No (PBW-5). KC-3
Yes (PBW-3)
Yes (PBW-4)
Yes (KC-4)
(BW-5)_____________
NEW BOREWELL
DRILLED___________
Yes (PBW-1). (PBW-2)

Open Well

Yes (PBW-3)
Yes (PBW-2), KC-2
Yes(PBW-l), (PBW-3)

Yes (PBW-5), (BW-F)

3

1
19

2
BDR-4

_______ 3
Wanjarkhed

_________ 4
OHT-7 Completed

20

BDR-4

Chalkapur

GLSR- Completed

21

BDR-5

Madargi

OHT-7 Completed

22

BDR-5

Kodambal

OHT-7 Completed

23

BDR-5

Bemalkhed

24

BDR-5

Waddankera

GLSR completed.
Sump Completed
OHT-7 Completed

25

BDR-5

Mangalgi

OHT-5

26

BDR-6

Shamtabad

OHT-7 Completed

27

BDR-6

Nagankera

OHT-7 Completed

28

BDR-6

Aurad (S)

OHT-7

29

BDR-6

Kanaji

OHT-7

30

BDR-7

Muchalam

OHT-7 Completed

31

BDR-7

Rajola

32

BDR-7

Jajanmugali

OHT-7 Completed
Sump Completed
OHT-7 Completed

33

BDR-8

Murki

OHT-7 Completed

34

BDR-8

Kherda (B)

OHT-7 Completed

35

BDR-8

Hokrana

OHT-7 Completed

36

BDR-8

Nidoda

OHT-5

37

BDR-9

Saigaon

OHT-7 Completed

38

BDR-9

K. Jawalga

OHT-7 Completed

39

BDR-10

K. Chincholli

GLSR completed

40

BDR-11

Nagoora

OHT-7 Completed

41

BDR-11

Kamthana

OHT-7 Completed

42

BDR-12

Manhalli

OHT-7 Completed

43

BDR-13

Kohinoor

OHT-7 Completed

J

J

RM-1.95Km/2.50
DM-1.20KM/1.69
RM-1.0KM/1.26
DM-4.25KM/5.345
RM-2.80KM/2.80
DM-2.981 KM/2.98
RM-2.2KM/2.2
DM-7.965KM/7.965

RM-3.46KM
DM-10.665KM/10.65
RM-4.90Km/2.51
DM-2.51KM/10.49
RM-2.81 Km/2.81
DM-6.426KM/6.4
RM-1.53Km/1.53
DM-3.185KM/3.185
RM-2.19Km/2.19
DM-3.10KM/3.10
RM-3.95Km/4.80
DM-3.50KM/4.038
RM-0.8Km/1.14
DM-3.00KM/4.86
RM-1.845Km/l. 845
DM-6.66Km/6.664
RM-1.25Km/2.95
DM-6.60KM/6.60
RM-Nil DM4.60Km/4.60________
RM-1.6KM/1.655
DM-4.62KM/4.625
RM-0.34KM/0.57
DM-2.35KM/2.35
RM-5.00Km/5.97
DM-4.26KM/4.26
RM-4.135KM/4.24
DM-2.9KM/3.0
RM-5.4Km/5.4
DM-4.37KM/4.37
RM-1.29Km/1.2
DM-2.42Km/2.42
RM-4.0Km/3.695
DM-13.0KM/10.76
RM-2.25Km/2.25
DM-4.38KM/3.49
RM-4.0Km/4.0
DM-13.00KM/12.46
RM-3.42Km/3.42
DM-11.55KM/10.49
RM-4.8Km/4.80
DM-5.6KM/5.60

- /3A -

___________ 6
Yes (PBW-1). FAIL
Open Well

Yes (PBW-5)
(PBW-1)_________________
(PBW-4)
(PBW-2). (PBW-3). (PBW5)_______________________
Yes(PBW-7). Yes KC-4,
PBW-8
Yes (PBW-3)
Yes(PBW-l). KC-3
Yes KC-1
Yes (PBW-2)
Yes(PBW-3).
Yes KC-1
Open Well

Yes KC-l.KC-2. (PBW-4)
yes KC-1 (PBW-2)
Yes KC-2. (PBW-4)
New Bore well drilled but
under dispute___________
Yes (PBW-1). (PBW-2)
(PBW-3)______________
Yes(BW-1.2)

Open Well
Yes KC-3
KC-2_____________________
Yes (PBW-1). (PBW-2). (PB).
(PBW-4) KC-2. 3___________
Yes KC-l.KC-2
Yes KC-1. (PBW-4).
KC-2___________
Yes KC-1.(BW-12)

Yes KC-5. KC-2. KC-3.
KC-9 No (PBW-3)
Open Well
Yes (PBW-1)
Yes (PBW-6)

o

1
44

2
BDR-13

______ 3_

Kherda (B)

OHT-6

45

BDR-14

Nima

46

BDR-15

Hailikhed(B)

47

BDR-16

Wadgaon-I.

OHT-7 Completed
Sump Completed
OHT-7 Two OHT
Completed______
OHT-7 Completed

48

BDR-16

Kamalnagar

OHT-7 Completed

49

BDR-16

Kalgapur

OHT-7 Completed

50

BDR-17

Gadgi

OHT-7 Completed

51

BDR-17

Chillargi MS 2

OHT-7 Completed

52

BDR-17

Chimkod

OHT-7 Completed

53

BDR-18

Hippalgaon

OHT-7 Completed

54

BDR-18

Markal

OHT-7 Completed

55

BDR-18

Byalhalli

OHT-7 Completed

56

BDR-19

Sonala MS 1

OHT-7 Completed

57

BDR-19

Nittur(B) MS 1

OHT-7 Completed

58

BDR-20

Yarandgi

OHT-7 Completed

59

BDR-20

G. Chincholli

OHT-7 Completed

60

BDR-20

Warwatti (B)

OHT-6

61

BDR-21

Bagdal

Land Dispute

62

BDR-21

Yadlapur

OHT-5

63

BDR-22

Bellura

OHT-1

64

BDR-22

Satholi

OHT-3 z

65

BDR-23

Rajeshwar

OHT-5

66

BDR-24

Chintaki

67

BDR-24

Chondi Mukhed

68

BDR-25

Belura

/

y-.

L
)

i

a*

4

6

i

1

RM-2.2Km/2.2
DM-4.5KM/4.5
RM-5.5KnV5.5
DM-12.0KM/12.0
RM-Started
DM-27.00Km/25.83
RM-4.30Km/4.30
DM-4.04Km/4.04
RM-5.04Km/5.04
DM-11.86Km/11.86
RM-2.0Km/2.0
DM-2.23KM/2.23
RM-2.124KM
DM-1.9KM______
RM-0.61/0.800
DM-5.80/5.885
RM-1.10/1.20
DM-4.0/4.840
RM-1.03Km/1.03
DM-2.55KM/2.55
RM-0.75Km/0.69
DM-2.99KM/3.02
RM-0.8Km/0.79
DM-3.1KM/______
RM-6.15Km6.15
DM-3.75KM/3.60
RM-1.78Km/l .70
DM-8.40KM/8.40
RM-1.200 KM/1.375
DM-3.400 KM/3.54
RM-0.620 KM/0.620
DM-3.00KM/3.115
RM-4.00 Km/4.15
DM-6.00 Km/6.525
RMDM-_____________
RMDM-_____________
RMDM-_____________
RMDM-_____________
RM- 3.00Kms
DM- 3.00Kms

RMDMRMDMRMDM-

OHT-1

- /33-

Yes (PBW-1), (BW-1)
Yes KC-1. (PBW-8). KC-3
(PBW-5) KC-4. (PBW-7)
Open Well
Yes KC-3. (PBW-1),
(PBW-2)___________
Yes (PBW-4). (PBW-1)
(PBW-7). (PBW-1).
(PBW-3). (PBW-5)
Yes KC-1 (PBW-1)
Yes(PBW-2). (PBW-1)

New Borewell is drilled
Yes(PBW-3)

Yes KC-1
Yes HP-4.
Yes (BW-1)
Yes (PBW-1.2)

Yes KC-2. KC-3
Yes KC-1. KC-3
Yes KC-2__________
Yes BW-(pp). (PBW-3)
No (PBW-2)________
Yes (PBW-1)
Yes (PBW-1). (PBW-3)
Yes KC-2_____________
KC-2. KC-3. KC-4 KC-5.
PBW-5 Sump 1CP
BW-8 (Newly drilled)

PBW-2. PBW-4. BW-1
PBW-1

PBW-3. KC-l.KC-2. KC-3. 1
Sump. KC-4. KC-5. KC-6.
KC-7. KC-8______________
PBW-1.PBW-2.PBW-3 SumpINo.____________________
PBW-2. PBW-3
PBW-LPBW-2. PBW-3.
PBW-4. Sump -INo.

2
BDR-25

Sastapur

OHT-1

70

BDR-26

Ladha

OHT-2

71

BDR-26

Ucha

OHT-5

72

BDR-27

Rolla

OHT-1

73

BDR-27

Naryanapur

OHT-1

74

BDR-28

Beeri (B)

OHT-1

75

BDR-28

Mehkar

OHT-5

76

BDR-29

Sonkera

77

BDR-29

Warwatti (K)

1

2

2

3
(

2

Noie:

5

4

69

OHT-1

OHT-1 :OHT-2:OHT-3:OHT-4:OHT-5:OHT-6:OHT-7:-

Foundation
G.L Bracing Beam
2nd Bracing Beam
3rd Bracing Beam
Bottom Ring Beam & Slab
Side Wall
Dome

MS 1
MS 2
MS 3

First Mile Stone
Second Mile Stone
Third Mile Stone

BB
GL
PSBW
BRB&S

Bracing Beam
Ground Level
Proposed Shallow Borewell
Bottom Ring Beam & Slab

RMDMRMDMRM- 0.9
DM- 2.6
RMDMRMDMRMDMRMDMRMDMRMDM-

___________ 6_
POW-l.POW-2
PBW-l.PBW-2, PBW-3

PBW-1.PBW-2.PBW-3

PBW-2
PB W-4.KC-3.PO W-1 .POW-3.
1 Sump. 1 CP_____________
PBW-1. PBW-3

PBW-2. KC-1. KC-2. KC-4.
KC-5_____________
PBW-2.KC-2. BW-1
KC-l.KC-2

DISTRICT MANAGER
ICT PVT LTD
BIDAR.

d

FORMAT-6
PHYSIC AL PROGRESS FOR REMAINING WATER SUPPLY COMPONENTS

For the month of December-99

District: Bidar
SI.
No

Package

HP
I

1

I

3
4

3
4

6
7
8
9
J
CP

In
i

hT
ii
12
13
14
15
16
17
18
19
20

REMARKS

WATER SUPPLY COMPONENTS IN NOS
__ CS

ST
A

7
8
9
10
11
12
13
14
15
16
17
18
19
20
Total

T
25
42
33
62
32
26
18
23
30
26
31
24
48
26
84
65
36
17
9
7
664

T

35
32
46
32

3
5

16
30
26
25
24
48
26
84
55
17
9
7
512

1
4

4

23

A

DB__
T
j\_
11
35
32
40
16
16
43
40
29
23
23
23
23
17
17
13
13
19
19
24
24
16
16
16
16
38
38
26
26
18
16
16
15
15
20
20
449 363

HP - I land pump
S T - Stand post
CS - C istern
CT - Cattle 1 rough WP - Washing Platform DB - Dust bin

CT

T
5
17
8
22
22

_1_8

J2
8

TT
ii
ii
8
7
11
10
7
9
19
14
1
9
7
12
221

8
7
11
10
9
9
19
14
9
7
12
180

WP
T___ A
34__ 58
82
100
51___
63
135
70
127
75__
75__
70__ 58
58__
44
50
72
72
60
64
50
56
60
128
95
95
65

All works are proposed
under milestone 1.2 & 3

51__ ’

47
70
1467

40
708

ft;,_ i

DISTRlCTMANAGi-R
ICT PVT L TD
BIDAR

INTERCONTINENTAL CONSULTANT AND TECHNOCRATS PVT. LTD.
KIRWS AND ESP PHASE-II PACKAGE-II
(WORLD BANK ASSITANCE)
1. Hydrauli testing of PVC Pipes.
SI.
No.

1

1
2
3
4
5
6
7
8

I
Vo
(T'
I

9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

Date of
testing

2

29-11-98
29- 11-98
3-12-98
3-12-98
28-11-98
3- 12-98
5-11-98
5- 11-98
To 8/11/98
7-11-98
10- 12-98
9-12-98
1- 12-98
4- 12-98
5- 12-98
6- 12-98
9-12-98
6- 12-98
2- 12-98
4-12-98
14- 12-98
15- 12-98
15-12-98
28-11-98
25-11-98
30- 11-98
11- 12-98
11-12-98

Package
No.

Name of
Village

3

4

RM in
km

__ 5
T

DM in
km

6^
A

7

8
A

BDR-2
BDR-2
BDR-2
BDR-2
BDR-2
BDR-2
BDR-3
BDR-3

Hedgapur
Santhapur
Dapka
Kathagoan
Khead
Doangoan
Aliamber
Hungarga

5.19 4.14
4 36 4.31
1.23 1.2
1.59 1.6
1.9 1
0.85 0.25
2.4 2.24
12.0 10.5

5.24
6.44
3.89
2.71
2.64
4.04
5.38
2.54

BDR-3
BDR-6
BDR-6
BDR-6
BDR-6
BDR-9
BDR-9
BDR-19
BDR-10
BDR-11
BDR-11
BDR-16
BDR-16
BDR-16
BDR-18
BDR-18
BDR-18
BDR-19
BDR-19

Eklar
Shamthabad
Nagankara
Aurad(s)
Kanaji
Saigaon
K.Jawalga
Nittur ’B"
K. Chincholi
N agora
Kamthana
Wadagaon
Kalagapur
Kamalnagar
Hippalgaon
Markal
Byalahalli
Sonal
Nittur ’B"

1.25 1.15
1.63 1.5
3.3 3.3
4.8 3.94
1.14 0.5
5.5
3.7
1.29 1.2
3.1
1.5
3.00 3.00
2.25 2.00
4.03 2.0
4.29 4.0
2.56 2.0
5.5 2.0
6’9 1.03
9.68 0.69
6.75 0.73
5.4
3.6
3.1 1.5

3.23
3.00
4.93
3.00
3.39 2.00
6.19
3.00
4.98
2.75
4.37 I. 3
2.42 2.2
8.4
7.80
10.00 10.00
3.49 3.00
12.46 II. 00
4.04
3.0
2 23 2.25
11.86 11.00
2.7
2.55
3.38 2.23
3.69 3.1
3.6
2.65
8.4
7.8

, ,a
District Manager ICT PVT LTD Bidar

2.1
2.0
3.8
2.7
2.5
3.9
4.9
1.5

T

Components tested
OHT
Inlet
outlet
pipes
pi| )es
9
10
12
11
A

RM
KM
13

Chainages
DM
KM.
14

DISTRICT : Bidar

OK/
not OK
15

0to4.14
0. to 2.1
Oto 2
0 to 1.6
Oto 1
0 to 0.25
0 to 2.24
Oto 10.5

O.to 2.1
Oto 4.3
Oto 1.2
0 to 2.7
Oto 2.5
0 to 3.9
0 to 4.9
Oto 1.5

OK
OK
OK
OK
OK
OK
OK
OK

Oto 1.25
Oto 1.5
Oto 3.30
0 to 3.94
0 to 0.5
Oto 3.7

0 to 3.00
0 to 3.00
0 to 2.00
0 to 3.00
0 to 2.75
Oto 1.3
Oto 2.2
0 to 7.8
Oto 10.00
0 to 3.00
Oto 11.00
0 to 3.00
0 to 2.25
Oto 11.00
O.to 3.1
Oto 2.65
O.to 3.1
Oto 2.65
0 to 7.8

OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK

Oto 1.29
Oto 1.5
0 to 3.0
0 to 2.00
0 to 2.00
0 to 4.00
Oto 2
Oto 2
0 to 0.73
0 to 3.65
Oto 0.73
0 to 3.65
Oto 1.5

Remarks
16

Comm./HO

Comm./H.O
-do-

Comm./HO
Comm./H.O
Comm./H.O

Comm./H.O

INTERCONTINENTAL CONSULTANT AND TECHNOCRATS PVT. LTD.
KIRWS AND ESP PHASE-II PACKAGE-II
MONTH : December 1999
DISTRICT : Bidar

2. List of deficit Contractors
SI. Package
No. No.

1
1
2
3
4
5
6
7
8
9
10
11
12
13
14

2
BDR-5
BDR-6
BDR-8
BDR-13
BDR-2Q
BDR-21
BDR-22
BDR-23
BDR-24
BDR-25
BDR-26
BDR-27
BDR-28
BDR-29

L

i

District Managar
ICT Pvt. Ltd
Bidar

No. of
Villages

_3
1
4
_4

2.
_3

2
2
2
2
2
2
2
2
2

Name of the
Contractor

Contract
value

Date
Start

Target as Achievement Shortfall in
24-9-99
to end of MS Progress in
Cumulative MS Cumulative
Amount

_________ 4_________
Satish Guttedar
__
KSCC
______ KSCC
Baswaraj R Sajjan
Satish Guttedar
Kotarki Shankar
Hanumant Rao Khoba
Dhanraj Tallampally
Hanumant Rao Khoba
P.Basaiah & Sons
Premanent Prestress
P.Basaiah & Sons
Kotarki Shankar
Satish Guttedar

5
113.14
87,24
104,78
49.65
53.48
43.83
25.76
50.06
40,86
70.61
26.31
57,25
46.31
24.76

6
25/3/98
06/04/98
06/04/98
16/3/98
25/3/98

20/5/99
25/6/99

25/5/99

7
113.14
87,24
104,78
49.65
53.48
43.83
25.76
50,06
40,86
70,61
26.31
57.25
46.31
24.76

9
102.12
63.45
79.84
43.67
35.28

13.65

13.33

10

Shortfall in

Delay attributed

Physical status

to Department

of work

/Contractor

%

11

12
OHT Mangalgi
OHT at Kanji
OHT Nidoda
OHT Kherda
OHT Warwatti(B)
All works
All works
All works
All works
All works
All works
__ All works
All works
All works

13
Contractor
Contractor
Contractor
Contractor
Contractor
Contractor
Contractor
Contractor
Contractor
Contractor
Contractor
Contractor
Contractor

INTERCONTINENTAL CONSULTANT AND TECHNOCRATS PVT. LTD.
KIRWS AND ESP PHASE-II PACKAGE-II
(WORLD BANK ASSISTANCE)
MONTH : December 1999
DISTRICT : Bidar

SI.
No.

Package No. of
No.
Villages

(5) List of Agencies on Whom penal action has been recommended.
Name of
Contract Date of
End of
Name of Financial cumulative
Contractor
Value
Start
Milestone
Scheme/ for Milestone WWIII

IWIII

1

sOfc

1

BDR-4

5

Meera & Ceiko

2

BDR-2

6

3
4
5
6
7
8
9
10
11
12
13
14
15
16

BDR-5
BDR-6
BDR-8
BDR-13
BDR-20
BDR-21
BDR-22
BDR-23
BDR-24
BDR-25
BDR-26
BDR-27
BDR-28
BDR-29

hvA

_4
4
_2
_3
2_
2

£

District Manager
ICT Pvt. Ltd., Bidar

2_
2_
2_
2_
2

112.15

Villages

^23/3/98

H.Tugaon
Bhatambra
Dhannura
Wanjarkhed
Chalkapur

H.A.Phulse

107.77 01/09/98

Hedgapura
Santhapur
Khed
Kathagaon
Donagaon
Dapka

Satish Guttedar
KSCC
KSCC
________
Baswaraj R Sajjan
Satish Guttedar
Kotarki Shankar
Hanumant rao Khoba
Dhanraj Tallampally
Hanumant rao Khoba
P.Basaiah & Sons
Premanent Prestress
P.Basaiah & Sons
Kotarki Shankar
Satish Guttedar

113.14 25/3/98
87.24 06/04/98
104.78 06/04/98
49.65
16/3/98
53.48
25/3/98
43.83
25.76
50.06
20/5/99
40,86
25/6/99
70,61
HI
26.31
25/5/99
57,25
46.31
zxLUlL
24.76

S' \A-‘

-4

-M-

V

2
J

t)

2

_J_
J
v

2
Z

2

T

52.97

status of
x
worke^-

Details of
Penal
action

Remarks

OHT
completed

‘ Rs.25000/-

Recovered

OHT
Completed

Rs. 25000/- Recovered

A

Shortfall
%
31.51
40.77

2 S'

113.14 102.12
87.24 63.45
104.78 79.84
49.65 43.67
53.48 35.28
43.83
25.76
50.06 13.65
40.86
70,61 13.33
26.31
1
57.25
46.31
24.76
mA ■

9.74
27.27
23.81
12.05
34.04

72.74

81.13
MO"/

is H

OHT Mangalgia fl
OHT atKanji !,
OHT Nidoda -1
OHT Kherda >
OHT Warwatti(B) y
All works_____
All works_____
All works_____
All works_____
All works_____
All works_____
All works_____
All works_____
All works

INTERCONTINENTAL CONSULTANT AND TECHNOCRATS PVT. LTD.
KIRWS AND ESP PHASE-II PACKAGE-II
{WORLD BANK ASSISTANCE)
MONTH : December 1999
DISTRICT : Bidar

(6) Ranking of Contractors.

SI. Package
No. No.

No. of
Villages

Name of
Contractor

Contract
Value

Date of
Start

Financial cumulative
for Milestone l/ll/lll
T
A
Shortfall

Physical
targets
Achieved

%
1

BDR-1

6

Satish V
Guttedar

165.59

25-Mar-98

165,59 170.20

-o
1

3-OHT is completed
2-GLSR Completed
R.M - 18.80 KMs
D M - 34.45 KMs
2

BDR-2

6

H A Phulse

107.77

09/Jan/1998 107,77 92 38

14.20

RANKING

asper item No.7

of W.B.Aide
Memoire_______

1 GLSR Completed

1

Remarks on

Quality of works

05-OHT's Completed

Maintain
Quality at the
Instance ofthe
Consultants

B

B

1-GLSR Completed
RM - 13.94 kms
DM - 24.1 kms
3

BDR-3

3

H.A . Phulse

134.03

09/Jan/1998 134,03 144.82

2-OHT completed

B

1 -GLSR Completed
R.M - 16 38 kms
D M - 12.24 kms
4

BDR-4

5

Meera & Ceiko

112 15

23-Mar-98

112,15 117.54

21 58

4-OHT Completed
1-GLSR Completed
R.M - 10.00 kms
D M - 25.93 kms

B

SI. Package
No. No.

No. of
Villages

Name of
Contractor

Contract
Value

Date of
Start

Financial cumulative
for Milestone l/ll/lll
T
A
Shortfall

Physical
targets
Achieved

%

Remarks on

RANKING

Quality of works

asper item No.7
of W.B.Aide
Memoire

5

BDR-5

5.

Satish V.
Guttedar

113.14

113 14

110.14

2.65

3-OHT’s completed
1 -OHT Bottom slab
1 GLSR completed
R.M - 15.29 km
D M - 30.40 km

B

06April/1998 87.24

55 84

35.99

2-OHT Completed

B

5-Mar-98
I

6

BDR-6

4

KSCC Ltd

87.24

1-OHT Top Dome
R.M - 9.13 kms
D M - 13.-17 kms

1
o
7

BDR-7

3.

R. Maheswar
Naidu

68.40

2-Mar-98

68.40

71.63

3-OHT completed

B

R.M - 3.60 kms
D M - 17.92 kms

8

BDR-8

4.

KSCC Ltd.

104.78

06/April/1998 104.78

80.55

13.52

3-OHT Completed
1-OHT Side wall
R.M -11.04 kms
D.M - 14.13 kms

B

9

BDR-9

2.

B.RamOsh

48.10

09/Jan/1998 48,10

47.84

0.55

2-OHT completed

B

R.M - 6.60 kms
D M -6.79 kms

10

BDR-10

1.

Dhanraj S.
Talampalli

66.24

9-Mar-98

66,24

76 00

1- GLSR completed
R. M - 4.00 kms
D M -13.00 kms

B

SI. Package
No. No.

No. of
Villages

Name of
Contractor

Contract
Value

Date of
Start

Financial cumulative
Physical
for Milestone l/ll/lll
____ targets
"A
T
Shortfall
Achieved

%
11

BDR-11

2

K.H Phulse

87 40

Remarks on
Quality of works
asper item K5.7
of W.B.Aide
Memoire

RANKING

2-OHT Completed
17-Feb-98

87.40

92 04

B

R.M - 6.25kms
D M - 17.38 kms
12

BDR-12

1.

R. Maheshwar
Naidu

43.52

12-Mar-98

43.52

40.62

1-OHT completed
R.M-3.42
D M - 11.55

B

2

Baswaraj
R Sajjan

49.65

16-Mar-98

49,65

55.49

1-OHT Completed
1-OHT Side wall
R.M - 7.0kms
D M - 10.10 kms

B

BDR-14

1

Basawaraj
R Sajjan

47.85

11-Mar-98

47.85

49.58

1 OHT completed
R.M - 5.5km
D M - 12.00 km

B

15

BDR-15

1

R.Maheshwar
Naidu

132 89

25-Mar-98

132.89

115.73

12.92

2-OHT completed
R.M - Started
D M - 27.04kms

B

16

BDR-16

3

G S. Kuberappa

122.54

17-Feb-98

122.54

103.96

15.16

3-OHT Completed

B

13

14

BDR-13

I
I

R.M - 11.30kms
D M - 18.07 kms
17

BDR-17

3

KLAC Ltd

63.88

20-Jun-98

63.88

47.82

18

BDR-18

3

B Ramesh

43 65

25-Mar-98

43.65

45.53

25.14

2-OHT Completed
1-OHT Top Dome U/P
R.M - 2.724 kms
D M - 14.00 kms

B

3-OHT Completed
R.M - 2.85 kms
D M - 8.64kms

B

SI. Package
No. No.

No. of
Villages

Name of
Contractor

Contract
Value

Date of
Start

Financial cumulative
for Milestone l/ll/lll
T
A
Shortfall

Physical
targets
Achieved

%
19

BDR-19

2

B.Ramesh

53.97

25-Mar-98

53.97

58.38

2-OHT Completed

I
20

BDR-20

3.

Satish.V
Guttedar

53.48

25-Mar-98

District Manager
ICT Pvt Ltd.
Bidar.

RANKING

B

R.M-9.15 kms
D M - 12.00 kms
53.48

44.96

15.94

2-OHT Completed
1-OHT Top Dome

R.M - 9.91 KMs
D M - 10.75 KMs

1

Remarks on
Quality of works
asper item No.7
ofW.B.Aide x
Memoire

B

INTEGRATED RURAL WATER SUPPLY AND
ENVIRONMENTAL SANITATION PROJECT
KARNATAKA
(World Bank Assistance)
Phase II

Package II Villages

PROGRESS REPORT
of Gulbarga District
For the Month of DECEMBER 1999

INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT LTD . NEW DELHI
CONSULTANTS FOR CONSTRUCTION MANAGEMENT AND QUALITY CONTROL

FORMAT - 3

PHYSICAL PROGRESS PACKAGE WISE FOR DECEMBER 1999
NAME OF DISTRICT : GULBARGA Phase-B
SI Package No.of

No

1

2

1

£

3

4

5

6

7

No.

GLB-1

GLB-2

GLB-3

GLB-4

GLB-5

GLB-6

GLB-7

villa
-ges

4

4

4

3

3

3

1

Name of
contractor

S.V.Guttedar

Period Contract Date of Mile
of compl values
start stone
-etion in in Rs.
months lakhs

18

M/s Coramandel
PresTcrete
Pvt Ltd.

18

H.A.Phulse

18

S.M.Amerkhed

H.A.Phulse

S.V.Guttedar

B.R.Sajjan

18

18

18

18

62.2

53

88

66.5

95.8

68.4

66.3

22-1-98

7-4-98

4-4-98

3-2-98

8-4-98

11-4-98

1-2-98

Physical Progress

Financial
Progress
T
A
in lakhs

I

S.P

C.P

R.M

DM

OHT

T | A

T | A

T | A

T | A

T | A

I
II
III

18

18
36
37.7
62.2 55.18

9

I
II
III

11
32
53

7.4
16.2
35.9

3.
5

I
II
III

17
53
88

39.6

2

54.9

2

69

8

I

II
111

13
13
28.5
33
66.5 43.50

I
II
III

I
II
III
I
II
III

3_
5

9

£
6

6

7
7

6

2

10

1.6
4,9
5

3
8
15

4.3
12.3
14

2
7
12

2
4.5
11

2

2.1
5.7
6.2
8.6
9.2

4
13
21

11.7
18.4
18.4

2
2 2

3.6

2.5

2_
4

2_
4

OHT 1 up

4.0

2
3

2

OHT 1 up

2

1

7

4.2
4.3

46
20
58 62.5
95.8 77.28

3_
5

2
2

2
5
9.5

1.6
6
8.5

2
7
12

3.5
6.8
11.6

2

13
40
68.4

10.6
36.1
58.5

3_
5

2
7

2
5_
8

2
6
8.6

2
7
12

2.7
5.2
11.7

_1_
2

15
40
66.5

21.4
34,6
46.0

_1_
2
3

2
5.
9

3_
_8
8

1

£

2
2

2

1
4
6.4

OHT 1 up

2_
4

4

6

£

2_
4

5

2
5_
9

1

Sump/
GLSR
T | A

No.of No. of
schemes scheme) Remarks
commis Prop
-sioned -sed

3.6

1

Ji
1

1/Nil
1/Nil

OHT 1 up

FORMAT - 3
PHYSICAL PROGRESS PACKAGE WISE FOR DECEMBER 1999

NAME OF DISTRICT : GULBARGA Phase-II
SI Package No.of
villa
No No.
-ges

8

9

GLB-8

GLB-9

10 GLB-10

11 GLB-11

12 GLB-12

13 GLB-13

14 GLB-14

2

3

3

4

3

2

4

Name of
contractor

M/s K.S.C.C

H.A.Phulse

S.V.Guttedar

G.S.Kuberappa

K.H.Phulse

B.Ramesh x

K.H.Phulse

Period Contract Date of Mile
start stone
of compl values
-etion in in Rs.
months lakhs

18

18

18

18

18

18

18

88.8

63

75.9

107

59

73.3

58.8

26-4-98

16-4-98

27-3-98

10-4-98

12-5-98

8-5-98

9-5-98

Physical Progress

Financial
Progress
T
A
in lakhs

I

S.P

C.P

R.M

D.M

OHT

T | A

T | A

T | A

T | A

T | A

I
II
III

33
18
54 67,2
88.8 90.32

2_
5_
8

2

I
II
III

12
36
63

42,9
49
59.3

2
4

2
4

I
II
III

26
13
40
38
55.20
75.9

3
8
13

I
II
III

46
22
64 680
107 90.63

I
II
III

18
36
59

25
41,4
41.44

4_

I
II
III

15 280
44 47,2
73.3 56.98

_1_
4_
7

I
II
III

23
11
35 29.3
58.8 49.68

4_

8

2

2
2

2
5
8.3

4.5
5
7.9

3
3
10
12
16 14.20

2

2

2
3

2
3

2
7
12

5,5
9.5
10.7

2

3.2
5,5
5.9

2

4_
7

2.

2
3.2

3
8.2
13

3.6
10.3
11.9
7,8
11
11

2
2

4
7

6.9

2

2

8.5

4
7

6

10

10

10

2
8
13

TT

1
4
4.2

2
7
11

2.2
5
8.7

2. £

6

6

13

7

4

4_
4

6

2
1

2
4

2

4_
8

4.
5

2
7
11

5.2
5,2
7

2.

2.9
3,8
4.5

2
7
11

6,4
6.4
9

3_
6

2
3

2
3

2
3

2

Nil/1
1

1

Nil/1

OHT 1 up

OHT 1 up
1

1/Nil
1/Nil

2

2
4

OHT 2 up

2

2
2.

1/nil 1/nil
1/ml 1/nil

1

2.
2

Sump/
GLSR
T | A

No.of No. of
schemes scheme Remarks
commis Prop
-sioned -sed

OHT 2 up

2
3

OHT 1 up

FORMAT - 3
PHYSICAL PROGRESS PACKAGE WISE FOR DECEMBER 1999
NAME OF DISTRICT : GULBARGA Phase-II
SI Package No.of
villa
No No.
-ges

15 GLB-15

4

Name of
contractor

k.H.Phulse

Period Contract Date of Mile
start stone
of compl values
-etion in in Rs.
months lakhs
18

56

20-5-98

I

17 GLB-17

3

3

S V Guttedar

G.S Xuberappa

18

-18

47

62.5

4-7-98

26-4-98

1

18 GLB-18

19 GLB-19
20 GLB-20

21 GLB-21

22 GLB-22

23 GLB-23

3

3
3
3

4

3

HSKumbar

K.H.Phulse

18

12

Rajemdra.
Andral.

12

G.V.Pratapreddy

18

M/s Pannanent
Prestress(P)Ltd?

12

M/s Pannanent
Prestress(P)Ltd.

12

55

43.40

56
57

54.7

50.40

9-7-98

15-7-99
5-7-99
4-9-98

21-3-99
2-5-99

S.P

C.P

R.M

D.M

OHT

T | A

T | A

T | A

T | A

T | A

2.5
4,5
4.9

2
7
11

6.3
9.8

2

2

10.2

4

3

1.2
3.2
3.7

3
9
15

7.2
9.2
11.6

2

2

2

2

2
6

10

3,5
6.7
6.7

2
7
11

3
8.2
9.5

11
34
56

23.0
31.2
49.38

II
III

13
38
47

11.7
35.6
41.5

I
II
III

30
12
37 37,9
62.5 58.66

2
2

2
2

4

9

5.5
5.8

I
II
III

11
33
55

11
17,5
30

2
2

2

2
2

2
2

2

8

4

I
II
III

16 GLB-16

Physical Progress

Financial
Progress
T
A
in lakhs

I

2

2

3

4

2
2

2

2
2

6

8

5

2_
4

5

II

22,00 14.0
43.40 -

4

I
III

28
56

40.30

2

I
II
III

I

5

5
9.4

0.5
1.5

_2

4

5
13

11.4 14.5
34 22.75
57 37.80

2
2

2
2

2

I
III

27,34 14.51
54.70 16.30

2

2

8

6

I
III

25.40 12.30
50.40 13.62

2

1
4.6

7

4

2
7

2

2

3
10.9 9.5
4

5
2
3.5

OHT 1 up

Nil/1

2
2
3

3

2
2

1

Nil/1 Nil/1 Nil/1

OHT 1 up

3

2

OHT 1 up

2

3

2

2
9.5

2
2

2

12

2

1

4
10.6

2

1

2
7

Sump/
GLSR
T | A

No.of No. of
schemes scheme Remarks
comm is Prop
-sioned -sed

2

1/0
1/1

1/1
1/1

OHT 1 up

OHT 3 up

4

6

2

12.4

3

OHT 2 up

FORMAT-4

Name & address of DM :- J.D.Boii
C/o B.N.Patil
H.No 1-867/3-D
Venkatesh Nagar
Gulbarga. Ph. 35780

District: Gulbarga phase-II

For the month of December 1999

SI Package Total Value
No. of of w ork
No. No.
villages in Rs

GLB-1

1

2

GLB-2

4

4

62.2

53

I
(T*

)

3

4

5

GLB-3

GLB-4

GLB-5

4

3

3

Name & address of
contractor

Sri S.V.Guttedar
PWD Class I contractor
Trishul building .MSK
Mill road,Gulbarga.
M/s Coramandel
Prestcrete Pvt Ltd.
No.8-2-268/l/B/18.plot
No 18.Aurora colony-11
Road No 3.Banjara hills
Hyderabad - 500034.

Sri H.A.Phulse
PWD Class I contractor
H.No 8-1-191.
Guru Nagar. Bidar.
66.5 Sri S.M.Amerkhed
Engineer & Contractor
MIG 32. Rampur road .
Nijalingappa Nagar.
Raichur - 584 101_____
95.8 Sri H.A.Phulse
PWD Class I contractor
H.No 8-1-191.
Guru Nagar. Bidar.

88

Name and
address of
contractor
personal

Name & address of
Assistant Engineer

Er. Ram.Hanumanthrao
H.No. 2-609,Navaranga
Challi Jagat Gulbarga.

Date of Date of Date of
award starting comple
-tion

Financial progress
( Cummulative in Rs. Lakhs)
Ml
M2
M3
T
A
T
A
T
A

13-1-98 22-1-98 22-7-99

18

18

36

37.7 62.2 55.18

7-10-99

,11

7.43

32

16.20 53

4-10-99

17

•39.6

53

54.9

3-8-99

13

13

33

28.5 66.5 43.5

8-10-99

20

46

58

62.5 95.8 77.28

1. Er. D.S.Phadnis
C/o M.D.Farooq
D.No 1-1-13/1. Badi Darga
Street. Chincholi.
2. Er. Shaliendra.Shahapur 31-3-98 7-4-98
C/o Prathviraj Gowda
Mansangal Gopan Gowda
Mailapur base. Yadgir.
3. Rajeshkumar
C/o M.D.Farooq
D.No 1-1-13/1, Badi Darga
Street. Chincholi._______
Er. S.B.Badiger
C/o Mailarappa. Zamadar 28-1-98 4-4-98
Kanina Nivas . Diggi base
Shahapur.______________
Er. Ravindra.G.Kalagi
C/o Sharanbasappa. Patil
Post : Javali (D) Tq: Aland 13-1-98 3-2-98
Dist : Gulbarga.
Er. S.B.Badiger
C/o Mailarappa. Zamadar
Kanina Nivas . Diggi base
'Shahapur.

29-1-98 8-4-98

Expendit
-ureduring
the month
in lakhs

35.9

88 69.00

7.30

FORMAT-4

District: Gulbarga phase-11
For the month of December 1999
SI Package Total Value
No. No.
No. of of work
villages in Rs
6

7

GLB-6

GLB-7

3

1

68.4

66.3

I

1

8

9

GLB-8

GLB-9

10 GLB-10

11 GLB-11

2

3

3

4

88.8

63

75.9

107

Name & address of
contractor

Sri S.V.Guttedar
PWD Class I contractor
Trishul building .MSK
Mill road.Gulbarga.

Sri B.R.Sajjan
PWD Class I contractor
H.No.l-31/lA.Rajendra
Nivas. Near Govl press
Station road . Gulbarga.
General Manager
M/sK.S.C.C
Vivikanand Nagar .
Gulbarga___________
Sri H.A.Phulse
PWD Class I contractor
H.No 8-1-191.
Guru Nagar, Bidar.
Sri S.V.Guttedar
PWD Class I contractor
Trishul building .MSK
Mill road.Gulbarga.

Sri G.S.Kuberappa
PWD Class I contractor
Parvati Nilay.Baswesh
-war colony. Behind
tahsil office Shahapur.

Name and
address of
contractor
personal

Name & address of
Assistant Engineer

Date of Date of
award starting

Name & address of DM :- J.D.Boli
C/o B.N.Patil
H.No 1-867/3-D
Venkatesh Nagar
________________ Gulbarga. Ph. 35780
Date of
Financial progress
Expendit
comple
-ureduring
( Cummulative in Rs. Lakhs)
-tion
Ml
M2
M3
the month
T
A
T
A
A
T
in lakhs

1. Er. Rajashekhar.R.Mulge
17-2-98 11-4-98 11-10-99
At post : Jawalga (J)
Tq: Aland . Dist: Gulbarga.
2. Er. Mallikarjun.Madani
Plot.No274.ClB colony.Gib.
Er. Ravindra.G.Kalagi
C/o Sharanbasappa.Patil
Post : Javali (D) Tq: Aland 13-1-98 1-2-98 1-8-99
Dist: Gulbarga.
Er. Sanjecv.Tirmal
16-3-98 26-4-98 26-10-99
C/o Prakash.R.Biral
Station area. Nalwar
Tq: Chittapur . Dist : Gib.
Er. Rajashekhar.Konek
21-2-98 16-4-98 16-10-99
C/o Arun.Shantappa
H. No 2-1-101/A
Jewargi, Dist : Gulbarga.
I. Er. Rajashekhar.R.Mulge
At post: Jawalga (J )
Tq: Aland , Dist: Gulbarga.
27-2-98 27-3-98 27-9-99
2. Er. Ravindra.G.Kalagi
C/o Sharanbasappa.Patil
Post : Javali (D) Tq: Aland
Dist : Gulbarga._________
1. Er. D.S.Phadnis
C/o M.D.Farooq
D.No 1-1-13/1. Badi Darga 27-3-98 10-4-98 10-10-99
Street.Chincholi.
2. Er. Rajeshkumar (-do-)

13

10.6

40

36.06 68.4 58.50

15

21.4

40

34.60 66.3 46.0

18

33

54

67.2 88.8 90.32

12

42.9

36

49

13

26

38 40.00 75.9 55.20

22

46

64

68

63

59.30

107 90.63

5.1

FORMAT-4
Name <& address of DM :- J.D.Boli
C/o B.N.Patil
H.No 1-867/3-D
Venkatesh Nagar
Gulbarga. Ph. 35780

District: Gulbarga phase-II
For the month of December 1999

SI Package Total Value
No. of of work
No. No.
villages in Rs

12 GLB-12

13 GLB-13

3

2

-b
Cp

1

14 GLB-14

15 GLB-15

16 GLB-16

4

4

3

Name & address of
contractor

Sri K.H.Phulse
PWD Class I contractor
H.No 8-1-191.
Guru Nagar. Bidar.
73.3 Sri B.Ramesh
PWD Class I contractor
LIG 94 . KHB colony
Bidar.______________
58.8 Sri K.H.Phulse
PWD Class I contractor
H.No 8-1-191.
Gum Nagar. Bidar.
59

56

47

Sri K.H.Phulse
PWD Class I contractor
H.No 8-1-191.
Guru Nagar. Bidar.

Sri S.V.Guttedar
PWD Class I contractor
Trishul building .MSK.
Mill road.Gulbarga.

Name and
address of
contractor
personal

Name & address of
Assistant Engineer

Date of Date of
award starting

Date of
comple
-tion

Er. Vijaykumar. Srivastava
4-5-98 12-5-98 12-11-99
C/o Gajanand Traders
Hshanapur APMC
Market yard , Shorapur.
Er. Sanjeev.Tirmal
C/o Prakash. R.Biral
4-5-98 8-5-98 8-11-99
Station area. Nalwar
Tq: Chittapur . Dist: Gib.
1. Er. Shaliendra.Shahapur
C/o Prathviraj Gowda
Mansangal Gopan Gowda
Mailapur base . Yadgir.
4-5-98 9-5-98 9-11-99
2 Er. Chanappa.B.Kindiger
C/o Basalingappa.Manager
New siddeshwar lodging
Station Bazar. Yadgir.
1. Er. Sanjeev.Tirmal
C/o Prakash.R.Biral
4-5-98 20-5-98 20-11-99
Station area. Nalwar
Tq: Chittapur. Dist : Gib.
2. Er. Mallikarjun.Madani
Plot.No274.CIB colony.Glb
Er. Vijaykumar. Srivastava
27-2-98 27-3-98 27-9-99
C/o Gajanand Traders
Hshanapur APMC
Market yard . Shorapur.

Financial progress
( Cummulative in Rs. Lakhs)
Ml
M2
M3
T
A
T
A
T
A

18

25

36

41.4

15

28

44

47.2 73.3 56.98

II

23

35 29.30 58.8 49.68

11

23

34

31.2

13

11.7

38

35.6 47.0 41.5

Expendit
-ureduring
the month
in lakhs

59 41.44

56 49.38

o-yo

FORMAT-4
Name & address of DM :- J.D.Boli
_
C/o B.N.Patil
H.No 1-867/3-D
Venkatesh Nagar
Gulbarga. Ph. 35780

District: Gulbarga phase-II

For the month of December 1999

SI Package Total Value
No. of of work
No. No.
villages in Rs

17 GLB-17

18 GLB-18

3

3

I
j

19 GLB-19

3

20 GLB-20

3

21 GLB-21

3

Name & address of
contractor

Sri G.S.Kuberappa
PWD Class 1 contractor
Parvati Nilay.Baswesh
-war colony. Behind
tahsil office Shahapur.
Sri
H.S.Kumbar.
55
PWD Class I contractor
C/o S.V.Seelvant
H.No 10-E-1049 .
behind Indira hospital.
Public Garden road
Gulbarga.____________
43.40 Sri K.H.Phulse
PWD Class 1 contractor
H.No 8-1-191.
Gum Nagar. Bidar.
56 Rajesndra.Andral
Engineer & contractor
Behind Hotel Lake view
Sharan Nagar.Gulbarga.
57 Sri G.V.Pratapreaddy
Engineer & contractor
opp: A.P.Chest hospital
S.R.Nagar.
Hyderabad.
62.5

Name and
address of
contractor
personal

Name & address of
Assistant Engineer

Er. Rajashekhar.Konek
C/o Arun.Shantappa
H.No 2-1-101/A
Jewargi, Dist: Gulbarga.

Date of Date of
award starting

Date of
comple
-tion

17-4-98 26-4-98 26-10-99

Financial progress
( Cummulative in Rs. Lakhs)
M3
M2
Ml
A
T
A
T
T
A

12

30

37 37.93 62.5 58.66

1. Er. Rajeshkumar
C/o M.D.Farooq
33 17.5 55
11
D.No 1-1-13/1, Badi Darga 19-6-98 9-7-98 9-1-2000 11
Street.Chincholi.
2. Er. Joyti BabuRao.K
At Post: Keriambalga
Tq : Aland. Dist: Gulbarga.
1. Er. Shaliendra.Shahapur
2-7-99 15-7-99 15-7-200 22.00 14.0 43.40
C/o Prathviraj Gowda
Mansangal Gopan Gowda
Mailapur base , Yadgir.
Er. Santoshkumar.Totnalli
5-7-99 5-7-2000 28 40.30 56
C/o Venkatesh Marketing
1-194 ,Behind old I.B Station.
road. Gulbarga - 585102.
1. Er. Sharanbasappa.
M. Jampani.
1-9-98 4-9-98 4-3-2000 114 14.5 34 22.75 57
Brahampur.
Gulbarga.

Expendit
-ureduring
the month
in lakhs

8.11

30

37.80


‘-I

FORMAT-4
Name <& address of DM :- J.D.Boli
C/o B.N.Patil
H.No 1-867/3-D
Venkatesh Nagar
Gulbarga. Ph. 35780

District: Gulbarga phase-II
For the month of December 1999

o
I

SI Package Total Value
No. of of w ork
No. No.
villages in Rs

Name & address of
contractor

M/s Paramenent
Prestress Pvt Ltd.
Opp Shivasharan
Sankiran. Court road
Gulbarga.

22 GLB-22

4

54.7

23 GLB-23

3

50.40 M/s Paramenent
Prestress Pvt Ltd.
Opp Shivasharan
Sankiran. Court road
Gulbarga.

Name and
address of
contractor
personal

Name & address of
Assistant Engineer

Date of Date of
award starting

Date of
comple
-tion

Financial progress
( Cummulative in Rs. Lakhs)
M2
M3
Ml
T
A
T
A
T
A

1. Er. Sadashiva.Yelgod
13-3-99 21-3-99 21-3-200 27.34 16.30 54.7
S/o Y.L.Siddramappa
H. No 1-1495/2 (C)
Godutai Nagar. Jewargi rd.
Gulbarga.
2 Er. Chanappa.B.Kindiger
C/o Basalingappa.Manager
New siddeshwar lodging
Station Bazar, Yadgir.
I. Er. Sadashiva.Yelgod
S/o Y.L.Siddramappa
26-4-99 2-5-99 2-5-2000 25.4 13.62 50.4
H.No 1-1495/2 (C)
Godutai Nagar. Jewargi rd.
Gulbarga.
2. Er. Ram.Hanumanthrao
H.No. 2-609.Navaranga
Challi .Jagat. Gulbarga.

(Er. J.D.Boli)
DM, ICT Pvt Ltd
Gulbarga.

Expendit
-ureduring
the month
in lakhs

FORMAT-5
VILLAGEWISE PHYSICAL PROGRESS FOR DECEMBER 1999
DISTRICT : GULBARGA.

SI. Package
No.
No.

1 '

GLB-I

Whether source
established
Yes / No

Hydraulic
testing of
pipes laid

Yes

A
1

OHT2- Completed
Sump- Nil
Nil
CPDMT
A
6.2
6.0

Hydraulic
testing of
pipes laid
done.

Yes

A
1.30

OHT2- Completed.
Sump- Nil
Nil
CPDMT
A
3.15
3.00

Yes

A
1.3

OHT2- Completed
Sump- Nil
Nil
CPDMT
A
1.5
1.5

Yes

A
1.40

OHT2- Completed
Sump- Nil
Nil
CPDMT
A
3.60
3.50

Yes

A
2.8

OHT2- Completed
Sump- Nil
Nil
CPT
DMA
3.10
3.0

OHT2- Completed
Sump- Nil
Nil
CPA
DMT
A
0.50
2.22
2.0

Yes

Status

Village
Name

S.Saradagi
2 nd in.stone

OHT1 -

SP- 3
RM-T

1.3
GLB-1

Kuinsi
3rd ni.stone

OHT1 -

SP- 2
RM- T

1.2

GLB-1

Dasatapur
1st m. stone

OHT1 -

(Commissioned)

RM-T

SP- 2
1.3
GLB-1

Arunkal
3rd m.stone

OHT1 SP- 2
RM-T

1.40
2

GLB-2

Ranjole
2nd m.stone

OHT1 -

SP- 1
(Commissioned)

RM-T

2.85

GLB-2

Dugnoor
T' in.stone

OHT1 -

SP- 2
RM- T
0.660

GLB-2

Kallur raod
3rd in.stone

OHT1 -

OHT2- Completed.
Sump- Nil

SP- 1
RM-T
0.18

GLB-2

Degal madi
3'*1 m.stone

A
0.40

CPDM-

SP- 2

CP-

Nil

DM-

T
3.50

A
2.00

- do -

- do -

- do --

Yes

A
3.0

OHT2- Completed

2.29

- do -

Nil

T
3.3

OHT1 -

RM-T

-- do --

- /5/-

e 130
079 34

A
3.00

Yes

FORMAT - 5

VILLAGEWISE PHYSICAL PROGRESS FOR DECEMBER 1999
DISTRICT : GULBARGA.

SI. Package
No.
No.

3

GLB-3

Kakkasagera
2 nd m.stone

OHT1 -

SP- 1
RM-T
2.17
GLB-3 Gundhalli tanda
I8' m.stone

1.0

Mudbole
3rd m.stone

4

GLB-4

Mudnoor K
3rd in.stone

Tadakal
3,d m.stone

Keriambalga
I81 m. stone

Tcerth
2lld m.stone

Yes

Hydraulic
testing done

A
3.06

OHT2- Completed
Sump- Nil
Nil
CPT
A
DM2.40
2.30

- Yes

A
0.20

OHT2- Completed
Sump- Nil
Nil
CPA
T
DM2.3
2.0

Yes

A
2.80

OHT2- Completed
Sump- Nil
Nil
CPA
T
DM6.0
6.76

- do -

- do -

Yes

No

A
Nil

OHT2- Bottom slab in
Sump- Nil progress.
Nil
CPA
T
DM4.80
Nil

Yes

A
4.3

OHT2- Completed
Sump- Nil
Nil
CPA
T
DM2.4
2.0

Yes

A
Nil

OHT2- Completed.
Sump- Nil
Nil
CPA
T
DM1.60
2.20

OHT1 -

OHT1 -

SP- 1
RM-T
4.24
GLB-4

Hydraulic
testing of
pipes laid
done.

OHT1-foundation OHT2- Staging in
Sump- Nil progress
completed.
Nil
CPSP- 2
A
DMT
A
RM-T
5.00
6.70
1.52 0.90

SP- Nil
RM- T
1.60
GLB-4

Yes

OHT1 -

SP- 2
RM- T
2.56
GLB-3

OHT2- Completed
Sump- Nil
Nil
CPT
A
A DM3.0
2.20
' 3.30

OHT1 -

SP- 1
RM-T
GLB-3

Hydraulic
testing of
pipes laid

OHT1 -

SP- 1
RM-T
2.56
GLB-3 Gundhalli main
I1” m.stone

Whether source
established
Yes / No

Status

Village
Name

OHT1 -

SP- Nil
RM-T
0.69

- do —

No

Hydraulic
testing of
pipes laid
done.

- do -

FORMAT - 5

VILLAGEWISE PHYSICAL PROGRESS FOR DECEMBER 1999
DISTRICT : GULBARGA.
SI. Package
No.
No.

Village
Name

Status

4______

5

GLB-5

Rajankollur
2 nd m.stone

OHT1 -

SP- Nil
RM-T
5.92
GLB-5

Gundalgera
3rd m.stone

Bapparga
1st m. stone

GLB-6

Badadal
I81 in. stone
(Commissioned)

GLB-6

Mashal
3rd m.stone

Astaga
2nd m.stone

8

GLB-7

GLB-8

Khajuri
All 3 m.s

D.Tegnoor
3 rd m. stone

A
1.40

SP- 1
RM-T
A
1.20 1.10
OHT1-

Yes
No

A
2.6

OHT2- Completed
Sump- Nil
CPNil
DMT
A
2.04
2.00

Yes

No

Yes

Sump- Nil
CPNil
DMT
2.68

No

A
2.70
Yes

A
2.00

OHT2- Completed
Sump- Roof slab in progn ss
CP2
DMT
A
6.47
6.30

Yes

A
5.50

OHT2- Side wall in Sump- Nil
progress.
CPNil
DMT
A
3.07
2.70

Yes

SP- Nil
RM-T
A
6.35 Nil

OHT2- Completed
Sump- Side wall in
CP- Nil
progress
DMT
A
8.60
8.00

OHT1 -

SP- 1
RM-T
4.26
7

Hydraulic
testing of
pipes laid
done.

Existing GLSR

SP- 5
RM-T
2.82

GLB-6

Yes

OHT2- Completed.
Sump- Nil
CPNil
DMT
A
7.02
7.0

Sump- Nil
CPNil
A
DMT
1.20
2.65

OHT1 -

SP- 2
RM-T
1.36
6

Hydraulic
testing of
pipes lard

Existing GLSR

SP- Nil
RM-T
2.25
GLB-5

A
5.90

Whether spurce
established
Yes / No

OHT1 -

OHT1 -

OHT2- Completed
Sump- Nil
SP- 2
CPNil
RM- T
A
DMT
A
1.29 0.50
3.30
2.00

-

No

Hydraulic
test condu
-cted for the
pipes laid.

- do -

Yes

Hydraulic
testing of
pipes laid
done.

FORMAT - 5

VILLAGEWISE PHYSICAL PROGRESS FOR DECEMBER 1999
DISTRICT : GULBARGA.
SI. Package
No.
No.

Village
Name

GLB-8

Nalwar main
1sl m.stone

Status

Nalwar hamlet
2nd m. stone

GLB-9

Kukunoor
2nd m.stone

Yelwar
1“ m.stone

Halgadla
3rd m.stone

Yes

A
1.70

OHT2- OHT Completed
Sump- Nil
CPNil
DMT
A
3.96
4.20
OHT2SumpCPDM-

Yes

A
2.00

OHT1 -

SP- 2
RM-T
7.67
GLB-9

Hydraulic
testing of
pipes laid
done.

OHT1 -

SP- 2
RM-T
2.19
GLB-9

Yes

A
5.70

OHT2- OHT Completed
Sump- Completed
CP2
DMT
A
8.85
8.00

OHT1 -

SP- 2
RM-T
0.975
9

Hydraulic
testing of
pipes laid

OHT1 -

SP- 4
RM-T
5.80
GLB-8

Whether source
established
Yes / No

A
7.50

OHT1SP- Nil
RM-T
A
1.70 1.20

10

GLB-10

GLB-10

Nimbal
I” m.stone

GLSR-Completed

(Commissioned)

SP- 5
RM-T
3.67

Kadganchi
3rd m.stone

GLB-10

Madaki
2nd m.stone

Yes
- do -

OHT2-Sidewall in progres;
Sump- Nil
Nil
CPDMT
A
1.43
1.50

No
. - do -

Yes

A
3.50

Yes

A
Nil

OHT2- Completed.
Sump- Nil
CPNil
DMT
A
4.60
3.60
OHT2- OHT completed.
Sump- Nil
CPNil
DMT
A
4.05
4.00

Yes

OHT1 SP- 2
RM-T
3.46

OHT2- Completed
Sump- Nil
Nil
CPDMT
A
3.20
3.00

- do --

Sump- Nil
CPNil
DMT
4.07

OHT1 -

SP- 6
RM-T
2.60

Top dome in
Nil
progress
Nil
T
A
1.87
1.40

-- do -

A

3.40

- do -

A
4.30

— do -

- do -

FORMAT - 5
VILLAGEWISE PHYSICAL PROGRESS FOR DECEMBER 1999
DISTRICT: GULBARGA.

SI. Package
No.
No.

Village
Name

Status

11' GLB-11

Ainapur
3 rd m.stone

GLSR- Roof slab in progress.
SumpSP- 2
CP2
RM-T
A
DMT
3.46
3.60
5.82

GLB-11

Nagaidalai
2nd m. stone

OHT1 -

Rudranoor
3rd m.stone

Yes

2.10

Yes

A
0.80

OHT2-Staging in progres;
Sump- Nil
CPNil
DMT
A
1.50
1.55

Yes

A
3.3

OHT2- Completed.
Sump- Nil
Nil
CPDMT
A
4.17
4.00

Yes

SP- 2
RM-T
A
3.21 0.20

OHT2- Completed
Sump- Nil
Nil
CPDMT
A
3.17
2.00

A

0HT1 -

SP- 1
RM-T
0.72
GLB-11

Chimmaidalai
I’1 m. stone

OHT1 -

SP- 2
RM-T
3.34
12

GLB-12

GLB-12

GLB-12

13 GLB-13

Balwandagi
3rd m.stone

Jeeratagi
2nd m.stone

Ankalga
1st m.stone

Ravoor
1” & 2nd m.s

A
3.50

OHT1-

OHT-PCC laid OHT2land under dispute. Sump- Nil
SP- 1
Nil
CPRM-T
A
DMT
4.84
4.0
3.72
OHT1-foundation OHT2excavation done Sump- Nil
SP- 1
CPNil
RM-T
T
A
DM0.270 Nil
3.91

OHT1 i

SP- Nil
RM-T
1.54

A
1.00

— do -

- do -

- do -

No

Yes

A
3.50

Hydraulic
testing of
pipes laid
done

Yes
No

A
3.20

OHT2- Top dome in
Sump- Nil
progress.
CPNil
DMT
A
2.20
6.40

- /irr -

Hydraulic
testing of
pipes laid

Hydraulic
Partly cstablishcc testing of
pipes laid
done.

OHT2- Completed
Sump- Nil
progress.
Nil
CPT
A
DM1.86
1.80

SP- 2
RM-T
2.19
GLB-11

Whether source
established
Yes / No

No

Hydraulic
testing of
pipes laid
done.

FORMAT - 5
V1LLAGEWISE PHYSICAL PROGRESS FOR DECEMBER 1999
DISTRICT : GULBARGA.

SI.

No.

Package
No.

Village
Name

GLB-13

Bhimanhalli
3 rd m. stone

Status

OHT1-

SP- 1
RM-T
5.45
14

GLB-14

Killankera
2nd m.stone

(Commissioned)
GLB-14

Kotagera
1st m. stone

Balched
3rd m.stone
2.00

GLB-14

Kudlur
3rd m.stone
0.30

15

GLB-15

GLB-15

2.0

Nil

Hagargundagi
3rd m.stone

B.Tegnoor1st m.stone

SP- 1
RM-T
1.54
OHT1 -

No

- do -

Yes

1.50

Yes

SP- 2
RM- T
A
2.00 2.00

OHT2- Completed.
Sump- Nil
CPNil
DMT
A
2.75
2.50

A

OHT1 -

Hydraulic
testing of
pipes laid

Hydraulic
Partly establishec testing of
pipes laid
done.

OHT2- Completed.
Sump- Nil
CPNil
DMT
A
3.86
3.20

- do -

— do —

OHT1-PCC laid OHT2- Staging in
Yes
Sump- Nil
progress
SP- Nil
CPNil
Flushed yiled &
RM-T
A
DMT
A
water test not
0.30
Nil
1.81
1.10
received.

- do -

OHT-Foundation OHT2- Staging in
excavation done Sump- Nil
progress
SP- Nil
CPNil
RM-T
A
DMT
A
2.93 2.90 .
3.35
3.40

Yes
- do -

OHT1-

Yes

A
0.50

OHT2- Completed.
Sump- Nil
CPNil
DMT
A
. 2.295 2.00

Yes

A
0.60

OHT2- Completed.
Sump- Nil
CPNil
DMT
A
1.71
1.90

SP- 1
RM-T
0.165
GLB-15

A
1.00

OHT2- Completed
Sump- Nil
CPNil
DMT
A
2.26
2.20

OHT1 -

SP- 1
RM-T
1.75

GLB-14

A
4.00

OHT2- Bottom slab in
Sump- Nil progress.
CPNil
DMT
A
4.76
4.00

Whether source
established
Yes / No

Melkunda
2nd m.stone

OHT1 -

(Commissioned)

SP- 1
RM-T
0.285

- do -

- do -

FORMAT - 5
VILLAGEWISE PHYSICAL PROGRESS FOR DECEMBER 1999
DISTRICT : GULBARGA.

SI. Package
No.
No.

GLB-15

Mudbule
2 nd m.stone

OHT1-

SP- 1
RM-T
0.60
16

GLB-16

GLB-16

Devatkal
3rd m.stone

Devapur
2nd m.stone

Arkera
1” m.stone

(Commissioned)
17

OHT1 -

SP- 2
RM-T
0.43

A
1.00

OHT2- Completed
Sump- Nil
Nil
CPA
T
A
DM4.37
0.70
4.60

Yes

No

Kondagalli
2nd m.stone

OHTl-PCClaid OHT2-Completed.
Sump- Nil
Nil
SP- Nil
CPRM- T
A DMT
A
0.795
Nil
2.53
1.00

GLB-17

H.Allapur
I81 m. stone

OHT1-

Aurad
3rd m.stone

OHT1-

SP- Nil
RM-T
1.475

GLB-18

Padasawwali
I81 m. stone

A
5.80

A
Nil

OHT1 -

SP- 2
RM-T
2.10

■ A

2.00

Hydraulic
testing of
pipes laid
done.

- do --

Yes

A
3.00

Hydraulic
testing of
pipes laid

Yes

GLB-17

GLB-17

Yes

OHT2- Completed
Sump- Nil
Nil
CPT
A
DM7.285 6.00

OHT1 -

SP- Nil
RM-T
7.65

18

A
0.60

OHT2- Completed
Sump- Nil
Nil
CPDMT
A
3.15
2.90

GLSR- Masonry in progress.
Sump- Nil
Nil
SP- 2
CPT
RM-T
A
DM1.64
Nil
2.66

SP- 4
RM-T
2.90
GLB-16

Whether source
established
Yes / No

Status

Village
Name

OHT2- Completed
Sump- Nil
Nil
CPT
DMA
4.44
3.20

- do -

- do --

K.C-7 to be
flushed

OHT2- Completed.
Sump- Nil
Nil
CPDMT
A
2.50
2.50

Yes
Water test
awaited for
PBW-3.

OHT2- Completed.
Sump- Nil
Nil
CPDMT
A
3.20
3.63

Yes

Hydraulic
testing of
pipes laid
done

- do -

- do -

FORMAT - 5
VILLAGEWISE PHYSICAL PROGRESS FOR DECEMBER 1999
DISTRICT : GULBARGA.

SI. package
No.
No.

GLB-18

GLB-18

Village
Name

Status

Whether source
established
Yes / No

Hydraulic
testing of
pipes laid

Kolakunda
3 rd m.stone

GLSR- Completed.
Sump- Nil
SP- 2
CP1
RM-T
A
DMT
243
1.00
5.225

Yes

Hydraulic
testing of
pipes laid
done.

Raikod
2nd m.stone

OHT1-

SP- 1
RM-T
1.675
19

20

A
1.00

A
3.80

OHT2- Staging in progres 5
Sump- Nil
CPNil
DMT
A
2.07
2.50

Yes

-- do -

GLB-19

Rampurhalli

OHT1-Excavation OHT2- Staging in
in progress.
Sump-Nil
progress
SP-Nil
CPRM- T
A
DM- T
A
0.47
Nil
1.57
Nil

Yes

GLB-19

Honagunta

OHT1-Excavation OHT2in progress.
SumpSP- Nil
CPRM-T
A
DM- T
0.305 Nil
4.995

No

A
Nil

GLB-19

Jogur

OHT1-Excavation OHT2- Staging in
in progress
Sumpprogress
SP- Nil
CPRM-T
A
DM- T
A
0.720 Nil
2.805 Nil

GLB-20

Itga

OHT1-Excavation OHT2in progress.
SumpSP- Nil
CPRM-T
A
DM- T
0.180 Nil 2.815

GLB-20

K.Bhosaga*

OHT1-

SP- Nil
RM-T
6.76

GLB-20

Magangera

SP- Nil
RM-T
6.435

Partly established

A
Nil

A
5.0

OHT2- Completed
SumpCPDMT
A
3.115
1.00

A
5.90

OHT2-Completed
SumpCPDMT
A
3.60
1.00

OHT1 -

- /re­

Yes

Yes

Partly established

1

{

FORMAT - 5
VILLAGEWISE PHYSICAL PROGRESS FOR DECEMBER 1999
DISTRICT : GULBARGA.

Si. Package
No. \ No.

21

Village
Name

Status

Hydraulic
testing of
pipes laid

Hydraulic
testing of
pipes laid
done.

GLB-21

Chichansoor
2 nd m.stone

GLSR- Completed.
Sump- Completed.
SP- 4
2
CPRM-T
A
DMT
A
2.13 2.00
5.87
5.00

Yes

GLB-21

Sawaleshwar
1” m.stone

OHT1-

Yes

A
0.90

OHT2- OHT completed.
Sump- Nil
CPNil
DMT
A
2.65
2.60

OHTl-Raft
in progress.
SP- 2
RM-T
A
1.72
1.00

OHT2- Bottom slab in
Sumpprogress
CPDMT
A
4.32
1.9

Yes

OHT1 -

OHT2-Top dome in prog
Sump- Nil
-ress.
Nil
CPDMT
A
3.925 1.00

Yes

OHT2- Completed.
Sump- Nil
Nil
CPDMT
A
1.00
2.55

Yes

OHT2- Staging in progresp
SumpCPDMA
T
2.175 Nil

Yes

SP- 1
RM-T
1.00
GLB-21

22

Whether source
established
Yes / No

GLB-22

Polakpalli
3 rd m.stone

Hirolli

SP- Nil
RM-T
1.915
GLB-22

Buragapalli

A
1.50

OHT1SP- Nil
RM-T
A
2.28
2.00

GLB-22

Chintakunta

OHT1-

SP- Nil
RM-T
1.110
GLB-22

Cliintapalli

A
1

OHT1-Excavation OHT2in progress
SumpSP- Nil
CPRM-T
DM- T
. A
0.635
Nil
1.90

-

- do -

- do -

No

A
Nil

FORMAT - 5
VILLAGEWISE PHYSICAL PROGRESS FOR DECEMBER 1999
DISTRICT : GULBARGA.

SI. Package
No.
No.

23

GLB-23

Village
Name

Kalgurthi

Status

OHT1-

SP- Nil
RM-T
1.44
GLB-23

Salahalli

GLB-23

Bagodi

Yes

A
Nil

OHT2- Bottom slab in
Sump- Nil ]progress.
CPNil
DMT
A
3.595 Nil

No

A
Nil

OHT2-Staging completed.
Sump- Nil
CPNil
DMT
A
2.665 Nil
OHT2Sump- Nil
CPNil
DMT
12.375

Yes

0HT1SP- Nil
RM-T
2.34

Whether source
established
Yes / No

OHT1-

SP- Nil
RM- T
A
4.795 Nil

Hydraulic
testing of
pipes laid

A
Nil

( Er. J.D.Boli)
DM, ICT Pvt Ltd
Gulbarga.

FORMAT -6
PHYSICAL PROGRESS OF REMAINING WATER SUPPLY COMPONENTS
Phase -II Gulbarga District

For the month of December 99

\S1

Package
No.
No.

1 GLB-1
2 ' GLB-2
3 ' GLB-3
4 GLB-4
5 GLB-5
6 GLB-6
7 GLB-7
8 GLB-8
9 GLB-9
10 GLB-10
11 GLB-11
12 GLB-12
13 GLB-13
14 GLB-14
15 GLB-15
16 GLB-16
17 GLB-17
18 GLB-18
19 GLB-19
20 GLB-20
21 GLB-21
22 GLB-22
23 GLB-23

HP
T

WATER SUPPLY COMPONENTS ( TARGET)
ST_
CS
DB
CT
WP
A
T
A
T
A
T
A
T
T
A
A

36
24
31
48
26
45
24
68
33
44
26
12
53
24
31
27
17
16
39
19
09
26
26

14

16
10
08
10
08
/

50
07
30

15

18
13
08
06
06

26
24
23
20
26
32
13
27
13
10
21
14
30
17
17
17
12
19
21
12
17
18
14

20
08
12
06
16
08
10
15
06
04
10

12
08
04
06
04

13
12
12
12
08
14
06
14
07
08
10
07
13
10
09
09
07
12
09
07
08
14
07

08
06
06
02
06
04
04
04
04
02
06

06
04
04
04
02

75
71
73
76
45
56
40
84
41
64
64
43
87
61
51
56
41
60
58
28
58
64
43

34
30
40
10
30
20
20
60
20
40
40

40
20
30
40
10

(Er. J.D.Boli)
DM , ICT Pvt Ltd
Gulbarga.

t

- /6/-

Remarks

All works
proposed
under 3rd
mile stone.

INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD
KIRWS & ESP PHASE-II PACKAGE
(WORLD BANK ASSISTANCE )

Month : December 1999
District: Gulbarga
1.
SI
No.

1

2

11/98
11/98
11/98
11/98

GLB-1

11/98

GLB-3

11/98
11/98
11/98

I
1

Date of Package
testing
No.

Name of
village

RM in
Km__
T
A

Hydraulic testing of PVC pipes.

DM in
Km
V A
6.0
5.0
3.2
2.5
1.5
1.6
3.7
2

1) S.Saradagi
2) Kumsi 1.
3) Dasatapur
4) Arunkal

0.92
1.4

1.2
0.9
1.0

1) Gundhalli main
Gundhalli tanda
2) Mudbole
3) Kakkasagera
4) Mudnoor.K

0.2
3.5
2.5
2.2
1.53

0.2
2.5
2.8
2.2
0.9

2.5
2.4
6.7
3.3
6

3.0
5

1.3
1.2

0.6

Components tested ■
OHT
Inlet
Outlet
~T
A
T
A

Chainages

OK/
not OK ©
O.K

1

1

1

1

1.57
2.4

O.K
O.K

O.K
O.K
O.K
O.K
O.K

6.0

3

1/99

GLB-4

1) Keriambalga
2) Teerth

4.2
0.62

4.0

2.0
2.2

1.5
1.60

4

11/98
8/99

GLB-5

1) Rajankollur
2) Bapparga
3) Gundalgera

5.9
1.4
2.25

5.27
0.86

7
2.1
2.65

5.3
2.0

OK
O.K
O.K

5

3/99

GLB-7

1) Khajuri

6.3

8.7

6.0

O.K

6

12/98

v GLB-8

1) Nalwar
2) D.Tegnoor

6.8

12.9
3.3

8.5
0.6

1).K

1) Yelwar
2) Kuknoor
3) Halagadla

8.0
2.2

GLB-10 1) Nimbal
2) Madaki
3) Kadganchi

7

8

11/98

11/98

GLB-^

4.2

1.3

7.5
2.0

1,7

3.2
2.0
1.5

1.45

3.7

4

3.5

2.6

4.6

1

1

1

1

O.K
O.K

O.K

3.0

O.K
O.K
O.K
2

2

1

1

O.K

Remarks

1.

SI
No.

Name of
village

Components tested

RM in
Km
T
A

DM in
Km
T
A

OHT
Inlet
T

Outlet
T
A

A

Chainages

OK/
not OK ©

9

11/98
11/98
11/98

GLB-11

1) Nagaidalai
2) Chimmaidalai
3) Ainapur

2.2
3.4
3.5

2.14
3.3
3.5

1.8
4.2
5.8

1.6
3.7
3.5

O.K
O.K
O.K

10

11/9^
& 12/98

GLB-12

1) Jeeratagi
2) Ankalga
3) Balwandagi

4.8
0.3
3.2

4

3.7
3.9
3.2

3.5
1.0

O.K
O.K

11

12/98

GLB-13

1) Ravoor
2) Bhimanhalli

TF

6.4
4.8

1.4
3.0

O.K
O.K

1) Kudlur
2) Kotagera
3) Balched
4) Killankera
1) Hagargundagi
2) B.Tegnoor
3) Melkunda
4) Mudbule

oT

TF

1.7
2
1.5
2.9
0.2
0.6
0.6

0.60

3.9
2.8
2.3
3.4
2.3
1.7
3.2

0.9
2.0
1.5
1.0
3.4
2.0
1.5
2.9

O.K
O.K
O.K
O.K
O.K
O.K
O.K
O.K

12

£

Date of Package
testing
No.

Month : December 1999

Hydraulic testing of PVC pipes.

13

11/98

12/98

GLB-14

GLB-15

i

5.4

4.0
0.8
2.0
0.8
2.9

1
1

1
1

1
1

1
1

1

1

1

1

1

1

1

1

14

3/99

GLB-16

1) Arkera
2) Devapur

0.43
2.9

0.60
2.5

4.4
7.3

4.2
5.5

15

11/98

GLB-17

1) H.Allapur
2) Aurad

7.6

5.5

4.4
2.8

3.2
2,5

O.K
O.K

16

2/99
GLB-18
27/7/99
26/7/99
8/99
GLB-21

1) Raikod
2) Padasawali
3) Kolkunda
1) Chichansoor
2) Savaleshwar
3) Polakpalli
1) Ranjole
2) Dugnoor
1) Mashal
2) Badadal

1.6
2.5
2.43
2.1
1.0
1,7
2.85
0.6
2.82
1.20

1.0
2.0
1.0
2.0
0.9
1.0
1.9
0.5
2.0
1.0

2.0
3.6
5.2
5.8
2.6
4.3
3.1
2.2
6.47
268

1.5
2.5
2,8
5.0
2.0
1.9
3.4
2,0
6.3
2.70

O.K
O.K
O.K
O.K
O.K
O.K
O.K
O.K
O.K
O.K

17

18
19

17/9/99 GLB-2
18/9/99
1/10/99 to GLB-6
3/10/99
5/10 to 6/10/99

1

1

1

1

Remarks

O.K
O.K

------------ (^^7^

, MgrjCT.Guibarga-Z

INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD
KIRWS & ESP PHASE-H PACKAGE
(WORLD BANK ASSISTANCE )

3.

Statement of Bottlenecks.
Month : December 1999
District: Gulbarga

SI.
No.

Name of
package /
village

1

GLB-1
1) S.Saradagi
2) Kumsi
3) Dasatapur
4) Arunkal

2

is
o
I

3

4

5

No of villages
flushing to be
done

No. of villages
New borewells
to be drilled

SBC
results
awaited

Sump sites
to be
handed
over

GLSR sites
to be handed
over

Awaiting
Energisation
for
commissioned

Pressure
testing
(RM + DM)
T
A

Hydraulic test
conducted for the
laid PVC pies vide
format No 1.

Nil

-do -

GLB-3
1) Kakkasgera
2) Gundhalli main
Gundhalli tanda
3) Mudbole
4) Mudnoor K

Nil

Hydraulic test
conducted for the
laid PVC pies vide
format No 1

t

GLB-4
1) Teerth
2) Keriambalga
3) Tadakal

3) Gundalgera

OHT sites
under
disputes

Nil

GLB-2
1) Rajole
2) Dugnoor
3) Kallor road
4) Degalmadi

GLB-5
1) Rajankollur
2) Bapparaga

No. of open
wells Shallow
borewells to
be drilled

Nil
Tadakal

- do -

Nil

Redrilling to be
done for PBW-2

- do -

3.

SI.
No.

6

7

Name of
package /
village

GLB-6
1) Badadal
2) Mashal
3) Astaga

No of villages! No. of villages
flushing
~ to *beJ J New borewells
done
to be drilled

Statement of Bottlenecks.
Month : December 1999
District: Gulbarga

No. of open
wells Shallow
borewells to
be drilled

Nil

GLB-7
1) Khajuri

OHT sites
under
disputes

SBC
results
awaited

Sump sites
to be
handed
over

GLSR sites
to be handed
over

Awaiting
Energisation
for
commissioned

Pressure
testing
( RM + DM )
T
A

Hydraulic test
conducted for the
laid PVC pipes
vide fonnat No 1.

— do —
8

I
9
I

10

11

GLB-8
1) D.Tegnoor
2) Nalwar main
Nalwar tanda

Nil

GLB-9
1) Kuknoor
2) Yelwar
3) Halgadla

Nil

GLB-10
1) Nimbal
2) Kadaganchi
3) Madaki

GLB-11
1) Ainapur
2) Nagaidalai
3) Rudranoor
4) Chimmaidalai

- do -

Halgadla (1)

- do --

Nil

- do Nil
— do -

3.

Statement of Bottlenecks.
Month : December 1999
District: Gulbarga

SI.
No.

Name of
package /
village

12

GLB-12
1) Balwandagi
2) Jeeratagi
3) Ankalga

13

14

GLB-13
1) Ravoor
2) Bhimanhalli

GLB-14
1) Killankera
2) Kotagera
3) Balched

No of villages
flushing to be
done

No. of villages
New borewells
to be drilled

No. of open
wells Shallow
borewells to
be drilled

OHT sites
under
disputes

SBC
results
awaited

Sump sites
to be
handed
over

GLSR sites
to be handed
over

Awaiting
Energisation
for
commissioned

Pressure
testing
(RM + DM )
T
A

Hydraulic test
conducted for the
laid PVC pipes
vide format No 1.

Nil
Jeeratagi
Ankalga

-- do -

Bhimanhalli

Bhimanhalli
Nil
- do -

4) Kudlur
th
i

15

16

17

GLB-15
1) Hagargundugi
2) B.Tegnoor
3) Melkunda
4) Mudbule
GLB-16
1) Devatkal
2) Devapur
3) Arkera
GLB-17
1) Kondagalli
2) H.Allapur
3) Aurad

Nil
-- do -

Nil
-- do --

Nil
- do -

3.

Statement of Bottlenecks.

Month : December 1999
District: Gulbarga

SI.
No.

Name of
package /
village

18

GLB-18
1) Padasawali
2) Kolkunda
3) Raikod

19

20

21

I
Ox

22

23

GLB-19
1) Rampurhalli
2) Hunagunta
3) Jogur
GLB-20
1) Itga
2) K.Bhosaga
3) Magangera

GLB-21
1) Chichansoor
2) Savaleshwar
3) Polakpalli

GLB-22
1) Hirolli
2) Burgapalli
3) Chintkunta
4) Chintpalli
GLB-23
1) Kalgurthi
2) Salalialli
3) Bagodi

No of villages
flushing to be
done

No. of villages
New borewells
to be drilled

No. of open
wells Shallow
borewells to
be drilled
Nil

OHT sites
under
disputes

SBC
results
awaited

Sump sites
to be
handed
over

GLSR sites
to be handed
over

Awaiting
Energisation
for
commissioned

Pressure
testing
( RM + DM )
T
A

Hydraulic test
conducted for the
laid PVC pipes
vide format No 1.

Hungunta

Nil

Nil

Hydraulic test
conducted for the
laid PVC pipes
vide format No 1.

Nil

Nil

DM, ICT Pvt Ltd Gulbarga.

INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD
KIRWS & ESP PHASE-H PACKAGE
( WORLD BANK ASSISTANCE )

Month : December 1999
District: Gulbarga

4.

SI Package No. of
villages
No. No.

Name of
contractor

List of works , the Agency is unlikely to achieve the mile stone targets.

Contract
value

Date
of
start

End of
Mile stone
I / II / III

Name of
scheme /
villages

Financial cummulative
for Mile stone I / II / III
T
A
Shortfall %

Status of
works

No Such Agencies are at pn sent.

1
<r*

00

1

DM, ICT Pvt Ltd
Gulbarga.

Remraks

INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD
KIRWS & ESP PHASE D PACKAGE
(WORLD BANK ASSISTANCE )

5. List of Agencies on whom penal action has been recommended.
Month : December 1999
District: Gulbarga
SI Package No.of
No No.
villa
-ages

Name of
contractor

Contract Date
value
of
Rs. in start
lakhs

End of
Mile stone
I / II / III

Name of
scheme /
villages

Financial cummulative in
lakhs for Milestone I/II/III
T
A
Short
fall %

1 GLB-2

4

M/s Coramandal
Prestcrete(pvt)
Ltd. Hyderabad

53.00

7/4/98 I- 7/10/98 1) Ranjole
I- 11
II- 7/4/99 2) Dugnoor
II- 32
III- 7/10/99 3) Kallur rd III- 53
4) Degalmadi

7.4
16.2
35.9

2 GLB-3

4

Sri H.A.Phulse
Pwd class I cont
Bidar.

88.00

4/4/98 I- 4/10/98 1) Kakkasgan I- 17
II- 4/4/99 2) Gundahalli II- 53
III- 4/10/99 main & tanda III- 88
3) Mudbule
4) Mudnoor k

39.6
54.9
69.0

21.59%

10.6
I- 13
36.6
II- 40
III- 68.4 54.0

18%
7.6 %
21%

J

£
i

3 GLB-6

3

Sri S.V.Guttedar 68.4
Gulbarga.

11/4/98 I- 11/10/98 1) Badadal
II- 11/4/99 2) Astaga
III- 11/10/9^ 3) Mashal

32.72%
49.37%
32.26%

Status of
works

Details of
penal action

Remarks

In three (3)villages work is The contractor has been Fine not
completed in all respects. In informed to leavy the L.D recovered
another one (l)village work in T.OfflettNo. DM/ICT so far.
is nearing completion. One /GLB/2849-52 dt 23-9-99
village is commissioned.
till commissioning of all
One village will be commis villages & again infomred
-sioned during Nov 99 and inT.OfflettNo. DM/ICT/
balance one village will be GLB/2987-89 dt 27-10-99.
commissioned during Dec 99

OHT, RM & DM completed The contractor has been Fine not
in 3 villages, one village is
informed to leavy the L.D recovered
commissioned. Another two inT.OfflettNo. DM/1CT so far.
villages are yet to be comm /GLB/2843-46 dt 23-9-99
-issioned. In Mudnoor village from 4-10-99 to till comm
OHT just started. RM & DM -ssioning of all villages.
X
completed except in rocky
out crop area.

Lumpsump
Out of three villages one is L.D of Rs. 5000/- is
fine of Rs
commissioned. RM & DM recovered in the R.A
5000/bill
submitted
during
Oct
except in rocky out crop &
recovered.
OHT in Mashal village is 1999.
completed. RM and DM in
Astga village completed &
sidewall of OHT in progress

Continued.

5. List of Agencies on whom penal action has been recommended.
Month : December 1999
District: Gulbarga
SI Package No.of
villa
No No.

Name of
contractor

-ages

4 GLB-11

4

G.S.Kuberrappa
Pwd class I cont
Shahapur.

Contract Date
of
value
Rs. in start
lakhs

End of
Mile stone
I / II / HI

Name of
scheme/
villages

107.00 10/4/981- 10/10/98 1)Rudranoor
n- 10/04/9* 2) Ainapur

Financial cummulative in
lakhs for Milestone I/II/III
T
A
Short
fall %
I- 22
II- 64

46
68
in-10/10/9< 3)Chimmaid|im-107 90.5

4)Nagaidalai

15.42%

Status of
works

Details of
penal action

(
Remarksss

RM & DM in all the villages The contractor has been Fine not
are completed. OHT in Chim informed to leavy the L.D recovered
-mmidalai & Nagaidalai
in T.OfflettNo. DM/ICT so for.
completed.OHT in Rudranoor / GLB / 2930-2932 dated
is nearing completion.
13-10-99, from 10-10-99
GLSRat Ainapur is nearing till commissiong of
completion.The Chimmidalai scheme.
village will be commissioned
by the end of 1999.

I


(Er. J.D.Boli)
DM, ICT Pvt Ltd
Gulbarga.

INTEGRATED RURAL WATER SUPPLY AND
ENVIRONMENTAL SANITATION PROJECT
KARNATAKA
(World Bank Assistance)

Phase II

Package

II

Villages

PROGRESS REPORT
of Raichur District
For the Month of DECEMBER 1999

INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT LTD NEW DELHI
CONSULTANTS FOR CONSTRUCTION MANAGEMENT AND QUALITY CONTROL

FORMAT-3

F1NANCIAL & PHYSICAL PROGRESS PACKAGE WISE
NAME OF THE DISTRICT : RAICHUR.
si
No

1

Pack
age
No

2

Numb
er of
Villag
es in
packa
ge/pro
gress

3

1
1

5/5

I
2

2

4/4

I

3

3

5/2

Name of
contract
or

4

N. S.
Prakas
-4i

N.S.
Prakas
h

M/s
Malu
Constr

Peri
od
of
com
pleti
on
in
mon
ths
5

18

18

18

actions

4

4

4/4

K.L.A.
C.

18

Contra
ct
values
in Rs
lakhs

Date of
Start

Mi lest
one

For the month of Dec’99
Financial progress
cumulative during
the month in Rs.
lakhs

T

6

78.93

7

23.1.9
8

A

T

A

CP in
Nos.
T
/A

12

13

SP in Nos.

8

9

10

11

I

24

24

3

II

56
78.9
3

56
171.1/
15.97

I

25

II

14

OHT

109.2
6

64.48

5.12.9
8

22.5.9
8

17

18

19

20

21

3.87

3.87

5

5

1

1c

5.64
24.2
2

9

9
18.3
5

2

2c

Nil

2

5

5c

Nil

5

Nil

1

Nil

2

Nil

4

2

7.31

25

5

5

2

2

4.5

4.5

4

4

1

1c

1/-

59

59

7

7

2

2

7

7

10

10

2

2c

1/-

III

83.6

103.8/
9.78

10

11

4

4

10.3

17.8
7

16.2

16.6

4

4c

2/-

I

33

5

5

3

2

2

II

76

8

8

4

9.2

6

3

1

2c
2c+
2 up
2c+
4up
1 c
2c +
lup
' 2c +

45

III

64.4
8

1

16

2

II

1

15

10

13.37
13.37/
Nil

-/-

A

11

I

25

T

5.64

109.
26
19

24

A

2

III

23

T

2

33
70.83/
10.45

22

A

6

8

Rem
arks

T

15

17.2.9
83.60

No.
of
sche
mes
prop
osed

SUMP/
GLSR_
T
A

DM

RM

3
P
6p

III

No
of
sche
mes
com
miss
tone
d

Physical progress (cumulative)

2

4

4

12

12

2

4

4

18

16

6

2

2

0.87

0.87

11.1
0
3

6

6

2.51

2.51

7

7

3

8

8

4.71

4

9.52

9.51

4

1c
/1c
/1c

+
lu
p/-

1
3

5

-/-

Nil

1

Nil

3

Nil

4

1

i

2

3

4

5

6

7

8

9

10

11

12

13

I

36

.36

7

7

2

I

5

6

5

6

5/5

5/5

N.S.
Prakas
h

Amara
gundap
pa A
Meti

18

18

121.4
6

7

7

5/4

M/s
Coram
andal

88.13

S. M.

P

8

9

10

8

9

10

4/4

2/2

16/1
6

Amark
bed

K.
R^mak
rishna

M/s
Main
Constr
actions

18

18

18

139.1
9

61.28

579.0
7

25.2.98

27.10.9
8

7

5

3

3c

1/-

23.
84

27.1
0

5

5c

3/-

5

7

.7 :

1

1 c

9

11

11

3

3c

2

15.7
9
2

14.
6
3

14.5
2
3

6/74

6.74

5

5

9.31
8

12

155.46/
12.64

12

15

6

6

12.2

I

32

32

4

80.89/
Nil
26

97
26

8

8
P

2

2

9

13

14

2

2

11

2

2

II

62

62

III

88.1
3

72.16/
16.37

13

42

42

6

8

8

2

10

4

6

2

2p

1

1 up

5

Nil

1

1/-

Ip
/-

Nil

3

1/-

Ip
/-

Nil

5

Nil

1

I

1

Nil

2

Nil

1

1/
1

1c
/I
c
1c
/2
c
1c
/2
c

27.9
4

2

2up

1/
2

2

3

3

5

5

1

1c

4

6:

6
10.2

13

2

2c

-/-

Nil

2

7

13
17.
18

18.8
7

2

2c

-/-

Nil

2

17

17

13

13

6

6 up

Nil

6

39

39

30

30

13

Nil

13

Nil

19

2p

I

18

42
61.2
8

18
42
56.08/

2

II

4
4

4

111

18

Nil

30.
4

2

451.23/
Nil

18

1 up

3

18.2
6

10

579.
07

12

4c+

Nil

65

122.84/
10.17

5.12.98

5

1

16.3

139.
19

405

14.2
3

1

1/
2

III

405

14.
22

1/-

1c
/1c
/-

5

1 up

2p

II

10.5
6

Nil

-/1/-

3

1

2

174

3

Nil

23

9

174

8.1

1c
/3c
/-

1

23

97

I

8.1

24

14

97

Nil

1

3c+
2 up
1c
~3c~

23

15

II

III

5

22

Nil

14

III

105.

21

14

121.
46

74

20
1 c

2

74

19
1

2

4

18

8

8

I

I

11.1
6
16.6

17
8.0

10

II

1.3.98

10

84

HI

18

10.0

84

18.2.98

16

2

II

I

7

15

11.1
6

17.2.98

105.8

14 |

2

10
18

9.59

55.4
0

44.
3

42.5
5

19

13

up
15
up

1/
1
2/
1
2/
1

25

1

11

12

2

11

12

3

5/5

3/3

4

Amar
gunda
ppa
A.
Meti

S. M.
Amar
khed

5

18

18

6

96.18

141.7
6

1

14

15

15

Praia
13

14

15
Ko
ppa
1
15
Rai
chu
r

5/5

2/2

1/1

2/2

TOTAL for
Package RCR 15
3/3

P
reddy
K.
Rama
krishn
a

M.
Mahu
r
M.
Mahu
r

18

18

75.42

63.84

23.23

18

19

20

21

6

6

8

8

I

1 c

1/-

7

7

12

12

3

3c

1/-

9.05

21.3
4

17.3
2

18.1
8

3

3c

1/
2

2p

4

4

14

14

1

1 c

2

2p

9

9

21

21

3

3c

2

2p

12.7
7
_3_
8

14.7
0
3
8

9

10.7
4

10.7
4

19

2

3

37/Nil

10

2

8

10

2

4

10.2
6
2.90
2.90

2.90
2.90

4

2.90

8.7

11

12

I

29

29

6

6P

II

67

63.96

8

III

96.18

101.26/
Nil

12

I

43

43

2

2

II

99

99

9

9

11

141.7
6
23
53

114.34/
Nil
23
53

III

75.42

60.47/
8.21

I

19

II

43

III

63.84

£

16
38

£

II

16
38

4

8.4.98

III

54.2

46.58/
4.58

4

7

7

8.4.98

I
II
III

16
23.23

16
26.94/N
il
23
73.52/"

3.3.98

25.2.9
8

17.10.
98

27.10.
98

18

77.48

17

10

54.2

18

16

9

III

£
13

15

8

7

I
II

2_1

III

77.43

54

8.4.98

' ml

13

14

2

2

11

2
6

22
1c
-/2
L1P
/I
c
+1
up

23

24

Nil

I

Nil

3

Nil

5

Nil
1/-

1c
/-

Nil
Nil

25

1

3

32.8
6
5
11

6

6c

£

1 c
3c

Nil
Nil

£

16.1

16.1
4

5

4c+
lup

Nil

5

3

4

4

1

1c

1/-

Nil

1

4

10

10

2

2c

1/-

Nil

2

14

2

2c

1/-

Nil

2

13.8
13.8

11.9
6
13.3
13.3

£

1 c
2c

Nil
Nil

£

2

13.8

13.3

2

2c

xNil

2

30.3

5
11

3

1c
/1c
/1c
/-

6
3

2

Nil
Nil
Nil

£

2

1c
2c

13.8
16.3

I
3

1 c
3c

Nil
Nil

£

20.2
7

4

4c

Nil

4

2.0
3.73

2.5
4.1

2.5
7.58

£

5

2.0
2.90

6

2.90
4.90

2.9
4.90

13.8
16.3

9

5.80

12.5

17.9

2

3

-/-

2

3

1

16

2

16

3

3/3

4

K.L.A.
C.

5

18

6

60.47

7

27.5.9
8

M/s

17

17

1/1

Navara
ng
Raichu

12

16.79

15.6.9
8

8
I

9

10

Ts

u

Ts

4

II

42

6

Tn

604

~6

I

7
5

24.33
27.53/
Nil
5

n

12

in

16.7
9

12
16.87/

12

13

14

15

16

17

4.60

TV

2

6.5

4
8.7

y

6J

18
1.9
4

19

20
1 c

21
1/-

22

1

23
Nil

24
2

8.7

3

y

3c
3c

1ZTa

-/-

8.1

Nil
NiT

J

7

3

2

1

3.4

3.4

T6

1.6

1

1 c

2

Nil

1

1

3.4
3.4

3.4
3.4

1.6
1.6

1.6

1
1

-/-/-

Nil

4.1
2

1 c
1c

2

Nil

i

5

8

8

1

I c

TT

2

2c"

-/Ta

-/-

nil
Nil

1

11

I

25.
78
2.2

25.
78
2.2

4

1/-

-/-

Nil

4

1

2c+2
P
1c

Nil

1

6.4
6
6.4
6

6.4
6
6.3

1

1c

-/-

Nil

2

2

lc+
lp

-/-

Nil

2

2

Nil

r

18

1

C
i

i

I

1

19

18

19

3/3

2/-

Amara
gundap
pa
Meti

B.R.
Meti

12

12

161.4
1

34.93

16.12.

98

15.4.91
9

I1

48

IT

TH

III
I

161.
41
11

II

24

3

2

3.4

III

34.9
3

5

2

3.4

48
68.70/
5.48

8.85/
5.71

4

10

2

5
10

15

2

15.4

2

0.37

4

25

FORMAT-4
Name & Address of DM

District : RAICHUR

Sl.No.

1

2

3

Pack
age
No.

Tot

al
No.
of
Vill
age
s__
5

1

2

4

3

5

For the month of Dec*99.

Value
of work
in Rs. in
lakhs

78.93

83.60

109.26

I
1

4

5

6

7

4

4

5

5

5

6

7

5

I

Sri. V.G.Khened
Khened Complex.No. 11-13-77.Netaji Road
RAICHUR. Ph. No. (08532)41527 office
(08532)43889 Residence

64.48

121.45

105.97

88.12

Name & Address of
Contractor

N.S.Prakash
H.No.1-11-154/8
Venkatesh Nagar
Raichur
Ph:(08532)20979
N.S.Prakash
H.No.1-11-154/8
Venkatesh Nagar
Raichur
Ph: (08532)20979
M/s Malu
Constractions
Gulbarga
Deputy Director
Land Army
Corporation Ltd.
Raichur____________
N.S. Prakash
H.No.1-11-154/8
Venkatesh Nagar
Raichur
Ph:(08532)20979
Amaragundappa Meti
Nagarhal (Post)
Tq : Lingasugur
Dt: Raichur
Ph:No.(08537)57099 pp
M/s Coramandala Pvt.
Ltd.
HYDERABAD

Name & Address of
Assistance Engineer

Nandagiri.S.C.
C/o Mohammad Ali
Building Near
Mazoor Road

Date of
award

Date of
starting

Date of
completio
n

Financial Progress(cumulative) during the
month in Rs. Lakhs. currcnt
M2

Ml

M3

T

A

T

A

T

A

8.8.97

23.1.98

22.7.99

24

24

56

56

78.93

171.1/
15.97

30.8.97

17.2.98

16.8.99

25

25

59

59

83.60

103.8/
9.78

19.9.98

5.12.98

4.6.2000

76

70.83/
10.45

109.26

6.4.98

22.5.98

21.11.99

19

13.37
/Nil

45

23.9.97

17.2.98

16.8.99

36

36

84

18.2.98

17.8.99

32

32

28.2.98

27.8.99

26

26

MANVI

Ph: (08538)20267 pp
Ghokhale Gurupaddappa
Bannigol Automobiles
Mohan Complex NH 13
Road, KUSTAGI
Ph. No. 67276(08536)pp

Sri. Madhu
C/o B Veeranna
Advocate, Near Govt,
girls high school
Deodurg___________
Santosh Kumar Mishra
C/o R C K. Constraction
Near S.V.E.M. School
Bus Stand Road, Koppal
Ph: No. 30485(08534)
Devanna
Bannigol Automobiles
Mohan Complex NH 13
Road. KUSTAGI
Ph No 67276(08536)pp

Shankara Naik
C/o Pampal Bhimayya
Main Bazar
l.ingasugur
Santosh Kumar Mishra
C/o R C K. Constraction
Near S V E M School
Bus Stand Road, Koppal
Ph No 30485(08534)

16.12.9
7

33

33

64.48

13.37/Nil

84

121.46

155.46/
12.64

74

74

105.9

62

62

88.13

_____

80.89/
Nil

72.16/
16.37

SI.
No

8

9

10

11

Packag
e No.

8

9

10

11

Tot
al
No.
of
Vill
age
s__
4

2

16

5

Value
of work
in Rs. in
lakhs

Name & Address of
Contractor

139.19

S.M. Amarakhed
MIG 32, Rampur
Road Nijalingappa
Colony RAICHUR
Ph:
No.40981,23971
K. Ramakrishna

61.28

579.07

96.17

1
o
1

12

13
14

12

13
14

3

5
2

141.76

75.42
63.84

Name & Address of
.Assistance Engineer

Date of
award

Date of
starting

Date of
completion

Financial Progress(cumulative) during the month in
Rs. Lakhs.
currcn‘
Ml

M/s Malu
Constractions
Amaragundappa A
Meti
Nagarhal (Post)
Tq : Lingasugur
Dt: Raichur
Ph:No.(08537)5709
9 pp___________ _
S.M. Amarakhed
MIG 32, Rampur
Road Nijalingappa
Colony RAICHUR
Ph:
No.40981,23971
Pratap Reddy

K. Ramakrishna

N. Muniraj
H.No. 5-6-72
Saibhani Chowk
RAICHUR
Ph:No. 42412(08532)
;Sri Vidya Sagar
C/o Abdul Aziz
Anchi,
J.P. Nagar Karatagi.
Sri. Umaprasad
Sri. Umesh N.Bulla
Sri. Suresha

Shankar Nayak

Earanna
C/o Kalayan Mandap,
Herur Village
Gangavati
Ph:No. (08533)
72349,732266 ___
Sri. Sharanabasavaraj

Sri. Hamiduddin

6.1.98

25.2.98

27.10.98

21.9.98

13.1.98

27.11.9
7

M2

A

T-

24.8.99

42

42

97

26.4.2000

18

18

174

A

M3
T~

A

97

139.19

42

42

61.28

174

405

405

579.07

29

29

67

67

96.18

101.26/
Nil

43

43

99

141.76

114.34/
Nil

23

23

53

53

19

19

43

37/
Nil

122.84/
10.17

56.08/

Nil

5.12.98

3.2.98

25.2.98

17.10.98
27.10.98

2.9.99

24.8.99

99

75.42
63.84

451.23/
Nil

60.47/
8.21
37/Nil

1(

SI.
No

Packag
c No.

15
Raich
ur

15

16

15
Koppa
1

lot
al
No.
of
Vill
age
s__
2

1

Value
of work
in Rs. in
lakhs

Name & Address of
Contractor

Name &. Address oT
Assistance Engineer

23.23

Malleshappa S.
Mahar
Lal Bahadur Shastri
Nagar Jewargi
Road
Gulbarga-585102
Malleshappa S.
Mahur
Lalbahadur Shastri
Nagar Jawargi
Road
Gulbarga-585102

Earanna
C/o Kalayan Mandap.
Herur Village
Gangavati '
Ph:No. (08533)
72349,732266
Earanna
C/o Kalayan Mandap,
Herur Village
Gangavati

54.19

Total

3

77.42

16

3

60.46

Deputy Director
Land Army
Corporation Ltd.
Raichur

J

17

17

1

16.79

18

18

3

161.41

19

19

2

34.93

M/s Navarang
Construction
Company Raichur

Amaragundappa
Meli ___
B.R. Meti

N. Muniraj
H.No. 5-6-72
Sheti Bowdi Chowk
Raichur
Ph:No. (08532)
42412____________
Nandagiri S.C.
C/o Mohammed Ali
Building Near IB,
Mastoor Road
Manvi
Ph:No. (08538)
20267 pp_______
Shankar Naik
Sri. Hameeduddin
Sri. Gokhale

Date of
award

Date of
starting

Date of
completion

18.2.98

8.4.98

30.9.99

Financial Progress(cumulative) during the month in
Rs. Lakhs.
tl,rren'

7

7.00

18.2.98

8.4.98

-do-

-do-

6.4.98

27.5.98

26.11.99

26.11.9
8

23.23

26.94/
Nil

38

54.20

46.58/
4.58

16

16

38

23

23

54

54

77.43

42

27.53
/Nil

60.47

18

15.6.98

16

30.9.98

-do-

6.4.98

16.0
0

18

73.52/
4.58

27.53/
Nil

14.6.99
5

5

12

12

16.79

16.87/
Nil

16.12.98

48

44

112

68.70
/ 5.48

161.41

68.70/
5.48

15.4.99

11

24
8.85/
5.71 |

34.93
_______

FORMAT - 5
District ; Raichur

SI.

r
i No.
2

VILLAGE WISE PHYSICAL PROGRESS
For the month of Dec'99

Package
No.
RCR-1

|Sadapur (MSI )|

RCR-1

■Mustuil

RCR-1

Galag (MS2&3)

Village Name

Start
Date
23.1.98

[(MS1&21

4

RCR-1

5

RCR-1

Status

Weather power supply is
given Yes/No

Commissioned on 25.7.99

Yes

Commissioned on 23.11.99

Yes

OHT 7- completed
SP-2 Procured
RM-completed

CP-2 Procured
DM-completed

Commissioned on 31.12.99

6

7

Jambaldinni
(MS 3)

RCR-2
RCR-2

OHT7-completed
SP-Not Procured

17.2.98
■Nelogall

FMS1&21
8
9

RCR-2
RCR-2

10

RCR-3

11

RCR-3

Hiregonnagar
(MS 2&3)
Challgera
(MS 3)

5.12.98

(MS 1&2)

!

12

RCR-3

13

RCR-3

14

RCR-3

15

RCR-3

16

RCR-4

17

RCR-4

18

RCR-4

i___ L

Herur
(MS 1&2)
Yatgpl
(MS 2&3)
Itagi
(MS 3)
Gugal
(MS 3)
Guladahalli
(MS 1&2)
Budugumpa
(MS 1)
Vanaballery
(MS 1&2)

Yes

Yes

Commissioned on 22.11.99

Yes

OHT7-completed

OHT3- 2nd BB
OHT7- completed

DM-completed
RM-completed
DM-completed
DM-completed
GM-completed
DM-Completed

OHT2-GLBB

22.5.98

WUP

Commissioned on 17.10.99

OHT 7- completed
DM- completed
SP- Procured
RM -Completed
OHT 7-completed
SUMP-under
1 SP-Procured for
progress
PBW3
2 CP- procured
RM-5/8
DM-completed
Intake well- cofferdam laid
Connecting pipeline - 42/105 m
Jack well-steining completed
Pumping main - completed
Gravity main - Completed
WTP - under progress
MBR - under progress

Head works &
Pumping
Machinery

Kirkihalli

DM-completed
RM-5/10

WUP

OHT1-GLBB
MBR3- 2nd BB
OHT 7- completed
SP-Not Procured
OHT7-completed
SP-Not Procured
OHT7-completed
SP-Not Procured

DM- completed

RM- 2.17/UP
DM-2.675/UP
RM-Completed
DM-completed
RMT/A = 0.76/UP
DM-completed

- IIS'-

Yes

WUP

Yes

WUP
WUP
WUP

WUP
Yes
Yes
Yes

Package
No.
19 ' RCR-4

SI.
No.

20

RCR-5

21

RCR-5

Status

Start
Date

VillageName

I

Commissioned on 17.10.99

17.2.98
planumanaj
|(MS1&2)|
Hulgera
(MS 2&3)

RCR-5

RM-0.97/UP
DM-2.15/Nil

OHT7-completed
SP- Not procured

Kunikera
(MS2)
[Vanageri (MSI )|

i Weather power suppl}
is given Yes/No
Yes

WUP

4-

Commissioned on 31.10.99
RM-completed
DM-completed
SUMP-under
progress

OHT7-completed
SP-procured.

I

Yes

WUP

1

23

1

RCR-5

Commissioned on 29.12.99

WUP

24

f RCR-5

Commissioned on 29.11.99

WUP

25

RCR-6

Commissioned on 9.2.99

Yes

26

RCR-6

Commissioned on 23.12.99

Yes

RM-completed
OHT 3-2nd BB
DM-completed
I SP-Procured
Commissioned on 31.11.99 & handed over ,
on 2.1.2000 1
RM- completed
' OHT4-3rd BB
DM-completed
SP-Not Procured

WUP

RCR-6

I
28 f RCR-6

u

|

Hulgunchi
(MS 2&3)
Bassapur
| MS 3)1
Gonwatla
(MS 2&3)

RCR-6

29a

30

RCR-6

FT8.2.98

I

1.3.98
31

32

33
____ L

34

RCR-7

Commissioned on 11.12.99

Yes

RCR-7

Muddaballi
(MS2&3)

I OHT“-Topdome
i SP- Procured
| RM- completed

RCR-7

lyadaganalj

RCR-8

BGabbui|

■iMSlfl
36

RCR-8

Bacal wad
(MS1&2)

37

RCR-8

38

RCR-8

Gonal
(MS2&3)
T ura kun dona
(MS 3)

39

RCR-9

25.2.98

RCR-9

27.10.98 J
1 1 SP-

WUP

Commissioned on 25.7.99

Yes

RM-6.93/3 Km
! DM- completed

WUP
Yes

WUP

Commissioned on 30.12.99

WUP

RM-completed
D M-completed

WUP

! OHT7-conipleted

I

WUP

WUP

i OHT 7-Top dome | RM-3.16/Nil
DM-completed
________ I SP-Not Procured
, OHT 7-completed RM-completed
DM-completed
i SP-Not Procured

leeralkalgudu

Singhnol
(MS1&2)

RM- completed
DM-completed
SUMP-under
progress_______
SUMP-completed
CP-Not Procured
DM-completed

Commissioned on 9.12.99

| GLSR-completed
j 1 SP- procured

■(MSlW
40

WUP

, OHT7-completed
SP- Not procured

|(MS3)g
35

Commissioned on 10.9.99

Karamudi
(MS1&2)

RCR-7

WUP

Commissioned on 30.12.99

RCR-7

____

-/75 -

I

SI.
41

I Package
'
No.
1 RCR-10

42

RCR-10

43

RCR-10

” 44

RCR-10

l5~1 RCR-10
46~ I
47

I

RCR-10

RCR-10

48

|

RCR-10

49

RCR-10

50

RCR-10

51

RCR-10

52

RCR-10

53

RCR-10

54

RCR-10

55

RCR-10

56

RCR-10

57

RCR-10

58

RCR-11

-------- ]------------------

59

I

RCR-11

60

RCR-1 1

61

RCR-11

Village Name
I lead works &
Pumping
Machinery

Start
Date
5.12.98

H. Akkur
(MS 2&3)
’ Tigeri
(MS 2&3)
Mattur
(MS2&3)
Nceralagi
(MS 2&3)
Bellur
(MS 2&3)
Domabarahalli
(MS 1&2)
Budihal
(MS2&3)
Hiresindogi
(MS 2&3")

Chikksindogi
(MS 2&3)
Bisarahalli
(MS 2&3)
Bikkenhalli
(MS 2&3)
Maina halli
(MS2&3)
Handaral
(MS 2&3)
Hanwal
(MS 2&3)
Kathralli
(MS 2&3)
Kolur
(MS 2&3)
LXnkasdoddj
[(MS2&3)|
[YerajentiB
■ (MS3)H
Medinapur
(MS 1)

3.3.98

RCR-11

63

RCR-12

64

RCR-12

Intake channel- 90% completed
Jack well- 17m steining done (95%)
VTPPumping main - 10.338/3
Gravity main-45.07/31
WTP- 9/4
MBR- 3/Sump- 3/1
OHT2-GLBB
DM-completed
2CP__________
OHT6-BRB
DM-completed
SUMP-_________
2CP-_________
OHT7-Top dome
DM-completed
OHT6-BRB
SUMPOHT3-2nd BB

DM- completed
2CP-_________
DM-completed

OHT7-completed

DM-completed

OHT1-foundation
excavation_____
OHT4-3rd BB

DM-completed
DM-completed

OHT2- GLBB

DM-completed

OHT5-BRB&S

OHT7-completed

DM-completed
2CP-_________
DM- completed

OHT3-2nd BB

DM-completed

OHT3^rT BB

DM-completed

OHT5-BRB&S

DM-completed

OHT2-GLBB

DM-completed

OHT5-BRB&S.

DM-completed

Santekallur

SNS

WUP

WUP
WUP
WUP
WUP

WUP
WUP

WUP
WUP
WUP

WUP
WUP

WUP
WUP
WUP
WUP
Yes

Commissioned on 30.11.99

Yes

J DM-completed
! Sump-under
; progress

Commissioned on 26.9.99

OHT7-Completed
SP-Not Procured

Karadigudda
(MS 3)

Weather power suppl}’ I
is given Yes/No

Commissioned on 29.1.99 & handed over
on 7.2.99

OHT 7-Completed
SP-Not Procured
RM-completed

|(MS 1&2)|

62

Status

I RM-Completed
DM-completed

WUP

SNS
Yes

25.2.98
Commissioned on 4.2.99

Yes

Commissioned on 20.8.99

Yes

SI.
No.
65

Package
No/

Village Name

RCR-12

67

RCR-12


68

RCR-12

69

RCR-13

70

RCR-13

71

RCR-13

Hosakera Diggi
Camp
(MS1&3)
[Hosakera SoulJ
■CampH
■<MS 2<V3)M

72

RCR-13

M(MS2)Mp

Commissioned on 31.8.99

Yes

■(Ms nni

Commissioned on 26.11.99

WUP

J
■i iiilix apui-iM 17.10.98
Navalahalli
(MS 1&2)

OHT7-completed
SP- not procured

Kvdiuuppa

RCR-14

Ojanahalli
(MS 2)
Bhagx’anagar
(MS 2)
I Herur

80

81

82

------------------ L

RCR-15

RCR-15
RCR-15
RCR-16
RCR-16

RCR-16

OHT7-completed
SP- not procured

RCR-17

27.10.98

8.4.98

[ms2:a__

85

86
8~
88

RCR-18

RCR-18

RCR-18
RCR-18

RCR-19

OHT7-completed
SP- not procured
OHT7-completed
SP- not procured

RM- 5.33/Nil
DM- completed
RM- 4.93/Nil
DM- completed

Commissioned on 18.10.99

Herur Camp
(Bapureddx
camp)
(MSI)
Hullur
(MS3)

OHT7-completed
SP-Not Procured

RM-0.46/Nil
DM-completed

OHT7-completed
SP-Not Procured

RM-completed
DM-completed

Kannur
(MS 3)
Katlatkur
(MS 2)

OHT7-completed
SP-Not Procured
OHT7-completed
SP-Not Procured
OHT7-completed
SP-Not Procured
RM-3.0/Nil

RM-2/Nil
DM-completed
RM-2.92/Nil
DM-completed

27.5.98

Bijangera
(MS3)

[RamathnaL

[Sannahosur

15.6.98

■(MS 1)|
84

RM- 1.8/Nil
DM- completed
CP-

Commissioned on 11.12.99

B(MS l)j
83

RM- completed
I DM- completed
| CP-

Commissioned on 24.12.99

Nidasheshi
(MS 2&3)

'

RCR-15

WUP

J

iMBevinalBtS

KalalbandH
■ MS’2)B

76

RM-2.24/Nil
DM-completed

Yes

RCR-13

RCR-14

79

Yes

Commissioned on 20.8.99

)

75

78

Commissioned on 31.8.99
OHT 7-completed
SP-Not Procured

■(MS 311

-j-;

Weather power supph [
is given Yes/No

RCR-12

66

74

Status

Start
Date

Kota
(MS 1)
K. Hosalli
(MS 3)
Satyanarayan
camp
Tavaragera
(MS 2)
Kandkur

16.12.98

i

SUMP-Site to be
finalised
CP-Not Procured
DM-3.94/Nil

WUP
WUP
WUP

WUP
WUP

SNS
Yes

WUP

Yes
Yes
Yes

SNS

Commissioned on 31.10.99

Yes

Commissioned on 26.10.99

Yes

OHT7-completed
OHT4-3'd BB
OW-not stalled_
OHT4-3,d BB
DM-completed

RM-9.9/3
DM-completed
RM-2.3/Nil
DM-completed
OW-not feasible
RM-2.3/Nil

OHT7-completed
SUMPOHT5-BRB&S

RM-3.16/Nil
DM-completed
RM-3.(Wil

- IS/-

SNS
SNS
SNS
SNS
SNS

SI.
i No.
89

Package
No.

Village Name

RCR-19

Veerapur

Start
Date
15.4.99

Status
0HT7- completed

NOTE : OHT 1 - Foundation
OHT 2-Gl. Bracing Beam
OHT 3 - 2nd Bracing Beam
OHT 4 - 3rd Bracing Beam
OHT 5 - Bottom Ring Beam & Slab (BRB &S)
OHT 6-Side Wall (SW)
OHT 7 - Dome
BB - Bracing Beam
GL - Ground Level
PSBW - Proposed Shallow Bore Well
F & YT - Flushed & Yield Tested
WUP - Work Under Progress
SNS-

RM- 3.2/Nil
DM- completed

MS 1 - First Mile Stone
MS 2 - Second Mile Stone
MS 3 - Third Mile Stone

Weather power supply I
is given Yes/No
WUP

FORM ATE-6
PHYSICAL PROGRESS FOR REMAINING WATER SUPPLY COMPONENTS
District : Raichur
For the month of Pecs99.
PAC KAGE

SI . No.

IIP

T

1
2
3_
4
5

____3_
4

2

6
7
8
- 9
__ 10

7
8

2
12

JJ_

ij_
12
13
14

J2
13

_1£
I

115
16

15

” 17

17
18
19
7

To

H
19
Total
Raichur
Total
[. Koppal
Cross

A

WATER SUPPLY C OMPONENT IN NOS
CT
DB
SP
CS
T
A
A
T _A_
A
T
T
13
6
22
31_ £8
14
24
23
15.
5
10
28
10
20
37_
14
24
29
24
31
4
11
22
9
17
34
11
2.1
39 _ _ 22
61 ~
18
26
36
49
2
6
12
6
12
27
27
32
56
35_
2
15
14
26
19

12
3
30
26
29
42
19
40
2f
12
19
9
19
~14
14
3
26 ~ " 26
P7
27
8
12
6
25
3
II
II
14
5

111

41



14

16

239

134

154

72

70

14

451

155

10

304

179

161

126

66

6

924

411

17

543

313

315

198

136

20

1198

566

I Total

HP

WP
T__ jA
75___ 20
79___ 48
30___
70
73
92
37
64
31
66
40
108
38__ 38
176
91___ 42
81 ~ 86
23
61
59
53
53

Hnad Pump

C'T - Cattle Trough

SP

Stand Post

CS

Cistern

WP

Washing Platform

DB

Dust Bin

REMARKS

INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
KIRWS & ESP PHASE-II PACKAGE-H
(WORLD BANK ASSISTANCE)

i

i

ii

District: Raichur

Month : Dec'99
1. Hydraulic testing of PVC pipes.

SI.
No.

Date of
testing

Packa
ge No.

Name of
Village

1

2
28.2.99

3
RCR-9

4

1

Components tested
DM in Km

RM in km

T
5

Singhanal

4. .

A
8
6.396

T
7
6.024

A
6

4^ t

t

: 7.74

f 3.000

T urukundona

1.5

0.6

5.915 i 3.5

Bagalwada

6.935

4.5

7.59

3.8.99

RCR-9

Singhnal

2

27.11.98

RCR-8

3

28.11.98

RCR-8

1

os

7.0



j

OHT________
Chainages
OK/
Remarks
Inlet
Outlet
not
pipes(mm pipes(mm
OK
dia)
dia)
A
___
T
A
X
9
10
11
12
13
14
15
63

N(^e
27-28
OK
lOkg/cnr
LI Node 31 -29
OK
. 12kg/cm2
Node 65-63
OK
9.5kg/cm2
j OHT-PBW
OK
12 KSC
110mm dia
PB W6 RMOK
300Rm
1
17-I8(70m)
OK
(DM)
131-148(125m) OK
(DM)
I
139-144(80m)
OK
(DM)
PBW6RMOK
250Rm
63
Node 1-8 (DM) OK
(115m)
63
Node 8-9(DM) OK
(75m)
63
Node 10-11
OK
(75m) (DM)
63
Node 247-249
OK
(70m) (DM)
I

Packa
ge No.

13.1.99

4

18.1.99

5

30.1.99

6

RCR-12

RCR-12

RCR-12

Name of
Village

4
Hosakera
(Kottai camp)

Components tested

RM in km

T
5
1.775

A
6
1.775

Soul camp

DM in Km

T
7

A
8

6.045

6.016

0.866

0.758

3.878

3.572

1.965

Elcganoor camp

OHT_________
Outlet
Inlet
pipes(mm
pipes(mm
dia)
dia)
A
T
A
I
12
9
10
11

2.478

0.130 ‘ 0.312
I

7

27.1.99

RCR-12

00

Eleganoor
village

3.020

2.674

0.07

0.066

5.325

5.402

1

8

9

10

23.1.99

2.2.99

2.2.99

RCR-12

RCR-15

RCR-15

Bevinal

1lerur

Bapureddy
camp

0.22

0.22

1.533

1.533

8.19
0.48

8.04
0.48

0.414
3.81

0.410
3.61

0.055 i 0.055



Chainages

QK/
not
OK

Remarks

14
13
PBW3toOHT
OK
1.775Rm(RM) I

15
75mm dia 6KSC

OK
309 to 310
(25Rm)(DM)
OK
44 to 45
(70Rm)(I)M)
OK
54 to 55
j (60Rm)(DM)
’ 1 to 29
OK
(155Rm)(DM)
| 107 to 124
OK
(1104Rm)
(DM)
116toll7
OK
(176Rm)(DM)
OK
46-47 (66Rm)
(DM)
OK
3-4 (66Rm)
; (DM)
' 75 to 74
OK
(75Rm)(DM)
OK
PBW13 to
Sump (RM)
PBW1 to Sump OK
OK
13-109(DM)
OK
ll-16(39Rm)
(DM)
OK
7-6 (DM)
' 266 to 267
OK
(DM)
OK
266 to 268
(DM)

63mm dia 4KSC
110mm dia 4KSC
63mm dia 4KSC
63mm dia 4KSC

63mm dia 4KSC

75mm dia 4KSC

63mm dia 4KSC
90mm dia 4KSC
63mm dia 4KSC
75mm dia 4KSC

90mm dia 6KSC
63mm dia 4KSC
75mm dia 4KSC
110mm dia 4KSC
63mm dia 4KSC
75mm dia 4KSC

-I

SI.
No.

1
11

Date of
testing

230.3.99

Packa
ge No.

Name of
Village

3

4
Jeerkalgudi
(camp)

RCR-9

RCR-9

29.5.99

RCR-9

2.6.99

Components tested

T
5
1.85

OK/
not
OK

Remarks

15
63mm dia
12.5KSC

2.148

13
14
' Node 126-127 ' OK
T.115 A. 104
.
(m)
OK
Node 129-131
T.65 A.67 (m)
_L__ (2.055 Km)
Node93-113 OK

f 0.358

Node 73-76

OK

Node 96-97

1 OK

Node 111-112

OK

2.512

Node 61-62

OK

0.114

Node 8-7

OK

OHT_______
Inlet
Outlet
pipes(mm pipes(mm
dia)
dia)
T
A_
T
A
9
10
11
12

DM in Km

RM in km

T
7
11.44

A
6
Nil

Jeerkalgudi

A
8
11.44

;

1.576

Jeerkalgudi
-t

I
RCR-9

28.6.99

09

Os

Jeerkalgudi

Chainages

I

-

i

Node 9-8

-

RCR-9

30.6.99

Jeerkalgudi

I

12

22.7.99

RCR-9

Jeerkalgudi

5.4.99

14

Bhagyanagar

1.05

OK

’ 0.996

Node 2-3

t OK

0.030

Node 2-OHT

OK

OHT-Sump

OK

Node 58-59
65mtr (DM)
Node 11-12
80mtr (DM)

OK

1.05
6.660

!

4.810

63
63

OK

63mm dia
10KSC
90mm dia
12KSC
75mm dia
10.5KSC
63mm dia
12KSC
63mm dia
10.5KSC
63mm dia
10.5KSC
75mm dia
11KSC
90mm dia
11KSC
110mm dia
12KSC
140mm dia
12KSC
110mm dia
6KSC
4KSC 10.5
kg/cm2
4KSC 12.5
kg/cm2

m

2

3

4

5

6

7

8

9

r io pi 1 Tn
63

14

6.4.99

4.015

Bhagyanagar

63

2.235

63
63

13

43.2.99

2

Nilogal

14.2.99

2

Nilogal

15.2.99

2

Nilogal

0.12
0.48
0.05
0.01
0.035
0.04
0.07
0.315
0.078
5.0

63
63
63
75
90
160
110
110
63
63 j

0.4
0.24
0.02
0.01
0.025
0.025
0.03
07035
0.040
5.0

63

(
oo

75

T4
90
I

110
160

20.4.99
21.4.99

14

11.4.99

2
2
2

Nilogal
Nilogal
Hiregonnagar

12.4.99

2

Hiregonnagar

2.82

90

2.315
1.625

|

75

2.070
1.30
1.5

Node 96-97
40mtr (DM)
Node 254-255
200mtr (DM)
Node 224-222
35mtr (DM)
Node 205-206
150mtr(DM)
120m
48m
50m
10m
35m
240m
75m
315m
78m
Node 1-2
(170m)
Node 11-9
(30m)
Node 61-14
(10m)
Node 14-13
(35m)
Node 5-6
(35m)
Node 1-4
(240m)





75
90

2.74

13

2070m
63
63
63

1300m
Node 123-134
(110m)
Node 125-135
(I25m)
Node 11 l-l 12
(90m)

OK
OK
OK
OK
OK
OK
OK
OK
OK
OK

15
4KSC 12.5
kg/cm"
4KSC 12.5
kg/cm2
4KSC 12.5
kg/cm2
4KSC 12.5
kg/cm2
7.0 KSC
7.5 KSC
7.6KSC
8.2KSC
9.5KSC
10.0 KSC
9.5KSC
10.2 KSC
7.5KSC
7.5KSC

OK

7.ZKSC

OK

8.3 KSC

OK

9.5KSC

OK

9.5KSC

OK

9.8KSC

OK
OK
OK
OK
OK

10.5KSC
11.2KSC
10.5 KSC
10.9KSC
7.2KSC

OK

7.5KSC

OK

8KSC

14
OK

OK
OK
OK

17.2.99

15

4

3

2

8

3.675

Tuggaldona

5

7

6

5

5.673

Hanumanal

5

I

j

12.4.99 |

75
110
140
63

6.614

r

5

Hanumanal

1.9

•"i—*“

140 T
75

2.73

90

14

70

0.390

Bhagyanagar

30

30

17.6.99

RCR-18

0.388

Tavaragera

5)
DO
I

0.578

4.6.99

13.6.99

....

28.6.99

0.231

7.6.99

4.298

i

4

I

I

r

I

10.6.99

1

110 t

20.5.99

18

!

90

*

I

75

'[ n o r

]

J-- 4.
17

63



J
r--- i----------- t

63

s

tzzx
14.2.99

| 10 Til i 12 I

4.202

-L

16

r

I

0.238

13
15
I 14 |
Node 123-124
OK
8.5KSC
(30m)
I—-- k
Node 4-5
OK
10.5KSC
Node 31-35
OK
10.5KSC
OK
Node 1-3
11KSC
OK
Node 0-1
11KSC
OK
Node 34-38
10.5KSC
' Nocje 27-29 I
10.5KSC
Node 2-4_ . OK
10.5KSC
Node 0-1
OK
11KSC
Node 10-14
OK
1 1KSC
OK
13.4KSC
OK
13.5KSC
OK
13.5KSC
1 Okg/cm2
: 2 to 108
j OK
75 mm
70mtr DM
' 8 TO 108
Ok
10 kg/cnr
30mtr DM
90mm
245 to 261
OK 7.5 kg/cnr
I 30mtr DM
1 110mm.
' 57 to 56
OK
i 9.5kg/cnr
I 140mm
30mtrsDM
‘ 39 to 58
9.Okg/cm2
OK
96.5mtrs DM
140mm
9.Okg/cm2
OK
59 to 60
44mtrs DM
140mm
OK
10.Okg/cm
2 to 3
29.5mtrs DM
160mm
9.5kg/cm2
4 to 5
OK
160mm
66.5mtrs DM
9.5kg/cm2
2 to 6
OK
160mm
100 mtrs DM
OK
4 to 60
9.5kg/cm2
231.0 mtrs-DM
200mm
OK
5 to 10
9.5kg/cm2
177mtrs DM
i 63mm
6 to 14
OK
10.0kg/cm2
131.5mtrs DM
i 63mm
OK
12 to 11
i 9.5kg/cm2
63mm
51 .Omtrs DM
88 to 87
OK
i 9.5kg/cm2
90mm
1 19.5mtrs DM

1

ok

1

r1

3

4

I

6

5

I

7

8

I 97 101 11 f 12 r ~ '3
1

I

I

15.6.99

1.435

■■

19

30.8.99

Gravity main

RCR-10

I 3.05
(GM)

31.8.99

Gravity main

RCR-10

I 1.17
I (GM)

OK
67 to 87
96.5mtrs DM
OK
75 to 83
15.0mtrs DM
OK
8 to 4
121.5mtrsDM
OK
5 to 9
150mtrs DM
OK
5 to 33
138.5mtrs DM
Node 4-7
I OK
(Zone-Ill) 60m. j
30m
OK
i OK
45mtrs
1 OK
Sump-2 to
Node-1 (Zone- i
II) 60m

I 90 mtrs
1.9.99

2.9.99

RCR-10

Gravity main

RCR-10

Gravity main

0.953

I (GM)
2.702
(GM)

f

I
20

9.1 1.99

RCR-1

Mustur

I 6.52

I

4.7

I

I

10.11.99
I

I
I

11.11.99

12.1 1.99
13.11.99

14.11.99
15.1 1.99

RCR-1

Mustur

2.2

0.8

I

I*

10.0kg/cm2
90mm
9.0kg/um2
90mm
9.5kg/cm2
110mm
10.0kg/cm2
1 10mm

9.5kg/cm2
110mm
110mm dia
110mm dia
110mm dia
160mm dia

Node 1-2
Zone-II 70mtrs

OK

160mm dia
140mm dia

I 40m

i OK
OK

140mm dia
140mm dia

Node 2-3
( Zone-II 40m
! 70m
| Jn.Pt. to OHT
1 34m length
28m length
31m length
18m length
23m length
49m length
40m length
24m length
’ Node 17-21
30m
Node 24 to 25
44m
’ Node 29 to 30
22m
Node 32 to 34
32m
Node 9 to 10
18m

OK

OK
OK

■ 140mm dia
90mm dia 6KSC

OK
OK
OK
OK
I OK

OK

90mm dia 6KSC
' 90mm dia 6KSC
90mm dia 6KSC
' 90mm dia 6KSC
90mm dia 6KSC
90mm dia 6KSC
90mm dia 6KSC
63mm dia 4KSC

OK

63mm dia 4KSC

OK

63mm dia 4KSC

OK

63mm dia 4KSC

OK

63mm dia 4KSC

OK
' OK

I

I

EZ

2
7.12.99

.3
RCR-1

■__________ 4

Jambaldinni

5
9.9

6
5.6

7

8

I
8.12;99

9.12.99

t'

10.12.99
I

[ 19.12.99
! 20.12.99 f

L______L

xO
Ok
I

r-

-L

9

10

11

12

13
Jn.Pt. to OHT
15m length
45m length
216m length
1
length
150m length
i 90m length
f 100m length
30m length
1
length
124m length
23m length

14
OK

i_______ 15
110mm dia 6KSC

OK
OK

110mm dia 6KSC
I 110mm dia 6KSC

' OK

' 110mm dia 6KSC

OK

110mm dia 6KSC

OK
OK

110mm dia 6KSC
110mm dia 6KSC

|

INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
KIRWS & ESP PHASE-II PACKAGE-II
2. List of deficit Contractors in III Milestone

SI.
No.

Pack a
ge
No.

Villages

JI

2

3

1

No. of'

4

Name of the
Contractor

________4_______
M/s KLAC Raichur

Contract
value
( Rs. In
Lakhs)

Date of

___ 5
64.48

___ 6

Start

22.5.98

T arget
for 3 MS
(Rs. In
Lakhs)
___ 7_
64.48

End of
I MS

8

Achievement
to end of MS
Cumulative
(Rs. In
Lakhs)
9

21.11.99

13.37

J
i

Month : Dec’99
District : Raichur
Shortfall in
Shortfall in
Physical status of
progress in MS
works
Cumulative
%
Amount
(in lakhs)
12____
10
11
OHT & RM are
completed in 3
7‘) 26
villages, DM
51.11
completed in all
villages.

Delay
attributed to
department/
Contractor
13

Contractor

INTEGRATED RURAL WATER SUPPLY AND ENVIRONEMENTAL SANITATION PROJECT.
KARNATAKA INTEGREATED RURAL WATER SUPPLY AND ENVIRONEMNTAL SAINTATION PROJECT. (WORLD BANK
ASSISTED) PHASE-II PACKAGE-II

3. Statement of Bottlenecks
Month : Dec'99
District: Raichur
SI.
No.

I

I
Kj

No. of
villages
flushing to
be done

No. of
villages New
Bore wells to
be drilled

No. of Open
Wells Shallow/
bore wells to be
drilled

Nil

4

Nil

OHT
Sites
under
dispute

SBC
results
awaited

Sump
sites to be
handed
over

GLSR
sites to be
handed
over

Awaiting
Energisation for
commissioned

1

1

Nil

6

I

1. New Bore wells yet to be drilled.
Pack
age
No.
No.
9
1
16
18
~"4
19
TOTAL

SI.

Village

No. of
borewells to
be drilled

Singnal
Bijangera
K.Hosalli
Kandkur

PE

V

Note: PE - Partlv Established
2) SBC Results yet to be handed over by the EE

SI.

Package

No.

No.

OHT

Kolur
1 Villages

10

Total

Remark

Village

4) SUMP Sites yet to be handed over by the EE
SI.

I No.
IT"'

Package
No.
14

Village

Remark

Bhagyanagar

Site is to be finalised

Land acquilsition for OHT on private Land
1 Package No.
I SI. No.
4
1
’ 4

6
4

’ 7

6

’ 10

7
' 8
9
10

' 15
15

11
12
13

19

10

13

18
18
19

8 Packages

I Village
Vanaballery (MS 1&2)
Buduguntpa (MS 1)
Hulgunchi (MS 1&2)
Wadaganal
Niralgi
Chikkasindogi
Navalahalli
Hullur(MS 1)
Konnur (MS 2)
Kota
K. Hosalli
Veerapur
Kandkur
13 villages

- |

I Action taken
Not paid
Not paid
Not paid
Not paid
Not paid
Not paid
Not paid
Not paid
Not paid
Not paid
Not paid
Not paid
Not paid

INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
KIRWS& ESPPHASE-II PACKAGE-II
( WORLD BANK ASSISTANCE )

4. List of works, the Agency is unlikely to Achieve the Milestone targets.
District: Raichur

SI.
No.

Pack
age
No.

No.
of
villag
es

Name of
contractor

Contract
Value
(Rs.
Lakhs)

Month : Dcc'99
Date of
Start

End of
Milestone
III

Name of
Scheme/Villa
ges

Nil

I

Financial cumulative for
Milestone l/II/IH
T
A
Short f
all %

Status of works

Remarks

INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
KIRWS & ESP PHASE-II PACKAGE-II
( WORLD BANK ASSISTANCE )

5. List of Agencies on whom penal action has been recommended.
District : Raichur

Month : Dec'99

SI.
No.

Pac
kag
e
No.

No.
of
villa
ges

Name of contractor

Contrac
t Value
(Rs.
Lakhs)

Date of
Start

1

4

4

M/s KLAC Raichur

64.48

22.5.98

End of
Mileston
e III

21.11.99

-O

2

7

5

M/s Coramandal

88.13

1.03.98
31.8.99

3

16

3

M/s KLAC Raichur

60.47

27.5.98

I

L

26.11.99

Name of
Scheme/Villa
ges

Financial cumulative for
Milestone 1/II/I1I
A
Short f
T
all %

1 .Budugumpa
2. Vanabellary
3. Kunikeri
4. Guldhalli

64.48

13.37

1 .Koradakera
2. Karamudi
3. Ncrabenchi
4. muddaballi
5. Vadaganal

88.13

1 .Bijangera
2. Katlatkur
3. Ramthnal

60.47

Status of works

Details of penal
action

79.26

OUT & RM are completed in
3 villages & DM are
completed in all villages

72.16

15.97

27.53

54.47

WSS at Koradakera
Nerebenchi and vadagnal are
commissioned. OHT & sump
are in progress at Muddaballi
and Sump is in progress at
Karmudi._________________
Water supply scheme at
Ramathnal village is
commissioned, OU T & DM
are completed in other two
villages & RM is to be started.

Liquidated
damages are
proposed from
22.11.98 at the
rate of Rs.
600/day______
Liquidated
damages are
being recovered
at the rate of
Rs.600 per day
from 1.9.98.
Liquidated
damages are
proposed from
26.1 1.98 at the
rate of Rs. 600/per day

INTEGRATED RURAL WATER SUPPLY AND
ENVIRONMENTAL SANITATION PROJECT
KARNATAKA
(World Bank Assistance)

Phase II

Package II

Villages

PROGRESS REPORT
of Shimoga District

For the Month of DECEMBER 1999

INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD., NEW DELHI
CONSULTANTS FOR CONSTRUCTION MANAGEMENT AND QUALITY CONTROL

Format - 3.
PHYSICAL PROGRESS PACKAGEWISE FOR THE MONTH OF December’99
PART-I - Villages

District: SHIMOGA
si.
NO.

2

1

SMG-1

1

2

I

3

4

i

Package
No

5

SMG-2

SMG-3

SMG-4

SMG-5

C - Completed,

No.
of
villag
es in
pack
age/
prog
ress

r-

6/6

4/4

6/6

4/4

7/7

Name of the
contractor

4

R.
Maheswara
Naidu

S. Umesh

S.V Bandi

V.
Narasimhan

A.S.
Rangappa

Peri
od of
com
pleti
on in
mont
hs

5

18

18

18

18

18

Contrac
t value

6

96.17

66 41

81.29

68.44

109.33

Up - Under progress

Date of
start

7

13-2-98

24-8-99

28-2-98

4-4-98

13-2-98

Mile
ston
e

Physical progress

Financial
progress in
lakhs
commutative in
Rs. Lakhs

Cumulative
During the month
CP in
nos^

SP in
nos.

RM in Kms

OHT in Nos

DS in Kms

Sump/GL
SR in Nos
_A_
T
22
21

Commission
ed

No. of
schem
es
propo
sed

23

24

2- Handed
over

1

T

A

T•

A

T

9

10

111

12

13

18.78

26.72

2

II

43.73

36.12

4

III

33.66

38.21

4

16.72

29.40

1

II

24.99

13.65

2

III

24.70

9.08

2

I

18.74

18.74

2

2

1.0

1.00

6.0

II

43.46

40.50

3

7

2.0

4.212

11.0

III

19.10

38.10

4

02

2.0

4.585

12.0

8.292

2

2C

17.44

18.40

1

2

1.0

1.70

3.0

6.00

1

1C

1- Handed
over

1

27.48

18.13

2

2

1.0

7.0

3.56

1

1C

01

1

II
III

23.52

11.02

2

03

1.0

2.50

7.0

7.51

2

1 C/1 up

18.59

36.82

2

2

2.0

2.00

6.0

6.00

1

1C

II

50.86

43.74

5

5

5.0

5.00

11.0

11.00

3

3C

III

39.88

8

14

T

A

T

A

T

A

15

16

17

18

19

20

1.0

3.40

5.0

6.20

1

1C

10

3.0

2.80

9.0

8.73

2

2C

01

3.0

3.77

9.0

8.205

2

2C

1.0

5.00

4.0

12.32

1

1 C

3.0

0.58

9.0

7.514

1

10

2

1 C/1 up

10.40

1

1C

12.94

2

2C

04

2

02

9.0

2.0

1

3

1C

1
02

1
2

2- Handed
over

1
2

03

3

2

3- Handed
over

1

3
04

23.52

4

7

5.0

7.01

11.0

15.47

3

2C-1 up

3

Remark

s

25

Format-3 Con. .

SI.
NO

1

6

7

1

8

9

10

Package
No.

2

SMG-6

SM G-7

SMG-8

| SMG-9

SMG-10

No.
of
villag
es in
pack
age/
prog
ress

Name of the
contractor

3

4

1/1

4/4

3/3

1/1

1/1

M.S Suprada
Constructions

S. Umesh

KC.
Shivaram

V.
Narasimhan

M s Suprada
Constructions

Peri
od of
com
pleti
on in
mont
hs

Contrac
t value

5

6

18

18

18

18

18

41.67

76 32

81.97

60.15

Date of
start

7

7-11 -98

25-8-98

1 -11 -98

1-11-98

42.76 | 7-11-98

J____
C - Completed,

Up - Under progress

Mile
ston
e

Financial
progress in
lakhs
commutative in
Rs. Lakhs

T

A

9

10

10.00

18.13

II

20.00

10.53

III

11.67

8

Physical progress

Cumulative
During the month
SP in
nos.

CP in
nos._

RM in Kms

T

A

T

A_

I

12

13

14

02

1
1

T
15

T
17

A

T

A

16

18

19

20

1.0

2.25

2.0

8.90

1

1C

A

1

1.0

3.0

1

1.0

3.0

2

8.00

4.0

1

1C

1

5.0

1.20

8.0

1

1C

1

5.0

1.00
1.00

8.0

1

1 Up

3.12

1.0

3

3.0

7.70

III

23.32

10.44

3

01

3.0

20.73

35.73

2

4

3.0

II

30.64

26.38

3

02

III

30.60

III

17 55

13.50

15.51

II

15.00

11.62

III

14.28 |

1.0

1

1

2

1

01

1 C/1 up

18.96

1

20.0

2

25.68

1

1

8.0

II

9.64

25

1

4.0

23.70

24

2C

4.02

II

22

2

1.0

2

23

_A_

9.0

2

27.67

T
21

Remark
s

1C

32.80

18.90

Sump/GL
SR in Nos.

No. of
scheme
s
propos
ed

1

27.32

3

OHT in Nos.

DS in Kms

No. of
schemes
commissio
ned

2.0

1.0

2.0

3 50

1

-

2.0

1.0

19.53

6.00
1

1

2.0

2.00
9.00

1

1

1.0

5.0

1

1

1.0

5.0

1C

1

J

1C

1 UP

1

(
Format-3 Con. .

SI.
NO.

1

11

12

13

J

Package
No.

2

SMG-11

No.
of
villag
es in
pack
age/
prog
ress

Name of the
contractor

3

4

5/5

R.Maheswara
naidu

SMG-11A

SMG-12

M/s Maloo
Constructions

2/2

Subbareddy

Peri
od of
com
pleti
on in
mont
hs

Contrac
t value

5

6

18

06

18

183.01

105.08

21.17

Date of
start

7

1-11-98

Mile
ston
e

T

A

8

9

10

I

35.60

97.00

II

88.00

58.34

III

59.41

18-11-99

4-9-98

Financial
progress in
lakhs
commutative in
Rs Lakhs

Physical progress

Cumulative
During the month
SP in
nos.

RM tn Kms

DS in Kms

OHT in Nos

Sump/GL
SR in Nos^

No. of
schemes
proposed

Remark
s

23

24

25

T___ A

T

A_

T

A

T

A

T

A

T

11I

13

14

15

16

17

18

19

20

21

3.0

18.50

6.0

19.30

1

10

4.156

11.0

12.83

2

2C

1

10

5

12

1

5

7.0

1

5

6.0

105.08

11.0

22

Impounding reservoir Under progress.

I

10.81

3.63

1

II

10.36

7.45

1

III

CP in
nos._

No. of
schemes
commissi
oned

0.22

1

0.2

0.10

1.0

1.05

1

1UP

1

0.4

0.40

3.0

2.50

1

1UP

1

2.0

•O

1

C - Completed. Up - Under progress.

rLcfc

Distrk
ICT Pvt. Ltd.,
Shimo^a-577 204.

Format - 3.
PHYSICAL PROGRESS PACKAGEWISE FOR THE MONTH OF December’99
Part - II - Villages__________

District: SHIMOGA
si.
NO.

1

1

Package
No.

2

SMG-13

No.
of
villag
es in
pack
age/
prog
ress

Name of the
contractor

3

4

2/2

S Umesh

Peri
od of
com
pleti
on in
mont
hs

Contrac
t value

5

6

12

26.52

Date of
start

7

Mile
ston
e

2

SMG-14

2/2

12

28.83

I
^5
o

4

SMG-15

SMG-16

2/1

2J2

i

5

SMG-17

3/2

S. Umesh

V.
Narasimhan

R Mahes'Aara
naidu

12

12

12

29.26

37.06

47.21

6

SMG-18

2/2

12

27.58

7

SMG-19

2/2

12

22.64

CP in
nos.__

RM in Kms

DS in Kms

A

T

A

14

15

16

T
17

T

A

T

10

11I

12

13

13.20

Nil

1

1.0

4.0

13.32

Nil

1

1.0

4.0

14.83

10.22

2

0.50

9.0

14.00

4.27

1

0.50

8.0

14.00

1

1.00

II

15.27

1

1.00

I

17.06

30.24

1

II

20.00

2.37

3

3.0

23.61

18.69

1

1.00

2.48

4.00

23.60

2.47

3

1.00

0.70

9.00

14.00

11.36

2

3.00

2.97

4.00

5.00

13.59

2.92

2

3.00

0.78

4.00

1 50

12.00

11.38

1

1.00

4.0

5.60

10.64

3.34

1

3.0

0.45

OHT in Nos.

Sump/GLS
R in Nos.

No. of
scheme
commts
sioned

No. of
schemes
proposed

Remark
s

23

24

25

A

T

18

19

A
20

T
21

_A_
22

1

Up

1

1UP

10.50

1

1UP

1

5.90

1

1UP

1

4.50

1

1 Up

1

4.50

1

20-8-99

01

17-3-99

0.72

17-6-99

06

1.0

3.50

4.0

11.22

1

1

1C

1

1

1C

1

1

1UP

1

26-3-99
9.0

3.00

7-5-99

04

2

2
1

1

1UP

17-3-99
II

V.
Narasimhan

SP in
nos.

9

8

II

M/S Suprada
Constructions

Cumulative
During the month

A

II

3

Physical progress

T

II

M/S Supra da
Constructions

Financial
progress in
lakhs
commutative in
Rs. Lakhs

1

1

1C

1

1UP

1

10-3-99

II

C - Completed, Up - Under progress

0.50

1

Format - 4
District: SHIMOGA
SL
No

Package

No.

SMG-1

1

2

SMG-2

Total
no. of
villages

06

04

Value
of work
in Rs.
Lakhs

96.17

66.41

FINANCIAL PROGRESS PACKAGE WISE for the month of December’99
PART-I - Villages
Name & Address of
contractor

Name & Address
of contractor
personal

Financial progress (Cumulative) in Rs. Lakhs
Name & Address of
assistant Engineer

Date of
award

Date of
start

Date of
completion
_____ 1------------

R. Maheshwara Naidu,
Engineers & Contractors,
H. No. 1911,
Somashekarappa Lay­
out, Basaveshwara
Nagar,
Bangalore - 79_________
Sri Umesh. S.
Engineers & contractors
•Sourabh"
A.N.K. Road, 5^ Cross

V.M. Rajaguru,
GPA Holder for
R.M Naidu,
#743, lO^Main,

PJ extension,
Davanagere.

S. K. Muralidhara &
S.B. Manjunath
Assistant Engineers,
Opp. Ranganatha Book
Depot, Taluk office road,
Honnali.

I MS

II MS

III MS

T

A

T

A

T

A

29-1-98

13-2-98

12-08-99

18.78

26.72

43.73

36.12

33 66

38.21

10-08-98

25-08-98

24-02-2000

16.72

29.40

24.99

13.65

24 70

9.08

13-02-98

28-02-98

28-08-99

18.74

18.74

43.46

40.50

19.10

38.10

3-4-98

04-04-98

03-10-99

17.44

18.40

27.48

18.13

2352

11.02

29-01-98

13-02-98

12-08-99

18 59

36.82

50.86

43.74

39 88

23.52

S.V. Sateesh

22-10-98

6-11-98

05-05-2000

10.00

18.13

20.00

10.53

11.67

L.S. Manjunath,
SridharT.D.&
SB Manjunath

10-8-98

25-8-98

24-2-2000

27 32

32.80

25.68

18.96

23 32

17-10-98

01-11-98

01-05-2000

20.73

35.73

30.64

26.38

30 60

S.V. Sateesh
LS. Manjunath,
B.Shivakumar.

Shimoga

3

SMG-3

06

81.29

Somashekar. V. Bandi,
Engineers & Contractors,
Plot NO. BCTS 669 - B,
Vishal Nagar, Behind
KSRTC, Bijapur.

4

SMG-4

04

68.44

V. Narasimhan,
Contractor
M.M. compound,
Tarikere Road,
Bhadravathi

5

SMG-5

07

109.33

A.S. Rangappa, Class I
contractor, Garden area,
II Cross, Shimoga

I
N
o
o

R. Paramesh,
GPA holder for
SV Bandi,
Nallur Post,
Channagiri Taluk,
Davanagere Dist

L. S. Manjunath,

& T. D. Shridhar
Assistant Engineers,
Gowramma road, Opp
Rajarajeshwari Convent,
Channagiri - 577 213.
E.B. ChandraShekar
C/O Bhogeshwarappa
BhavaniRao Keri,
Shikaripura,
Shimoga Dist__________
S.V. Satheesh
Assistant Engineer,
Sri Madava Nilaya,
5th Cross, Gndi Nagara

Shimoga

6

7

SMG-6

SMG-7

01

04

41.67

76.32

M/s Suprada
Construction Co.
behind Vijaya Talkies,
Vijaya Road, Dharwad.

Mohamad Imam,
GPA holder for
M/s Suprada
Construction Co.
Rajendra Prasad
Road , Sagar.

Sri Umesh. S.
Engineers 4 contractors
‘Sourabh*
A.N.K. Road, 5*h Cross

Shimoga

8

SMG-8

03

81.97

Sri K.C. Shivaram
Engineer & Contractor
No. 109, 8th main road,
4th Block, A0' Stage,

Basaveswara Nagar,
Bangalore

Basheer Khan.
GPA holder for
KC Shivaram
#2603/3,
MCC A’ Block.
Church Road,
Davanagere.

T.D. Shridhar &
B. Shivakumar

10.44

Remar
ks

____________________________________ Format-4 Con
SL
No

9

SMG-9

01

Value
of work
in Rs.
Lakhs

60.15

M/s Supra da
Construction Co.
behind Vijaya Talkies,
Vijaya Road, Dharwad.

SMG-10

01

42.76

11

SMG-11

05

183.01

13

105.08

SMG-11 A

SMG-12

02

Name & Address of
contractor

V. Narasimhan,
Contractor
M.M. compound,
Tarikere Road,
Bhadravathi

10

12

J

Package
No.

Total
no. of
villages

21.17

Name & Address
of contractor
personal

Mohamad Imam,
GPA holder for
M/s Suprada
Construction Co.
Rajendra Prasad
Road , Sagar

M/S Maloo constructions,
23/1 and 2, 3rd Cross,
1* floor, Gandinagar,

Bangalore - 9.__________
. Maheshwara Naidu,
ngineers & Contractors,
. No. 1911,
omashekarappa Lay-out,
asaveshwara Nagar,
angalore - 79___________
Sri T. Subbareddy,
Engineers & contractor,
s/o T.RamakrishnaReddy
Tadamari Village,
Ananthapura Dist,
ANDRA PRADESH

Name & Address of
assistant Engineer

Date of
award

Date of
start

Date of
completion

E.B. Chandrashekar

17-10-98

01-11-98

22-10-98

D.Raghu, C/O Gururaj,
PWD contractor,
’ Guru Krupa",
Behind Commercial tax
office
Vinoba Nagar, Sagar,
______Shimoga Dist.
Sri T Prakash
C/O KB. Eshwar,
Swamy Rice Mill,
Rippenpet

Sri L.S. Manjunath & Sri
S.K. Muralidhar.

E. Yangaiah, S/o
E. Narasimhjaiah
Kappanahalli,
Shikaripura taluk,
Shimoga Dist.

E.B. ChandraShekar &

T.D. Sridhar

I MS

Financial progress (Cumulative) in Rs. Lakhs____________
Rem
III MS
II MS
arks

T

A

T

27.67

23.70

9.64

17.55

13.50

15.51

15.00

11.62

14.28

01-04-2000

35.60

97.00

88.00

58.34

59.41

11-11-99

11-4-2000

105.08

04-09-98

03-03-2000

10.81

3.63

10.36

7.45

TOTAL

332.21

360.55

403.90

295.06

T

A

01-05-2000

18.90

07-11-98

05-05-2000

17-10-98

01-11-98

11-10-99

19-08-98

A

0.22

297.69

130.59

O

1

in 2 TOT

ICT F’vt. Ltrl.,
Shimo^-577 204.

)

Format - 4
District: SHIMOGA

SL
No

13

Package

No.

SMG-13

Total
no. of
villages

02

Value
of vwsrk
in Rs.
Lakhs

26.52

FINANCIAL PROGRESS PACKAGE WISE for the month of December’99
PART-II - Villages

Name & Address of
contractor

Name & Address
of contractor
personal

Sri Umesh. S.
Engineers & contractors
“Sourabh"
A.N.K. Road, 5th Cross

Name & Address of
assistant Engineer

Date of
avsard

Date of
start

Date of
completion

Financial progress (Cumulative) in Rs. Lakhs
IMS
’ II MS

T

A

T

Remarks

A

E.B. Chandrashekar
& B.S. Annappa

06-05-99

20-8-99

5-5-2000

13.20

D. Raghu

16-03-99

17-03-99

16-03-2000

14.83

S.B. Manjunath &
D.Umlanaik

12-05-99

17-6-99

12-5-2000

14.00

S.V Sateesh

19-03-99

26-03-99

25-03-2000

17.06

30.24

20.00

2.37

S.K. Muralidhar &
Ravi K.V

22-04-99

07-05-99

06-05-2000

23.61

18.69

23.60

2.47

T.N. Shashidhar

16-03-99

17-03-99

16-03-2000

14.00

11.36

13.59

2.92

L.S Manjunath

02-03-99

10-03-99

09-03-2000

12.00

11.38

10.64

3.34

Total

108.70

81.90

110.42

15.37

13.32

Shimoga

14

15

16

SMG-14

SMG-15

SMG-16

02

02

02

28.83

29.26

37.06

1

C>

17

SMG-17

03

47.21

r

18

19

SMG-18

SMG-19

02

02

M/s Suprada
Construction Co.
behind Vijaya Talkies,
Vijaya Road, Dharwad.

Mohamad Imam,
GPA holder for
M/s Suprada
Construction Co.
Rajendra Prasad
Road , Sagar.

Sri Umesh. S.
Engineers & contractors
‘Sourabh’
A.N.K. Road, 5* Cross

Shimoga_______________
V. Narasimhan,
Contractor
M.M. compound,
Tarikere Road,
Bhadravathi____________
R. Maheshwara Naidu,
Engineers & Contractors,
H. No. 1911,
Somashekarappa Lay­
out, Basaveshwara
Nagar,
Bangalore - 79

27.60

M/s Suprada
Construction Co.
behind Vijaya Talkies,
Vijaya Road, Dharvwad.

22.64-

V. Narasimhan,
Contractor
M.M. compound,
Tarikere Road,
Bhadravathi

V.M. Rajaguru,
GPA Holder for
R.M Naidu,
# 743, 10,h Main.

10.22

14.00

4.27

15.27

PJ extension,
Davanagere.
Mohamad Imam.
GPA holder for
M/s Suprada
Construction Co
Rajendra Prasad
Road , Sagar.

lO't I vt. J - ■

VILLAGE WISE PHYSICAL PROGRESS
(PART-I & PART-II VILLAGES)
District
.
P

si
No

Package
No

1

SMG-1

2

I
N-

£

SHIMOGA.

SP/CP

OHT/GLSR
Name of the village

Start date
completion date

13-2-98
12-8-99

Chirdoni*

t---------

Rising main in Km
A
Cumulative
T
during the month

Distribution main
A
Cumulative
T
during the month

Whether sources
established OR not

T

A

T

A

01

01 C

03

03

3.60

4.94

6.80

7.48

YES

01

01 C

01

01

1.37

1.37

4.30

4.30

YES

SMG-1

Bannikodu

3

SMG-1

Mukthenahalli

Scheme Was Handed Over To VWSC On 4th November’99

YES

4

SMG-1

Beeragondanahalli

Scheme Was Handed Over To VWSC On 2tJh October'99

YES

5

SMG-1

Kamsagara

01

01 C

01

01

0.371

0.371

1.61

1.00

YES

6.

SMG-1

Hosakere ( GLSR )

01

01 C

02

02

1.35

1.35

3.87

3.87

YES

7

SMG-2

Haramaghatta*

01

01 C

02

02

4.01

4.01

5.90

5.90

YES

8.

SMG-2

Holalur*

01

01 C

02

02

1.12

1.12

7.205

7.131

YES

9.

SMG-2

Barandur

01

010

01

NIL

0.485

0.45

6.126

6.803

YES

10.

SMG-2

B.Beeranahalli
j------------

01

01 UP

01

SMG-3

Kanchiganahal*

01

01 C

02

11.

25-08-98
24-02-2000

YES
02

1.641

1.641

4.311

4.311

YES

----------------- i--------------------------------

28-02-98
28-08-99

Scheme Was Handed Over To VWSC On 29th October'99

12.

SMG-3

Kagathur

13.

SMG-3

Vaddanal*

01

01 C

02

02

3.521

3.521

5.056

5.056

YES

14.

SMG-3

Hodigere*

01

01 C

04

04

1.315

1.315

8.890

8.890

YES

YES

j------------------------------------

15.

SMG-3

Somalapura

16.

SMG-3

Devarahalli
i

Scheme Was Handed Over To VWSC On 13th December’99.

NIL

_____

NIL

02

NIL

1.270

1.27

YES
3.605

3.92

Note ;
T-Target,

A - Achievement,

P - Procured,

UP - Under progress,

C - Completed.



Commissioned

YES

OHT/GLSR
SI
No.

Package
No.

17.

SMG-4

Gama *

18.

SMG-4

Thyagarthi *

Name of the village

SP/CP

Rising main in Km

Start date
completion date

T

A

T

A

T

04-04-98
03-10-99

01

01 C

02

02

1.67

01

01 C

01

01

0.97

*

Cumulative
______ during the month

Distribution main

T

A
Cumulative
______ during the month

Whether sources
established OR not

1.67

2.064

3.40

YES

0.92

6.75

7.60

YES

—i—

I
N
o
i

19.

SMG-4

Kappanahalli

01

01 C

01

02

0.51

0.51

3.295

4.070

YES

20.

SMG-4

Kuppagadde

01

1UP

01

02

0.582

1.10

5.045

2.00

YES

21.

SMG-5

Attigunda

22.

SMG-5

Veerapura

23.

SMG-5

Kudligere*

01

01 C

01

01

1.89

2.64

5.535

5.948

YES

24.

SMG-5

D.B.Halli*

01

01 Up

02

02

1.63

1.63

2.37

2.37

YES

25.

SMG-5

Timmalapura*

01

01 C

02

02

3.10

3.10

4.32

4.32

YES

26.

SMG-5

Marashettyhalli*

01

01 C

02

02

2.195

2.195

5.93

5.93

YES

27.

SMG-5

Thattehalli

28.

SMG-6

Melinakuruvalli
(SSI)

29.

SMG-7

Billahalli*

30.

SMG-7

Pandomatti

31.

SMG-7

32.

SMG-7

Scheme Was Handed Over To VWSC On 2dh July’99
13-02-98
12-08-99

Scheme Was Handed Over To VWSC On 2ffh July’99

Scheme Was Handed Over To VWSC On 22nd October’99
06-11-98
05-05-2000

01

01 C

SP-02.
CP-02

SP-02

2.25

2.25

8.90

8.90

YES
(Tonga river)

01

01 C

01

01

0.725

0.725

3.30

3.30

Shortage of
source

01

01 C

04

NIL

7.10

6.50

9.95

9.95

YES

Belimallur

01

01 UP

Maravanji

01

01 C

01

NIL

1.50

1.50

3.50

3.50

YES

Maravanji Hamlet

01

01 C

02

NIL

3.00

3.00

3.25

3.25

YES

25-08-98
24-02-2000

YES

Note ;
T - Target,

A - Achievement,

P - Procured,

UP - Under progress,

C - Completed.

Commissioned

1
N
O

OHT/GLSR

Rising main in Km
A

SP/CP

Distribution main
T

A
Cumulative
during the month

Whether sources
established OR
not

8.0

15.63

15.63

YES

1.20

3.90

3.90

YES

Start date
completion date

T

A

T

A

T

Cumulative
during the month

01-11-98
01 -05-2000

01

01 C

04

04

10.980

Arabilachi

01

01 C

02

02

1.20

SMG-8

Kudli

01

01 UP

02

NIL

36.

SMG-9

Chandragutti (SSI)

01-11-98
01-05-2000

01

01 C

SP-02,
CP-02

SP-02,
CP-02

3.125

3.125

5.20

6.0

YES
(Varada river)

37.

SMG-10

Keladi (SSI)

07-11-98
05-05-2000

02

1 C/1 up

SP-02,
CP-02

NIL

3.50

3.50

11.00

11.00

YES
(Ml Tank)

38.

SMG-11

Anandapuram

01-11-98
01 -05-2000

01

01C

SP-02,
CP-02

02 CP

7.50

8.24

8.655

10.00

39.

SMG-11

Achapura

(SSR)

01

01 C

02 CP

02 CP

5.0

5.30

6.085

6.46

40.

SMG-11

Yadehalli

01

01 C

02 CP

02 CP

3.50

3.70

6.00

6.93

41.

SMG-11

Malandur

01

01 C

02 CP

02 CP

5.22

5.40

5.160

6.30

42.

SMG-11

Khyra

NIL

NIL

NIL

NIL

NIL

NIL

2.50

2.50

43.

SMG-11 A

Impounding
reservoir

11-11-99
10-4-2000

44.

SMG-12

Udagani

04-09-98
03-03-2000

45.

SMG-12

Humcha

si.
No.

Package
No

33.

SMG-8

Haranahalli

34.

SMG-8

35.

Note ;
T-Target,

Name of the village

A - Achievement,

P - Procured,

YES

YES
(Nandi hole)

Impounding reservoir-Jungle clearance completed.

01

01 UP

01

01

01

01 UP

01

NIL

UP - Under progress,

0.395

0.50

C - Completed.

2.495

2.55

YES

1.25

YES

VILLAGE WISE PHYSICAL PROGRESS
PART - II - Villages

District: SHIMOGA.
SI.
No.

Package
No.

Name of the village

1.

SMG-13

Kodakani (GLSR)

2.

SMG-13

Sigga

I
N
O
'7'
I

SMG-14

OHT/GLSR

SP/CP

Rising main in Km
A
T
Cumulative
_______ during the month

Distribution main
A

T

A

01

01UP

01

01UP

01

01 UP

5.00

5.00

Hirenallur Hamlet
(Kagodu)

01

01 UP

7.00

6.90

Nil

Nil

5.00

4.50

Hirenallur
3.

Start date
completion date

4.

SMG-14

Mudugoppa

5.

SMG-15

Kulagatte

6.

SMG-15

Kyasinakere

7.

SMG-16

Nidige

8.

SMG-16

Antharagange

9.

SMG-17

Kumblur

10.

SMG-17

Suragondanakoppa

11.

SMG-17

Chilur

12.

SMG-18

Hunsekatte

13.

SMG-18

Hosudi

14.

SMG-19

Joladal

15.

SMG-19

Malahal ( GLSR )

20-8-99
5-5-2000
17-03-99
16-3-2000

17-6-99
12-5-2000
26-03-99
25-03-2000
07-05-99
06-05-2000

T

A

T

Cumulative
______during the month

YES
YES

01

01

0.72

0.72

01

01 UP

01

01 C

02

03

1.97

1.95

6.100

6.82

YES

01

01C

01

02

0.575

1.55

3.935

4.40

YES

01

01 UP

01

0.505

2.984

6.41

3.00

Potability established
balance 1200 LPH requred

YES

0.70

YES

Proposed to drop by E.E, DPMU

10-03-99
09-03-2000

Shortage of source

Proposed to drop by E.E, DPMU

01

17-03-99
16-03-2000

Whether sources
established OR not

01

01 UP

NIL

NIL

NIL

01

01C

01

01 UP

YES
2.05

0.30

4.59

4.00

YES

NIL

1.08

1.50

3.49

2.50

YES

01

NIL

0.60

0.50

2.11

2.11

YES

03

NIL

1.85

NIL

3.94

3.94

YES

Note ;

Work under progress in 17 villages,
2 villages proposed to drop by E.E, DPMU
T-Target
A - Achievement,
P - Procured,
UP - Under progress,

C - Completed.

HABITAT DEVELOPMENT (Components)
PART - I - Villages
District : SHIMOGA
si
No

I
N>

Package
No

Water supply components

HP

T

ST

A

CS

T

A

47

T

CT

DB
A

WP

T

A

T

A

T

41

41

17

17

129

1

SMG-1

47

2

SMG-2

07

3

SMG-3

11

20

39

31

21

4

SMG-4

05

10

31

31

14

5

SMG-5

24

54

36

36

6

SMG-6

7

SMG-7

8

SMG-8

9

SMG-9

04

06

SMG-10

04

10

05

26

11

SMG-11

22

26

11

65

12

SMG-12

8

4

25

08

6
10

10

07

06

15

03

Remarks

A

24

24

13

124

125

03

90

61

18

103

65

2

14

03
06

02

21

10

20

o
i

10

---------- [

C- Completed,

03

18

Up - Under progress.

jCT Pvt. L J ■

Shimo^a-S^

HABITAT DEVELOPMENT (Components)
PART - n - Villages
District: SHEMOGA
Water supply components
SI.
No.

Package
No.

13

SMG-13

14

SMG-14

15

SMG-15

16

T

CS

ST

HP

A

A

T

DB

A

T

CT
A

WP

A

T

T

06

27

12

06

38

10

11

58

10

05

18

06

08

30

2

10

SMG-16

03

12

17

SMG-17

4

17

I

18

SMG-18

9

C>
OD

19

SMG-19

11

Remarks

A

rufci
ICT Pvt. 1'
Sbimoga-577 2A

/

DETAILS OF HYDRAULIC TEST CONDUCTED PACKAGE WISE
(PART - I VILLAGES)

Month : DECEMBER’99

District: SHIMOGA

1

5

--0

Total

Target

To end
of
prev.
Month

21.135

21.135

5

19.834

13.102

13.102

03

9.797

31.632

30.512

30.512

05

1.63

1.63

17.07

3.622

3.622

03

14.01

14 01

14.01

32.47

32.47

32.47

06

SMG-6

2.25

2.25

2.25

8.90

8.90

8.90

01

SMG-7

11.72

0 72

0.72

20.00

14.84

14 84

8.

SMG-8

9.20

1 20

1.20

19.53

19.598

9

SMG-9

3.12

3.12

3.12

6.00

10.

SMG-10

3.50

3.50

3.50

11.

SMG-11

22.656

22.656

22.656

12.

SMG-12

0.50

Totals

96 503

Target

To end
of
prev.
Month

SMG-1

9.97

2.

SMG-2

3.

SI
No

Package
No.

1.

Total

Target

To end
of prev.
Month

9.97

9.97

23.135

5.58

4 30

4.30

SMG-3

9.797

9.797

4.

SMG-4

4.20

5.

SMG-5

6.

During
month

I

During
month

GLSR

OHT

Distribution main

Rising main

Durin
g
mont
h

Total

Target

03

03

01

03

03

01

01

04

01

01

19.598

02

01

01

6.00

600

01

11.00

11.00

11.00

01

32.13

32.13

32.13

04

To end of
previous
month

During
the
month

Remarks

Total

Laying of pipe line
under progress

3 55

73.153

73.153

225.251

193.309

193.309

35

09

09

01

DETAILS OF HYDRAULIC TEST CONDUCTED PACKAGE WISE
(PART-II VILLAGES)

SI
No

Package
No.

Target

To end
of
prev.

During
month

Total

Target

Month

I

5

To end
of prev.
Month

During
month

Total

Target

To end
of
prev.
Month

GLSR

During
month

Total

Target

To end of
previous
month

During
the
month

Remarks
Total

Pipe line work not
started

1

SMG-13

2

SMG-14

3

SMG-15

4

SMG-16

3.50

5

SMG-17

3.184

6

SMG-18

3.75

6.50

7

SMG-19

0.50

6.05

Total

10.95

*

OHT

Distribution main

Rising main

Pipe line work
under progress

16.40

0.72

Pipe line work not
started

11.22
2.484

2.484

2.484

2.484

3.00

43.17

Pipe line work
under progress

02

2.980

2.980

Pipe line work
under progress

01

2.980

2.980

- - do - -

03

ABSTRACT
(Part-I & Part-II)

Target

To end
of
prev.
Month

Part - I

96 503

Part -II

SI
No

Package
No.

1
2

Total

Target

To end
of prev.
Month

193.309

193.309

35

43.17

002.980

002.980

03

268 421

196.289

196.289

38

Total

Target

To end
of prev.
Month

73.153

73.153

225.251

1095

2.484

2.484

107.453

75.637

75.637

During
month

OHT

Distribution main

Rising main

During
month

GLSR

During
month

Total

Target

09

09

01

09

09

01

To end of
previous
month

During
the
month

Remarks
Total

ICT Pvt. Lt
a

r * •

INTER CONTENT INENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
KIRWS & ESP
PHASE - H PACKAGE(WORLD BANK ASSISTANCE)
District

Month

SHIMOGA
: December’99

LIST OF DEFICIT CONTRACTORS IN 1st MILESTONE

End of lrt
MS

Achievement to
end of 1“ MS
cumulative in lakhs

Shortfall in
progress in lrt MS
cumulative
Amount
%
m lakhs

Shortfall in
physical status of
works

Delay attributed
to Department/
Contractor

78%

01 - OHT

Contractor

Nil

100%

01-OHT

Contractor/
due to site
dispute.

Nil

100%

01-OHT

Contractor

SI
No

Package
No./Village

No. of
villages

Name of the contractor

1.

SMG-12
/Udagani

02

E. Yangaiah, GPA
holder of
Sri T. Subba Reddy

21.17

4-9-98

10.81

4-3-99

3.63

7.18

2.

SMG-13

02

S. Umesli

26.52

20-8-99

13.20

19-2-2000

Nil

2

----r 02
SMG-15

S.Umesh

29.26

17-6-99

14.00

16-12-99

Nil

I
S’

Date of
start

Target for
1“ MS in
lakhs

Contract
value in
lakhs

l

r vt i' :-

LIST OF DEFICIT CONTRACTORS IN 2nd MILESTONE

SI
No

Package
No./Village

No. of
villages

Name of the contractor

Contract
value in
lakhs

1.

SMG-12/
Humach

02

E. Yangaiah, GPA
holder of
SriT. Subba Reddy

21.17

Date of
start

Target for
2nd MS in
lakhs

End of 2nd
MS

Achievement to
end of 2"* MS
cumulative in lakhs

4-9-98

10.36

3-09-99

7.67

Shortfall in
progress in 2nd MS
cumulative
Amount
%
in lakhs

7.67

25%

Shortfall in
physical status of
works

Delay attributed
to Department?
Contractor

Ol-OHT

Contractor

i
N
N

ICT Pvt. Ltd.,
Shimoga-577 204,

INTER CONTLNTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
KIRWS & ESP
PHASE - H PACKAGE(WORLD BANK ASSISTANCE)
SHIMOGA
District
Month : December’99

STATEMENT OF BOTTLENECKS

1

SI No.

Package No.

No. of
villages
flushing to
be done

1.

SMG-1

NIL

2.

SMG-2

3.

SMG-8

4.

SMG-ll
TOTAL |

No. of
villages New
Borewells to
be drilled

No. of Open
wells
shallow

OHT sites
under
dispute

NIL

NIL

SBC
results
awaited

Sump
sites to be
handed
over

OHT
sites to be
handed
over

Awaiting
Energisation
for
commissioning

NIL

NIL

02

Road cutting
PWD/Highway

Railway
crossing

01

01

01

01

01
Nil

01

Nil

Nil

Nil

Nil

03

01

02

NOTE : List of Villages Package wise Appended.

N
03

1

ICT Pvt-

Pressure testing
( RM + DSM )

T

A

BOREWELL TO BE DRILLED

I

I

I

1

SMG-2

B.Beeranahalli

I
LIST OF VILLAGES AWAITING ENERGISATION

I

SI. No.

Package No.

Village

1.

SMG-1

Kama sagar

2.

SMG-1

Hosakere

3.

SMG-8

Arabilachi

LIST OF VILLAGES AWAITING PERMISSION FOR ROAD CROSSING

N

c

1.

I

SMG-2

Barandur

LIST OF VILLAGES AWAITING PERMISSION FOR RGA&CRtOSSING

SI. No.

Package No.

Village

1.

SMG-8

Haranahalli

2.

SMG-11

Anandapuram & other
villages (SSR).

v
---- Manager
ICT Pvt. Ltd.,
Shimo<ja-5?7 234.

INTER CONTINTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
KIRWS & ESP
PHASE - H PACKAGE(WORLD BANK ASSISTANCE)
District : SHIMOGA
Month : December’99
ST
MILESTONES.
LIST OF WORKS, THE AGENCY IS UNLIKELY TO ACHIEVE THE 1
SI
No.

1

2.

I
b’
<9

3.

Package No.

SMG-12

SMG-13

SMG-15

No. of
villages

02

02

02

Name of Contractor

E. Yangaiah, GPA
holder of
Sri T. Subba Reddy

S. Umesh

S.Umesh

Contract
valve

21.17

26.52

29.26

Date of
start

4-9-98

20-8-99

17-6-99

End of 1“
milestone

4-3-99

19-2-2000

16-12-99

Name of
scheme/village

Udagani

Kodak ani

Kyasinakere

Financial cumulative for
milestone^___
Shortfall %
A
T

10.81

13.20

14.00

3.63

Nil

Nil

Status of
works

Remarks

78%

1 - OHT

Notices has been
issued to the
contractor to make
gwd the shortfall &
Liquidated damages
proposed.

100%

1 - OHT

Notices has been
issued to the
contractor to make
good the shortfall.

1 - OHT

Notices has been
issued to the
contractor to make
good the shortfall.

100%

1

ICT Pvt. Ltd .
Shimo$a-5i7 201.

V

LIST OF WORKS, THE AGENCY IS UNLIKELY TO ACHIEVE THE 2nd MILESTONES.
SI
No.

2.

Package No.

SMG-12

No. of
villages

Name of Contractor

E. Yangaiah, GPA
holder of
Sri T. Subba Reddy

02

Contract
valve

21.17

Date of
start

4-9-98

End of 2nmilestone

3-9-99

Name of
scheme/village

Humcha

Financial cumulative for
milestone II___
Shortfall %
A
T

10.36

7.67

25%

Status of
works

Remarks

1-OHT

Notices has been
issued to the
contractor to make
good the shortfall
Liquidated damages
proposed.

1

i
V
(?'
I

ICT Pvt. Ltd., Shimo^l-Si 1204.

INTER CONTINTINENTAL CONSULTANTS AND TECHNOCRATS PVT. LTD.
KIRWS & ESP
PHASE - II PACKAGE(WORLD BANK ASSISTANCE)
District
LIST OF AGENCIES ON WHOM PENAL ACTION HAS BEEN RECOMMENDED.
SI
No.

Package
No.

SMG-12

1

No. of
villages

02

Name of Contractor

T. Subba Reddy

Contract
valve

21.17

Date of
start

4-9-99

End of 1”
milestone

03-03-99

Name of
scheme/village

Udagani

Note : Liquidated damages proposedfor 220 days @ Rs. 200/- per day as per
i.e Rs. 44000/-.

Financial cumulative for
milestone I__
Shortfall %
A
T

10.81

3.63

78%

Status of
works

SHIMOGA

Details of penal
action

Remarks

Liquidated
damages
1-OHT Proposed
for 220 days

NCBfrom the date of completion of V milestone period

)
I

SI
No.

1.

Package
No.

SMG-12

No. of
villages

02

Name of Contractor

T. Subba Reddy

Contract
valve

21.17

Date of
start

4-9-98

End of 2n,'
milestone

04-09-98

Name of
scheme/village

Humcha

Financial cumulative for
milestone II___
Shortfall %
A
T

10.36

7.67

25%

Status of
works

Details of penal
action

l-OHT

Liquidated
damages
Proposed
for 38 xdays

Remarks

Note : Liquidated damages proposedfor 38 days @ to. 300/- per day as per NCBfrom the date of completion of 2"“ milestone period.
i.e. Rs. 11400/Total amount levied Rs. 55400/-. The same has been proposed to recover liquidated damages in the

Part bill of the tender

contractor.

ICT T\ t. C .
?-4.

o

INTEGRATED RURAL WATER SUPPLY AND
ENVIRONMENTAL SANITATION PROJECT
KARNATAKA
(World Bank Assistance)

Phase II

Package

II

Villages

PROGRESS REPORT
of SSI-SSR Schemes
For the Month of DECEMBER1999

INTERCONTINENTAL CONSULTANTS AND TECHNOCRATS PVT LTD NEW DELHI
CONSULTANTS FOR CONSTRUCTION MANAGEMENT AND QUALITY CONTROL

PROGRESS REPORT FORMAT FOR SSI / SSR SCHEMES

abstract
Type o’ Scheme
Sr
No.

Name of the
District

No of Packages
/ Villages

Tender
cost

No. of
contrctor

SSR

SSI

Expenditure to end of 12 /
99 (Rs. In lakhs)

I

River/lntake well

T

A

X

Y

X

Y

1

2

1

2

8

9

10

11

12

13

14

15

1

2

14

5

5

1

2

3

4

5

6

7

1

Belgaum

14/22

2330.46

14

233046

1317.12

12

2

Bellary

1/1

84.97

1

8497

32.65

1

3

Raichur

2/21

688.33

2

481.00

511.61

4

Shimoga

4/9

327.59

4

250.44

248.44

TOTAL

21/53

3431.35

21

3145.9

2109.82

Y - No. of schemes (work under progress)
1 = Work started and under progress to be ticked
2 = work completed to be ticked

1

1

2

2

1

3

1

4

4

16

5

21

10

i

Ch

Status of permission for
drawal of water

5

PROGRESS REPORT FORMAT FOR SSI / SSR SCHEMES

Raw water pumping machinery
Approach Channel

Approach
Bund/Bridge

Jack well work

Pumps procured
cleared

Pumps
procured

KEB approached
for power

Power
sanctioned

Erection done

Commissioned

25

26

27

1

2

1

2

1

2

16

17

18

19

20

21

22

23

24

6

2

10

3

11

3

8

6

14

4

4

2

10

18

2

1

1

1
1

1

2

1

2

I

4

£

-o

8

3

15

4

4

15

5

11

1 = Work started and under progress to be ticked
2 = work completed to be ticked

Pr_sk

2

Water Treatment Plant
A

B

C

D

E

G

F

OHT/Sump

1

2

1

2

1

2

1

2

1

2

1

2

1

2

1

2

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

14

2

14

4

s

20

15

I

A - Aerator
B - Flash Mixer
C - Clariflocculator
D - Rapid/ Slow Sand Filters
E - Clear Water Sump
F - Pure Water Sump House
G - Pure Water Pumping Machinery
1 - Work started
2 - Work completed

14

14

1

i

Pr sir

Length of RM laid in Kms

2

1

3

4

15

3

20

T

A

Length of DM laid in kms

T

A

44

45

46

47

14

98.55

54.1

154.15

106.66

1

4.70
0.95

4.64 (GM)
0.08

2

73.4

50.00

55.40

54.80

4

26

31.52

53.00

58.00

4

202.65
0.95

136.52
0.08

262.55

219.46

17

Impounding
Reservoir
%of
Progress
48

Bottlenecks
if any.
49

PROGRESS REPORT FORMAT FOR SSI / SSR SCHEMES
District : Belgaum
Expenditure to end of
(Rs. In lakhs)
T
A
9
8
54.86
95.74

Name of the
package

Name of the Village/
Villages

Tender
Cost

Name of the
Contractor

Date of
Start

Date of
completion

2
7

2
BGM - 02

3
Bellad
Bagewadi

4
95.74

5
Shri. B.R. Patil
Nippani

6
13/10/99

7
25/4/2000

2

BGM-16

Kunnur

116.11

M/s. Suprada
Constructions
Dharwad

8/12/98

08/6/2000

116.11

83.11

3

BGM-17

Mangavati

51.26

Shri. Lathure &
Brothers Lathur

18/12/98

18/6/2000

51.26

12.36

4

BGM-18

Ainapur

93 36

Shri. B.R. Patil
Nippani

25/10/98

25/4/2000

93.36

25.36

5

BGM-19

Jugul

99 34

Shri. B. R. Patil.
Nippani

25/10/98

25/4/2000

99.34

20.65

6

BGM-19A

Shiruguppi

79.3

Shri. B. R. Patil
Nippani

25/10/99

25/4/2000

79.3

29.56

7

BGM-20

Akkol

117.10

Shri. E3 R. Patil
Nippani

25/10/98

25/4/2000

117.10

53.74

8

BGM-21

Soundatti

126.80

M/s. Suprada
Constructions
Dharwad

23/9/98

23/3/2000

126.80

91.39

9

BGM-22

Chmchali

225

Shri. H. P.
Madhukar, Hubli

27/10/98

27/4/2000

225

152.41

13

BGM-23

Borgaon

146 45

Shri. B.R. Patil
Nippani

25/10/98

25/4/2000

146.25

55.49

11

BGM-24

Hosur

241

Shri. G.
Krishna Reddy
Hubli

27/10/98

27/4/2000

241

116.48

12

BGM-30

Asundi

197

Shri. H P.
Madhukar, Hubli.

25/10/98

25/4/2000

197

154.03

• Sr. No.

1

Types of Scheme

H

SSI

X
10

Y
11

SSR
X
12

y
13

Status of permission
for drawal of water
1
2
14
15



Sr. No.

1

13

Name of the
package

Name of the Village/
Villages

Tender
Cost

Name of the
Contractor

Date of
Start

Date of
completion

2
BGM-26

3

4
540

5

6
24/9/98

7
24/3/2000

16/12/98

26/6/2000

Neginhal
Sampgacn
M. K. Hubii
Hole Hosur
Sanikop

14

202

BGM-27
Pachapur
Sindhihatti
Rustumpur
Bagamal
Karaguppi

M/s. Rao
Constructions
Bangalore.

Shri. H. P.
Madhukar, Hubli.

Expenditure to end of
(Rs. In lakhs)
T
A
8
9
540
335.30

202

SSI

X
10

Types of Scheme
. |
SSR

Y
11

X
12

y
13

Status of permission
for draws I of water
1
j
2
14
|
15"

132.38

X - No. of schemes where work is over till water treatment plant:
Y - No. of schemes (work under progress)

1 = Work started and under progress to be ticked
2 = Work completed to be ticked.

)
P



r

District Manager,
ICT. Pvt Ltd.,
Belgaum.

PROGRESS REPORT FORMAT FOR SSI / SSR SCHEMES
River / Intake well

1
16

2
17

Approach Channel

1
18

2
19

Approach Bund / Bridge

1
20

2
23

Pumps
procured
cleared
24

Pumps
procured

25

______ Raw water pumping machinery
Power
Errection
KEB approached for
Power
sanctioned
done

26

z
z

z

z

z

1
22

z

z

z

2
21

Jack well work

z

z

z

z

z

z

z

z*

z

z
I

z

N
N

z

z

z

W

z

z

z

z

z

z

z

z

z

z

■/

z

z

V

z

J

7

27

28

Commissioned

29

River / Intake well

1

2

16

17

Approach Channel

1
18

2
19

Approach Bund / Bndge

•1
20

2
21

Jack well work

1
22

2
23

Pumps
procured
cleared
24

z

z

Pumps
procured

25

______ Raw water pumping machinery
KEB approached for
Power
Errection
Power
sanctioned
done

26

27

Commissioned

28

z
z
1= Work started and under progress to be ticked
2 = Work completed to be ticked
District Manager,

ICT. Pvt Ltd.,
Belgaum.

l
V
I

29

PROGRESS REPORT FORMAT FOR SSI / SSR SCHEMES

30 |

0

B

A

2
31

1
32

2
33

1
34

2
35

1
36

0

Z

Z

<8>

I
P

Length of RM laid in Mtn

Water Treatment Plant
D
E

2
37

1
38

2
39

1
40

2
41

_1_
42

Z
Z

0

0

o

0

0

Z

0

0

0

0

0

0

Z

0

0

0

0

0

0

0

0

0

0

0

0

Z

0

0

0

0

0

0

Z

0

0

0

0

0

0

Z

0

0

0

0

0

0

0

0

0

0

0

0

Z

0

0

0

0

0

0

Z

0

0

0

0

0

0

Impounding
Reservoir
.% of Progress

Bottlenecks

50

51

OHT/Sump

T

44T 45

46

47

48

z

5.25

1.1

10.5

5.0

NA

2.25

2.0

8.3

7.3

NA

2.20

1.8

3.22

3.22

NA

2.20

13

5.0

NA

2.20

10.5

5.5

NA

Z

’ z

z

5.2

0.5

8.73

6.5

NA

2.9

2.3

6.7

6.2

NA

Z

1.85

1.1

12.0

12.0

NA

Z

8.9

8.4

24.0

8.5

NA

Z

2.9

1.0

10.2

3.0

NA

0.39

60

5-0

NA

13.5

11 0

9.0

NA

Z

Z

z

Z

-

Z

Z

2
43

A

A

Z

0

z

G

F

Length of DM Laid in Kms

T

z

Z

5.2

z

140

if any. Q

I

1
30

C

5

A

2
31

1
32

2
33

1
34

2
35

<8>

A - Aerator
B - Flash Mixer
C - Clariflocculator
D - Rapid I Slow Sand Filter
E - Clear Water Sump
F - Pure Warer Sump House
G - Pure Water Pumping Machinery

1 - Work Started
2 - Work Completed

I

s
»

1
36

2
37

1
38

OHT / Sump

T

A

T

A

Impounding
Reservoir
% of Progress

Bottlenecks
if any.

2
45

46

47

48

49

50

51

29.^

22-10

23 0

24-x0

7

6.24

Length of RM laid in Mtre

Water Treatment Plant
E
D

G

F

2
39

1
40

z

z

z

Z

2
41

1
42

Z

2
43

1
44

14.50

Length of DM Laid in Kms

Survey in progress

NA

District Manager,
ICT. Pvt. Ltd.,
Belgaum.

PROGRESS REPORT FORMAT FOR SSI SCHEMES

District : Bellary

Type of Scheme
Sr.
No.

Name of the
Package

Name of the
Village

1

2

3

1

BLR -13

Total

1

1

Tender cost

4

84.97

84.97

Name of the
Contractor

5

Date of
Start

6

1

1 = Work started and under progress to be ticked
2 =■ work completed to be ticked

i

P
i

7

M/s. Rao
Constructi
ons
17-4-99 16-4-2000
Bangalore

Y - No. of schemes (work under progress)

N

Date pf
Completion

Expenditure to end of 12
/ 99 (Rs. In lakhs)

SSI

SSR

Status of permission River/lntake well
for drawal of water

T

A

X

Y

X

Y

1

2

8

1

2

9

10

11

12

13

14

15

16

17

84.97

32.65

1

84.97

32.65

1

PROGRESS REPORT FORMAT FOR SSI / SSR SCHEMES

Raw water pumping machinery
Approach Channel

Approach Bund/Bridge

Jack well work

1

2

1

2

1

2

18

19

20

21

22

23

Pumps procured
cleared

Pumps
procured

KEB approached
for power

Power
sanctioned

Erection
done

24

25

26

27

28

Commissioned

29

T

1

1

I
N

£

1 = Work started and under progress to be ticked
2 = work completed to be ticked

Water Treatment Plant

I


OHT/Sump

G

F

E

D

C

B

A

Length of RM laid in Kms

1

2

1

2

1

1

2

1

2

1

2

1

2

1

2

30

31

32

33

34

36

37

38

39

40

41

42

43

44

45

A - Aerator
B - Flash Mixer

C - Clariflocculator
D - Rapid/ Slow Sand Filters
E - Clear Water Sump
F - Pure Water Sump House
G - Pure Water Pumping Machinery
1 - Work started

T

A

46

47

4.70

7.64

4.70

7.64

Length of DM laid in kms

T

48

A

49

Impounding
Reservoir
% of
Progress
50

Bottlenecks
if any..

51

PROGRESS REPORT FORMAT FOR SSI / SSR SCHEMES
Month : Nov'99

SI.
No.

I
N
w
9

Name of
the
package

Tender cost
Name of the Village
in Rs.
Lakhs

Name of the
contractor

Date of
start

Date of
completion

Expenditure to end
of Nov'99 (Rs. In
lakhs)

Type of Scheme
SSI

SSR

T

A

X

Y

X

Y

1

2

12

13

14

15

1

2

3

4

5

6

7

8

9

10

11

1

RCR-3

Kurkehalli & other
4 villages

109.26

M/s Malu
Constructions

5.12.98

4.6.2000

76

60.38

Nil

Nil

2

RCR-10

H. Akkur & other
15 villages

579.07

M/s Malu
Constructions

5.12.98

4.6.2000

405

451.23

X - No. of schemes where work is over till water treatment plant:
Y - No of schemes (work under progress)
1 - Work started and under progress to be ticked
2 - Work completed to be ticked

Status of
permission for
drawal of water

1

1

PROGRESS REPORT FORMAT FOR SSI / SSR SCHEMES

Raw water Pumping Machinery

River/lntake well Approach Channel

Approach
Bund/Bridge

Jack well work
Pumps
procured

KEB
approached
for power

Power
sanctioned

Erection
done

Commissioned

1

2

1

2

1

2

1

2

Pumps
procured
cleared

16

17

18

19

20

21

22

23

24

25

26

27

28

29

Nil

Nil

Yes

No

Yes

under
progress

No

No

Yes

No

Yes

under
progress

No

No

I
N
Cj

7
1 - Work started and under progress to be ticked
2 - Work completed to be ticked

1

Length of RM
laid in mtrs

Water Treatment Plant

T

A

T

A

Impounding
Reservoir %
of Progress

46

47

48

49

50

Nil

18

16

11.1

10.5

Nil

Nil

55.4

34

44.3

44.3

Nil

C

B

A

E

D

F

OHT /
Sump

G

1

2

1

2

1

2

1

2

1

2

1

2

1

2

1

2

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

I
VJ

p

A - Aerator
B - Flash Mixer
C - Clariflocculator D - Rapid/Slow Sand Filters
E - Clear Water Pump
F - Pure Water Sump House
G - Pure Water Pumping Machinery
1 - Work started
2 - Work completed

Length of DM
laid in mtrs

A

Bottlenecks
if any

51

PROGRESS REPORT FORMAT FOR SSI/SSR SCHEME

Date of
start

Sr.
No.

Name of
the
package

Name of the villages

2

3

4

_________ 5_______ __

6

1

1

SMG-6

Melinakururvalli

41.67

M/s Suprada
Construction Co.

2.

SMG-9

Chandragutti

60.15

SMG-10
SMG-11

4.

Tender
cost

Name of the
contractor

Date of
completion

Expenditure to end of
Dec’99
(Rs. in Lakhs)

Month : DECEMBER’99
Status permission for
drawal of water

Type of scheme
SSI
X______
10

SSR

x

1

2

14

Ts

T

A

7

8

9

6-11-98

5-5-2000

37.50

28.66

1

1

V. Narasimhan

1-11-98

1-5-2000

46.84

37.31

1

1

7-11-98

5-5-2000

30.00

27.13

1

Keladi

M/s Suprada
Construction Co.

1

42.76

Anandapuram
& other 4
villages_____

183.01

M/s Maloo
Constructions.

1-11-98

1-5-2000

136.10

155.34

Y
11

12

Y
13

1

1

_

I
N
)

x - No. of Schemes were works is over till water treatment plant

V- No. of schemes ( Work under progress)
1
2

Work started and under progress to be ticked
work completed to be ticked.

Contd.

.2.

I

-2-

i

River/Intake
well
Package
No.

1

16

I


2

17

Approach
channel

1

18

2

19

Approach
bund/bridge

1

20

2

21

Jackwell work

1

22

2

23

Raw water pumping machinery

Pumps
procured
cleared

Pumps
procured

24

25

KEB
approached

Power
sanctioned

Erectio
n done

Commissioned

power
26

27

28

29

for

SMG-6

1

1

1

YES

YES

YES

NO

NO

SMG-9

1

1

1

YES

YES

YES

NO

NO

SMG-10

1

1

1

YES

YES

NO

NO

NO

SMG-11

1

1

1

YES

YES

NO

NO

NO

V)

1

1 Work started and under progress to be ticked
2 = work completed to be ticked.

NOTE : KEB work completed for SMG-6 & SMG-10 connection not availed.

Contd

3.

- 3 -

Length of RM lain
in Kni

Water Treatment Plant
Package
No.

B

A
1
30

SMG-6

2
31

1
32

l
-

SMG-9
SMG-10

2

1

2

i

2

33

34

35

36

37

2

1
42

T

A

T

A

2
43

44

45

46

47

__<8_

49

50

51

1

2

38

39

1
40

2

1

I

2

3.0

2.25

8 00

8 Q0

NIL

NIL

1

1

2

4.0

3 12

5.00

6.00

NIL

NIL

1

2

3.0

3.50

12.00 |

11 00

NIL

NIL

2

16.00

22.656

28.0

32.13

NIL

NIL

1

41

-b

4-

i

1

SMG-11

2

1

1

2

1

J

i

1

A - Aerator
B - Flash Mixer
C - Clariflocculator
D - Kapid/Slow sand filters
E - Clear water Sump
F Pure water sump 1 louse
G - Pure water pumping machinery.
1 - Work stalled
2 - Work completed.

1

1

C

Impounding Bottlene
cks
reservoir %
of progress , IF ANY

OHT/
Sump
2
1

G

F

E

D

C

Length of DM lain
in Kin

i